SUBMITTED TO
ANDHRA PRADESH POLLUTION CONTROL BOARD,
REGIONAL OFFICE, SRIKAKULAM
NACL INDUSTRIES LIMITED
SY.NO.177, ARINAMA AKKIVALASA VILLAGE,
ETCHERLA MANDAL, SRIKAKULAM DISTRICT,
ANDHRA PRADESH
SUBMITTED TO
ANDHRA PRADESH POLLUTION CONTROL BOARD,
REGIONAL OFFICE, SRIKAKULAM
Contents
CONTENTS
Section Description Page
No.
1.0 Introduction of the Project 1-1
1.1 Product Profile 1-3
1.2 Technology 1-6
1.3 Plant Location & Layout 1-6
1.31 Purpose of the Report 1-7
1.4 Plant Layout 1-7
1.5 Scope of EIA Studies 1-12
List of Tables
Section Description Page No.
List of Figures
Section Description Page No.
1.0 INTRODUCTION
M/s. NACL Industries Limited (formerly known as Nagarjuna Agrichem Ltd) obtained
environment clearance vide letter no. F.No. J-11011/75/2007-IA II (I) dated 30.07.2007
to manufacture agrochemicals. The unit had renewed consent for operation vide order
No. APPCB/VSP/VZN/53/CFO/HO/2021 dated 12.03.2021 valid till 28.02.2025. It is
proposed to increase the manufacturing capacity of agrochemicals from 30 TPD to 70.1
TPD and also include Captive Co-generation Power Plant of 6 MW in existing site area
of 100 acres. The capital cost for proposed expansion is Rs. 65 crores, towards
additional facilities utilities and enhancement of zero liquid discharge facility.
M/s. NACL Industries Limited. is conscious of its responsibility towards the society in
minimizing the pollution load due to the proposed expansion and accordingly decided
to carry out the Environmental Impact Assessment to identify the negative and positive
impacts due to the project, and to delineate effective measures to control and mitigate
the environmental pollution. M/s. NACL Industries Limited. has appointed Team
Labs and Consultants for the preparation of Environmental Impact Assessment report.
Field team of M/s. Team Labs and Consultants worked in the study area during
October to December 2020 and base line data for various environmental components
i.e., air, water, soil, noise and flora and fauna and socio economic status of people was
collected in a circular area of 10 km radius by taking the industry site as the center
point, to assess the existing environmental status as per the guidelines specified by
Ministry of Environment, Forest and Climate Change (MoEFCC), Government of India.
This report presents the results of environmental impact assessment study along with
the environmental management plan, necessary to avoid or mitigate the observed
environmental impacts due to the proposed synthetic organic chemicals manufacturing
unit.
Agrochemicals Formulations
S.No Name of Product Unit Capacity
1 Granules MT/year 20000
2 Liquids Kl/Year 25000
3 Powders MT/year 5000
Total 50000 50000
1.2 Technology
The technology for the product profile is indigenous based on organic chemistry. The
facility shall have required infrastructure to manufacture multiple products. The
product profile has been finalized based on the market demand and the technology
compatibility. The synthesis involves reaction of chemicals in a solvent medium,
followed by separation, purification and drying.
Fig 1.1 Location of NACL Industries Limited (Terms of Reference No. 4(ii))
Fig 1.2 Plant Layout of NACL Industries Limited (Terms of Reference No. 4(vi) & (viii)
EIA study involves three basic components, viz. identification, prediction and
evaluation of impacts. The brief scope of EIA study incorporating the Standard terms of
reference (TOR) obtained from MoEFCC is as follows:
• Base line data generation and characterization of air, water, soil, noise and
vegetation in the ten kilometer radius area (impact zone) over a period of Three
months.
• A thorough study of the process including provisions for pollution control, and
environmental management that includes prediction of impacts and relevant
mathematical modeling.
2.0 Introduction
M/s. NACL Industries Limited (formerly known as Nagarjuna Agrichem Ltd) obtained
environment clearance vide letter no. F.No. J-11011/75/2007-IA II (I) dated 30.07.2007
to manufacture agrochemicals. The unit had renewed consent for operation vide order
No. APPCB/VSP/VZN/53/CFO/HO/2021 dated 12.03.2021 valid till 28.02.2025. It is
proposed to increase the manufacturing capacity of agrochemicals from 30 TPD to 70.1
TPD and also include Captive Co-generation Power Plant of 6 MW in existing site area
of 100 acres. The capital cost for proposed expansion is Rs. 65 crores, towards
additional utilities and enhancement of zero liquid discharge facility. The
manufacturing capacity of permitted and proposed products and by products is
presented in Table 2.1, Table 2.2 & Table 2.3.
Table 2.1 Manufacturing Capacity – Permitted
S. Name of Capacity (TPD)
No Product Group Group Group Group Group Group Group Group
1 2 3 4 5 6 7 8
1 Profenofos 9.5 6 5.5 7.5 9 5 15.5 15
2 Propiconazole 2 3.5 3 1 1 0.5
Bromoketal
Intermediate)
3 Tricyclazole 1 2.5 2 1 1 0.5
4 Myclobutanil 0.3 0.3 0.3 0.3 0.3 0.1
5 Pretilachlor 4.3 4.7 6.5 4 6 5
6 Thifluzamide 0.5 0.1 0.5 0.4 0.5 0.6 0.5 0.65
7 Flucarbazone 0.55 0.2 0.185 0.7 0.4 0.6
Sodium
8 Tebuconazole/ 0.25 0.2 0.1 0.2 0.75
Oxirane
(Intermediate)
9 Hexaconazole 0.1 0.2 0.1 0.1
10 Difenthiuron 0.1 0.2 0.1 0.1
11 Imidacloprid 0.1 0.1 0.1 0.1 0.1
12 Epoxiconazole 0.1 0.5 0.1 0.1 0.1
13 Cyproconazole 0.5 0.1 0.1 0.1 0.1
14 Omethoate 0.5 0.7 0.6 0.7 0.8 0.4
15 Metribuzin 0.3 0.5 0.5 0.5 0.1 0.2
chemicals are presently sold by few leading multinationals. Dosages per acre of these
chemicals are very low compared to conventional crop protection chemicals and are
relatively less toxic. Solubility of these chemicals in water is negligible because of which
water sources will not get contaminated after application in the field. However, these
chemicals are very expensive because of which our formers are still depending on
conventional agrochemicals which are highly toxic and are likely to cause
contamination of water sources. Manufacture of this class of crop protection chemicals
in our country at affordable prices in our country will encourage formers to switch over
to enviro friendly crop protection chemicals.
2.2 Utilities
The proposed expansion requires additional steam for process, ZLD system and solvent
recovery system. It is proposed to establish coal fired boilers of capacity 1 x 50 TPH coal
fired boiler in addition to existing 1 x 16 TPH, 1 x 10 TPH coal fired and 1 x 6 TPH oil
fired boilers. It is proposed keep existing boiler as standby after establishment of
proposed 1 x 50 TPH boiler. It is proposed to establish 1 x 10 lakh k.cal/hr and 1 x 6
lakh k.cal/hr thermic fluid heaters as part of expansion. The total power requirement is
estimated to be 4.0 MW. The DG sets required for emergency power during load shut
down is estimated at 2 x 2000 kVA proposed in addition to existing 1 x 1000 kVA and 2
x 500 kVA. The list of utilities is presented in Table 2.4.
Table 2.4 List of Utilities
S.No Utility Existing Proposed After
expansion
1 Coal Fired Boilers (TPH) 1 x 16 1 x 50, 1 x 50,
1 x 10 1 x 16 *
1 x 10 *
2 Furnace oil boiler (TPH) 1x6 -- 1x6*
3 Thermic Fluid Heaters (K.cal/hr ) 1 x 10 Lakh 1 x 10 Lakh
1 x 6 Lakh 1 x 6 Lakh
4 DG Sets (kVA)# 1 x 1000, 2 x 2000 2 x 2000
2 x 500 1 x 1000
2 x 500
* Standby after expansion #DG sets will be used during load shut down by Transco.
total effluent generated and mode of treatment is presented in Table 2.6. The compiled
characteristics of process effluents for each product are presented in Table 2.7.
Table 2.6 Total Effluent Generated and Mode of Treatment
Description Quantity (KLD) Mode of Treatment
Permitted After
Expansion
HTDS Effluents
Process 75 265 Sent to Stripper followed by MEE and
Scrubber Effluent 35 95 ATFD. Stripper Condensate sent to
Raw water pre- 120 Cement Plants for Co-Incineration. MEE
treatment rejects and ATFD Condensate sent to Biological
treatment plant followed by RO. RO
rejects sent to MEE and permeate is
reused in cooling towers make-up,
washings, scrubbers and process
Total I 110 480
LTDS Effluents
Washings 70 Sent to Biological Treatment System
Process – LTDS 40.5 followed by RO. RO permeate reused for
Boiler Blow downs 36 cooling tower makeup. RO rejects sent to
Contaminated steam 426 MEE and permeate is reused in cooling
from boiler 184 towers make-up, washings, scrubbers and
Cooling Tower Blow 300 process.
downs
Domestic 25 60
Total II 249.5 892
Grand Total (I+II) 359.5 1372
Table 2.7 Process Effluents Quantity and Quality – Product Wise after Expansion
S. Product Name Quantity (Kg/Day) Conc. (mg/l)
No Water TDS COD Total TDS COD
Input Effluent
1 Cloquintocet Mexyl 1500 1039.2 2592.8 400813
2 Triazinone / 3236 2100 1546.8 6625 316981 233479
Thiocarbohydrazide/ Dichloro
Pinacolone /Pinacolone
4 Profenofos 1500 739.1 159.1 2599.6 284301 61214
6 Fipronil 4840 799.6 10.1 5845.2 136789 1724
7 Imidachloprid 2500 701 3347.8 209378
9 Lambda Cyhalothirin 1400 2381 3961 601111
11 Cypermethrin 1235 140.4 1375.4 102066
12 Carbendazim 4595 860.2 5455.2 157691
cooling towers, contaminated steam from MEE, washings and domestic activity are
considered as Low COD/TDS stream.
The treated effluents after biological treatment are subjected to tertiary treatment in a
reverse osmosis (double RO) system. Permeate from RO is reused for process,
washings, scrubber and cooling towers make-up while rejects are sent to MEE followed
by ATFD. Sludge from various units of Biological treatment is thickened in sludge
handling system and sent to TSDF. Schematic diagram of effluent treatment system is
presented in Fig 2.4. Details of treatment facilities are presented in Table 2.8. The
effluent treatment system shall be developed in modules for ease of operation.
Technical specifications of proposed effluent treatment system are presented in Table
2.9.
procedure, while hydrogen gas is let out into atmosphere through a water column. The
quantity of process emissions is presented in Table 2.13. Technical Specifications of two
stage scrubber is presented in Table 2.14.
Table 2.13 Quantity and Mode of Treatment of Process Emissions – after expansion
S.No Product Name Name of Gas Quantity Mode of Treatment
(Kg/day)
1 2, 3 Dichloro Pyridine Hydrogen Chloride 570.6 To Scrubber
2 Profenofos Hydrogen bromide 216.7 To Scrubber
3 Imidacloprid Hydrogen Chloride 285.5 To Scrubber
4 Bifenthrin Hydrogen Chloride 86.2 To Scrubber
5 Diafenthiuron Ammonia 44.2 To Scrubber
6 Propiconazole Hydrogen bromide 269 To Scrubber
7 Tricylazole Ammonia 89.9 To Scrubber
8 Thifluzamide Hydrogen Chloride 318.8 To Scrubber
Sulfur dioxide 121.2 To Scrubber
Chlorine 82.2 To Scrubber
9 Hexaconazole Hydrogen Chloride 116.2 To Scrubber
10 Difenoconazole Hydrogen Chloride 89.7 To Scrubber
11 Epoxiconazole Hydrogen Chloride 201.0 To Scrubber
12 Pendimethalin Sulphuric Acid 348.7 To Scrubber
13 Quizalofop-P-Ethyl Hydrogen Chloride 97.9 To Scrubber
14 Clethodim technical Hydrogen Chloride 101.4 To Scrubber
15 S-Metolachlor Carbon dioxide 155.0 Let into atmosphere
Technical safely
Hydrogen 0.3 Let into atmosphere
safely through water
column
passed through condensers, which mitigate odor. Vent condensers in series to reactors,
distillation columns, driers and centrifuge etc. are provided to mitigate VOC emissions
release. Other vents are connected to common headers and scrubbers. The transfer
pumps shall be provided with double mechanical seals. The transfer of solvents will be
mainly by closed pipeline systems, while drum transfer is by using air operated
diaphragm pumps in closed hoods. The charging of solid raw materials shall be by
powder transfer system to avoid dust emissions, safety and hazard of static electricity.
