& Department of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAU
——
Region Vil
met Region
Document 11S No
‘Company ID No) EMBR7=1213821
Date:
ECC-RO7-1711-0010 .
MR. ARNOLD ESPINOZA
President
ARN Central Waste Management Inc.
Sitio Kainsikan, Barangay Binaliw
Cebu City
Cebu
Subject; ENVIRONMENTAL COMPLIANCE CERTIFICATE (ECC-RO7-1711-0010)
Dear Mr. Espinoza,
‘This refers to the Environmental Compliance Certificate (ECC) amendment application for
the ARN Central Materials Recovery Facility and Sanitary Landfill Expansion Project
located at Sitio Kainsikan, Barangay Binaliw, Cebu City, Province of Cebu, Region 7 which
was covered by ECC-RO7-1711-0010 issued by EMB R7 office on November 4, 2017
original ECC) and amended on June 3, 2020 (1* amendment)
After satisfying the requirements of the said application, this Bureau has decided to grant
an ECC amendment for the abovementioned project
Along with the issuance of this ECC, you are expected to implement the measures
presented in Environmental Impact - Environmental Performance Report and
Management Plan (EIS-EPRMP) document. This is intended to protect and mitigate the
project's adverse impacts on community health, welfare, and the environment.
Environmental considerations shall be incorporated in all phases and aspects of this
project.
‘This Certificate may not be used right nor authorization to implement the
project, therefore, you are hereby reminded to secure all the necessary and relevant
permits from other pertinent Government Agencies prior to project implementation, but
not limited to the enumeration as stated in Annex B
Please be guided accordingly
fun LA iy
MARIBEL B. MUNSAYAC |
Regional Director JR
CERTIFIED TRUE COPY]
. Oh)
{Sean a Ce aa ec ey an panna Ne
Banilad, Mandaue City, Cebu, Philippines, 6014 fae
Tel, Nos. (+6332) 260-9777 Teletax No, 3460426
Website: r7.emb.gov.phEmail:
[email protected]Ss
Ss Department of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAU
—
me Region Vil
—__
ENVIRONMENTAL COMPLIANCE CERTIFICATE
issued tinder Presidential Decree 1586)
ECC-RO7-1711-0010
THIS IS TO CERTIFY THAT THE PROPONENT, ARN Central Waste Management
Ine.. represented by its President, Mr. Arnold Espinoza, is granted this Environmental
Compliance Certificate (ECC) for the ARN Central Materials Recovery Facility and
Sanitary Landfill Expansion Project located in Sitio Kainsikan, Barangay Binaliw, Cebu
City, Province of Cebu, Region VII by the Department of Environment and Natural
Resources (DENR), through the Environmental Management Bureau Region VI
SUBJECT ONLY to the conditions and restrictions set-out in this ECC and in
attached document labeled as Annex A. Recommendations have been provided in Annex
B as guidance to concerned Government Agencies and Local Government Units for
consideration in the decision-making process.
PROJECT
The ECC covers the proposed ARN Central Materials Recovery
Facility and Sanitary Landfill Expansion Project with a total land area
of one hundred seventy four thousand two hundred seventy-two and thirteen
hundredths (174,272.13) square meters (formerly: 104,272.13 square
meters) to be located in Sitio Kainsikan, Barangay Binaliw, Cebu City,
Province of Cebu, Region Vil.
UPDATED PROJECT COMPONENTS
Area
(square meters)
Description
| EXISTTING PROJECT COMPONENTS
4 nk
5. | Engineered Sanitary Landfill pit 1
© | Fuel and water ——
7 | Gute 2 guard house
8 | Leachate Pon
9 | Locker room
1 | Me s Treatment Facility
1 | Motorpool —T. te
1 | Powerhouse (220 V) 50)
1 Powerase 30. t 50S
& Department of Environment and Natural Resources
ae SNRG ATE MANAGEMENT BUREAU
—
L Safety/Security Building 50
‘eatment Plant (STP) 1,000
“Temporary Facies 3,000
Thermal Reduction Unit (TRU) 3.000
1) Waiting sheds - == - 20
1 Weak bay Fac - 50000
2) Weigh Bigs Foclis 50
- Weigh bridge with controlroom 44.52
ADDITIONAL PROJECT COMPONENTS
> Baffer Zone, Tree Planting 5:
2 (composed of three (3) additional lots) _
3) Covered Parking (proposed) with central warehouse (part of 207-00
3 existing area)
68.512.87
The project has a total waste handling of 1,200 metric tons per day
(Category 4 Sanitary Landfill), an annual treatment/processing
capacity of 5 metric tons of medicaVhealth care wastes, and a total
volume capacity of 663 cubic meters for the sewerage treatment plant
as stated in the submitted EIS-EPRMP document.
