0% found this document useful (0 votes)
80 views1 page

DG Inspection Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

DG Inspection Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Soma Enterprise Limited

(WFC Western Freight Corridor Project)

DIESEL GENERATOR (DG) INSPECTION CHECKLIST

Name of Site :
DG Code:
Inspected By : Date : / /
Sl.
Points Observations Measures
No.
Whether the continuity and tightness of
1
earth conductor are checked?
Mention the gauge of the earth conductor
2
used
3 Whether earth resistance is measured?
4 Mention the value of Earth Resistance
5 Is DG provided under shed / cover?
Whether entry is restricted into the DG
6
room?
7 Are cable trenches are covered?
Is insulation provided on the battery
8
terminals?
Is thermal insulation done for the DG
9
exhaust?
Whether DG exhaust is diverted out side
10
the shed?
Are all the rotating parts of DG guarded
11
(coupling, radiator fan)?
Whether any leakage of fuel / oil in the
12
DG room?
Whether DG surrounding is free from
13
flammable material?
Whether fire extinguisher / fire buckets
14
with stand are provided?
Whether DG is fitted with Acoustics &
15
Silencer insulations?

Signature :

Sr. SHE Electrical Engineer

You might also like