Safety relief valves rupture disc, Breather provided to reactors, thermal insulation, vent
condenser and nitrogen blanketing provide for bulk storage tanks. Thermal insulation
and condensers will be provided for storage tanks of low boiling point solvents. The
reactor or solvent storage tank vents when not use shall be kept closed.
Odour is caused mainly by diffuse and fugitive emissions of low boiling organic
chemicals/ compounds releasing volatile organic compounds. The above-mentioned
measures for mitigation and control of diffuse and fugitive emissions shall reduce release
of VOC’s into atmosphere and the resultant odour
Solid wastes are generated from process, solvent distillation, wastewater treatment and
utilities. Process residue contains mainly unreacted raw materials and byproducts.
These are collected from the reactors and other process equipment and stored in drums.
Solvent residue is generated from distillation units, the residues are tarry substances
with good calorific value, and are stored in drums. The other major waste is salts from
multiple effect evaporator and agitated thin film dryer section of effluent treatment
system. These salts are stored in HDPE lined bags. All solid waste storage
containers/drums/bags are labeled showing the source, nature of hazard and type of
wastes. All the hazardous wastes are stored in a closed shed with fire safety measures,
and the shed is provided with a leachate collection facility connected to effluent
conveyance lines. The stripper distillate, process residue and solvent residue are sent to
cement plants for co-incineration based on acceptability. If these wastes are not suitable
for co-incineration, the same is sent to TSDF facility. Mixed solvents shall be sent to
authorized recyclers /cement plant for co-incineration while spent solvents are
recovered within plant premises. The evaporation salts are sent to TSDF. Filter media,
activated carbon and catalysts are sent to TSDF. Waste oil and used batteries from the
DG sets are sent to authorized recyclers. The sludge from effluent treatment plant is
considered hazardous and the same is sent to TSDF. The other solid wastes expected
from the unit are containers, empty drums which are returned to the product seller or
sold to authorize buyers after detoxification. The process wastes are compiled for each
product wise is presented in Table 2.16. Thequantity of solid waste generated in the
plant and the disposal practice is presented in Table 2.17.
Propargyl
36 Bispyribec Sodium 683.7 969.3 1652.9
37 Bensulfuron Methyl 142.9 95.4 238.3
38 Glufosinate 155.8 1982.3 135 290.8
Ammonium
39 Quizalofop-p-ethyl 0.0
40 Tribenuron Methyl 621.8 54.4 676.1
41 Clethodim 337.9 53.0 390.9
42 Pinoxsulam 21.2 49.5 70.7
43 S-Metolachlor 43.1 39.0 40 82.1
44 Verbinone 111.1 337.8 448.9
45 (Z)-hezatec – 11-en-1- 1520 709.2 100 2329.2
yl
46 (Z)-hezatec – 9-enal 2170 1232.2 140 3542.2
47 (8E,10E) – Dodoca-8, 1100 369.8 1469.8
10-dyen-1-ol
48 7Z,11Z hexadeca 3.2 0.3 0.1 3.3
dienyl acetate
49 7E, 9Z dodoca dienyl 558.7 26.3 584.9
acetate
50 8Z Dodecinyl acetate 104.8 28.7 7.0 140.5
51 (Z)-Octadeca – 13 – 1.3 0.3 0.1 1.6
enyl acetate
Total 13491.6 22266.3 8498.3 162.0 633.6 247.1 22399.0
3.1 Introduction
Impact is defined as difference between what would happen with action and
without. Hence the baseline data is an integral aspect of Environmental Impact
Assessment Report to establish what is happening without the project, by conducting
a baseline data study. Baseline data reflects present status of environment before
initiation of any activity of the proposed expansion project. Baseline data facilitates
impact assessment as the effects of the proposed expansion are superimposed on
baseline data. The study was conducted in the impact area; 10 km radius area
surrounding the project site, during October – December, 2020. Studies were
undertaken to generate baseline data of Micrometeorology, Ambient air quality
(AAQ), water quality, noise levels, flora and fauna, land use, soil quality and socio-
economic status of the community were collected.
3.2.1 Physiography
Sailent features of the Project are presented in Table 3.1.
Description Remarks
Name of the Project Expansion of Arochemicals manufacturing capacity
and inclusion of bio-based agrochemicals and
Captive Co-generation Power Plant
Location of the Project Sy No: 177. Arinama Akkivalasa Etcherla Mandal,
Srikakulam, Andhra Pradesh
Project / Activity 5 (b) – Agrochemicals Manufacturing Unit
Category (A/B1/B2) A
New / Expansion / Modernization Expansion
Product Agrochemicals Manufacturing Unit
Capital Cost, Rs.65 crores
Land Use Pattern (Forest, Grazing, Private Land – 100 acres
Agricultural, Barren etc.)
Latitudes (North) 18°16'14.29"N – 18°16'32.64"N
Description Remarks
Longitudes (East) 83°47'17.64"E - 83°47'48.99"E
Survey of India sheet No 65 N/15
Elevation above Mean Sea Level 52-60 m
(AMSL), m
Seismic zone Seismic Zone: II as per IS: 1893 (part -1): 2002 and
can be classified as Least Active seismic Zone
Site surroundings North : Connect road
East : Open lands
West : Open lands
South : Open lands
Nearest Village Kesavadasupeta village – 0.3 km – NW direction
Accessibility to site Road connecting – North direction
Road access Chilakapalem to Lolugu road - 0.3 km - NE
direction, NH 5 road – 0.6 km – SE.
Nearest Town Srikakulam – 10.6 km – NE direction
District Head quarters Srikakulam – 10.6 km – NE direction
Nearest Railway station Ponduru – 10.5 km – N direction
Nearest airport Visakhapatnam Airport – 85 km – SW direction
Major Industries Nil within 10 km
Water Bodies Seasonal Pedda Gedda stream 4.2 KM - SW
Seasonal Chitti Gedda stream 4.7 km - SW
The Project / Activity attracts the Not Applicable
provisions of CRZ
Reserve Forest Nil within 10 km
Inter-state boundary and Nil within 10 km
international boundary
Protected Areas notified under the Nil within 10 km
Wild Life (Protection) Act, 1972
Eco-sensitive areas as notified under Nil within 10 km
section 3 of the E (P) Act, 1986
Critically polluted areas as identified Nil within 10 km
by the Central Pollution Control
Board from time to time
The site photographs are presented in Figures 3.1. The base map of the study area is
presented in Figure 3.2.
Figure 3.1 Site and Plant Photographs (Terms of Reference No. 4(vii))
3.2.4 Soils
Soil may be defined as a thin layer of earth’s crust that serves as a natural medium
for the growth of plants. It is the unconsolidated mineral matter that has been
subjected to and influenced by genetic and environmental factors such as parent
materials, climate, organisms and physico-chemical action of wind, water and
sunlight, all acting over a period of time. Soil differs from the parent materials in
the morphological, physical, chemical and biological properties. Also, soil differs
among them in some or all the genetic or environmental factors, therefore, some
soils are yellow, some are black, and some are coarse textured. Soil functions as a
reservoir of nutrients for plants and crop providing mechanical anchorage and
favorable tilth, facilitating food and biomass production. The other functions of
soil include controlling and regulating interaction of water flow and quality,
facilitating carbon sequestration, providing habitat, preserving cultural heritage,
providing platform for buildings and roads in addition to providing raw materials
by way of minerals, building stones, gravel etc.
Soil analysis for various indicators reflecting various soil functions is proposed as
part of baseline data collection. The Soil characteristics include both physical and
chemical parameters reflecting various soil functions ranging from biodiversity,
production, water and solute flow, nutrient cycling, filtering and buffering, and
structural support. M/s. Team Labs and Consultants field team carried out soil
survey to assess the soil characteristics of the study area. The land use and land
cover map of the study area is shown in Figure 3.5. It may be noted that the land
use land cover map reflects predominant agriculture nature of the impact area,
and also its dependence on tanks for irrigation. Representative soil sampling was
done at several important locations and these locations are shown in Figure 3.6.
Analytical data of soil samples is presented in Table 3.3.
Figure 3.5 Land Use and Land Cover of the study area (Terms of Reference No. 4(ix))
The test results of soil samples collected in the impact area are interpreted
referring to the book; “Interpreting soil test results” by Pam Hazelton and Brian
Murphy. The reference tables are presented in Table 3.4. The pH of soil samples
ranges from Neutral to mildily alkaline. The cation exchange capacity of the soils
is very low in all smaple locations. The level of nitrogen is very low in all samples,
while the potassium levels are low in six samples, medium in one sample and
high in one sample. The calcium magnesium ratios of the samples reflect is Ca
deficient in two samples and low Ca in all samples. Bulk density of soil of impact
varies from 1.18 g/cc among loam and 1.11-1.25 g/cc among sandy loam. The
porosity values range from 53-58 % among Sandy loam (6 sample), Soil texture is
predominantly Sandy loam.
Table 3.4 Soil Test Results – Reference Tables
General interpretation of pH Measured Rating for Cation Exchange Capacity
pH Range Classification CEC (Cmol)+)/kg
<4.5 Extremely Acidic Very low <6 *
4.51 -5.0 Very Strong Acidic Low 6-12
5.1-5.5 Strong Acid Moderate 12-25
5.6- 6.0 Moderately Acid High 25-40
6.1-6.5 Slightly acid Very High >40
6.6-7.3 Neutral Source: Metson (1961)
7.4-7.8 Mildily Alkaline * Soils with CEC less than three are often
7.9 -8.4 Moderately Alkaline low in fertility and susceptible to soil
8.5-9.0 Strongly Alkaline acidification.
>9.0 Very Strongly Alkaline
Source: Bruce and Rayment (1982).
