Kindly arrange to provide ACR forms for following staff posted at CMTS Jhajjar and Bahadurgarh:
Sub: Requirement of stationery items for the month of February 2012 for commercial section.
Sir,
Following stationery are required for Commercial section at Bahadurgarh:
SDE (Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
SDE (Group),
BSNL, Bahadurgarh.
This is to inform you uptime availability of some of the BTS sites is very poor especially
revenue of Chhara & Bupania sites has reduced drastically for last six months. This is causing
revenue loss to BSNL & dissatisfaction to our customers. Port out cases have also increased in
those areas. So it is requested that please try to make BTS availability better that will in turn
increase our sales & more revenue to BSNL. Availability list site wise is given below:
TOTAL
Site Name AVAILABILITY Down Time
for Jan-2010 (In Hrs.)
MATAN_41 73.84 194.61
GUBANAMAJRA_15 74.97 186.23
BUPANIA_10 80.78 143.01
KHANONDA_17 81.08 140.74
BAHAMNOLA_9 81.17 140.06
ROHAD_4 82.80 127.95
CHHARA_2 84.77 113.34
JAKHODA_14 87.70 91.48
MANDHOTI_8 90.81 68.39
TE DULHERA_65 92.88 52.96
BAPRODA_41 93.33 49.65
LADRAWAN_51 93.58 47.80
NUNA MAJARA_65 94.11 43.83
BADSA_20 94.36 41.96
TE BADLI_29 96.50 26.06
SIDHIPURLOWA_50 97.25 20.49
DABODA
KHURD_12 97.44 19.06
ASHODA_1 99.02 7.26
JASSUR KHERI_6 99.38 4.61
SDE(Commercial),
Bahadurgareh.
Copy to:
1. AGM (Sales), O/o Sr. GMTD Rohtak
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
SDE (Marketing),
O/o Sr. GMTD, Rohtak.
This is to inform you that following marketing material is required for Bahadurgarh
SDE (Commercial),
Bahadurgarh.
No:SDE(Comm)/BDM/Genl/2012/05
dated February 7, 2012
Certified that Telephone No: 01276-236453 is working since 18.03.1998 till date & is in
the name of:
SDE (Commercial),
Bahadurgarh.
Sub: Provision of Prepaid SIM with talk time of Rs. 200/- to TM & TTA’s who undertake
outdoor duties & select non executive on functional need.
Sir,
With reference to BSNl HQ letter no: 2-22/2002-PHA dated 18.01.2012 for providing Rs
200 talktime per month for prepaid connection to TM & TTA, please find attached the list of
employees of Bahadurgarh SDCA received from various sections:
SDE (Commercial),
Bahadurgarh.
Sir,
This is to inform your goodself that today at around 2:00 pm Sh K.C. Malik Sr. TOA
posted at Commercial section Bahadurgarh misbehaved & manhandled with Sh Gopal (JTO
CMTS-Comm) in the exchange compound. Then I called upon both the officials to DE(P) office
in front of DE(Phones) Bahadurgarh. There also he passed on lewd & caste based remarks
remarks to Sh Gopal JTO & to Sh Vijender Singh TTA also in front of everyone present there.
Upon enquiring it was also found that Sh Malik is under the influence of liquor.
Under these circumstances, it is requested that Sh Malik is not required at all in the
commercial section. Firstly he should be removed from capacity of commercial section
Bahadurgarh without any substitute & a strong disciplinary action should be initiated against the
official.
This is for your kind information & necessary action at your end please.
SDE (Commercial),
Bahadurgarh.
Copy to:
1. AGM (sales), O/o GMTD, Rohtak.
2. DE (phones), Bahadurgarh.
SDE(MM),
O/o GMTD, Rohtak.
No: SDE (Comm)/BDM/Genl /2012/08 dated February 15, 2012
SDE (Commercial),
Bahadurgarh.
RELIEVING ORDER
Following officers are hereby relieved on 02/03/2012 A/N for taking LDCE exam to be
held on 4th March 2012 at Farooka Khalsa Senior Secondary School, Ambala Cantt.
Name HR No.
1. Sh Narendra Kumar Kushwah 200304927
2. Sh Gopal 200201243
SDE (Commercial),
Bahadurgarh.
AO (Cash)
O/o Sr. GMTD, Rohtak.
No: SDE (Comm)/BDM/Genl /2012/09 dated February 18, 2012
Please update my savings for the financial year 2011-12 as detailed below:
Dushyant Kumar
HR No: 200205268
SDE (Commercial),
Bahadurgarh.
No:SDE(Comm)/BDM/Genl/2012/10
dated February 21, 2012
SDE (Commercial),
Bahadurgarh.
SDE(HRD)
O/o Sr. GMTD, Rohtak.
Sir,
This is to inform you that my annual increment is due on 01/03/2012 & I am present on
duty on this day. Please allow my annual increment from 01/03/2012. My present basic salary is
Rs 29120.
Dushyant Kumar
HR No: 200205268
SDE (Commercial),
Bahadurgarh.
This is to inform you that due to Billing server migration in the month of May-2011,
some landline numbers were underbilled by BSNL & later on Bill of May-2011 was regenerated
but it was not paid by you. Hence the difference of the bills is payable by you & the bills are
handed over Mr. Arvind Das. Printed bills cannot be given as bill image of bills older than 6
months is not available with us.
Please arrange to make the payment of these bills at the earliest otherwise disconnection
of the numbers will be wholly your responsibility.
AO(TR)
BSNL, Bahadurgarh.
Sub: Requirement of stationery items for the month of March 2012 for commercial section.
Sir,
Following stationery are required for Commercial section at Bahadurgarh:
SDE(Commercial),
Bahadurgarh.
Sir,
This is to inform you that PC of CSC counter is in very
SDE(Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
SDE (Admin),
Bahadurgarh.
Subject: Absentee Statement for period 21/02/2012 to 20/03/2012 of commercial section Bahadurgarh.
RELIEVING ORDER
SDE (Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
SDE (Admin),
Bahadurgarh.
Subject: Absentee Statement for period 21/04/2012 to 20/05/2012 of commercial section Bahadurgarh.
SDE(Commercial),
Bahadurgarh.
Sir,
Please provide prepaid CAF’s for CMTS-commercial section Bahadurgarh
SDE(Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
SDE(HRD),
O/o GMTD, Rohtak.
Sir,
Please find details of TTA’s working under SDE (CMTS-commercial) Bahadurgarh.
1. Sh Sunil Kumar : Handles CCN counter in CSC Bahadurgarh. All works related to prepaid customers such as
SIM swap, new numbers, MNP, recharge etc.
2. Ku Upasana: Handles CCN counter in CSC Bahadurgarh. All works related to prepaid customers such as
SIM swap, new numbers, MNP, recharge etc.
3. Sh Vijaypal : All works related to postpaid GSM numbers & CAF/workorder acceptance in r/o Franchisee
Bahadurgarh.
SDE(Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
SDE(HRD),
O/o GMTD, Rohtak.
Sub: Requirement of stationery items for the month of May-2012 for commercial section.
Sir,
Following stationery are required for Commercial section at Bahadurgarh:
SDE(Commercial),
Bahadurgarh.
RELIEVING ORDER
SDE (Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
All Staff
CMTS-Commercial section
Bahadurgarh.
In suppression to previous orders following work distribution will take immediate effect
for smooth functioning of CMTS-commercial section.
1. Sh Vijaypal TTA: Postpaid number creation / Postpaid MNP / Franchisee & DSA
workorders/ CAF acceptance/POI & POA checking.
2. Sh Dinesh Sr TOA: Stock keeping / CAF reverificaton/ VTM/ CAF maintenance
3. Sh Ram Charan: Unaddressed data & CAF scanning.
4. Sh Sunil Kumar/ Ku Upasana: CSC work/ prepaid/ Prepaid MNP/ Preparing of
database of all duplicate SIM’s.
All officials engaged in prepaid/postpaid sale should ensure that all essential columns in
CAF’s should be properly filled with all stamps & signatures. All types of CAF’s should
be properly handed over to Sh Dinesh Kumar.
Any other left out work may be decided by Sh Gopal JTO under intimation to
undersigned.
SDE (CMTS-Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
AO(Cash)
O/o Sr GMTD Rohatk
Total Sales tax collected for April 2011 to March 2012: Rs 7455/-
Total Sales tax collected for April 2012 to May 2012: Rs 924/-
SDE (CMTS-Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Commercial) Bahadurgarh-124507
Ph: 01276-220511, Fax: 01276-238800
To
SDE (Admin),
Bahadurgarh.
Subject: Absentee Statement for period 21/05/2012 to 20/06/2012 of commercial section Bahadurgarh.
SDE(Commercial),
Bahadurgarh.
Bharat Sanchar Nigam Limited
O/o SDE (Trans & Mobile)-II
Jhajjar-124103
To
SDE(HRD),
O/o Sr. GMTD, Rohtak.
Sub: Requirement of stationery items for the month of July-2012 for Mobile section, Jhajjar.
Sir,
Following stationery required for Mobile section, Jhajjar.
1. A4 paper 2 packets
2. Register (4 Quire) 4
3. Register (8 Quire) 4
4. Notesheet 2 packets
5. Stapler 2
6. Stapler pins 10 packets
7. File covers 20
8. Permanent Marker 4
9. Gum 2 bottles
10. Whitener 2 bottles
11. Blue pens 10
12. Red pens 5
Dushyant Kumar
SDE(Trans & Mobile)-II
Jhajjar.
Bharat Sanchar Nigam Limited
O/o SDE (Trans & Mobile)-II
Jhajjar-124103
To
SDE (HRD),
O/o Sr GMTD Rohtak.
Subject: Absentee Statement for period 21/06/2012 to 20/07/2012 of Mobile section Jhajjar
SDE(Trans &
Mobile)
Jhajjar.
BHARAT SANCHAR NIGAM LIMITED O/o Sub Divisional Eng(Trans/Mobile)
(A Government of India Enterprise) Main Telephone Exchange, Jhajjar,Haryana
To
The Asst. Manager,
M/s Ascend Telecom Infrastructure Private Limited
E-160, Phase 7 Industrial Area
Mohali -160055
Subject: Heavy downtime due to non availability of power at IP sites relating to M/s AITL.
This is to inform you that you have provided infrastructutre to BSNL in Jhajjar (Haryana) SDCA at
following sites. But I am very sorry to say that for last 2-3 months performance of infra is deteriorating day by day.
You can realize this fact by following sheet.
From above table you can make out that how can we sustain in market with this type of service. Previously
Kashni site was working satisfactorily but for past one week this site is also getting down. Hence you are requested
to please look in the matter urgently & take some emergent action to minimize downtime of these sites.
SDE(Trans &
Mobile)
Jhajjar.
BHARAT SANCHAR NIGAM LIMITED O/o Sub Divisional Eng(Trans/Mobile)
(A Government of India Enterprise) Main Telephone Exchange, Jhajjar,Haryana
To
SDE(MM)
O/o Sr GMTD Rohtak
Sh Ajit Singh Yadava TTA Bahadurgarh is authorized to receive following stores on behalf of SDE(Trans
& Mobile) Jhajjar
SDE(Trans &
Mobile)
Jhajjar.
BHARAT SANCHAR NIGAM LIMITED O/o Sub Divisional Engr(Trans/Mobile)
(A Government of India Enterprise) Main Telephone Exchange, Jhajjar,Haryana
To
DGM (MSC)
Panipat
Subject: Exemption of downtime count in r/o Nai Basti , Bahadurgarh site in Rohtak SSA.
Sir,
With reference to above cited subject, I wish to elaborate some points regarding Nai Basti BTS site at
Bahadurgarh.
1. Nai Basti site is rooftop site & ericsson 2G & 3G BTS’s are installed at this site.
2. We received complaints from landlord that there are cracks in the building .
3. After receiving complaints from the landlord, a team consisting of DGM(CFA), DE(Trans), JTO(Civil)
visited the site & found the cracks in the building.
4. Now landlord does not allow us to run the generator in case of power failure which leads to high downtime
of site.
5. We have written to NP section Ambala & our planning section also that this site may be shifted to some
other nearest site at the earliest.
6. A suitable site owned by IP M/s Vyom is also being referred to.
In view of above facts I wish to request you that downtime of this site may not be counted in daily downtime
report as the cause is beyond our control.
This is for your kind information & necessary action at your end please.
SDE(Trans &
Mobile)
Jhajjar.
BHARAT SANCHAR NIGAM LIMITED O/o Sub Divisional Engr(Trans/Mobile)
(A Government of India Enterprise) Main Telephone Exchange,
Jhajjar,Haryana
To
SDE (HRD),
O/o Sr GMTD Rohtak.
Subject: Absentee Statement for period 21/07/2012 to 20/08/2012 of Mobile section Jhajjar
SDE(Trans &
Mobile)
Jhajjar.
BHARAT SANCHAR NIGAM LIMITED O/o Sub Divisional Engr(Trans/Mobile)
(A Government of India Enterprise) Main Telephone Exchange,
Jhajjar,Haryana
To
AGM (CM-NP),
O/o Sr. GM(CM-P)
Ambala.
Subject: Addition of Govt polytechnic (2G + 3G combo site) in Jhajjar SDCA for phase-VII project.
Sir,
With reference to above subject, It is to intimate you that area around govt polytechnic Jhajjar has been left
out during planning of sites for phase-VII. This is very important area in terms of its location because there is govt
polytechnic college, govt degree college, central school, Police line jhajjar are situated. This site would earn a good
revenue for BSNL. So it is proposed that this site may be added in this current phase only. Nominals for this site are:
28.613914
76.693535
Regards,
SDE(Trans &
Mobile)
Jhajjar.
BHARAT SANCHAR NIGAM LIMITED O/o Sub Divisional Engr(Trans/Mobile)
(A Government of India Enterprise) Main Telephone Exchange,
Jhajjar,Haryana
To
SDE(Planning),
O/o Sr GMTD Rohtak
To
SDE(Planning),
O/o Sr GMTD Rohtak
Following stores are required for proper functioning of BTS at Mundahera (Jhajjar)
To
SDE(MM)
O/o Sr GMTD Rohtak
Sh Ajit Singh Yadava TTA Bahadurgarh is authorized to receive following stores on behalf of SDE(Trans
& Mobile) Jhajjar
SDE(Trans &
Mobile)
Jhajjar.
To
DE(CMTS)
O/o Sr. GMTD Rohtak.
Sir,
In reference to complaints received from Sh Manjeet Ahlawat, It is to inform that 3G sites
(Gandhi Chowk, Old Ind Area) were down during that period due to non availability of power modules as
there was no tender for repairing of power modules. Ericsson engineer also visited premises of the
complainant two three times but he could not get 3G network there due to sites down. Now all sites are up
after repairing of modules on & 3G data is working fine now in that area.
To
SDE(Planning)
O/o Sr. GMTD Rohtak.
Sir,
With reference to your above referred letter, please find attached h/w find collector rates of jhajjar
SDCA.
To
DE(CMTS)
O/o Sr. GMTD Rohtak.
Sir,
In reference to complaints received from Sh Amit Sharma regarding inter not working on mobile
number 9416059293. I have talked personally to customer & internet is working satisfactorily on the
mobile No 9416059293.
Hence complaint may be closed please.
DGM(NTR)
Ambala.
Sub:- Media requirement for BTS sites of jhajjar of Phase VII GSM Project.
It is requested to kindly allocate following media from Bahadurgarh NTR to Jhajjar NTR in
Rohtak SSA for GSM Project Phase VII. This requirement is based on 0.8 Million lines capacity
allocation to Haryana Telecom Circle as per BSNL HQ letter no. 57-66/2010/CMTS/plg/part Dated
20.04.2012
BERI BADSA
DIGGAL BIROHAR
BADLI BAPRODA
DUJANA CHIMNI
CHHUCHHKWAS DHOUD
DUBALDHAN DADARITOYE
DHAKLA GOCHHI
JAHAGIRPUR HASANPURA
KABLANA JAHAJGARH
MACHHRAULI KASHNI
MATANHAIL KHERIJAT
PATAUDA MUNDAHERA
SASROULI MAROT
SEHLANG SONDHI
SALAHWAS SILANI PANAZLIM
AKEHRI MADANPUR SIWANA
Reminder-I
No: SDE(Trans & Mobile)-II/JJR/Genl /2012/27 dated September 14, 2012
Subject: Heavy downtime due to non availability of power at IP sites relating to M/s AITL.
This is to inform you that you have provided infrastructutre to BSNL in Jhajjar (Haryana) SDCA at
following sites. But I am very sorry to say that for last 3-4 months performance of the infra is deteriorating day by
day. You can realize this fact by following sheet.
Site Name Total down time Total down time in Total down time
in July-2012 (hrs) August -2012 (hrs) till 13th September -
2012 (hrs)
Akheri Madanpur 174 139 79
Silani Pana Zalim 164 214 147
Siwana 127 82 51
Kashni 38 99 51
From above table you can make out that how can we sustain in this competitive market with this type of
service. Previously also it was informed to you to take some urgent step to come out of this situation but nothing
constructive has been done so far from your end.
Now, In this present situation this communication may be treated as notice from our side to vacate these IP
sites & we are forced to look for another vendor in these villages. Hence you are requested to please look in the
matter urgently & take some emergent action to bring these sites to zero downtime.
Following stores are required for proper functioning of BTS at Marot (Jhajjar)
Following stores are required for proper functioning of BTS at Gochi (Jhajjar)
To
DE(CMTS),
O/o Sr. GMTD Rohtak.
No: SDE(Trans & Mobile)/JJR/Sites shifting /2012/01
Sir,
This is regarding shifting of BTS sites of Bahadurgarh city due to various reasons as detailed below:
This is again reiterated that all these three sites may shifted to nearest possible IP site which is suitable in
terms of RF point of view. In case of shifting of Somany Exchange & BTS (UBG003), SSA has already acquired
building on rent in Kasar village. New combo site is also proposed in phase-VII in kasar village. Coordinates of
Kasar are: 28.703030° , 76.883320°.
Hence Kasar site may directly be handed over to M/s ZTE as new site after RF clearance & UBG 003 may
be shifted to nearest IP site.
We should hire new sites ASAP so that ZTE combo BTS’s for all these three sites may be installed in new
location & it will save our expenditure of BTS shifting.
To
AGM (IT)
APCPL, Jharli
Sir,
This is in reference with meeting of APCPL officers with Sr GMTD BSNL at Rohtak & visit of Jharli plant
by Sh Subhash DE BSNL & undersigned with Mr M.D. Mishra & Mr. Pradeep Chaudhary from APCPL on
21/11/2012. It was noticed that coverage in some part of residential complexes is not up to mark & this issue can be
solved by installing one more BTS site in plant area. And a suitable site was chosen in block B11, from there we can
cover all part of residential complexes of APCPL.
Hence you are requested to provide us space on roof top of B11 block with 3 phase AC supply & with all
necessary permissions so that we can start the work of installing BTS at the location. This BTS will give services to
both 2G & 3G customers. We will be installing pole mounted antennas & a space of 20*20 sq feet will be sufficient.
Committed to give you better services at all times & hoping for a favorable response from your end.
Regards,
Dushyant Kumar
SDE(Trans & Mobile)
Jhajjar.
To
DE(CMTS),
O/o Sr. GMTD Rohtak.
Sir,
This is regarding shifting of Somany Ind BTS sites of Bahadurgarh city as detailed below:
This is again reiterated that Somany Ind is an RSU & SSA has already acquired building on rent in Kasar
village for shifting of RSU. New combo site is also proposed in phase-VII in kasar village. Coordinates of Kasar are:
28.703030° , 76.883320°. Hence Kasar site may directly be handed over to M/s ZTE as new site after RF clearance
& UBG 003 may be shifted to nearest IP site.
If we are able to finalize new site early then ZTE combo BTS may be installed in new location & it will
save our expenditure of BTS shifting.
To
SDE(HRD),
O/o GMTD, Rohtak.
Sir,
Following stationery are required for mobile section at Jhajjar:
1. A4 paper 2 packets
2. ACE-2 account book 1
3. Blue pen 5
4. Red pen 5
5. Note sheet 2 books
6. Attendance register 1
7. Register (4 Quire) 5
8. Register (8 Quire) 2
To
SDE(Operation),
O/o Sr. GMTD, Rohtak.
This is to inform you that RSTC installed in the name of undersigned at Bahadurgarh has been
disconnected on 18/12/2012. Hence, RSTC may be sanctioned at jhajjar please at the address below:
Dushyant Kumar
c/o Sh Ravinder Kumar
Near LIC building Kosli Mod
Jhajjar.
Dushyant Kumar
HR No: 200205268
SDE(Trans & Mobile)
Jhajjar.
To
AO (Cash)
O/o Sr GMTD, Rohtak.
To
DE(CMTS)
O/o Sr GMTD, Rohtak.
Sir,
Please find h/w detailed report of main market jhajjar BTS (UJH005):
1. Complaint was booked on 14/09/2012 vide docket No: HAR0000119261.
2. Ericsson Engr. Mr Kuldeep visited on 25/09/2012 & declared that flash card is faulty.
3. Flash card was arranged by BSNL & Mr Kuldeep again visited on 12/11/2012. But even after replacing flash
card site was still down & he declared that backplane is faulty. Ericsson falsely closed the docket that
issue is resolved.
4. Hence docket was again raised to Ericsson vide docket No: HAR0000124491 dated 14/11/2012
5. After this no one visited the site & backplane not arranged by M/s Ericsson even after repeated calls to
Mr. Prikshit.
To
DE(CMTS)
O/o Sr GMTD, Rohtak.
Sir,
With reference to above subject, Pl find various issues related to phase-VII GSM project:
1. The area around govt polytechnic Jhajjar has been left out during planning of sites for phase-VII. There is
gap of 10 kms between Jhajjar & Kablana BTS sites & even outdoor coverage is very poor in this area.This
is very important area in terms of its location because there is govt polytechnic college, govt degree
college, central school, Police line jhajjar are situated. This site would earn a good revenue for BSNL. So it
is proposed that new combo site may be added in this current phase only. Nominals for this site are:
28.613914
76.693535
2. Somany Ind RSU (UBG 003) BTS site is under shifting & SSA has already acquired building on rent in
Kasar village for shifting of RSU. New combo site is also proposed in phase-VII in kasar village & this site
has already been handed over for tower erection as new site. But a huge gap of 5 kms will be created after
shifting of UBG003 site to Kasar village. Hence a IP site may be hired near to old location of UBG003 to
fill this gap. Existing nominals of Somany BTS site are: 28.711944°, 76.890011°.
3. We are pursuing for 3G coverage for last 4 years at PDM college Bahadurgarh. But it is still not added in
latest proposal of BTS sites. Hence you are requested to please add 3G site on 2G site of Sarai Aurangabad
Bahadurgarh (AUR001).
4. In phase V.2, 2G BTS site was proposed at Vill-Rohad Bahadurgarh & BTS was also installed at Infratel IP
site. But due to theft of BTS this site could not be made ON-AIR in that project. As feeder cable, minilink
etc. are installed at site & only a BTS is required to make site ON-AIR. Hence new 2G BTS may be given
at this site. Population of village is more than 8000.
5. Similarly Birdhana at Jhajjar was also installed at Infratel IP site. It could not be made ON-AIR due to
feeder cable damage. Minilink is installed at the site. Population of this village is around 7000. This village
falls on Chhara-Jhajjar road 10 kms. Hence 2G BTS with feeder may be given at this site. Nominals of
village are 28.66488, 76.6604
6. At Bhambewa village, land was taken on rent & leased deed was also executed with the landlord in 2010.
But this site is not included in this phase. Hence 2G BTS may be proposed at this site in this phase & may
be handed over for further work.
To
AO (Cash)
O/o Sr. GMTD, Rohtak.
Please update my savings against 80C for the financial year 2012-13 as detailed
below:
Total 30998/-
Dushyant Kumar
HR No: 200205268
SDE (Mobile), Jhajjar
To
DE(CMTS)
O/o Sr GMTD, Rohtak.
Sir,
With referenece to above subject, Pl find diesel & Electric bill of Sondhi BTS site for Nov & Dec-2012.
To
SDE(Planning),
O/o Sr GMTD Rohtak
This is to inform you that Beri BTS site has been leased out to M/s IDEA for providing GSM services.
Hence following stores are required to make site ready for installation.
To
SDE(MM),
O/o Sr GMTD Rohtak
Sh Vishal Vats (TTA) is hereby authorized to receive following stores on behalf of undersigned.
To
SDE(Planning),
O/o Sr GMTD Rohtak
To
DGM(Planning),
O/o Sr GMTD Rohtak.
Sir,
In reference to above subject, the designated committee visited Bupania BTS site on 2/2/13
& following observation was made during the visit.
To
SDE(Planning),
O/o Sr GMTD Rohtak
Following stores are required for proper functioning of BTS at Jharli (Jhajjar)
To
SDE(Operation),
O/o Sr GMTD Rohtak
With reference to above referred complaint, It is to intimate that I talked to customer Mr Anil Kumar
9467779922 regarding his complaint. It was found that facebook was not opening in his mobile & I asked him to
visit CSC or meet undersigned to resolve the issue. But after that, complainant is not picking up the calls made to
him. Customer is a resident of Ladrawan village & EDGE is working fine in that site.
This complaint may be treated as resolved in view of above facts.