33kV Relay Testing
33kV Relay Testing
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 25 - INCOMER 04 21/03/2024
NAME TESTING
51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
1.06 121 0.11 122.4
2.12 1.685 0.22 1.713
4.24 0.8475 0.44 0.8513
Pf -1 +1 0 0
Angle 0° 180° 90° 270°
Real power -136.670 136.6 0.220 0.242 MW
Apparent
power 0.220 -0.242 136.6 -136.6 MVAR
Reactive
power 136.64 136.6 136.6 136.6 MVA
3. Remarks:
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 24 – MZINGA FEEDER 13 21/03/2024
NAME TESTING
51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.6 3.835 0.11 0.5114
1.2 0.7933 0.0554 0.22 0.5119 0.0505
2.4 0.0328 0.44 0.0432
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.070 0.066 MW
Apparent
power -0.060 0.070 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -227.6 MVA
3. Remarks:
Page 2 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 23 – MORO TOWN 2 FEEDER 12 21/03/2024
NAME TESTING
51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.7 9.111 0.11 14.23
1.2 2.006 0.056 0.2 2.012 0.0573
2.4 0.9911 0.4 0.9967
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.062 0.059 MW
Apparent
power -0.062 0.059 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA
3. Remarks:
Page 3 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 22 – MKULAZI FEEDER 11 21/03/2024
NAME TESTING
51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r
0.7
MKULAZI 400/1 0.1 NI 3 0.1 DT 0.15 0.1 NI 1.5 0.01 DT
5
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.85 5.639 0.25 1.381
1.5 5.623 0.4962 0.3 1.024 0.2936
3 0.4882 0.6 0.5068
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.750 -22.764 -0.040 0.043 MW
Apparent
power -0.037 0.040 -22.75 22.76 MVAR
Reactive
power 22.763 22.764 22.75 -22.76 MVA
3. Remarks:
Page 4 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 21 – TURIANI FEEDER 10 21/03/2024
NAME TESTING
51 50 51N 50N
S/ CT Tim
FEEDER NAME
N RATIO Iset TM Cha Iset Time Cha Iset TM Cha Iset e Cha
(A) S r (A) (sec) r (A) S r (A) (sec) r
0.7 0.7
TURIANI 400/1 0.15 NI 3 0.01 DT 0.12 0.15 NI 0.01 DT
5 5
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.85 8.456 0.22 1.754
1.5 1.504 0.7474 0.24 1.524 0.5681
3 0.7415 0.48 0.755
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.040 0.060 MW
Apparent
power -0.040 0.040 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA
3. Remarks:
Page 5 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 20 – MTIBWA FEEDER 09 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.63 4.068 0.3 1.758
1.06 1.006 0.5188 0.4 1.03 0.4297
2.12 0.0354 0.8 0.5118
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.069 0.066 MW
Apparent
power -0.070 0.066 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA
3. Remarks:
Page 6 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 19 – MKUNDI FEEDER 08 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.4 4.625 0.06 5.85
0.6 1.908 0.1 1.52
0.8 1.349 0.2 0.749
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.0480 0.051 MW
Apparent
power -0.0510 0.050 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA
3. Remarks:
Page 7 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 16 – KILOSA FEEDER 07 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.475 8.809 0.25 3.131
0.75 2.864 0.9207 0.3 2.312 0.1212
1.5 1.4 0.6 1.153
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22..63 -22.764 -0.059 0.058 MW
Apparent
power -0.060 0.059 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA
3. Remarks:
Page 8 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 15 – MORO TOWN 1 FEEDER 06 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
MORO
400/1 0.6 0.2 NI 5 0.01 DT 0.1 0.2 NI 2 0.01 DT
TOWN 1
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.7 9.114 0.2 2.038
1.4 1.632 0.6405 0.21 2.033 0.4605
2.8 0.892 0.44 0.9975
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.048 0.050 MW
Apparent
power -0.050 0.044 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA
3. Remarks:
Page 9 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 14 – KISAKI FEEDER 05 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.475 6.282 0.11 14.14
0.75 2.048 0.668 0.2 2.004 0.0569
1.5 0.9999 0.4 0.9992
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.763 -22.764 -0.055 0.055 MW
Apparent
power -0.060 0.055 -22.76 22.76 MVAR
Reactive
power 22.763 22.764 22.76 -22.76 MVA
3. Remarks:
Page 10 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 13 – INCOMER 3 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.27 62.52 0.11 12.09
0.52 3.408 0.2 1.709
1.04 1.698 0.4 0.8531
Pf -1 1 0 0
Angle 0° 180° 90° 270°
Real power -136.6 136.64 0.264 -0.440 MW
Apparent
power 0.242 -0.242 136.6 -136.6 MVAR
Reactive
power 136.6 - 136.64 136.6 136.6 MVA
3. Remarks:
Page 11 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 11 – BUS COUPLER 21/03/2024
NAME TESTING
51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r