Ca/mg Ratio Base Saturation as a Criterion of
Leaching
Description Range (%BS) Rating
<1 Ca Deficient 70-100 Very Weakly Leached
1-4 Ca (Low) 50-70 Weakly Leached
4-6 Balanced 30-50 Moderately Leached
6-10 Mg (Low) 15-30 Strongly Leached
>10 Mg deficient 0-15 Very Strongly Leached
Source: Eckert (1987) Source: Metson (1961)
Rating of Total Nitrogen Extractable Potassium (K)
Rating (% by W) Description K
<0.05 Very low low <150 ppm* (< 0.4 meq/100 g soil)
0.05-0.15 Low medium 150–250 ppm (0.4–0.6 meq/100 g soil)
0.15-0.25 Medium high 250–800 ppm (0.6–2.0 meq/100 g soil)
0.25-0.50 High excessive >800 ppm (>2.0 meq/100 g soil)
>0.5 Very High Source: Abbott (1989)
Source: Bruce and Rayment (1982)
Table 3.5 Water Analysis Data –Surface Water (Terms of Reference No. 6(iv))
Parameters SW-1 SW-2 SW-3 Units Method of Analysis IS
2296:1982
Temperature 27 27 27 oC IS:3025 part 09:1984 (RA:2017) NS
Colour 5 5 5 Hazen IS:3025 part 04:1983 (RA:2017) 300
Turbidity 0.5 0.4 0.2 NTU IS:3025 part 10:1984 (RA:2017) NS
pH 7.04 6.93 6.69 - IS:3025 part 11:1983 (RA:2017) 6.5-8.5
Total Solids 494 397 383 mg/l IS:3025 part 15:1984 (RA:2019) NS
Total Dissolved Solids 482 387 371 mg/l IS:3025 part 16:1984 (RA:2017) 1500
Total Suspended 12 10 12 mg/l IS:3025 part 17:1984 (RA:2017) NS
Solids
Total Hardness (as 345 150 141 mg/l IS:3025 part 21:2009 (RA:2019) NS
CaCO3)
Calcium (as Ca) 70 34 30 mg/l IS:3025 part 40:1986 (RA:2019) NS
Magnesium (as Mg) 41 16 16 mg/l IS:3025 part 46:1994 (RA:2019) NS
Sodium (as Na) 29 67 65 mg/l IS:3025 part 45:1993 (RA:2019) NS
Potassium (as K) 6.0 2.9 1.9 mg/l IS:3025 part 45:1993 (RA:2019) NS
Total Alkalinity (as 75 110 125 mg/l IS:3025 part 23:1986 (RA:2019) NS
CaCO3)
Chloride (as Cl) 169 103 89 mg/l IS:3025 part 32:1988 (RA:2019) 600
Sulphates (as SO4) 55 33 27 mg/l IS:3025 part 24:1986 (RA:2019) 400
Nitrite Nitrogen (as 18 12 16 mg/l IS:3025 Part 34:1988 (RA:2019) 50
NO3)
Silica (as SiO2) 1.1 5.4 2.9 mg/l IS:3025 part 35:1988 (RA:2019) NS
Fluoride (as F) 0.17 0.31 0.11 mg/l IS:3025 part 60:2008 (RA:2019) 1.5
Residual, Free <0.2 <0.2 <0.2 mg/l IS:3025 part 26:1986 (RA:2019) NS
Chlorine
Mineral Oil Nil Nil Nil mg/l IS:3025 part 39:1991 (RA:2019) NS
Aluminium (as Al) <0.5 <0.5 <0.5 mg/l APHA-3500 Al:2017 NS
Arsenic (as As) <0.001 <0.001 <0.001 mg/l IS:3025 part 37:1988 (RA 2019) 0.2
Boron (as B) <0.1 <0.1 <0.1 mg/l APHA- 4500 B:2017 NS
Cadmium (as Cd) <0.01 <0.01 <0.01 mg/l IS:3025 part 41:1992 (RA:2019) 0.01
Hexavalent <0.05 <0.05 <0.05 mg/l IS:3025 part 52:2003 (RA:2019) 0.05
Chromium (as Cr6+)
Copper (as Cu) <0.01 <0.01 <0.01 mg/l IS:3025 part 42:1992 (RA:2019) 1.5
Iron (as Fe) 0.52 0.46 0.45 mg/l IS:3025 part 53:2003 (RA:2019) 50
Lead (as Pb) <0.01 <0.01 <0.01 mg/l IS:3025 part 47:1994 (RA:2019) 0.1
Manganese (as Mn) <0.01 <0.01 <0.01 mg/l APHA-3500 Mn :2017 NS
Mercury (as Hg) <0.01 <0.01 <0.01 mg/l IS:3025 part 48:1994 (RA:2019) NS
Nickel (as Ni) <0.01 <0.01 <0.01 mg/l IS:3025 part 54:2003 (RA:2019) NS
Selenium (as Se) <0.001 <0.001 <0.001 mg/l IS:3025 part 56:2003 (RA:2019) 0.05
Zinc (as Zn) 0.29 0.31 0.11 mg/l IS:3025 part 49:1994 (RA:2019) 15
DO 4.2 4.5 4.1 mg/l Is:3025 Part 38:1989 (RA:2019) 4
BOD 2.6 2.1 3.5 mg/l IS:3025 Part 58:2006 (RA:2017) NS
COD 11 7.5 9.8 mg/l IS:3025 Part 44:1993 (RA:2019) 3
SW1- Narayana Sagaram, SW2- Chilakapalem, and SW3- Echcrla
Figure 3.7 Drainage Pattern of the study area (Terms of Reference No. 4(xi))
• Mostly the wind speeds are observed to be in the range of 10-15 kmph and 5-10
kmph.
2. Temperature: (a) Maximum: 42.90C (b) Minimum: 18.70C (c) Average: 28.90C
3. Humidity: The daily relative humidity values are observed to range between
29-64%.
4. Rain Fall: (a) Maximum: 6.4 mm (b) Minimum: 0 mm (c) Mean: 0.8mm
Wind Speed
Direction (blowing from)
NORTH
29%
23.2%
17.4%
11.6%
5.8%
WEST EAST
WIND SPEED
(m/s)
SOUTH >= 4.20
2.80 - 4.20
1.40 - 2.80
0.28 - 1.40
Calms: 5.43%
2.59 m/s
The data required to assess air quality impacts in and around neighborhood is
achieved by designing such a network, which encompasses micro meteorological
conditions, quantity and quality of emissions, locations, during, resources /
monitoring technology and operational criteria.
3.4.6 Ambient Air Quality Status (Terms of Reference No. 6(iii), B3)
The baseline data for ambient air quality is presented in Table 3.11. It may be
noted that the monitoring values for VOC and HCl are below detectable limits at
all monitoring including the plant area. The observed values are found to be
within the prescribed NAAQ standards. Graphical representation of ambient air
quality is presented in Figure 3.11.
Table 3.11 Summary Ambient Air Quality Status
Pollutant Maximum Minimum Mean 98 Percentile
1) Location: site
PM10 46 40 43.12 46
PM2.5 22 18 19.81 22
SO2 10 8 9.15 10
NOx 12 10 10.98 12
VOC (in PPM) 6.3 0.3 2.8 6.0
HCl 2.4 1.1 1.8 2.2
2) Location: Keshavadasupeta
PM10 45 39 41.62 45
PM2.5 20 18 19.08 20
SO2 10 9 9.54 10
NOx 12 10 11.31 12
VOC (in PPM) 2.2 0.3 2.1 2.1
HCl 1.1 0.7 1.2 1.0
3) Location: Chilakapalem
PM10 47 42 44.04 47
PM2.5 21 17 19.54 21
SO2 11 8 9.73 11
NOx 13 10 11.68 13
VOC (in PPM) BDL BDL BDL BDL
HCl BDL BDL BDL BDL
4) Location: Pattusalipeta
PM10 43 36 39.12 43
PM2.5 23 19 20.77 23
SO2 11 9 10.04 11
NOx 13 11 11.96 13
VOC (in PPM) BDL BDL BDL BDL
HCl BDL BDL BDL BDL
5) Location: Allinagaram
PM10 45 40 42.42 45
PM2.5 21 17 18.65 21
SO2 9 7 8.38 9
NOx 11 8 10.06 11
VOC (in PPM) BDL BDL BDL BDL
HCl BDL BDL BDL BDL
6) Location: Narsapuram
PM10 42 37 39.50 42
PM2.5 18 15 16.00 18
Table 3.14 Equivalent Noise levels in the study area (Terms of Reference No. 6(vii))
Direction Distance Equivalent Noise Levels dB(A)
Location w.r.t plant from Plant
Leq day Leqnight
site site, km
Site - - 51 41
Keshavadasupeta NW 0.3 48 33
Chilakapalem E 0.4 49 34
Pattusalipeta SW 1.5 46 33
Allinagaram SE 1.4 47 32
Narsapuram NW 1.9 49 31
Echerla NE 2.0 48 34
Neliveda NE 2.8 47 32
3.6 Demography
The study area falls under the following mandals of Srikakulam district; Etcherla,
Laveru and Ponduru in Andhra Pradesh. Study area comprises of 90 revenue villages
and 18 hamlets.
3.6.1.1 Literacy
Census operations consider a literate as a person who is above six years old and who
can write and read as per the census. Table 3.16 presents the literacy levels in the
study area. The population below six years old is 20778 consisting of 10649 males
and 10129 females, which is 10.83 % of the study area population. The percentage of
literacy level in the study area among males is 65.7 and 46.6 among females of total
polulation. It may be observed that the literacy level among females is comparatively
less than males.
3.6.1.2 Employment/Occupation
Work is defined as participation in any economically productive activity -
Physical/mental. The work force is classified into three categories: a) main workers,
b) marginal workers and c) non-workers. Main workers are those who work for a
substantial part of the year for a living such as salaried employees, agricultural labor
etc. Marginal workers are those who worked the previous year but have not worked
for a substantial part of this year. Non-workers constitute students, house wives,
dependents, pensioners etc. Table 3.17 presents the population distribution for
employment.
It may be observed that a majority of the study area population falls in the non
worker category among 50.75 % of the total population and the marginal workers
from about 13.1% of the total population. The male female difference is also
significant in all the regions and in all the categories. There are few females among
the workers where as there are more non workers and marginal workers among
females.
Table 3.17 Employment - Study Area
Category kms Total
0-3 3-5 5-7 7-10
Total Population 11314 29414 25435 125702 191865
Total Population – Male 5718 15056 13116 63567 97457
Total Population – Female 5596 14358 12319 62135 94408
The main workers are further classified into; Total cultivators: those who engage a
single worker or his family member to cultivate land for payment in money, kind or
share; Agricultural labor : those who work in other’s lands for wages; household
workers: workers involved in manufacturing and processing industries in the house
hold industries; and other services; Livestock, forestry, fishing and allied activities;
Workers involved in mining and quarrying; Workers involved in manufacturing and
processing industries in the house hold industries; non house hold industries;
construction workers; workers in trade and commerce; workers involved in
transport, storage and communication ; and other services: government employees,
teachers, priests, artists etc. Table 3.18 presents the main workers distribution
among the study area population. It may be observed that over 19% of the study area
population is involved in cultivation or agriculture labor, followed by other services
to the tune of 13.82%. It may also be observed that the people involved in non
household industry are significantly more reflecting on the industrial nature of the
area. Significant differences are observed among the male and female workers,
Female workers are found to be more in agricultural activity largely due to more
percentage of females being agricultural labor.
Table 3.18 Main workers Study Area
Category kms Total
0-3 3-5 5-7 7-10
Total Population 11314 29414 25435 125702 191865
Total Population – Male 5718 15056 13116 63567 97457
Total Population – Female 5596 14358 12319 62135 94408
Total Main Workers 3442 10348 9769 45882 69441
Main workers – Male 2528 6879 6540 29746 45693
The infrastructure facilities available in the impact zone are reflecting the rural
nature of the entire study area.
I. Educational Facilities
The educational facilities available in the rural areas are meager, despite the
proximity to urban area of Vijayanagaram. There are 134 primary schools, 29
middle schools and 2 high schools in the study area. There is one junior college in
the area. Five of the villages in the study area do not have any educational facilities.
The higher educational need of the population is met by Ranastalam, Pusapatirega
and Sathivada. Vizianagaram and Srikakulam has a number of engineering colleges,
PG colleges, Junior colleges and degree colleges, apart from a Maharajah's Institute of
Medical Sciences, Vizianagaram and Andhra University Campus, Vizianagaram. The
ditrict capital Vizianagaram caters to the educational needs of surrounding areas as
far as 70 kms.
VII. Housing
Census defines the house hold as a group of persons living together and sharing their
meals from a common kitchen. The number of households in the impact zone is
33945, while the number of the houses is 33864. The density of the households is
approximately five. The traditional houses made up of mud walls and covered by
dry common grass and leaves of bourses are commonly found in the rural area,
which are not considered pucca houses. The government has been augmenting the
housing standards by constructing housing colonies for various weaker sections of
the society.
It may be concluded that satisfactory amenities are available for the population of the
impact zone, while the amenities are available either within the village or at a
minimum distance of 5 km. The chemical complex has been contributing to the
industrial growth of the area, which in turn; generates employment, and improve the
infrastructure facilities of the area by strengthening the same economically.
Methods of study
1. Baseline data of Terrestrial and Aquatic biological environment by studying
distribution pattern, community structure, population dynamics and species
composition of Flora and Fauna. Secondary data is collected from various sources.
2. Areas used by protected, important or sensitive species of Flora or Fauna for
breeding, nesting, foraging, resting, over wintering, migration shall be as
ascertained.
3. Photo documentation of the flora and fauna including local habitats showing the
ecological status of the project site.
4. Discussing the predicted impacts by the proposed activity with local villagers and
EIA functional area experts on air, water, noise and other pollutants.
5. Impacts quantification through vegetation analysis.
6. Preparation of the mitigation measures if applicable.
Methodology
A reconnaissance survey has been made randomly to observe the critical habitats to
study in detail. General interviews were made with local people on native animals and
medicinal plants used frequently. A thorough review was made at each sampling point
and spent about 20-30 minutes at each point. The present environmental condition is
observed at site area and adjoining areas.
A detailed survey of flora and fauna was carried out during the study period. Field
visits are personally carried by expert members. The project details were collected from
EIA coordinator and discussed the possible impacts of the project on flora and fauna.
Secondary data collected from the GIS division especially the maps related to Land use
and Land cover, forest type, forest cover, villages / settlements, road, rail network etc.
The total area was analyzed in detail and with GIS tools and marked around 12
sampling points by covering the various ecosystems of impact area in all the directions.
Only photographs were taken during the field survey and no damage is created to flora
and fauna during the sampling. Specimens were not collected and preserved.
Floral study
Quadrate method has been used for carryout the study of trees, shrubs, herbs and
grasses. 20 m X 20 m Quadrates for tree species, 5 m X 5 m quadrates for shrubs and 1
m X 1 m quadrates for herbs. Statistical analysis is made for 10 sampling points.
Species were compared with standard floras and identifying the plants need for
conservation. The status of the each species was represented by common, sporadic or
rare. The data was compared with the list mentioned in red data book to check REET
species.
Faunal study
A detailed study has been carried out for faunal species by direct and indirect methods.