This ECC is issued in compliance to the requirements of Presidential Decree No.
1586, in accordance to Department Administrative Order No. 2003-30. The Bureau,
however, is not precluded from reevaluating, adding, removing, and correcting any
deficiencies or errors that may be inconsistent with the Revised Procedural Manual of
DAO 2003-30 after issuance of this ECC.
Issued at EMB Region Vil, Banilad, Mandaue City this day of # DEC mez
2022
Recommending Approval
Madero
ENGR. RIZALINA R. SABERON
Chief, Clearance and Permitting Division
HAMIRA, . _OPuRTO
proved Pai oreLER AG UMENT CONTHCSLER
nn de SD
(BEL B
Regional Director
Banilad, Mandaue City, Cebu, Philippines, 601:
| Nos. (+6392) 260-9777 Telefax a e
bsite: r7.emb.gov.phEmail:
[email protected]Sm Oepatnent ot nem nd Naural aes
ENVIRONMENTAL MANAGEMENT EAU
—
“Sm Region Vil
oe 9)
ANNEX A.
1. ENVIRONMENTAL IMPACT AND MANAGEMENT
All commitments, mitigating measures and monitoring requiremems, contained in the
Environmental Impact Statement-Environmental Performance Report and Management
Fu (HIS-EPRMP) document for the ARN Central Materials Recovery Facility and
Sanitary Landfill Expansion Project. particularly inthe Environmental Impact
Management Plan and Environmental Monitoring Plan, including any modifications
soe ditional information as approved by the EMB, shall be instituted to minimize
inv adverse impact of the project to the environment throughout its implementation,
which shall include among others to wit
BOTRBTIAL ~ | RaTING/
eel PERFORMANCE
PROJECT MITIGATING MEASURES ee
ACTIVITY PER
MEASURES
|Site Development/Site Clearing |
Potential siltation of | « Provision of sediment control 100% no
nearby bodies of measures such as sediment traps, siltation of
water due to soil slope stabilization, etc nearby bodies of
erosion water
Degradation of * Provision of (indicate number) | 100% no
nuniace water quality | portalets for construction workers | discharge of
due to domestic
Cantamination from Note: at ieast one (1) portalet for 60 wastewater to
Gomestic wastewater | workers where the number of male nearby bodies of
workers exceeds 500 (as per IRR- water
Industrial Hygiene, PD 856
‘Amending Administrative Order 111
Series of 1991)
Note: at least one (1) portalet for 25
workers where the number of male
workers exceeds 100 (as per IRR-
Industrial Hygiene, PD 856
Amending Administrative Order 11 TRIE cory
i
Series of 1991)
« Provision of septic tank or
wastewater collection system for
workers
« Hauling of wastewater from
portalets/ septic tank by third
contractor with
Banilad, Mandaue City, Cebu, Philippines, 6014
Tel, Nos. (+8332) 260-9777 Telefax No, 3469426 fe
Website: r7.emb.gov.phEmail:
[email protected]RE Department of Environment and Natural Resources
-amm ENVIRONMENTAL MANAGEMENT BUREAU
SS Region vil
licensed permit from LGU and with
valid Discharge Permit for
L wastewater treatment facility
Generation of dust” * Maintain a wet access road 100% no dust
from site preparation —surface/project site by sprinkling generation
water at least twice (2x) a day
| oe during dry season _ |
| Noise pollution from | «Use of mufilers and exhaust 100% Noise
| delivery trucks silene hin standard
| |Generation of noise «Use of mufflers and exhaust
from heavy silencers for construction within standards
equipment equipment
«Provision of appropriate noise
mitigating measures (such as
construction of fences, enclosure of
stationary work areas and
equipment, maintenance of
equipment, ete.) whenever
applicable a
Generation of spoils. | Excavated materials shall be properly | 100% no spoil
(including excavated | stockpiled and properly disposed or | materials will be
soils) reused. Excess soil materials shall _left unattended
not be deposited along areas and no mud/dirt
traversed by runoff and away from —_ will be
! waterways and valuable crops. The transferred in
| proponent shall identify stockpile the road
sites (with geographical coordinates)
Spoil materials will be hauled b
third party hauler with approved
permit/clearance from LGU or the
proponent should identify disposal
sites (with geographical coordinates) |
‘Trucks shalll be thoroughly washed
before leaving the project site to avoi
| the transfer of mud /dirt in the road
SHAMIRA ‘TL. OBORTO
Use of spoils as fill materials in lowed aDMINOFTI Ronen ONTROLLEY
100%
construction debris in compliance to collected /hauled |
‘© Segregation and collection of
Generation of RA 9003,
construction debris construction
