Mass stabilization 2015 April 23, 2015
Ground disasters on soft ground
slope failure by earthquake excavation ground settlement
pile failure liquefaction in 1964 liquefaction in 1995
3
Mass stabilization 2015 April 23, 2015
Development of ground improvement
techniques
Replacement
Kobe Port Island
SD PVD Pack D Pack drain
Consolidation
Nagasaki Nagoya Tomei Kansai Haneda, C Kansai Haneda, D
on land SCP marine SCP static SCP SAVE-SP
Compaction
Kansai Haneda, D
vibro heavy tamping
Compaction
Kansai
CDM DJM
In-situ Stabilization
Yokohama Kansai 羽田D
Premix SGM pneumatic
development Plant stabilization
application Kobe Chubu
jet grout Chiba
Jet grouting
1920 1940 1960 1980 2000 2020
4
Mass stabilization 2015 April 23, 2015
Classification and application
1500
strength (kPa)
1000
Deep
500
Mid
0 Shallow
0 5 10 15
improvement depth (m)
5
Mass stabilization 2015 April 23, 2015
Purpose of shallow depth mixing
required
binder factor
Purpose strength W/C ratio
(kg/m3)
qu (kN/m2)
transporting soft soil 50~100
improving roadbed 50~100 dry
beneficial use of soft soil 100~300
barrier for contaminated soil, mitigating
100
stench
assuring stability of structure 200~200
improving traficability 100~200 100~150 100~130%
others
6
Mass stabilization 2015 April 23, 2015
Shallow depth mixing
7
Mass stabilization 2015 April 23, 2015
Floating mixing
Purpose of improvement:
improving traficability
surface barrier for contaminated soil
mitigating stench
design strength : 100~300 kN/m2
binder factor : 100~150 kg/m3
W/C ratio : 100~130 %
8
Mass stabilization 2015 April 23, 2015
Horizontal & vertical mixing
Purpose of improvement:
improving traficability
surface barrier for contaminated soil
mitigating stench
design strength : 100~300 kN/m2
binder factor : 100~150 kg/m3
W/C ratio : 100~130 %
9
Mass stabilization 2015 April 23, 2015
Stabilizer mixing
Purpose of improvement:
improving roadbed
design strength
upper roadbed: qu7= 2.9 MN/m2
lower roadbed: 0.98 MN/m2
binder factor: 50~100 kg/m3 (dry)
10
Mass stabilization 2015 April 23, 2015
Bucket mixing, bucket & vertical blade
mixing Purpose of improvement:
transporting soft soil
beneficial use of soft soil
surface barrier for contaminated soil
improving traficability
mitigating stench
improvement depth: 2 m
bucket & vertical blade mixing
11
Mass stabilization 2015 April 23, 2015
Purposes of mid mix improvement
retaining wall foundation retaining wall foundation box culvert foundation
slope stability embankment stability building bearing capacity
shut off wall stabilization of mud beneficial use of subsoil
12
Mass stabilization 2015 April 23, 2015
Mid depth mixing
13
Mass stabilization 2015 April 23, 2015
Horizontal mixing
mixing blade: 0.4 to 1.6 m
depth: 2 to 16 m
slurry: penetration injection
design strength: 600~1000 kN/m2
binder factor: 200~350 kg/m3
quality control
Nd Nu
T M
Vd Vu
where
T : blade rotation number (N/m) >450 to 650/m
M : number of mixing blade (3)
Nd : rotation speed during penetration (10 rpm)
Vd : penetration speed (0.5 m/min)
Nu : rotation speed during withdrawal (30 rpm)
Vu : withdrawal speed (1.0 m/min)
14
Mass stabilization 2015 April 23, 2015
Vertical mixing
diameter: 1.3 to 1.5 m
shape: rectangular solid column
quality control
1 1
N M n
Vu Vd
where
N : blade rotation number (N/m) >230/m
M : number of mixing blade (4)
n : rotation speed (rpm)
Vd : penetration speed (m/min)
Vu : withdrawal speed (m/min)
15
Mass stabilization 2015 April 23, 2015
Bucket mixing, bucket & vertical blade
mixing
bucket & vertical blade mixing
16
Mass stabilization 2015 April 23, 2015
Trencher mixing
Trencher width: 1.0 m
W/C : 150 to 200 %
quality control
R
N
A B
W
Dc Vc T where
R N : blade rotation number (N/m2) >50
Pm Pm R : total mixing number (N)
A LH A : improvement area (m2)
3 to 5 m B : improvement width (m)
W : width of trencher (m)
Vc : speed of chain (m/sec)
T : mixing time (sec)
80 to 100 m3 Dc : total distance of chain movement (m)
Pm : pitch of mixing blade (m)
L : improvement length (m)
H : improvement depth (m)
17
Mass stabilization 2015 April 23, 2015
Trencher mixing
18
Mass stabilization 2015 April 23, 2015
Original soil
Original soil
(GL -0.00~-5.00m)
(GL -5.00~-7.00m)
19
Mass stabilization 2015 April 23, 2015
Core sample of stabilized soil
improvement bottom
RQD=98.1%
20
Mass stabilization 2015 April 23, 2015
Properties of stabilized soil
wet density(t/m3) quf/qul
0.75 1.00 1.25 1.50 1.75 2.00 0.01 0.1 1 10 100
0 0
1 1
stabilized soil qul
original soil
quck(0.3qul)
2 2
0.85quck
Depth (m)
Depth (m)
3 3
4 4
5 5
6 6
7 7
COV in wet density: 0.01 COV in qu : 0.33 to 0.40
21
Mass stabilization 2015 April 23, 2015
Quality control and assurance
• monitoring during execution
▫ binder content
▫ position of blade
▫ blade rotation number
• quality assurance
▫ core sampling
▫ wet grab sampling
▫ qu test, needle penetration test
22
Performances of CDM improvements Mass stabilization 2015 April 23, 2015
River embankment
unimproved ground improved ground
block type improvement
as=100%
quck=100 kN/m2
River embankment
block type improvement
as=100%
quck=1,000 kN/m2
Road embankment
grid type improvement
as=50%
quck=200 kN/m2
improved area
23
Mass stabilization 2015 April 23, 2015
slope failure in 2007 earthquake
Earthquake attack in 1995 earthquake
Liquefaction in 1964 earthquake
Tsunami attack in 2011 earthquake
24
Mass stabilization 2015 April 23, 2015
Concluding remarks
• brief explanation of shallow & mid depth mixing
in Japan, purpose, machine, execution, quality
control and assurance
• Cement mix techniques, shallow and mid depth,
are essential in infrastructure development for
mitigating disaster.