N. Be (1) All questions a
7TUBSCLT Serow
POViae
ject Code: $2701 / Soft:
33/01
vroject Man)
2% Nour)
Q) Make su
3) Ans
(4) Numbers to the right indicate
(5) Draw neat labeled di
(6) Use of Non-programmahle ¢
ios wherever necessary and state the
ust he written ta
Attempt ay three of the followi 15,
What is a project? What are its characteristics?
State and Explain phases of Project Management Life Cycle.
What do you mean by Project portfolio management? What ate its elements?
How do you perform Cost benefit analysis (CBA)?
Draw the diagram of Step Wise approach to planning software projects and explain step
1: Establish project scope and objectives in detail
Consider the project cash flow estimates for four projects as shown in the table;
Negative levels represent expenditure and positive values income: Rank the four
projects in order of financial desirability and make a note of your reasons for ranking
them in that way. Conclusion should be based on Net profit, and ROL (Return on
Investment)
Year Project 2] Project 3 [Project
=100000[ -1000000] -120000
20000] 300000{~ 30000
30000] 30000] —300000|— 0000
Tova |” 20000] 300000| 30000
20000] —300000[ 30000
5 20000] 30000] 300000[ 50000:
INet Profit ? ? 2 z
leon z 7 2 2
Attempt any three of the following: 15
What is Ater/ynamic Systems Developme.: Method? What are its igi: cove
principles?
‘What are the Capers Jones Estimating Rules of Thumb?
Explain Water fall Model with the help of diagram
Explain Scrum, What do you understand by the term ‘ceremonies’ in a Serum project”
Discuss the common problem faced during effort estimation,
Write a short note on Albrecht Function Poinv/FPU
Attempt any diree of the following: 1s
Differentiate betwee m Review Techniques) and CPM
(Critical Path Method).
Define Keisk Mai |. Explain the different Categories of risk
State and describe the Burn tin project management
What are the Buel ‘Wt risks?
[urn over
1154
Page 1 of2
ocanned with VamscePoE me es
53701 / Software Project Management
Paper / Subject Code
Draw CPM and Determine the critical pall
completion time. for wing activities,
ty Predecessi
L cece mee | TT
Draw ‘edence network conventions for the project in table,
Also show stepwise activities of forward pass and backward pass
“Adtivity Duration | Precedents
Attempt any three of the followi
Define the any three terms following: i) Scheduling Variance ii) Cost Variance
iii) Earned Value iv) Schedule performance index v) Cost performance index
What is Contract? Explain the advantages and disadvantages of fixed price contracts
Explain general recruitment process.
Discuss the factors of job satisfaction given by Oldham-Hackman. Also state the
methods of improving motivation,
‘What is Stress? Explain stress management.
Describe the Ethical and Professional concem.
Attempt any three of the following:
What are the different types of Team Structure? 18
What is CMM (Capability Maturity Model)? What are the various levels of CMM?
‘What is ISO standard? What arc the sub-characteristics of Func.-onality and Reliability
of ISO 9126 software qualities?
What are the five basic stages of Team Development?
What is Testing? Explain Test plan and Test management.
What do you mean by Premature Termination? What are the reasons for proj
ation?
premature termi
10154
Page 2 of 2