Direct sightings were made for aves, reptiles and insects and secondary data on
mammals was collected from local villagers. Bird surveys were carried out through
point count method at dawn and desk near water bodies. These techniques are accepted
in EIA studies as per the EIA Notification of 2006. The species sighted were
photographed and identified with standard pictorial guides. Scheduling of species was
done according to Wild life (Protection act) 1972 and IUCN is done for each species and
checked the REET species. No quantitative data was calculated as some species are
listed through secondary source. As the animals were migratory, habitats used by
protected, important or sensitive species for breeding, nesting, foraging, resting, over
wintering, migration were ascertained.
Identification of Species
Species of flora and fauna are identified through local field guides. Unidentified plants
are taken pictures and later confirmed by BSI, ZSI and forest officials.
Secondary Data
List of flora and fauna from Forest Department, Previous studies for EIA and other
NGOs research in the study area and local villager’s information was taken into
consideration while preparing the list and other parts of the report.
The species specific literature is also gathered and checked with primary data.
Flora: Forest department working plan
Within the project site the area is totally covered with small herbs and grass varieties.
The proposed project falls in
❖ 6D – Deccan Peninsula Deccan Plateau as per the Biogeography Classification of
India.
❖ Hot Semi arid type as per the India's Köppen climate classification.
The vegetation of the study area falls under
✓ 5A:Southern tropical dry deciduous forests C3: Southern dry mixed deciduous
forest;
✓ 6A: Southern tropical thorn forests DS1: Southern thorn scrub, 2S1: Secondary dry
deciduous forest by revised classification of Indian forest types (Champion and Seth, 1968).
These types of forests are seen throughout the Eastern Ghats and few parts of Western Ghats of
the country.
The proposed project site does not encounter with any kind of forest types like Reserve
Forest, Protected forest or un- classed Forest (declared Protected under “The Indian
Forest Act, 1927”) and “Forest (Conservation) Act, 1980 with Amendments Made in
1988”. (Source: Forest Department). Further no tree cutting is involved in the project as
there is no vegetation at all within this project site. Thus, no forest Clearance is required
for the proposed development. There are no Scheduled species recorded within the
proposed construction site.
Wetland
No wetland notified under “The Ramsar Convention – 1971” or listed under “the
National wetland Conservation Programme – 2009” is reported within 10 km from
project boundary.
Among the trees found in the core area, Ficus religiosa, Ficus bengahalensis and Acacia
nilotica are represented by more than a couple of individuals in the entire core area
while others like Azadirachta indica, Butea monosperma, Ponagamia pinnata, Leucaena
leucocephala are represented by few plants only. It is represented by sparse thorny scrub
vegetation in between the fallow agriculture land. The major part of the study area is
devoid of large trees except Azadiracta indica, Borassus and Phoenix and mainly consists
of scattered and sparse shrubs i.e. Euphorbia caducifolia, Balanites aegyptiaca, Opuntia
dillenii, Prosopis juliflora, Casia auriculata and Zizyphus numularia the major grasses
include several species of Cyperus and herbs such as Euphorbia hirta, Tridax procumbance.
Within the core zone a huge number of Anacardium species with an average GBH of 132
cm and up to 9 m tall. In the remaining patch Clerodndron inerme, Calotropis procera, Sida
acuta, Ziziphus nummularia, Lantana camera, Parthenium histerophorus are sporadically
scattered. There are no rare or endangered or endemic or threatened (REET) plants in
the core area. There are no forests or wild life sanctuaries or biosphere reserves or
nesting or breeding grounds for any of the rare species or other protected areas within
the core area. The project site is not situated within or adjacent to any cultural heritage
sites, protected areas, site area and adjoining area of protected areas, or special areas for
protecting biodiversity. As such the area identified for the existing Cement plant site is
not ecologically sensitive.
The proposed site is with manmade ecosystem with few selected trees, shrubs and
herbs. Entire area is with terrestrial vegetation is without any forest or agriculture land
and it was devoid of any ecologically sensitive biological resources. There are no REET
species present in the core zone. No migratory corridors or breeding grounds for faunal
species present here.
The common butterflies, Honey bees, dragonflies, birds were sighted here. Within the
site, certain trees such as Polyalthia longifolia, Peltophorum pterocarpum, Azadiracta indica,
Terminalia catappa and Palm trees near the entrance and other ornamental species and hedge
species raised in the site.
The faunal composition generally with arboreal and semi arboreal based animals. Some
very common small animals like Squirrels, rats, skinks and lizards are generally found
here. In aves, only spotted doves and blue rock pigeons are seen. Butterflies are fairly
attracted to the ornamental plants and water present on grasses.
Barleria prionitis
Carissa carandas
The faunal composition was also estimated based on the direct and indirect evidences.
Eucalyptus globules, Casuarina equisetifolia, Thespecia populnea, Delonix regia, Dalbergia
sisso, Pongamia pinnata and Polyalthia longifolia, Phoenix aculis, Borassus flabellifera,
Azadirachta indica, Prosopis spicegera, Ficus sp, Acacia sp, Tribulus terrstris, Achyranthus
aspera, Euphorbia caudifolia, E. tirucelli, Opuntia are mainly restricted to waste and
culturable waste lands. Albizia procera, Albizia lebbeck, Delonix regia, Azadirchta indcia,
Peltoforum sp., Terminalia catapa, Psidium guava, Dalbergia sisso and Tamarindus indica are
predominant near surrounding villages.
Vegetation structure
Trees: The most common tree species occurring are Pongamia pinnata, Polyalthia
longifolia, Albizia lebbeck, Bauhinia purpurea, Casuarina equisetifolia, Eucalyptus globulus,
Bauhinia purpurea, Plumeria alba, Ficus benghalensis, Azadirachta indica, Phoenix sylvestris,
Alstonia scholaris, Acacia auriculiformis, Pithecellobium dulce, Caesalpinia pulcherrima, Ficus
microcape, Grewia hirsuta, Peltophorum pterocarpum, Anacardium occidentale and Bambusa
arundinacea.
Shrubs: The most common shrubs are Lantana camera, Hyptis suaveolens, Cassia
auriculata, Calotropis procera, Prosopis juliflora, Acacia leucocephala, Catunaregam spinosa,
Caesalpinia bonducella, Canthium parviflorum, Carissa carandas, Capparis sepiaria, Celastrus
paniculata.
Herbs: The most common herbs are Tridax procumbens, Cassia occidentalis, Crotan
bonplantianum, Datura metel, Eclipta alba, Boerhavia diffusa, Tephrocia purpuria, Achyranthes
aspera. Cassia tora, Abutilon indicum Ipomoea macrantha
Climbers: The commonly seen climbers are Capparis horrida Abrus precatorius,
Hemidesmus indicus, Clitoria ternatea, Cuscuta reflexa, Desmodium triflorum, Pergularia
daemia, Desrris scandans, Hemidesmus indicus, Ipomoea pes-caprae, Ipomoea nil, Ipomoea
macrantha, Mucuna pruriens, Evolvulous alsinoides, Gloriosa superba.
Grasses: The common grass species are Chloris barbata, Cyperus castaneus, and Cynodon
dactylon Dactyloctenium aegyptium, Digitaria ciliaris, Eragrostis tenella, Fimbristylis cymosa,
Ilaloipsis binata and Imperata cylindrica.
Aves
All the listed birds are Least Concern under IUCN and Schedule - IV under Wild life
(Protection Act) 1972
S. No Scientific Name Common Name I - WPA IUCN
1 Accipiter badius Crested Shikra (Indian Shikra) S-IV LC
2 Accipiter nisus Eurasian Sparrow Hawk S-IV LC
3 Accipiter virgatus Besra Sparrow Hawk S-IV LC
4 Acridotheres ginginianus Bank Myna S-IV LC
5 Acridotheres tristis Common Myna S-IV LC
6 Acrocephalus agricola Paddy Field Warbler S-IV LC
7 Acrocephalus stentoreus Reed Warbler S-IV LC
8 Actitis hypoleucos Common Sandpiper S-IV LC
9 Alcedo atthis Small blue Kingfisher S-IV LC
10 Allauda gulugula Eastern-Sky lark S-IV LC
Reptiles
S.No Scientific Name Common Name IWPA IUCN
1 Calotes versicolor Common Garden Lizard LC
2 Sitana ponticeriana Fan-throated lizard LC
3 Calotes rouxi Forest Calottes LC
4 Chameleo zylanicus Chameleon S-II LC
5 Dendrelaphis tristis Common Indian Bronze back LC
6 Lycodon aulicus Common Wolf Snake LC
7 Ptyas mucosa Indian Rat Snake S-II LC
8 Ahaetulla nasutus Common green tree Snake LC
9 Enhydris enhydris Common Smooth Water Snake LC
10 Macropisthodon plumbicolor Green keel back LC
11 Xenochrophis piscator Checkered Keel back S-II LC
12 Bungarus caeruleus Common Indian Krait LC
13 Hemidactylus brooki Brook’s Gecko LC
14 Hemidactylus flaviviridis Northern house Gecko LC
15 Mabuya carinata Common Skink LC
16 Varanus bengalensis Indian Monitoring Lizard S-II LC
17 Vipera ruselli Russell’s viper S-II LC
18 Naja naja Indian Cobra S-II LC
19 Ophiophagus hannah King cobra S-II LC
20 Echis carinatus Saw scaled viper LC
Amphians
S.No Scientific Name Common Name Family Status IWPA
1 Bufo melanostictus Common Indian Bufonidae LC S-IV
Toad
2 Euphlyctis cyanophlyctis Skittering Frog Ranidae LC S-IV
3 Euphlyctis hexadactylus Indian Pond Frog Ranidae LC S-IV
4 Hoplobatrachus tigerinus Indian Bull Frog Ranidae LC S-IV
5 Polypedates maculates Common Tree Frog Rhocophoridae LC S-IV
Fishes
Taxonomic composition of fish fauna from Secondary source
SNo. Scientific Name Common Name Population IUCN CAMP
Status Status Status
1 Notopterus notopterus Grey feather back C LC LRnt
2 Catla catla Catla A VU LRnt
3 Labeo ariza Reba carp C LC NE
4 Labeo rohita Rohu A LC LRnt
Invertebrates
S. No. Scientific Name Common Name Family
1 Acraea violae Tawny Coster Nymphalidae
2 Anax guttatus Dragon fly Aeshnidae
3 Anax immaculifrons Dragon fly Aeshnidae
4 Appias albina darada Common Albatross Pieridae
5 Badamia exclamationis Brown Awl Hesperiidae
6 Belenois aurota aurota Indian Pioneer Pieridae
7 Borbo bevani Bevan's Swift Hesperiidae
8 Borbo cinnara Rice Swift Hesperiidae
9 Brachythemis contaminata Dragon fly Libellulidae
10 Castalius rosimon rosimon Continental Common Pierrot Lycaenidae
11 Catochrysops strabo strabo Oriental Forget-me-not Lycaenidae
12 Catopsilia pyranthe pyranthe Mottled Emigrant Pieridae
13 Catopsilia crocale Lemon Emigrant Pieridae
14 Cepora nerissa nerissa Common Gull Pieridae
15 Chilades lajus lajus Indian Lime Blue Lycaenidae
Himalyan Dark Clouded
Colias fieldii fieldii Pieridae
16 Yellow
17 Colotis danae danae Crimson Tip Pieridae
18 Colotis etrida Small Orange Tip Pieridae
19 Colotis eucharis eucharis Plain Orange Tip Pieridae
20 Crocothemis servilia servilia Dragon fly Libellulidae
21 Curetis thetis Indian Sunbeam Lycaenidae
22 Danaus chrysippus chrysippus Plain Tiger Nymphalidae
23 Danaus genutia genutia Striped Tiger Nymphalidae
24 Delias eucharis Common Jezebel Pieridae
25 Diplacodes trivialis Dragon fly Libellulidae
26 Euchrysops cnejus cnejus Oriental Gram Blue Lycaenidae
The interaction of project expansion activity on the environment was assessed by posing
questions related to each aspect of project activity envisaged as part of proposed
expansion of the plant, to identify valued eco components. After broad identification of
impacts, an interaction table enumerating the activity vs factors of various environmental
components was prepared for various stages of project implementation considering the
entire life cycle of construction, operation and decommissioning. The operational stage
was considered for both regular operation and for incidents and emergencies caused by
both human errors and extreme weather phenomena. The critical aspects of accident
release of chlorine and chloroform are also considered.