Hauling of construction debris by | debris
______3" party hauler -
1d, Mandaue City, Cebu, Philippines, 6014
(08. (6332) 260-9777 Telefax No, 3469426 es
Website: r7.emb.gov.phEmail:
[email protected]S
8S Department of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAU
Region Vil
eee Regi
* Provision of storage for hazardous | 100%
Generation of used
oil, paint, batteries, Wastes with proper labelling compliance to
ndother haardos ° Collection of hazardous wastes by | RA 6969
DENR accredited 3° party hauler and
materials
treater
Generation of § * Provision and maintenance of 100%
wastes Materials Recovery Facility compliance with
* Implement recovery re-use and RA 9003
recycling of waste materials
‘+ Provide receptacles / bins for solid
wastes,
_* Composting of Organic Wastes _
Contamination of Provision of adequate Wastewater 100%
surface water from Treatment Facility (Sewage Treatment conformance to
domestic wastewater Plant) to treat’ the — collected effluent
wastewater, whichever is applicable: | standards
Hygienic septic tank (for 212
occupants or less ~ DILG MC 2019
62) with regular desludging by |
third party contractor (the
contractor must have a valid
discharge permit of its treatment |
facility). |
Wastewater treatment facility (for |
more than 212 occupants ~ DILG |
MC 2019-62)
Note: For 98L per person per day water
consumption; 80% will become |
wastewater — hence for 300 persons; at,
least 23.52 cubic meter per day WTF
capacity shall be installed and
—joperated - 2 eect
Noise pollution due). yg
‘SHAMI
‘ONIN OFFIUER/ DOCUMENT CONT HY 2?
po aD
OATE:
to operation of heavy ed re See renee within standard |
equipment during
silviremaval * All workers must be equipped with
oll —
Generation of + Monitoring of the following 100%
effluents due to significant effluent quality | compliance with
wastewater parameters: | DENR effluent
| generation | standards (RA
nes ____ 9275)
Banilad, Mandaue City, Cebu, Philippines, 6014
Tel. Nos, (+6392) 260-9777 Telefax No, 3460426
Website: r7.emb.gov.phEmail: r™@emb.gov.phSs
8S Department of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAU
“Region Vil
—
@ Total Suspended Solids 2016-08 and
@ pH DAO 2021-19)
@ Oiland Grease
@ Fecal/Total Col
form
U1, UPDATED ECC CONDITIONS
This amended ECC shall supersede the old ECC conditions set forth in
ECC-RO7-1711-0010 issued on November 4, 2017 (original ECC) and
amended on June 3, 2020 (1st amendment);
2. The proponent shall strictly comply with the commitments, mitigating
neasures and moni requirements, especially those contained in the
Environmental Impact Statement - Environmental Performance Report and
Management Plan (EIS-EPRMP), particularly in the Environmental
Management and Monitoring Plan (EMMoP), to minimize any adverse impact
to the environment throughout the project implementation as indicated in
Annex A:
The proponent shall ensure that discharges/effluents comply with the
DENR standards and with all the provisions of RA 9275, the Philippine
Clean Water Act of 2004 and its Implementing Rules and Regulations at
all time:
There shall be no disposal of leachate and other untreated wastewater to
the nearest waterbody, and proponent must ensure that there will be no
leaking of leachate or wastewater that would lead to possible
contamination of the underground water table or aquifer. A regular
monitoring should be conducted;
5. The proponent shall install and maintain air pollution control devices to
minimize dust and gas emissions from different sources. Likewise, the
proponent shall ensure that emissions at all times comply with the DENR
standards and with all the provisions of RA 8749, the Philippine Clean
Air Act of 1999 and its Implementing Rules and Regulations;
©. The proponent shall install, operate, and maintain collection, handling,
treatment, storage and disposal facilities or any system serving different
sources of hazardous waste. The system shall be properly operated to
ensure compliance with all the provisions of RA 6969, the Toxic
Substances and Hazardous and Nuclear Wastes Control Act of 1990 and
its Implementing Rules and Regulations;
7. The proponent shall ensure compliance with all the provisions of RA
9003, the Ecological Solid Waste Management Act of 2000 and its
Implementing Rules and Regulations, such as but not li
Banilad, Mandaue City, Cebu, Philippines, 6
Tel. Nos. (+6332) 260-9777 Telefax No. 34694;
Website: r7.emb.gov.phEmail:
[email protected]]
“tPoRra
ct PEROT ‘CONTROLLEP.
DATE? eeMn.
I ce creme eimai
ENVIRONMENTAL MANAGEMENT BUREAU
—=
SS Region vil
—"
installation of Materials Recovery Facility (MRF), implementation of
recycling, composting, and segregation at source;
8. Conduct an effective Information, Education and Communication (IEC)
Program to inform and educate all stakeholders, especially its contractors,
workers, and local residents about the mitigating measures embodied in its
EIS-EPRMP, the conditions stipulated in this Certificate and the
environmental and human safety features of the project for greater awareness,
understanding and sustained acceptance of the project. The program shall be
submitted once to EMB Regional Office prior to project implementation;
9, Implement a Comprehensive Social Development Program (SDP) on an annual
basis and submit a separate report with the 2nd semester Compliance
Monitoring Report (CMR) to the concerned EMB Regional Office;
10, Establish a reforestation program in collaboration with the DENR-
PENRO/CENRO using endemic/indigenous species to mitigate greenhouse
gas (GHG) emissions of the project in line with the DENR's thrust for GHG
emissions reduction programs and National Greening Program. The Proponent
shall establish a nursery for the 43,868 seedling production, planting,
maintenance and protection in support to the Green Philippines Master Plan
which will be utilized for tree planting activities. The Proponent shall likewise
submit an approved work and financial program (WFP) for the tree planting
activities after one (1) month from the receipt of the ECC as well as an affidavit,
of execution by the Proponent for the tree planting activities. The timeline shall
also be indicated in the WFP. However, if tree planting activities will be
conducted by a 3rd party organization, the Proponent shall submit copy of the
MOA between the Proponent and the 3rd party organization.
11, The proponent shall establish an adequate rainwater harvesting/cistern
storage tank upon project implementation as an additional measure in water
resources management. The rainwater collected shall be utilized for flushing
toilets, landscaping, and other recycling initiatives to prevent storm run-off
water from directly overflowing to nearby areas or road networks;
12, The proponent shall designate a Pollution Control Officer (PCO) and secure
accreditation at the EMB Regional Office within six (6) months from the
issuance of this ECC who shall take charge on the environmental concerns of
the project:
13, Emergency Preparedness, Contingency Plan and Preventive Maintenance to
address possible case of oil spills, exp a anmental
to this
L.
A,
seems ONIN DRBICER/ OUCLENT CONTROLLED
Banilad, Mandaue City, Cebu eo
Tel. Nos, (+6332) 260-9777 Telefax No. 3469426 oe
Website: r7.emb.gov.phEmail: ™@emb.gov.ph{ VIP
"amen ENVIRONMENTAL MANAGEMENT BUREAU
14
‘The proponent shall ensure that the tenurial instrument and/or proof of
authority over the project area are valid prior project implementation.
Any complaint and issue arising from the ownership or right over the
area/s covered shall be resolved by the Proponent with the appropriate
concerned Government Agency/Entity (e.g. DENR 7 for Tenurial
Instruments such as FLA, MLA, SLUP, SAPA, etc., affected LGUs, Registry
of Deeds, Judicial Courts, etc.). No development shall be done without an
approved tenurial instrument or any valid proof of authority over the
area;
The Proponent shall ensure that the nature of the project is compatible
to the approved Comprehensive Land Use Plan (CLUP) of the LGU. Hence,
any inconsistency or issue in the said compatibility shall be resolved
prior project implementation by the Proponent with the concerned LGU;
Any inconsistency or misrepresentation of data, information, plans, proof
of authority, land use compatibility, or any supporting documents in the
submitted ECC application in comparison with the actual
implementation as determined by this Office shall be a ground for the
suspension of this ECC and/or other legal sanctions;
Creation of an Environmental Unit (EU) (e.g, ng Head, Pollution Control
Officer (PCO), Safety Officer, ete.) that competently handle the
environment-related aspects of the project shall be established before project
implementation, In addition to the monitoring requirements as specified in the
Environmental Management Plan/ Environmental Monitoring Plan, the EU
have the following responsibilities:
Monitor actual project impacts vis-a-vis the predicted impacts and
management measures in the [EEC
15.2 Recommend revisions to the EMP/EMoP, whenever necessary subject to
the approval of EMB RO;
15.3 Ensure that data gathered during monitoring activities are properly
documented, assessed, evaluated and reported to EMB in accordance
with the standard formats; and
5.4 Ensure that monitoring and submissions of reports (such as but not
limited to semi-annual Compliance Monitoring Report, quarterly Self-
Monitoring Report, etc.) to EMB are carried out as required:
15. A billboard containing this message: “Notice to the Public, This project
of with geographic coordinates of
Latitude and Longitude has been issued an
Environmental Compliance Certificate (ECC Number) by the
Environmental Management Bureau of the Department of Environment
and Natural Resources, Region VII" shall be installed at a
conspicuous/visible area to inform the general public before proje
implementation and shall be posted all throughout the project operation. The
Banilad, Mandave City, Cebu, Philippins
Tel. Nos. (+6332) 260-9777 Telefax No.
lebsite: r7.emb.gov.phEmail: [email protected](5 PBd ovrreettrcnrn neste
ENVIRONMENTAL MANAGEMENT BUREAU
———
Re vit
SS Fesion
19.
21
25,
26.
‘ovide copies of this approved ECC to the following
to wit: DENR-MGB7, DENR7-PENRO, DENR7-CENRO,
atural Resources
Proponent shall
government agenci
DENR7-LMB, Provincial Government - Environment and
Division, DOLE 7, DOH 7, Barangays, and concerned LG!
‘That the proponent shall ensure that whatever is declared in the attached
Site Development Plan (SDP) will be followed and implemented, especially
the prescribed Wastewater Treatment Facility, Materials Recovery
Facility, Rainwater Tank, etc. In case of change in engineering designs,
the proponent shall apply an amendment of the ECC based on the final
and approved engineering designs prior to project implementation;
The Proponent shall allow entry of EMB-7 field personnel into the project site
at all times to conduct monitoring and to validate project’s compliance to the
ECC conditions stipulated therein;
‘The proponent shall submit an Abandonment Plan to the EMB Regional Office
at least six (6) months prior to project abandonment. The plan shall include
rehabilitation measures/clean-up, remediation of areas affected by the project
and proposed alternative projects in the area.
2. The proponent shall ensure that their clients (LGUs and private firms) will
strictly implement that all garbage trucks loaded with municipal waste should
be covered at all times while plying on the road heading to the sanitary landIill
Likewise, no spillage and leakage of leachate from waste during transit;
An adequate buffer zone surrounding the sanitary landfill shall be established.
The same shall be planted with fragrant tree/shrub species to reduce the
impact of potential odor nuisance;
.The proponent shall conduct regular spraying of environment-friendly
substances to reduce the impact of potential odor nuisance and proliferation
of flies and other insects;
The proponent shall strictly observe the prescribe Acceptance criteria in
allowing the disposal of solid, medical/healthcare, and temporary storage of
household hazardous wastes in the project site;
‘The proponent shall strictly implement soil stabilization measures of the
disturbed elevated areas to avoid soil erosion and siltation to the low-laying
areas,
powiarr ek! oagpeep COWTPOLLEP
ee
Banilad, Mandaue City, Cebu, Philippines, 6014
Tel. Nos. (+6332) 260-9777 Telefax No. 3469426
Website: r7.emb.gov.phEmail [email protected]Fommen ENVIRONMENTAL MANAGEMENT BUREAU
— een
m1.
30
31
33.
RESTRICTIONS
The Proponent shall cater to municipal wastes and accept only pre-
treated infectious hospital and medical wastes to be disposed of ina
separate in the sanitary landfill;
‘The proponent shall provide at least three (3) meters as easement from
water bodies in urban areas, twenty (20) meters in agricultural areas, and
forty (40) meters in forest areas in compliance to the Water Code of the
Philippines;
If the project is not implemented for five (5) years from the date of ECC
issuance, the same is deemed expired unless the proponent has regularly
submitted the Compliance Monitoring Reports (CMR) pursuant to Section 4.g,
of EMB MC 2014-005. The reckoning date of project implementation is the
date of groundbreaking, based on the Proponent's work plan as submitted to
EMB.
‘The proponent shall coordinate with other concerned Government
Agencies in the management of the project and shall implement only
after securing all the necessary and relevant permits from other pertinent
Government Agencies;
Land clearing shall be limited to the project area. Any destruction of
adjacent properties related to the Proponent’s construction and
operation shall be rehabilitated and affected parties shall be duly
compensated;
No cutting down of trees during project implementation, however, when
clearing an area is unavoidable, the proponent should comply with the
pertinent provisions of Presidential Decree (PD) 705, Executive Order
(EO) 23, and other existing forestry laws. Replacement of trees shall
follow the following ratio: 50 trees for one (1) planted tree cut and 100
trees for one (1) naturally growing tree cut. Proponent shall submit a Work
and Financial Program (WFP) within one (1) month from the
implementation of the project to the EMB Regional Office:
The Proponent shall not commercialize nor illicitly dispose outside the
project site any quarried material resulting from clearing and
development of the project. Otherwise, a separate ECC/ECC amendment
will have to be applied for quarry activities;
‘The Proponent shall only acquire
sources with an ECC and valid perth
CERTIFE ee UE COPY)
TGA, GRTO
DN OFFICER/DOCLMINT CONTROLLER RS
Lisi inn ord?
Banilad, Mandaue City, 4
Tel Nos. (+6332) 260-67)
ite: r7.emb.gov.phEmail: 7™@emb.gov.phDepartment of Environment and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAU
Region Vil
\\p
35, The allocated open space of the project area shall be solely for parking and
parks and shall be designated strictly as non-buildable zone,
36. No other activities shall be undertaken other than what was stipulated in the
S-EPRMP document. Any expansion or modification of the project beyond
the project description or any change in the activity shall be subject to a new
BIA study; and
37.In case of transfer of ownership of this project, these same conditions and
restrictions for which written notification must be made by herein grantee to
EMB within fifteen (15) working days from such transfer.
Pursuant to Section 9.0 of P.D. 1586, non-compliance with any of the provisions of this ECC shall |
hie sufficient cause for its cancellation or suspension and/or imposition of a fine in an amount wot
to exceed Fifty Thousand Pesos (PlP30,000.00) thereof.
CERTIFIED TRUE COPY
ADMINGFFILS
= Banilad, Mandaue City, Cebu, Philippines, 6014
Tel. Nos. (+6332) 260-8777 Telefax No. 3469426
Website: r7.emb.gov.phEmail: 7™@emb.gov.ph=
ENVIRONMENTAL MANAGEMENT BUREAU
———
— a
PROJECT ASSESSMENT PLANNING TOOL
For the assistance and guidance of the Proponent and Government agencies
concerned in the management of the Project and for better coordination in
mitigation of the impacts of the Project on its surrounding areas and the
environment, the following recommendations are forwarded to the parties and
authorities concerned for appropriate action,
Environmental Planning Recommendations and Regulatory
Requirements for the Proponent
Local Government Unit (LGU)
1. The proponent shal
give priority employment to qualified local residents, Adequate
public information for jobs available to local residents in the affected areas shall
be provided
2. The proponent shall comply with the Building Code and Sanitation Code of the
Philippines
3. The proponent shall coordinate with the concerned LGU for the implementation of
Solid Waste Management Plan
4. The proponent shall implement the emergency response plan and disaster
preparedness program in case of emergencies
DENR-Forest Management Bureau (FMB)
5. The proponent shall secure tree cutting permit if anv
©. The Proponent shail re @ Certification on Land Classification Status for the
entire project area prior to project implementation.
7. The Proponent shall apply the appropriate tenurial instr
DOLE ~ Bureau of Working Condition
8. The propor
BFP ~ Bureau of Fire Protection
ent for the jetty area
‘9. ‘The proponent shall comply with the fire safety protection requirements ofthe Fire
Code of the Philippines saa =
MGB- Mines and Geescienc
For the dissemination and proper action of the agencies congémned.
/
(Mehinw es
ENGR. RIZALINA R. SABERON |ARIBEL B. MUNSAYAC
Chief || Regional Director
Clearance and Permitting Division
\