0% found this document useful (0 votes)
168 views22 pages

33kV Relay Testing

The document describes site acceptance testing for 33kV protection relays at the MSAMVU substations. It provides protection settings, tripping times, power recordings, and health status for relay equipment on multiple feeders.

Uploaded by

Nestory Ngeleja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views22 pages

33kV Relay Testing

The document describes site acceptance testing for 33kV protection relays at the MSAMVU substations. It provides protection settings, tripping times, power recordings, and health status for relay equipment on multiple feeders.

Uploaded by

Nestory Ngeleja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 22

SUBSTATION EXTENTION AND

REHABILITATION WORK AT 220kV


MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 25 - INCOMER 04 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r

120MVA 2400/ 1.0


0.17 NI 0.1 0.17 NI
INCOMER 4 1 5
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
1.06 121 0.11 122.4
2.12 1.685 0.22 1.713
4.24 0.8475 0.44 0.8513

2. Power Recorded on the relay at full load

Pf -1 +1 0 0
Angle 0° 180° 90° 270°
Real power -136.670 136.6 0.220 0.242 MW
Apparent
power 0.220 -0.242 136.6 -136.6 MVAR
Reactive
power 136.64 136.6 136.6 136.6 MVA

3. Remarks:

Healthiness of Relay: OK NOT OK


SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 24 – MZINGA FEEDER 13 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r

MZINGA 400/1 0.5 0.1 NI 2 0.01 DT 0.1 0.1 NI 0.5 0.01 DT


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.6 3.835 0.11 0.5114
1.2 0.7933 0.0554 0.22 0.5119 0.0505
2.4 0.0328 0.44 0.0432

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.070 0.066 MW
Apparent
power -0.060 0.070 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -227.6 MVA

3. Remarks:

Healthiness of Relay: OK NOT OK

Page 2 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 23 – MORO TOWN 2 FEEDER 12 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r

MORO TOWN 2 400/1 0.6 0.2 NI 5 0.01 DT 0.1 0.2 NI 2 0.01 DT


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.7 9.111 0.11 14.23
1.2 2.006 0.056 0.2 2.012 0.0573
2.4 0.9911 0.4 0.9967

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.062 0.059 MW
Apparent
power -0.062 0.059 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT OK

Page 3 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 22 – MKULAZI FEEDER 11 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r

0.7
MKULAZI 400/1 0.1 NI 3 0.1 DT 0.15 0.1 NI 1.5 0.01 DT
5
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.85 5.639 0.25 1.381
1.5 5.623 0.4962 0.3 1.024 0.2936
3 0.4882 0.6 0.5068

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.750 -22.764 -0.040 0.043 MW
Apparent
power -0.037 0.040 -22.75 22.76 MVAR
Reactive
power 22.763 22.764 22.75 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT OK

Page 4 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 21 – TURIANI FEEDER 10 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r

0.7 0.7
TURIANI 400/1 0.15 NI 3 0.01 DT 0.12 0.15 NI 0.01 DT
5 5
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.85 8.456 0.22 1.754
1.5 1.504 0.7474 0.24 1.524 0.5681
3 0.7415 0.48 0.755

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.040 0.060 MW
Apparent
power -0.040 0.040 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT OK

Page 5 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 20 – MTIBWA FEEDER 09 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

MTIBWA 400/1 0.525 0.1 NI 2 0.01 DT 0.2 0.1 NI 1 0.01 DT


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.63 4.068 0.3 1.758
1.06 1.006 0.5188 0.4 1.03 0.4297
2.12 0.0354 0.8 0.5118

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.069 0.066 MW
Apparent
power -0.070 0.066 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 6 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 19 – MKUNDI FEEDER 08 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

MKUNDI 400/1 0.3 0.19 NI 0.05 0.15 NI


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.4 4.625 0.06 5.85
0.6 1.908 0.1 1.52
0.8 1.349 0.2 0.749

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.0480 0.051 MW
Apparent
power -0.0510 0.050 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 7 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 16 – KILOSA FEEDER 07 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

KILOSA 400/1 0.375 0.28 NI 3 0.1 DT 0.15 0.23 NI 3 0.1 DT


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.475 8.809 0.25 3.131
0.75 2.864 0.9207 0.3 2.312 0.1212
1.5 1.4 0.6 1.153

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22..63 -22.764 -0.059 0.058 MW
Apparent
power -0.060 0.059 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 8 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 15 – MORO TOWN 1 FEEDER 06 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

MORO
400/1 0.6 0.2 NI 5 0.01 DT 0.1 0.2 NI 2 0.01 DT
TOWN 1
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.7 9.114 0.2 2.038
1.4 1.632 0.6405 0.21 2.033 0.4605
2.8 0.892 0.44 0.9975

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.048 0.050 MW
Apparent
power -0.050 0.044 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 9 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 14 – KISAKI FEEDER 05 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

400/1 0.375 0.2 NI 3 0.01 DT 0.1 0.2 NI 2 0.01 DT


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.475 6.282 0.11 14.14
0.75 2.048 0.668 0.2 2.004 0.0569
1.5 0.9999 0.4 0.9992

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.055 0.055 MW
Apparent
power -0.060 0.055 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 10 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 13 – INCOMER 3 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

INCOMER 03 400/1 0.26 0.34 NI 0.1 0.17 NI


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.27 62.52 0.11 12.09
0.52 3.408 0.2 1.709
1.04 1.698 0.4 0.8531

2. Power Recorded on the relay at full load

Pf -1 1 0 0
Angle 0° 180° 90° 270°
Real power -136.6 136.64 0.264 -0.440 MW
Apparent
power 0.242 -0.242 136.6 -136.6 MVAR
Reactive
power 136.6 - 136.64 136.6 136.6 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 11 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 11 – BUS COUPLER 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r