TRANSPORATAION OF
RAW MATERIALS AND POWER
FINISHED GOODS CONSUMPTION
UTILITIES PARKING
(BOILER, DG PRE-
SETS, HVAC)
TREATMENT PROCESS BLOCKS
WATER WITHDRAWL
Changing Out-Migration
In-Migration Tradition
and Transport Facilities
Culture
Salaries
Ease of living
Industrial
Quality of life
Activity Gender
Employment Equity
Taxes
Development of
Social Infrastructure
RM and Resources Water Stress Stress on Health
Facilities
Stress on
Housing
Traffic Demand
Impact
Business Opportunity Urban Sprawl
Stress on Municipal/ Urban Heat Island
Local body
infrastructure
Table 4.1 Activity and Environmental Impact (Impact Identification Matrix) - Construction Stage
Environment Abiotic Biotic Socio Others
Component Climate Atmosphere Land Water Economic
Factors
Occupational health
Noise and vibration
Waste Management
Micrometeorology
Climate Change
Socio Economic
Ground Water
Surface Water
Air quality
Fire Safety
and safety
Geology
Fauna
Flora
Soil
Activity
Construction Stage √
Clearing and Grubbing √ √ √ √ √ √ √
Leveling by way of cut and √ √ √ √ √ √ √ √ √
fill
Foundation excavation √ √ √ √ √ √ √ √
Civil Construction √ √ √ √ √ √
Equipment and machinery √ √ √ √ √
erection
Electrical installation √ √ √ √ √
plumbing and piping √ √ √ √ √
painting works √ √ √ √ √
√ Indicates Impact
Table 4.2 Activity and Environmental Impact (Impact Identification Matrix) - Regular Operation Stage
Environment Abiotic Socio
Biotic
Component Climate Atmosphere Land Water Economic Others
Micrometeoro
Surface Water
Occupational
Management
Air quality
Fire Safety
health and
Noise and
Economic
vibration
Geology
Ground
Climate
Change
Waste
Fauna
safety
Water
Socio
Flora
logy
Soil
Factors
Activity
Operation Stage
Regular Operation √
Raw material and finished product transport √ √ √ √ √
Raw material and finished product storage √ √ √
Transfer of raw materials and products √ √ √ √
Water use √ √
Effluent generation √ √ √ √
Domestic Wastewater generation √ √ √ √
Utility emissions √ √ √ √ √ √ √ √ √ √
Process emissions √ √ √ √ √ √ √ √ √
Diffuse emissions √ √ √ √ √ √ √ √ √
Wastewater storage √ √ √ √
Solid waste transfer and storage √ √ √ √ √ √
Solvent storage and use √ √ √ √
Waste transport √ √ √ √
Effluent transfer and Treatment √ √ √ √ √ √
Wastewater Transfer and Treatment √ √ √ √ √
Emissions control √ √ √ √ √ √ √ √
Machine and Equipment Operation √ √
Solvent Recycle √ √ √ √
√ Indicates Impact
Table 4.3 Activity and Environmental Impact (Impact Identification Matrix) - Incidents and Accidents
Environment Abiotic Biotic Socio Others
Component Climate Atmosphere Land Water Economic
Factors
Occupational health
Noise and vibration
Waste Management
Micrometeorology
Climate Change
Socio Economic
Ground Water
Surface Water
Air quality
Fire Safety
and safety
Geology
Fauna
Flora
Soil
Activity
Operation Stage
Incidents and Accidents
Spillage √ √ √ √ √ √ √ √ √ √
Fugitive emissions √ √ √ √ √ √ √
Equipment Failures √ √
Batch failures √ √
Containment failure √ √ √ √ √ √ √ √ √
Fire accidents √ √ √ √ √ √
Accidents during transport of √ √ √ √ √ √ √ √ √ √
Raw materials and products
Accidents during transport of √ √ √ √ √ √ √ √ √ √
wastes
Arson and Vandalism √ √ √ √ √ √ √ √ √
Extreme Weather phenomenon √ √ √ √ √ √ √ √ √ √ √
√ Indicates Impact
Table 4.4 Activity and Environmental Impact (Impact Identification Matrix) – Decommissioning
Environment Abiotic Biotic Socio Others
Component Climate Atmosphere Land Water Economic
Factors
Occupational health
Noise and vibration
Waste Management
Micrometeorology
Climate Change
Socio Economic
Ground Water
Surface Water
Air quality
Fire Safety
and safety
Geology
Fauna
Flora
Soil
Activity
Plant Decommissioning √
Inventory preparation √
Transfer and disposal of chemicals √ √ √ √ √ √ √ √ √ √
Transfer and disposal of wastes √ √ √ √ √ √ √ √ √ √
Decontamination of equipment and containers √ √ √ √ √ √ √ √ √
Disposal of Equipment √ √
Dismantling of facility √ √ √ √ √ √
Demolition Waste √ √ √ √ √
Site cleanup √ √ √ √ √ √ √ √
Capping drains and locking water sources √ √ √ √ √
√ Indicates Impact
expected impacts of the indicators when measured against the assessment criteria.
Technically, the assessment process is comprised of four steps that must be completed
in sequence: Step I — create a set of indicators, Step II — provide numerical values for
the indicators, Step III — compute environmental scores and Step IV — evaluate the
alternatives. RIAM is based on the knowledge that certain specific criteria are common
to all impact assessments, and by scaling these criteria it becomes possible to record the
values of the assessments made. RIAM works with both negative and positive impacts.
Not all criteria can be given the same weight, and so the criteria are divided into two
groups: those which individually are important in their impact; and those that
collectively important. The important assessment criteria fall into two groups: (A)
Criteria that are of importance to the condition, and which can individually change the
score obtained. (B) Criteria that are of value to the situation, but individually should
not be capable of changing the score obtained. The value ascribed to each of these
groups of criteria is determined by the use of a series of simple formulae. These
formulae allow the scores for the individual components to be determined on a defined
basis.
The process can be expressed:
(a1) x (a2) = aT
(b1) + (b2) + (b3) = bT
(aT) x (bT) = ES
Reversibility (B2)
This defines whether the condition can be changed and is a measure of the control over
the effect of the condition.
1 = no change/not applicable
2 = reversible
3 = irreversible.
Cumulative (B3)
This is a measure of whether the effect will have a single direct impact or whether there
will be a cumulative effect over time, or a synergistic effect with other conditions.
1 = no change/not applicable
2 = non-cumulative/single
3 = cumulative/synergistic
Environmental components
The RIAM requires specific assessment components to be defined through a process of
scoping; and these environmental components fall into one of four categories, which
are defined as follows:
Sociological / cultural: Covering all human aspects of the environment, including social
issues affecting individuals and communities; together with cultural aspects, including
conservation of heritage, and human development.
4.2.2Air Environment
The sources of air pollution from proposed expansion are utility emissions, process
emission, emissions from pollution control facilities, and storages in addition to diffuse
emissions during equipment operation and fugitive emissions due to equipment failures,
containment failures and spillages. The direct impact of utility emissions from boilers
and DG sets consists of particulate matter, sulfur dioxide, and oxides of nitrogen resulting
in change in criteria air contaminants in ambient air quality. The process emissions and
other emissions are hazardous and may result in change in health of the receptors both
flora, and fauna including humans. The adoption of adequate mitigation measures shall
reduce the impact to low levels. Storage of solvents may also lead to diffuse emissions
unless adequate mitigation measures like breather valves, double lined storage and
condensers are adopted.
The quantifiable impacts on air environment are predicted using various air quality
impact prediction models for utility emissions and diffuse emissions due to handling and
operation of solvents. The impact prediction for accident scenarios is addressed in
consequence analysis of risk assessment chapter. All these emissions impact air quality
negatively, resulting in health impacts indirectly. The anticipated impacts on air
environment are presented in Table 4.5 and, Table 4.6 presents significance of each
impact based on RIAM.
Waste transport √
Effluent transfer and Treatment √
Wastewater Transfer and √
Treatment
Emissions control √ √
Solvent Recycle √
Operation Stage - Incidents
and Accidents
Spillage √ √ √
Fugitive emissions √ √ √ √
Containment failure √ √ √
Fire accidents √ √ √
Accidents during transport of √ √
Raw materials and products
Accidents during transport of √
wastes
Arson and Vandalism √ √ √
Extreme Weather phenomenon √ √ √
Plant Decommissioning
Transfer and disposal of √
chemicals
Transfer and disposal of wastes √
Decontamination of equipment √
and containers
Dismantling of facility √
Demolition Waste √
Site cleanup √ √
Capping drains and locking √
water sources
√ Indicates Impact
Predictions of ground level concentrations of the pollutants were carried out based on
site meteorological data collected during the study period. For calculation of predicted
ground level concentrations, ISCST3 model of Lakes Environmental based on USEPA,
ISCST3 algorithms, was used; as it’s based on more sophisticated algorithm incorporating
deposition, better algorithm for area sources, etc.
Some of the model input options have changed and newer input options have been added
as a result of the new features contained in the ISC3 models. The source deposition
parameters have changed somewhat with the new dry deposition algorithm, and there
are new source parameters needed for the wet deposition algorithm in the Short-Term
model. There are also new meteorology input requirements for use of the new deposition
algorithms. The option for specifying elevation units has been extended to source
elevations and terrain grid elevations, in addition to receptor elevations.
The utility programs, STOLDNEW, BINTOASC, and METLIST have not been updated.
While they may continue to be used as before, they are not applicable to the new
deposition algorithms in the ISC3 models. The salient features of the ISCST3 model are
presented below in Table 4.7.
Table 4.7 Salient Features of the ISCST3 Model
S.No Item Details
1 Model name ISCST3 (Based on USEPA algorithm)
2 Source Types Point, Area, Volume, Open Pits
3 Dispersion Equation Steady State Gaussian Plume Equation
4 Diffusion Parameters Pasquill Gifford Co-efficient
5 Plume Rise Briggs Equation
6 Time Average 1 hr to Annual/Period Has Short Term and Long-Term
modeling options
7 Deposition Both Dry and Wet Deposition
8 Application Input Data:
(i) Source Data Stack co-ordinates
(ii) Receptor Data Grid interval, number of receptors, receptor elevations
(iii) Meteorological Hourly meteorological data i.e. wind speed, direction,
Data ambient temperature, stability and mixing heights
Model Formulation
The model uses the following steady state Gaussian plume equation. The basic equation
for calculating the concentration of pollutants for any point in x, y, z co-ordinates is given
below:
C(x,y,z,H) = Q/2yz U exp[-1/2(y/y)2] x [exp{-1/2(z-h/z)2}
+ exp{-1/2 (z+H/z)2}]
Where;
C= Concentration of pollutants in mg/m3
Q= Strength of emissions in g/sec.
H= Effective Height (m), i.e., physical height + plume raise
y, z= diffusion coefficients in y and z directions in m.
U= average wind velocity in m/sec.
The following assumptions are made in Gaussian dispersion model.
This model assumes no diffusion in the down wind direction and thus applicable to a
plume and not a puff of pollutant. The dispersion parameter values used for horizontal
dispersion coefficient and vertical dispersion coefficients are those given in the “Work
book of atmospheric dispersion estimates”. These dispersion coefficients assume a
sampling time of about 10 min., the height values of interest to be in the lowest several
hundred meters of the atmosphere, a surface corresponding to the open country. The
stacks are tall enough to be free from building turbulence so that no aerodynamic down
wash occurs. The given stability exists from ground level to well above the top of the
plume.
The Gaussian dispersion model has been tested extensively for its validity and found to
be reasonably applicable for different atmospheric conditions. BIS has also adopted this
basic plume dispersion model. Hence the same model is adopted for predictions of
downwind concentrations of pollutants in this report.
Meteorological Data
Data recorded by the weather monitoring station at site on wind speed, direction, solar
isolation, temperature and cloud cover at one hourly interval for three months i.e. One
full season has been used for computations.
Mixing Height
The mixing heights for ambient air quality predictions are adopted from Atlas of Hourly
Mixing Height and Assimilative Capacity of Atmosphere in India by S.D Attri, Siddartha
Singh, B. Mukhopadhya and A.K Bhatnagar, Published by Indian Metrological
Department, New Delhi. 2008. The mixing heights range from 300 to 1450 m during
summer season. There is no record of inversion for this area (Reference: Atlas of Hourly
Mixing Height and Assimilative Capacity of Atmosphere in India by S.D Attri, Siddartha
Singh, B. Mukhopadhya and A.K Bhatnagar, Published By Indian Metrological
Department, New Delhi. 2008). There is no record of inversion in this area as observed
from the IMD data.
emission rates of SO2, NOx and Particulate Matter from each stack are presented in Table
4.8.
Table 4.8 Emission Details of Pollutants from Stack
S. Stack Connected Stack Dia of Temp. Exit Pollutant Emission
No to height, stack, m Of Velocity, Rate, g/sec
m exhaust m/sec PM SO2 NOx
gases, 0C
Existing
1 1 x 16 TPH coal 30 0.65 140 5.57 0.4 0.52 0.18
fired boiler*
2 1 x 10 TPH coal 30 0.25 160 8.23 0.05 0.14 0.18
fired boiler*
3 1 x 6 TPH oil fired 30 0.8 160 6 0.01 0.62 0.33
boiler*
4 1 x 1000 kVA DG 6.5 0.35 180 8.5 0.01 0.04 0.12
Set**
5 2 x 500 kVA DG 7 0.1 180 6.8 0.002 0.01 0.02
Set**
Proposed
1 1 x 50 TPH Coal 60 2.2 165 10.2 1.8 3.2 3.6
fired boiler
2 1 x 10 Lakh Kcal 30 0.5 160 4.5 0.06 0.08 0.12
Thermic Fluid
Heater
3 1 x 6 Lakh Kcal 20 0.3 180 6.2 0.03 0.03 0.09
Thermic Fluid
Heater
4 2 x 2000 kVA DG 10 0.3 200 10.2 0.02 0.06 0.08
sets
* Standby after expansion ** DG sets will be used during load shutdown.
The composition of particulate matter was obtained from USEPA AIRCHIEF AP-42 and
the same was considered in determining the source concentration of PM10 and PM2.5 for
prediction purpose. It may be noted that the predicted values of the SO 2 and NOx are
based on the assumption that the DG sets are used constantly, whereas the DG set usage
is only during load shut down from TRANSCO.
8000
0.49
6000
4000
49
0.
2000
9
0.4
0.4
0
9 312 0.63
-2000
-4000
-6000
-8000
PLOT FILE OF HIGH 1ST HIGH 24-HR VALUES FOR SOURCE GROUP: ALL ug/m^3
Wind Speed
Direction (blowing from)
0 29%
Consultants,Hyderabad
23.2%
17.4%
11.6%
5.8%
WEST EAST
CONC
End Date: 12/31/2020 - 23:00
MODELER:
0 5 km
M/s.Team Labs and
Consultants, Hyderabad
CALM WINDS: TOTAL COUNT:
2.59 m/s
1.42323 ug/m^3
8000
6000
4000
2000
0
312 0.25
-2000
-4000
-6000
-8000
PLOT FILE OF HIGH 1ST HIGH 24-HR VALUES FOR SOURCE GROUP: ALL ug/m^3
Wind Speed
Direction (blowing from)
0 29%
Consultants,Hyderabad
23.2%
17.4%
11.6%
5.8%
WEST EAST
CONC
End Date: 12/31/2020 - 23:00
MODELER:
0 5 km
M/s.Team Labs and
Consultants, Hyderabad
CALM WINDS: TOTAL COUNT:
2.59 m/s
0.56929 ug/m^3
8000
6000
4000
2000
0
312 0.11
-2000
-4000
-6000
-8000
PLOT FILE OF HIGH 1ST HIGH 24-HR VALUES FOR SOURCE GROUP: ALL ug/m^3
Wind Speed
Direction (blowing from)
0 29%
Consultants,Hyderabad
23.2%
17.4%
11.6%
5.8%
WEST EAST
CONC
End Date: 12/31/2020 - 23:00
MODELER:
0 5 km
M/s.Team Labs and
Consultants, Hyderabad
CALM WINDS: TOTAL COUNT:
2.59 m/s
0.25618 ug/m^3
8000
6000
4000
0.99
2000
0
0
.9
312 9
-2000
-4000
-6000
-8000
PLOT FILE OF HIGH 1ST HIGH 24-HR VALUES FOR SOURCE GROUP: ALL ug/m^3
Wind Speed
Direction (blowing from)
0 29%
Consultants,Hyderabad
23.2%
17.4%
11.6%
5.8%
WEST EAST
CONC
End Date: 12/31/2020 - 23:00
MODELER:
0 5 km
M/s.Team Labs and
Consultants, Hyderabad
CALM WINDS: TOTAL COUNT:
2.59 m/s
2.22929 ug/m^3
8000
1.04
6000
4000
04
1.
2000
8
1.3
1.04 1.
04
0
312
-2000
-4000
-6000
-8000
PLOT FILE OF HIGH 1ST HIGH 24-HR VALUES FOR SOURCE GROUP: ALL ug/m^3
Wind Speed
Direction (blowing from)
0 29%
Consultants,Hyderabad
23.2%
17.4%
11.6%
5.8%
WEST EAST
CONC
End Date: 12/31/2020 - 23:00
MODELER:
0 5 km
M/s.Team Labs and
Consultants, Hyderabad
CALM WINDS: TOTAL COUNT:
2.59 m/s
3.11307 ug/m^3
Mitigation measures for utility emissions during construction and operation phases are
presented in Table 4.11. Technical specifications of control equipment are presented in
Table 4.12.
Table 4.11 Mitigation Measures for Utility Emissions - Construction and Operation
Activity Impact Mitigation measure
Construction phase
Emission from ➢ Change in air quality ➢ PUC certification of transport
transportation of materials ➢ Change in visibility vehicles.
➢ Health Impact ➢ Water sprinkling system on
roads.
➢ Periodic maintenance.
Emissions from DG sets ➢ Change in air quality ➢ Effective stack height.
➢ Health Impact ➢ Periodic maintenance.
Material Transfer ➢ Increase noise levels ➢ Reduced drop height.
➢ Rubber padding at discharge
point and at the impact point,
avoidance of metal bunkers.
Operation Phase
Emissions from Boilers ➢ Change in air quality ➢ Electro Static Precipitators
➢ Health Impacts (ESP).
➢ Usage imported coal with <
0.5% sulfur content
➢ Effective stack height
Emissions from Thermic ➢ Change in air quality ➢ Bag Filters.
Fluid heater ➢ Health Impacts ➢ Usage imported coal with <
0.5% sulfur content
➢ Effective stack height
Standby DG sets ➢ Change in air quality ➢ Stack height based on CPCB
➢ Health Impacts formula
For the General Ventilation Model, the overall estimate of the airborne concentration of
a contaminant is obtained by use of following equation.
Cv = (1.7*105) Ta*G
M*Q*m
Where: C v = Contaminant concentration in workplace (ppm)
Ta = Ambient temperature of the air (K)
G = Vapor generation rate (gm/sec)
M = Molecular Weight (gm/gm-mole)
Q = Ventilation rate (ft3/min)
m = Mixing factor (dimensionless)
The solvent loss and the predicted airborne concentrations of the various solvents are
tabulated in the Table 4.15.
It may be observed that the predicted air borne concentration of solvents are within the
prescribed TLV standards within the work room area. The predicted air borne
concentrations range from 0.1 to 177.5 ppm. The predicted airborne concentration of
solvents is in the range of 0.5 to 88.8% of TLV value. It may be concluded that the
dispersion of these solvents into atmosphere shall have low impact as the releases from
the work room shall be a maximum of 88.8% of TLV values due to dilution followed by
dispersion in atmosphere. Mitigation measures for process emissions are presented in
Table 4.16.
Table 4.16 Mitigation Measures for Diffuse and Fugitive Emissions
Activity Impact Mitigation measure
Transfer of Raw ➢ Change in odor and ➢ Closed operation system
materials, health related ➢ Less bends in pipeline system
Solvents containments ➢ Minimal number of flanges
➢ Effect on soil due to dry ➢ AOD pumps for drum transfer
and wet deposition ➢ Powder transferring system
➢ Dip pipe provision to reactors
➢ PPE to employees
➢ House-keeping
Distillation of ➢ Change in odor and ➢ Dual condensing system
solvents, health related ➢ Vacuum Pumps
containments ➢ Agitated nutche filter and dryer
(ATFD) system
The impact assessment indicates that the proposed expansion of manufacturing activity
on surface water has moderately negative change/ impact due to change in surface
water quality and release of process related chemicals and spillage, negative change/
impacts due to change in erosion and sedimentation, slightly negative change /impacts
due to change in runoff quality, runoff peak flow, surface water quality, surface and
ground water interaction, change in channel morphology and Dry and wet deposition
leading to acidity.
The impact assessment indicates that the proposed expansion of manufacturing activity
on ground water will have slightly negative change/ impact due to change in ground
water quality, flow regime and change in ground water and surface water interaction.
Mitigation measures for water environment are presented in Table 4.21. Technical
specifications of effluent treatment system are presented in Table 4.22.
The project activities that have an impact on noise environment are operation of
turbine, motors, pumps, compressors, DG sets resulting in direct impact of increasing
ambient noise levels both within the plant area and outside. Excessive noise will
trigger health risks such as headaches, depression, deafness and retardation of
sensory mechanisms in the impact area population. The incremental noise levels due
to these activities were predicted and the values reflect low impact outside the
premises. The increase in noise levels shall have low impact, restricted to within site
area due to its low magnitude and occasional frequency. The incremental noise levels
however shall have direct negative impact on the noise levels, with low significance
due to mitigation measures and also due to absence of sensitive receptors within 1.07
km of the sources. The impact significance is calculated using RIAM. The impacts
due to various activities during the life time of the project including the emergency
scenarios on noise levels is presented in Table 4.24. The impact significance on noise
levels is presented in Table 4.25.
The calculated noise levels are further super imposed (logarithmically) on the
background noise levels. The model assumes that the noise spectrum is mainly
centered on a spectrum of 1000 Hz and attenuation due to building materials is also at
the same frequency. DhwaniPro is a computer program developed to undertake
construction, industrial and traffic noise propagation modeling for which an
environmental noise assessment may be required. A variety of scenarios can be created
quickly in DhwaniPro, allowing the user to determine the impact of changing the
source, layout and adding/ removing the effects of shielding due to noise mitigation
devices such as barriers.
The major sources of noise generation and noise levels ranging from 87 dB (A) - 104
dB (A), considered for modelling is presented in Table 4.26. The predicted cumulative
noise levels due to the source and the existing level as calculated from the logarithmic
model without noise attenuation ranged between 45 and 80 dB(A) at distances ranging
between 100-150 m which falls within the plant boundary. The impact of noise on the
population in the surrounding area will be negligible, as the nearest habitation is at
least 0.3 km away from the site. Noise levels mitigation measures during construction
and operation stage are presented in Table 4.27.
Table 4.26 Sources of Noise Generation (Tentative)
S. No Sources of Generation Noise Levels (dB(A)
Minimum Maximum
1 Coal Conveyor Belt 86 96
2 Compressor 87 100
3 Boiler Feed Pump 84 97
4 Turbine Floor 85 98
5 FD Fan 83 104
6 ID Fan 76 89
7 Cooling Towers 74 79
Table 4.27 Noise Levels Mitigation Measures - Construction and Operation stages
Activity Impact Mitigation measure
Construction phase
Transport vehicles ➢ Increase in Noise levels ➢ Avoidance of engine idling.
➢ Transport during day time.
➢ Periodic maintenance.
Construction equipment: ➢ Increase in noise levels, ➢ Periodic maintenance.
drills, Pneumatic and vibration ➢ Enclosed operator room.
equipment, excavators, ➢ Attenuating screens between
dumpers etc. operators and sources.
➢ Periodic maintenance.
➢ Barriers, guard covers,
isolation of equipment,
antivibration pads.
➢ Training to operators and
drivers.
➢ PPE to operators.
Material Transfer ➢ Increase noise levels ➢ Reduced drop height.
➢ Rubber padding at discharge
point and at the impact
point, avoidance of metal
bunkers.
Other construction works ➢ Impact on workers’ ➢ Training to workers.
health due to noise ➢ PPE.
levels
diversity and ecological integrity: C/N ratio, negative change/ impacts due to
accidental release of chemicals leading to degradation of soil quality, soil compaction,
and change in acid buffering function due to wet and dry deposition: CEC and base
saturation, whereas slightly negative change/ impacts due to change in erosion, land
capability, ground sealing, permeability, loss of emission protection and loss of
nutrients due to land use operations. Mitigation measures during construction and
operation stage are presented in Table 4.30.
Arson and √
Vandalism
Extreme Weather √
Phenomena
Plant
Decommissioning
Transfer and √ √
disposal of
chemicals
Transfer and √ √
disposal of wastes
Decontamination of √ √
equipment and
containers
Site cleanup √ √ √
Capping drains and √
locking water
sources
√ Indicates Impact
The ecological factors that are considered most significant as far as the impact on flora
and fauna concerned are:
assessment indicates that the proposed expansion on fauna will have negative
change/ impacts due to loss or alteration of habitat availability, fragmentation of
habitat, and reduced habitat connectivity, increased morality risk and reduce
abundance/ diversity. Photographs of existing greenbelt development layout is
presented in Fig 4.13. Action plan for proposed enhancement of greenbelt is presented
in Table 4.31.
