0% found this document useful (0 votes)
206 views1 page

02 Schedule of Column & Footing

Uploaded by

vishal jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
206 views1 page

02 Schedule of Column & Footing

Uploaded by

vishal jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RM STORE GENERAL NOTES:-

(1 ) STANDARD NOTES / DRAWINGS SUPPLIED


WITH DRAWINGS SHALL BE FOLLOWED
Schedule of R. C. C. Column ( Use M : 25, Fe : 500 ) THROUGH OUT THE PROJECT.

Column upto Plinth Level Stirrups (2 ) STRUCTURAL DRAWINGS SHALL BE READ


IN ACCORDANCE WITH RELEVANT
Column No ARCHITECTURAL DRAWING / DETAILS.
Size Steel Spacing Type
(3 ) ALL FORM WORK & REINFORCEMENT
D SHALL BE CHECKED & VERIFIED FROM US
3,4,23,24 610 X 1060 26 No 0 16 mm 0 8 @ 100 to 150 c/c BEFORE CONCRETING.
B
(4 ) USE CONCRETE GRADE M20 OR M25 AND
STEEL GRADE Fe415 OR Fe500 AS
2,5,6,7,8,9,10,11,22,25,26, SPECIFIED.
27,28,29,30,31 610 X 1060 26 No 0 16 mm 0 8 @ 100 to 150 c/c B M-15 MIX MEANS 1:2:4
M-20 MIX MEANS 1:1½:3
M-25 MIX MEANS 1:1:2
D
1,12,21,32 400 X 920 16 No 0 16 mm 0 8 @ 100 to 150 c/c (5 ) DO NOT MEASURE THE DRAWING, READ
B THE DIMENSIONS.

D
13,14,19,20 COLUMN & FOUNDATION NOTES:-
450 X 550 14 No 0 16 mm 0 8 @ 100 to 150 c/c B
15,16,17,18
(1 ) THIS STRUCTURE IS DESIGNED FOR
GROUND + UPPER FLOORS.

Schedule of R. C. C. Footing ( Use M : 25 & Fe : 500 ) (2 ) CONSIDERED SOIL BEARING CAPACITY


( S.B.C. ) = 20 T / M ² .
P. C. C. R. C. C. Reinforcement (3 ) COLUMN REDUCTIONS SHALL BE
Column No 125 mm Thk. FOLLOWED IF SHOWN IN DRAWINGS.
Bottom Part
( M :15 ) D // To short span // To long span
LxB (4 ) ALL CONCRETING TO BE DONE USING
CONCRETE MACHINE MIXER &
3,4,23,24 4100 X 3400 3800 X 3100 750 0 16 @ 150 c/c 0 16 @ 150 c/c VIBRATOR ONLY.

2,5,6,7,8,9,10,11,22,25,26, (5 ) STRIPPING TIME OF FORM WORK FOR


4100 X 3400 3800 X 3100 750 0 16 @ 150 c/c 0 16 @ 150 c/c ALL VERTICAL SIDES OF FOOTING &
27,28,29,30,31 COLUMNS SHOULD BE 24 HOURS.
1,12,21,32 4200 X 3450 3900 X 3150 750 0 16 @ 150 c/c 0 16 @ 150 c/c
(6 ) FOOTING DEPTH SHALL BE TO LEVEL OF
13,14,19,20 PERMANENTLY STABILIZED STRATA OF
3500 X 3500 3200 X 3200 600 0 12 @ 150 c/c 0 12 @ 150 c/c HARD MURRUM OR YELLOW SOIL AND IN
15,16,17,18
NO CASE , IT SHALL BE LESS THAN 1.5 MT.
BELOW THE EXISTING GROUND LEVEL.

(7 ) P.C.C. SHALL BE EITHER IN M15 GRADE


CONCRETE ( UNLESS OTHERWISE
TYPICAL DETAIL OF FOOTING SPECIFIED ).

(8 ) CLEAR CONCRETE COVER


( a ) FOOTING BOTTOM & SIDE - 50 MM
Ground Beam ( b ) COLUMN SIDES ( 9” WIDE ) - 40 MM

Column (9 ) LAPPING OF MAIN BARS. COMPRESSION


Ground level BARS = 50 x d ; WHERE, d = BAR'S DIA.
A A TENSION BARS = 60 x d. OR ELSE
SPECIFIED.
L
Stirrups
Steel // L

(10 ) COLUMN BARS SHALL BE GIVEN AN


Bottom Part Steel // B L - BEND OF 45d ( DIAMETER OF BAR )
AND SHALL BE EXTENDED IN TO THE
Steel // B Top Part FOOTING COMPLETELY.
Bottom Part D
P.C.C.(1: 1.5 : 3)
B .E . ( CIVIL ) , MIE , FIV
L
M.E. ( STRUCTURE ) AMIE

B Steel // L Chartered Civil Engineer, Govt. Approved Valuer


7/1434 , Near Purna Mata Temple, Khatriwad, Junathana, Navsari - 396445
TEL : +91 63529 35403, Cell : +91 98252 72401, Email : [email protected]

Plan of Footing Section - AA Date 28/10/20 Title :


Detail Of Column & Footing
Drg. No 02
Drg. by Tarun Owner : Atul Ltd. ( RM STORE ) Scale :

Chkd. by