BUS 2500/
1 0.13 NI 0.1 0.13 NI
COUPLER 1
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
1.1 9.619 0.11 9.262
2 1.304 0.2 1.305
4 0.6398 0.4 0.651
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 142.2 -142.2 -0.275 0.275 MW
Apparent
power -0.275 0.275 -142.2 142.2 MVAR
Reactive
power 142.2 142.2 142.2 -142.2 MVA
3. Remarks:
Page 12 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 10 – AUX TR 2 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.06 19.13 0.11 4.427
0.1 5 0.2 1.91
0.2 2.484 0.4 0.9568
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.7 -22.7 -0.048 0.051 MW
Apparent
power -0.051 0.048 -22.7 22.7 MVAR
Reactive
power 22.7 22.7 22.7 -22.7 MVA
3. Remarks:
Page 13 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 09 – FEEDER 04 (ICO) 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.8 10.58 0.11 14.34
1.4 2.006 0.00834 0.2 2.014 0.3731
2.8 0.997 0.4 1.002
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.75 -22.7 -0.06 0.06 MW
Apparent
power -0.06 0.06 -22.7 22.7 MVAR
Reactive
power 22.75 22.7 22.7 -22.7 MVA
3. Remarks:
Page 14 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 08 – FEEDER 03 (TUNGI) 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
TUNGI 400/1 0.25 0.15 NI 3.75 0.1 DT 0.075 0.15 NI 1.25 0.1 DT
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.26 27.83 0.076 55.61
0.5 1.504 0.5227 0.15 1.501 0.123
1 0.7419 0.3 0.7511
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.78 -22.78 -0.04 0.04 MW
Apparent
power -0.04 0.044 -22.7 22.7 MVAR
Reactive
power 22.78 22.7 22.7 -22.7 MVA
3. Remarks:
Page 15 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 07 – INCOMER 02 21/03/2024
NAME TESTING
51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r
2400/
INCOMER 2 0.18 0.39 NI 0.1 0.17 NI
1
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.19 51.16 0.11 11.93
0.36 4.085 0.2 1.701
0.72 1.945 0.4 0.8501
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power -136.6 136.6 0.308 0.308 MW
Apparent
power 0.330 -0.308 136.6 136.6 MVAR
Reactive
power 136.6 136.6 -136.6 -136.6 MVA
3. Remarks:
Page 16 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 05 – BUS COUPLER 21/03/2024
NAME TESTING
51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r
BUS 2500/
1 0.13 NI 0.1 0.13 NI
COUPLER 1
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
1.1 9.598 0.11 9.29
2 1.302 0.2 1.317
4 0.6461 0.4 0.6515
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 142.5 -142.5 -0.183 0.200 MW
Apparent
power -0.206 0.185 -142.5 142.5 MVAR
Reactive
power 142.5 142.5 142.5 -142.5 MVA
3. Remarks:
Page 17 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 03 – FEEDER 02 (MIKESE) 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
MIKESE 400/1 0.23 0.05 NI 2.25 0.01 DT 0.075 0.2 NI 1.5 0.01 DT
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.24 8.345 0.076 79.41
0.46 0.5084 0.1475 0.15 2.013 0.0576
0.92 0.2479 0.3 0.9996
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.78 -22.78 -0.062 0.059 MW
Apparent
power -0.062 0.062 -22.78 22.78 MVAR
Reactive
power 22.78 22.78 22.78 -22.78 MVA
3. Remarks:
Page 18 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 04 – AUX TR 1 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.06 19.34 0.11 4.416
0.1 5.012 0.2 1.91
0.2 2.496 0.4 0.9503
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.76 -22.75 -0.095 0.090 MW
Apparent
power -0.092 0.092 -22.76 22.75 MVAR
Reactive
power 22.75 22.75 22.75 -22.75 MVA
3. Remarks:
Page 19 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 02 – FEEDER 01 (ALLIANCE) 21/03/2024
NAME TESTING
51 50 51N 50N
FEEDER CT
S/N Cha Iset Time Iset Iset Time Cha
NAME RATIO
Iset (A) TMS r (A) (sec) Char (A) TMS Char (A) (sec) r
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.2 13.69 0.076 35.93
0.38 1.002 0.2455 0.15 0.0609 0.0532
0.76 0.497.6 0.3 0.0501
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power 22.80 -22.80 -0.044 0.048 MW
Apparent
power -0.048 0.051 -22.80 22.80 MVAR
Reactive
power 22.80 22.80 22.8 -22.80 MVA
3. Remarks:
Page 20 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
VOLTAGE
EQUIPMENT PROTECTION RELAY 33kV
LEVEL
BAY NO/ DATE OF
H 01 – INCOMER 01 21/03/2024
NAME TESTING
51 50 51N 50N
S/ FEEDER CT
Iset Time Iset Iset Time Cha
N NAME RATIO
Iset (A) TMS Char (A) (sec) Char (A) TMS Char (A) (sec) r
2400/
INCOMER 1 0.18 0.39 NI 0.1 0.17 NI
1
1
OC 50 EF 50N
Fault Trip time Trip time Fault Trip time
Current (s) (s) Current Trip time (s) (s)
0.19 51.27 0.11 12.01
0.36 3.914 0.2 1.704
0.72 1.94 0.4 0.8477
Pf +1 -1 0 0
Angle 0° 180° 90° 270°
Real power -136.6 136.626 0.352 -0.330 MW
Apparent
power -0.352 -0.352 136.624 -136.626 MVAR
Reactive
power 136.6 136.624 136.604 136.604 MVA
3. Remarks:
Page 21 of 22
SUBSTATION EXTENTION AND
REHABILITATION WORK AT 220kV
MSAMVU SUBSTATIONS
Sl.
Description Make Equipment Serial Number
No
Name:
Designation
Signature:
Page 22 of 22