The proposed expansion shall have moderately negative impact on traffic, health
concern, public safety concern, while negative impact on traditional use impact,
impact on health, common water resource both ground and surface water, slightly
negative change/ impacts on migration: in and out. Positive impacts are anticipated
due to change/ impacts on employment, housing, change in quality of life, business
opportunity for locals in associated activities, whereas moderately positive change/
Spillage √ √ √
Fugitive emissions √ √ √
Equipment Failures √ √
Batch failures
Containment failure √ √
Fire accidents √
Accidents during √ √
transport of Raw
materials and
products
Accidents during √ √
transport of wastes
Plant √ √ √ 1
Decommissioning
Inventory √
preparation
Transfer and disposal √
of chemicals
Transfer and disposal √
of wastes
Decontamination of √
equipment and
containers
Disposal of √
Equipment
Dismantling of √
facility
Demolition Waste √ √
Site cleanup √
Capping drains and √
locking water sources
√ Indicates Impact
Local Content: About 200 no. of employees are from the surrounding villages. Local
produce like rice, vegetables, milk etc. is procured from surrounding villagers by the
canteen.
Payment of Taxes: The proposed industry will be paying above Rs. 50 crores per year
towards various central and state taxes.
The traffic study for the connecting road revealed that the peak traffic volume in PCU
is 618 during 8 to 9AM and the level of service of the connecting road remains A, after
proposed expansion also. Modified level of service for connecting roads considering
the additional truck trips for proposed expansion is presented in Table 4.41. It may
be noted that the peak traffic volume is during shift changeover only, while material
transport traffic volume is less.
Table 4.41 Modified level of services for connecting roads
Road Existing Existing Additional Modified Modified Modified Los
volume, volume/ volume/hr Volume volume/ & performance
PCU/hr Capacity (peak) Capacity
Service
road to 218 0.12 40 258 0.14 “A” (Excellent)
NH-5
The proposal is for expanding the manufacturing capacity without any addition of land
area. The existing site area is sufficient for proposed expansion and hence there is no
requirement of alternative site or additional site area.
The process mass intensity was mainly contributed by water and solvents. Solvents are
used as a medium of reaction for all the stages of process. The material balance of each
stage of the product was reviewed and it was observed that the solvent usage was
ranging from 2 to 12.3 KLD. Solvents like Methylene dichloride, Ethylene dichloride,
tetrahydrofuran etc. were observed to be used in the manufacturing process of various
products. The management has been a pioneer of conducting research and development
of agrochemicals and is in process of identifying potential solvents from the list of
preferred solvents based on green chemistry principles, i.e., water, methanol, ethanol,
propanol, ethyl acetate etc.
The usage of high-pressure water jet in place of fill and vacate method of washing is
chosen as the best alternative of equipment washing. The product washings will be
optimized by agitating the wash product thereby reducing number of washings. The
management proposed to assess process mass intensity of each stage of manufacturing
and evaluate the best options of reducing the process mass intensity by reducing usage
of water and solvents in addition to improving the yields of reaction.
The constant flux cooling jacket reactors are proposed for regulating the process
temperature without altering the jacket temperature for quick cooling of reaction mass
to avoid diffuse emissions and loss of media. Other technologies identified for adoption
are dip pipe provision for transfer of liquid materials from day tanks to reactors to avoid
static electricity, air operated diaphragm (AOD) pumps for transfer of materials from
drums, powder transfer systems for solids and transfer by pipeline. The identified
alternative for filter and dryers was agitated nutche filter and dryer (ANFD) which
serves the purpose of both filtration and drying thereby reducing transfer of material
from one equipment to the other resulting in reduced diffuse emissions. It is proposed
to enhance the capacity of solvent recovery system by installing fractional distillation
columns in place of simple distillation to increase purity of recovered solvents, which
can be reused in process, thereby reducing solvent usage and resulting diffuse emissions.
Seamless pipes will be used for piping, with a smaller number of bends and flanges to
avoid loss of material and fugitive emissions. Double mechanical sealed flanges for
solvent transfer pipelines, PTFE pumps for transfer of corrosive material transfer and
charging are the identified alternatives proposed for implementation.
and electro static precipitator. Electro static precipitator is selected as the optimum
technology for boilers considering its large capacity and to ensure particulate emission
standards as prescribed by CPCB/SPCB. The alternatives assessed for mitigating
emissions from process are scrubber with single stage, and double stage, and condensers,
and to mitigate diffuse emissions, nitrogen blanketing with breather valves and thermal
insulation for storages; nitrogen blanketing for low boiling solvents was assessed.
Condensers are proposed to mitigate both diffuse and process emissions and the
alternatives of cooling medium assessed were RT water, cold water, chilled brine. Cold
water and chilled brine were identified as the best medium to mitigate release of VOC
emissions into atmosphere.
Zero liquid discharge based effluent treatment system is being used for treated effluent
disposal and the same is practised after expansion also. The concentration of effluents is
high for TDS and COD from multiple streams. Accordingly, a complex system involving
chemical precipitation, physical separation and filtration by RO and biological treatment
was identified considering the inadequacy of a single and simple technology to treat
complex wastes from agrochemical manufacturing, to ensure reuse of treated
wastewater. The adoption of zero liquid discharge-based treatment system however
observed to be a source of solid waste as the organic and inorganic components are
separated, as either stripper condensate and or salts from multiple effect evaporator
(MEE) and agitated thin film dryer (ATFD). The management identified this aspect and
proposed to identify alternative solid waste treatment/disposal methods, and
accordingly proposed to assess the feasibility of extracting saleable by-products,
disposing the stripper condensate for co-incineration in cement plants.
6.1.1 Introduction
These follow up programs may involve direct participation of stakeholders also, with
respect to monitoring, evaluation, and management. This follows up activity will
provide a feedback loop to project authority and regulators to ensure adaptive
management, ensuring continual assessment of impacts, and converting EIA/EMP into
a dynamic document. The objective of the follow up is threefold, a. monitoring and
evaluation of EIA activity to assure the adequacy of environment management at micro-
scale, b. evaluation of EIA systems at the macro scale addressing the efficiency and
effectiveness of the EIA system and c. evaluation of the utility of EIA at the meta scale
addressing the key question of whether EIA works?
6-1
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
6.1.2 Objectives
6.1.3 Methodology
The proposed expansion involves construction of few facilities, electro mechanical works
related utilities, manufacturing facilities and enhancement of zero liquid discharge
facility. The Construction activity results in mainly air emissions consisting of dust and
particulates, increased noise levels, wastewater from domestic water use, construction
and demolition waste in addition to municipal solid waste and empty containers and
other hazardous wastes. The operational phase results in mainly air emissions, liquid
effluents, and solid wastes in significant quantity. Accidents and incidents may result in
air emissions consisting volatile organics, increased noise levels, effluents from
firefighting, and other solid wastes due to accidental spillages. The decommissioning
stage results in air emissions consisting of dust and particulates, increased noise levels,
effluents from cleaning and detoxification, etc., and solid wastes consisting of demolition
wastes and other hazardous and non-hazardous wastes. Hence the monitoring program
shall address the above aspects within the plant, outside the battery limit, and at the
6-2
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
sensitive locations in the impact area. The monitoring program includes visual
observations, frequent sampling, and monitoring, continuous monitoring, and analysis
of selected parameters. Monitoring methodology for air quality, noise levels, water
quality, solid wastes and soil, ecology, and biodiversity cover the following key aspects:
• Components to be monitored
• Parameters for monitoring of the above components
• Monitoring frequency
• Monitoring standards
• Responsibilities for monitoring
• Direct responsibility
• Overall responsibility
• Monitoring costs.
Environmental monitoring of the parameters involved and the threshold limits specified
are discussed below for the proposed expansion of agrochemicals unit of M/s. NACL
Industries Limited.
6-3
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
6-4
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
Limit in the
Permissible
Absence of
Characteristics ent Outside the Desirable of Test
Alternate
Source
(Desirable Limit (Ref. To
Limit) IS)
ESSENTIAL CHARACTERISTICS
1 Colour, Hazen 5 Above 5, consumer 25 3025 Extended to 25 only if
units, Max. acceptance decreases (Part 4) toxic substances are not
1983 suspected, in absence of
alternate sources
2 Odour Unobjectio - - 3025 a) Test cold and when
nable (Parts5): heated
1984 b) Test at several
dilutions
3 Taste Agreeable - - 3025 Test to be conducted
(Part 7& 8) only after safety has been
1984 established
4 Turbidity NTU, 5 Above 5, consumer 10 3025 -
Max. acceptance decreases (Part 10)
1984
5 pH Value 6.5 to 8.5 Beyond this range, the No 3025 -
water will affect the relaxatio (Part 11)
mucous membrane n 1984
and/or water supply
system
6 Total hardness 300 Encrustation in water 600 3025 -
(as CaCO3) supply structure and (Part 21)
mg/l, Max adverse effects on 1983
domestic use
7 Iron (as Fe) 0.3 Beyond this limit 1 32 of 3025 : -
mg/l, Max taste/appearance are 1964
affected, has adverse
effect on domestic uses
and water supply struc-
6-5
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
Limit in the
Permissible
Absence of
Characteristics ent Outside the Desirable of Test
Alternate
Source
(Desirable Limit (Ref. To
Limit) IS)
6-6
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
Limit in the
Permissible
Absence of
Characteristics ent Outside the Desirable of Test
Alternate
Source
(Desirable Limit (Ref. To
Limit) IS)
Limit in the
Permissible
Absence of
Characteristics ent Outside the Desirable of Test
Alternate
Source
(Desirable Limit (Ref. To
Limit) IS)
22 Radioactive materials: 58 of -
3025:01964
23 a) Alpha - - 0.1 - -
emitters Bq/l,
Max
24 Beta emitters - - 1 - -
pci/1, Max
25 Aluminium (as 200 Beyond this limit taste 600 13 of -
Al), mg/l, Max becomes unpleasant 3025:1964
26 Aluminium (as 0.03 Cumulative effect is 0.2 31 of 3025: -
Al), mg/l, Max reported to cause 1964
dementia
27 Boron, mg/l, 1 - 5 29 of 3025: -
Max 1964
Source: Indian Standard Drinking Water Specification-IS10500:1991
6-8
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
6-9
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
NACL Industries Ltd have established a laboratory and also obtain accreditation from
NABL as a testing laboratory for environmental monitoring. The laboratory has facility
to collect, monitor and analyses samples for ambient air quality, stack emissions, solid
waste, wastewater and noise levels. The equipment and instruments are purchased in
accordance with “guidelines for recognition of environmental laboratories under
Environment (protection) act, 1986” CPCB, 2009. Records shall be maintained for
analysis of raw effluents and treated effluents, ambient air quality data, stack emissions
monitoring results, micro- meteorological data and noise levels. These records are not
only required for the perusal of the Pollution Control Board authorities but also to derive
at the efficiencies of the pollution control equipment as the objective of the project
proponent is not only compliance with statutory regulations, but also a serious
commitment towards clean environment.
The industry shall maintain the records as per the hazardous waste regulations and EPA
regulations and apply for the annual consents for air and water, and renewal of
authorization for the storage of hazardous waste as per Hazardous Waste (Handling
&Management) Rules, 1989. The records of hazardous waste manifest will be
maintained.
6-10
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
Reporting system provides the necessary feedback for project management to ensure
compliance with stipulated standards and facilitate adaptive management. The rationale
for a reporting system is based on accountability to ensure that the measures proposed
as part of the environmental management plan get implemented in the project.
Periodic Work zone monitoring is carried out to review indoor toxic chemicals
concentration. The periodicity of monitoring is dependent on the concentrations i.e.,
below or above TLV values, ranging from once a month in case of higher values to once
a year in case of lower values.
6-11
Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
7.0 Introduction
This chapter presents the risk assessment study results for the plant operations, transport
and storage of raw materials, and identifies maximum credible accident scenarios to draw
the emergency management plan addressing various credible scenarios identified.
The strategy to tackle such emergencies, in-depth planning and person(s) or positional
responsibilities of employees for implementation and coordination of timely and effective
response measures are described in onsite detail in Emergency Plan.
