The document provides a site acceptance test report for a sub main distribution board for a solar PV project in Sea World Abu Dhabi. It details test results for breaker insulation resistance, contact resistance, trip tests, protection settings, current transformer tests, and calibration details of testing instruments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views4 pages

Cut Out Panel 2

The document provides a site acceptance test report for a sub main distribution board for a solar PV project in Sea World Abu Dhabi. It details test results for breaker insulation resistance, contact resistance, trip tests, protection settings, current transformer tests, and calibration details of testing instruments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

GENFOCU

SITE ACCEPTANCE TEST REPORT FOR SUB MAIN DISTRIBUTION BOARD


PROJECT: SEA WORLD ABUDHABI SOLAR PV PROJECT
CLIENT M/S. MIRAL/SEA WORLD DATE: 16-03-2024
DEVLOPER M/S. EMERGE/MASDAR PAGE: 1 of 4
SOLAR EPC M/S. GOLDEN FALCON EQUIPMENT CUT OUT PANEL 2
TESTING AGENCY M/S. GENFOCUS SUBSTATION / LOCATION UTILITY LV ROOM

1. BREAKER NAME PLATE DETAILS:

MAKE SCHNEIDER CURRENT RATING 2000 A


TYPE EASYPACT MVS20H SL.NO DU225050500
VOLTAGE RATING 1000V ASSET DETAIL CUT OUT-2

2. GENERAL CHECKS:

S No Description Result
1 Check visual inspection of LV PANEL, ACB and other equipment. OK
2 Check any damages, painting and identification label, etc. OK
3 Check the tightness of Cable and Equipment. OK
4 Check tag name of cable. NA
5 Check ACB Cable tightness. OK
6 Verify ACB Rating and panel details as per load schedule. OK
7 Check visual inspection of CT wiring. OK
8 Check the healthiness of the auxiliary fuse. OK
9 Check secondary injection ACB trip test. OK
10 Check torque tightness of Busbar & ACB. OK

3. BREAKER INSULATION RESISTANCE TEST:

ACB Condition Phase Applied Voltage (V) IR Value(GΩ) Remarks


R - R’ >100 OK
OFF Y - Y’ >100 OK
B - B’ >100 OK
500V DC for 1 Min
R-(Y+B+E) >100 OK
ON Y-(R+B+E) >100 OK
B-(R+Y+E) >100 OK

4. ACB CONTACT RESISTANCE TEST:


S No Phase Ref. Measured Value [µΩ] REMARKS
Tested by Witness by/Approved By Witness by/Approved By
Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024
GENFOCU
S

SITE ACCEPTANCE TEST REPORT FOR SUB MAIN DISTRIBUTION BOARD


PROJECT: SEA WORLD ABUDHABI SOLAR PV PROJECT
CLIENT M/S. MIRAL/SEA WORLD DATE: 16-03-2024
DEVLOPER M/S. EMERGE/MASDAR PAGE: 2 of 4
SOLAR EPC M/S. GOLDEN FALCON EQUIPMENT CUT OUT PANEL 2
TESTING AGENCY M/S. GENFOCUS SUBSTATION / LOCATION UTILITY LV ROOM

1 R-ɸ 15 OK
2 Y- ɸ 14 OK
3 B-ɸ 14 OK

5. BREAKER TRIP TEST REPORT: Note:(FFK Trip Test File Attached)

6. FINAL PROTECTION SETTING:


Protection curve Protection Setting Delay time Test trip
Long time (Ir) 0.4 x In 0.5@6Ir PASSED

Short time (Isd) 1.5 x Ir 0.1 I²t PASSED


Instantaneous (Ii) 2.0 x In - PASSED

TESTING OF CURRENT TRANSFORMER

1. Name Plate Detail


Feeder / CT Ref. CUT OUT PANEL 2

Tested by Witness by/Approved By Witness by/Approved By


Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024
GENFOCU
S

SITE ACCEPTANCE TEST REPORT FOR SUB MAIN DISTRIBUTION BOARD


PROJECT: SEA WORLD ABUDHABI SOLAR PV PROJECT
CLIENT M/S. MIRAL/SEA WORLD DATE: 16-03-2024
DEVLOPER M/S. EMERGE/MASDAR PAGE: 3 of 4
SOLAR EPC M/S. GOLDEN FALCON EQUIPMENT CUT OUT PANEL 2
TESTING AGENCY M/S. GENFOCUS SUBSTATION / LOCATION UTILITY LV ROOM

Type/Make ZIEGLER
Purpose Metering
Ratio (A) 2000/5
Class 0.5 FS 10
Burden (VA) 30 VA
Serial No. R-ɸ G230237991 Y-ɸ G230237918 B-ɸ G230237909

2. Visual Inspection Tests:


Description R-ɸ Y-ɸ B-ɸ
Check Visual Inspection for damage, proper installation and Name Plate Detail   
Tightness Check at CT Sec. TB – LV Compartment   

3. Insulation Resistance Tests: Duration: 1 Min


Insulation Resistance Value (GΩ)
Reference Applied Voltage (V)
R-ɸ Y-ɸ B-ɸ
Secondary – Earth 500 45 41 52
4. Polarity Test:
NOTE: Refer the Attached Omicron CT Analyzer Test Report

5. Winding Resistance Measurement Test (Secondary):


NOTE: Refer the Attached Omicron CT Analyzer Test Report

6. Magnetization Characteristic Test (Knee Point):


NOTE: Refer the Attached Omicron CT Analyzer Test Report

1. REMARK: NIL

2. EQUIPMENT DETAILS:

Tested by Witness by/Approved By Witness by/Approved By


Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024
GENFOCU
S

SITE ACCEPTANCE TEST REPORT FOR SUB MAIN DISTRIBUTION BOARD


PROJECT: SEA WORLD ABUDHABI SOLAR PV PROJECT
CLIENT M/S. MIRAL/SEA WORLD DATE: 16-03-2024
DEVLOPER M/S. EMERGE/MASDAR PAGE: 4 of 4
SOLAR EPC M/S. GOLDEN FALCON EQUIPMENT CUT OUT PANEL 2
TESTING AGENCY M/S. GENFOCUS SUBSTATION / LOCATION UTILITY LV ROOM

SL.NO INSTRUMENT NAME MAKE/MODEL SERIAL NO CALIBRATION VALID


1 IR Tester Megger / MIT515 101283345 08-06-2024
3 Digital Multimeter Fluke / 87V 38030052 31-01-2025
4 MOM Programma / MOM200A 1603262 31-01-2025
6 CT Analyzer Omicron / CT Analyzer LF541J 14-04-2024
7 Secondary Injection Schneider/FFK 10626017424 22-08-2024

Tested by Witness by/Approved By Witness by/Approved By


Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024