0% found this document useful (0 votes)
29 views3 pages

PR Mep02

The document provides a progress report on the supply and installation of exhaust systems for a Cummins diesel engine and HFO MAK genset. It summarizes that mufflers have been installed for the Cummins engine and a cyclone for soot removal is being manufactured for the HFO genset. Testing and commissioning of the exhaust systems will be conducted upon installation of the cyclone to verify functionality and performance. The project is expected to be delivered by March 17, 2024, on schedule and within budget.

Uploaded by

Ali Husseini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views3 pages

PR Mep02

The document provides a progress report on the supply and installation of exhaust systems for a Cummins diesel engine and HFO MAK genset. It summarizes that mufflers have been installed for the Cummins engine and a cyclone for soot removal is being manufactured for the HFO genset. Testing and commissioning of the exhaust systems will be conducted upon installation of the cyclone to verify functionality and performance. The project is expected to be delivered by March 17, 2024, on schedule and within budget.

Uploaded by

Ali Husseini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Exhaust Systems

Progress Report
Supply and Installation of
Genset Exhaust Systems
Ref# MEP02 ● March 7, 2024

OPERATIONS

Prepared by

Ali Lakkis
Mechanical Engineer
[email protected]

R as El Ei n, Ali L ak kis Bldg, Baal bec k, L ebano n T el: +9 6 1 -7 6 -8 0 3 4 3 5


Email:la k kis ali7 6 @gm ail. c o m
Progress Report March 2024
Gensets Exhausts Ref# MEP02
2024

Project Overview:
The project involves the supply and installation of exhaust systems for a Cummins diesel engine and a
High Fuel Oil (HFO) MAK genset. This includes the provision of two mufflers for the Cummins engine and a
cyclone for soot removal on the HFO MAK genset.

Accomplishments:

1. Supply Procurement:
Successfully procured all required materials, including two mufflers for the Cummins diesel engine and a
cyclone for soot removal on the HFO MAK genset, in line with project specifications.

2. Cummins Diesel Engine Exhaust System:


Completed installation of two mufflers for the Cummins diesel engine, ensuring proper alignment and
secure mounting to mitigate noise and emissions, in addition to exhaust pipes insulation and coating.

© 2024 MEPrime Page | 2


Progress Report March 2024
Gensets Exhausts Ref# MEP02
2024

Upcoming Tasks:

1. HFO MAK Genset Exhaust System:


Cyclone for soot removal is currently being manufactured, we expect to receive it on site in 1 week. Once
the cyclone is received our team is ready to install it in up to two working days.

Typical cyclone to be installed at La Reine plant.

2. Testing and Commissioning


Our team will conduct rigorous testing procedures to verify the functionality and performance of the
exhaust systems, including pressure testing and emissions monitoring.

Conclusion:

The supply and installation of genset exhaust systems, including mufflers for the Cummins diesel engine
and a cyclone for soot removal on the HFO MAK genset is ongoing within the specified timeline and
budget. MEPrime team remains committed to delivering superior quality and performance, ensuring the
satisfaction of our valued client.
Project delivery date expectation: 17 March 2024