BUS 2500/
1 0.13 NI 0.1 0.13 NI
COUPLER 1
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
1.1 9.619 0.11 9.262
2 1.304 0.2 1.305
4 0.6398 0.4 0.651

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 142.2 -142.2 -0.275 0.275 MW
Apparent
power -0.275 0.275 -142.2 142.2 MVAR
Reactive
power 142.2 142.2 142.2 -142.2 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 12 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 10 – AUX TR 2 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

AUX TR 2 400/1 0.05 0.5 NI 0.1 0.19 NI


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.06 19.13 0.11 4.427
0.1 5 0.2 1.91
0.2 2.484 0.4 0.9568

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.7 -22.7 -0.048 0.051 MW
Apparent
power -0.051 0.048 -22.7 22.7 MVAR
Reactive
power 22.7 22.7 22.7 -22.7 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 13 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 09 – FEEDER 04 (ICO) 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

ICO 400/1 0.7 0.2 NI 4 0.07 DT 0.1 0.2 NI 2.5 0.35 DT


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.8 10.58 0.11 14.34
1.4 2.006 0.00834 0.2 2.014 0.3731
2.8 0.997 0.4 1.002

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.75 -22.7 -0.06 0.06 MW
Apparent
power -0.06 0.06 -22.7 22.7 MVAR
Reactive
power 22.75 22.7 22.7 -22.7 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 14 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 08 – FEEDER 03 (TUNGI) 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

TUNGI 400/1 0.25 0.15 NI 3.75 0.1 DT 0.075 0.15 NI 1.25 0.1 DT
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.26 27.83 0.076 55.61
0.5 1.504 0.5227 0.15 1.501 0.123
1 0.7419 0.3 0.7511

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.78 -22.78 -0.04 0.04 MW
Apparent
power -0.04 0.044 -22.7 22.7 MVAR
Reactive
power 22.78 22.7 22.7 -22.7 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 15 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 07 – INCOMER 02 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r

2400/
INCOMER 2 0.18 0.39 NI 0.1 0.17 NI
1
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.19 51.16 0.11 11.93
0.36 4.085 0.2 1.701
0.72 1.945 0.4 0.8501

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power -136.6 136.6 0.308 0.308 MW
Apparent
power 0.330 -0.308 136.6 136.6 MVAR
Reactive
power 136.6 136.6 -136.6 -136.6 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 16 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 05 – BUS COUPLER 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r

BUS 2500/
1 0.13 NI 0.1 0.13 NI
COUPLER 1
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
1.1 9.598 0.11 9.29
2 1.302 0.2 1.317
4 0.6461 0.4 0.6515

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 142.5 -142.5 -0.183 0.200 MW
Apparent
power -0.206 0.185 -142.5 142.5 MVAR
Reactive
power 142.5 142.5 142.5 -142.5 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 17 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 03 – FEEDER 02 (MIKESE) 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

MIKESE 400/1 0.23 0.05 NI 2.25 0.01 DT 0.075 0.2 NI 1.5 0.01 DT
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.24 8.345 0.076 79.41
0.46 0.5084 0.1475 0.15 2.013 0.0576
0.92 0.2479 0.3 0.9996

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.78 -22.78 -0.062 0.059 MW
Apparent
power -0.062 0.062 -22.78 22.78 MVAR
Reactive
power 22.78 22.78 22.78 -22.78 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 18 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 04 – AUX TR 1 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

AUX TR 1 400/1 0.05 0.5 NI 0.1 0.19 NI


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.06 19.34 0.11 4.416
0.1 5.012 0.2 1.91
0.2 2.496 0.4 0.9503

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.76 -22.75 -0.095 0.090 MW
Apparent
power -0.092 0.092 -22.76 22.75 MVAR
Reactive
power 22.75 22.75 22.75 -22.75 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 19 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 02 – FEEDER 01 (ALLIANCE) 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r

ALLIANCE 400/1 0.19 0.1 NI 3 0.1 DT 0.075 0.1 NI 0.15 0.01 DT


1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.2 13.69 0.076 35.93
0.38 1.002 0.2455 0.15 0.0609 0.0532
0.76 0.497.6 0.3 0.0501

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.80 -22.80 -0.044 0.048 MW
Apparent
power -0.048 0.051 -22.80 22.80 MVAR
Reactive
power 22.80 22.80 22.8 -22.80 MVA

3. Remarks:

Healthiness of Relay: OK NOT

Page 20 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 01 – INCOMER 01 21/03/2024
NAME TESTING

1. Protection Settings and Tripping Time

51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r

2400/
INCOMER 1 0.18 0.39 NI 0.1 0.17 NI
1
1

OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.19 51.27 0.11 12.01
0.36 3.914 0.2 1.704
0.72 1.94 0.4 0.8477

2. Power Recorded on the relay at full load

Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power -136.6 136.626 0.352 -0.330 MW
Apparent
power -0.352 -0.352 136.624 -136.626 MVAR
Reactive
power 136.6 136.624 136.604 136.604 MVA

3. Remarks:

Healthiness of Relay: OK NOT

4. Testing Instrument used:

Page 21 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS

DOCUMENT NAME: SITE ACCEPTANCE TEST REPORT


DESCRIPTION: SITE ACCEPTANCE TESTING
FOR 33kV Protection Relays

Sl.
Description Make Equipment Serial Number
No

01 CMC 356 Omicron JA245R

Witnessed By: Witnessed By:


Performed By: XD
Manufacturer TANESCO

Name:

Designation

Signature: