Project Engineer CV
Project Engineer CV
SUMMARY
A Mechanical Engineer with cumulative experience of 6 years in industry. During these 6 years I learned, how to save
cost & man hours by strategic resource allocation & planning. Along with this I also have expertise in HVAC equipment
& its piping, firefighting equipment & its piping, fire alarm system. Being Engineer I also have strong passion for
internet of things (IOT) & networking technologies.
WORK EXPERIENCE
General
Leading execution at site as per ASME, NFPA, ASHRAE, SMACNA & IPC standards.
Coordinating with Site-based consultation team for Submittal approvals and RFIs.
Comprehending system specifications from Project specification documents.
Generating purchase demand as per specifications and BOQ.
Aggressive follow up of procurement cycle to ensure scheduled PO completion days.
Responsibility of reviewing the contract, BOQ, Project Schedule, Schematic, Riser & Shop Drawings of all
services.
Coordination
Responsible for coordinating with electrical, civil & steel teams for execution as per plan.
Coordination with sub-contractors, HSE Engineers & Construction managers to obtain clearance before
starting the work to ensure smooth & efficient execution of work.
Responsible for attending project related meeting with client / consultant / main contractor & reporting
back to The manager Projects or General Manager on the proceedings.
Conducting daily progress meetings with clients.
Manpower Management
Responsible for ensuring optimal usage of Manpower & resources. Prioritizing & delegating tasks to
team members to maximize efficiency.
Quality & Work Schedule Management
Estimating the required consumable material, equipment & tool before starting new activity.
Planning for next day activities & preparing program on weekly basis.
Support the Project manager in accomplishing all the goals & targets for mechanical groups at site.
Carrying out site inspection on a random basis to monitor the quality of work & schedule.
Responsible for ensuring that all construction works are executed as per specifications, standards &
quality requirements.
Carrying out pipe welding inspection as per WPS.
Overseeing hydro test as per design & specification.
Verifying material & equipment arrived at site as per Purchase order (PO) & specifications.
Billing & Final Documentation
Supervising QS in billing matters. Handing Over operating manuals & preparation of As-built drawings.
CERTIFICATIONS
Project Management Techniques (LinkedIn Learning)
Basics of Welding and Joining Technologies (Alison)
IOT – Internet of things (Edx)
LANGUAGES
English (Proficient), Urdu (Native)