The plant site of 100 acres is located at Sy. No. 177, Arinama Akkivalasa village, Etcherla
mandal, Srikakulam district, Andhra Pradesh. The site at the intersection of 180 16’31” (N)
latitude and 830 47’33” (E) longitude. The plant site is surrounded by open agricultural
lands in east, west and south directions, chilakapalem road connecting to Akkivalasa
village in north direction. The main approach road is NH-5 is at a distance of 0.53 km in
south direction. The nearest habitation from the site is Kesavadasupeta located at distance
of 0.3 km in northwest direction. The nearest town is Srikakulam at a distance of 10.6 km
in NE direction. The nearest railway station is Ponduru at a distance of 10.5 km in north
direction and nearest airport is Visakhapatnam located at a distance of 85 km in southwest
direction. Pedda gedda a seasonal stream is at a distance of 4.2 km in SW direction. Chitti
gedda a seasonal stream is at a distance of 4.7 km in SW direction. There are no reserve
forests, national Parks, sanctuary, biosphere reserves, ecologically sensitive area, critically
polluted area and interstate boundary within the impact area of 10 km surrounding the
site. The manufacturing capacity after expansion is presented in Table 7.1 and by products
in Table 7.2
Agrochemicals Formulations
S.No Name of Product Unit Capacity
1 Granules MT/year 20000
2 Liquids Kl/Year 25000
3 Powders MT/year 5000
Total 50000 50000
Table 7.2 List of By-products – After Expansion
S.No Name of the Product By-Product Quantity
(Kg/day)
1 Triazinone Hydrochloric Acid (30%) 2470
NASH solution 1300
2 Myclobutanil Sodium Bromide 1070
3 Difenoconazole Potassium Chloride 183.5
Potassium Bicarbonate 246.4
4 Tribenuron-methyl Technical Ethanol 116.5
Table 7.3 List of Raw Materials and Inventory (Terms of Reference No. 3(iv) & (3(v))
S. Name of Raw Inventory Mode of Storage Physical Nature of
No Material (MT) Form Chemical
1 Acetic Acid 1 x 10 SS Storage Tank Liquid Flammable,
Corrosive
2 Acetone 2 x 50 SS Storage Tanks Liquid Flammable
3 Acetonitrile 2 x 50 SS Storage Tanks Liquid Toxic
4 Bromine 2 x 10 SS Storage Tanks Liquid Toxic
5 Benzene 1x1 SS Storage Tank Liquid Toxic
6 Chlorine Tonners Tonners Liquid Toxic
7 Cyclohexane 1 x 30 SS Storage Tank Liquid Highly Flammable
8 Dimethyl Formamide 2 x 30 SS Storage Tanks Liquid Flammable
9 Dimethyl sulfoxide 1 x 30 SS Storage Tank Liquid Irritant and
flammable
10 Ethylene Dichloride 1 x 30 SS Storage Tank Liquid Carcinogenic
11 n-Hexane 1 x 30 SS Storage Tank Liquid Flammable
12 n-Heptane 1 x 30 SS Storage Tank Liquid Flammable
13 Isopropyl Alcohol 1 x 10 SS Storage Tank Liquid Flammable
14 Methanol 2 x 50 SS Storage Tanks Liquid Flammable
15 Methylene Dichloride 2 x 50 SS Storage Tanks Liquid Carcinogenic
16 Methyl tert-butyl ether 1 x 30 SS Storage Tank Liquid Flammable
17 N-Methyl-2- 1 x 10 SS Storage Tank Liquid Toxic
Pyrrolidone
18 Tetrahydrofuran 1 x 30 SS Storage Tank Liquid Flammable /
Carcinogenic
19 Toluene 2 x 50 SS Storage Tanks Liquid Flammable
20 Xylene 1 x 30 SS Storage Tanks Liquid Toxic
The production facilities shall be designed for proper handling of materials and machines.
Safety of operators, batch repeatability and process parameter monitoring shall be the
major points of focus in the design of facility. The current Good Manufacturing Practices
(GMP) guidelines shall be incorporated as applicable to synthetic organic chemicals
manufacturing facilities.
7.4.2 Utilities:
The proposed expansion requires additional steam for process, ZLD system and solvent
recovery system. It is proposed to establish coal fired boilers of capacity 1 x 50 TPH coal
fired boiler in addition to existing 1 x 16 TPH, 1 x 10 TPH coal fired and 1 x 6 TPH oil fired
boilers. It is proposed keep existing boiler as standby after establishment of proposed 1 x
50 TPH boiler. It is proposed to establish 1 x 10 lakh k.cal/hr and 1 x 6 lakh k.cal/hr
thermic fluid heaters as part of expansion. The total power requirement is estimated to be
4.0 MW. The DG sets required for emergency power during load shut down is estimated
at 2 x 2000 kVA proposed in addition to existing 1 x 1000 kVA and 2 x 500 kVA. The list of
utilities is presented in the following Table 7.4.
Coal will be stored under covered shed with water sprinkler system in emergency. Ash
silos will be provided for storage and handling of ash generated from combustion of coal.
Water sprinkling system shall be installed on stocks of coal in required scales to prevent
spontaneous combustion and consequent fire hazards. The stack geometry shall be adopted
to maintain minimum exposure of stock pile areas towards predominant wind direction.
Loss of Containment • Dykes for all tanks (Dyke capacity to be min. 110% of tank capacity
and Spillage and dyke distance from tank to be min half the tank height).
• Tanker unloading area (road) to be dyked.
• Availability of the Spill control kit.
Bulk Materials Store (liquid chemicals) Drum Yard and Special Chemicals Store
Fire/ Explosion • Fenced area, Access Control and control of visitors
• Building capable of being locked when not in use.
• Control of ignition sources.
• Control of inventory to minimum possible
• Segregation of materials.
• Smoke/ Heat detection system (non-electricity based)
• No water based firefighting setup around the store.
• Adequate CAUTION displays
• Fire hydrants and fire monitors
• Provision of foam
• No electrical installation inside the Store
• Adequate natural light and ventilation.
Loss of Containment • Arrangements of drums in rows of two (two levels max) and a gap
Spillage of at least 2 feet between rows and from the walls all around.
• Storage in open area on hard impervious floor surrounded by a
dyke/ sill. (For Bulk Materials Store and New Solvent Drum Shed)
• Availability of the Spill control kit
7.5 Hazard Analysis and Risk Assessment (Terms of Reference No. 3(ix))
7.5.1 Introduction.
Hazard analysis involves the identification and quantification of the various hazards
(unsafe conditions) that exist in the plant. On the other hand, risk analysis deals with the
identification and quantification of risks, the plant equipment and personnel are exposed
to, due to accidents resulting from the hazards present in the plant.
Hazard and risk analysis involve very extensive studies, and requires a very detailed
design and engineering information. The various hazard analysis techniques that may be
applied are hazard and operability studies, fault-tree analysis, event-tree analysis and
failure modes and effects analysis.
Risk analysis follows an extensive hazard analysis. It involves the identification and
assessment of risks; the neighboring populations are exposed to as a result of hazards
present. This requires a thorough knowledge of failure probability, credible accident
scenario, vulnerability of population's etc. Much of this information is difficult to get or
generate. Consequently, the risk analysis is often confined to maximum credible accident
studies.
In the sections below, the identification of various hazards, probable risks, maximum
credible accident analysis, consequence analysis are addressed which gives a broad
identification of risks involved in the plant.
consider incidents, which have occurred elsewhere at similar facilities including within the
same industry and in other industries.
filtrate
Vibration due to uneven cake settling in
centrifuge- may result into fire and accident
Fire due to static charges& flammable vapor-
air mixture over open Nutch filter
Fire due to static charges & ingress of air
6. Drying Overheating during drying may result into fire
and explosion
Air ingress and static charges during Fluid Bed
Drying may result in explosion
Fire & explosion due to static charges due to
low ignition energy & thermal decomposition
7. Milling, Pulverization & Sifting Potential explosion hazard if the powder has
very low minimum ignition energy & Kst
value and prone to generate static charges
8. Blending Fall hazard & caught in Hazard during
Blending operation
Table 7.7 Hazard Associated and Mitigative/ Control Measures with Manufacturing Activity
Event Hazardous event Causes of Hazards System elements / events that Prevention and mitigation control
ID No. can lead to a major accident measures/ safety relevant components
1 Fires from spills Spills of flammable are more Spills are contained within Plant design specifications ex. Stainless
likely to be involved in fires. the bounded areas. Size of steel for piping and minimum flanges.
Spills can be the result of fire will depend on spill size Equipment inspection and maintenance
mechanical failures and time delay to ignition procedures. Operating procedures and
ex. Corrosion of pipes training. Control of ignition sources.
oversells operational errors Fire protection systems ex. Hydrants,
due to human factors or foam, monitors and fire extinguishers as
control problems (ex. Faulty currently available on the site.
high-level protection)
2 Over pressuring Failure of the pressure control Failure of pressure relief Interlock provided
the pressure valve
vessel
3 Pump Fires Pumps being dead headed or Localized fire at pump Preventive maintenance for pumps.
seal failures Fire protection system ex. Hydrants,
foam, monitors and fire extinguishers as
currently available on the
site
4 Leak during road Failure of flexible hose Leak of material from road High level of surveillance and use of leak
tanker transport connection, leaks from valves tanker, resulting in fire if detection during unloading.
or fittings flammable material gets Permit system for loading / unloading.
ignited. Impact to people, Dyke system for tanker unloading
property and the
environment due to
radiant heat
5 Toxic gas/liquid Failure of pumps and Leak from tank / or from High level surveillance and use of leak
leak corrosive joints unloading tanker, resulting detection, periodical maintenance should
dispersion of toxic gas to the be followed
atmosphere and
surrounding area
Considering operating modes of the facility, and based on available resources the following
hazard identification process chosen are:
a) Fire Explosion and Toxicity Index (FETI) Approach;
b) HAZOP studies;
c) Maximum Credible Accident and Consequence Analysis (MCACA);
d) Classification of Major Hazard Substances;
e) Manufacture Storage and Import of Hazardous Chemical Rules, 1989 (GOI Rules,
1989);
f) Identification of Major Hazardous Units.
The physical properties of solvents used in the process are presented in Table 6.2 which
forms the basis for identification of hazards during storage and interpretation of the
Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 (GOI Rules, 1989)
The guide applies to process unit only and not to auxiliary units such as power
generating stations, plant water systems, control rooms, fired heaters, structural
requirements, corrosive nature of material handled and personal safety equipment. These
are regarded as basic features that do not vary according to the magnitude of the fire and
explosion hazard involved. The guide also does not cover the processing and handling of
explosives such as dynamite, TNT etc.
Computation of F&EI
The F&EI is calculated as a product of Material factor, General process hazard factor, and
special process hazard factor The Material factor is a measure of the intrinsic rate of
potential energy release from fire or explosion of most hazardous material or mixture of
materials present in significant quantity, whether it is raw material, intermediate,
product, solvent etc. by combustion or chemical reaction. “In significant quantity” here
means such quantity that the hazard represented by the material actually exists. The
National Fire Protection Agency of USA (NFPA) have specified standard values for
material factor which should be used for F&EI calculations and are available in Dow’s
Hazard Classification Guide. In case itis not readily available, it can be calculated using
the heat of combustion, flammability indices etc.
The F&EI index is calculated as a product of Material factor, General process hazard factor,
and Special process hazard factor.
Hazard Ranking
Table 7.10 Degree of Hazard for F&EI
F&EI Index Range Degree of Hazard
1 – 60 Light
61 – 96 Moderate
97 – 127 Intermediate
128 – 158 Heavy
159 & above Severe
The estimated values of F&EI and hazard ranking are given in the Table 7.11. The radius
of exposure is determined by 0.26meter x respective F&EI. The estimated values of F&EI
reflect light hazard in view of the low volume of chemicals.
The fire and explosion index evaluation can be very useful in developing plant layouts or
adding equipment and buildings to existing plants. Evaluation of the F&EI calculations
and layout considerations will result a safe, operable, maintainable and cost-effective
arrangement of equipment and buildings.
Table 7.11 Fire & Explosion Index for Tank farm
S. Name of Solvent Fire & Radius of Degree of
No. Explosion Index Exposure (m) Hazard
(F1*F2*MF) F&EIx0.26
1 Acetone 94.3 24.5 Moderate
2 Cyclohexane 137.7 35.8 Heavy
3 Di Methyl formamide 26.3 6.8 Light
4 Dichloromethane 105.3 27.4 Intermediate
5 Hexane 105.3 27.4 Intermediate
6 Isopropyl alcohol 105.3 27.4 Intermediate
7 Methanol 104.5 27.2 Intermediate
8 Methyl Iso Butyl Ketone 112.8 29.3 Intermediate
9 Toluene 112.8 29.3 Intermediate
10 Xylene 112 29.1 Intermediate
11 Ethylene Dichloride 115.3 27.8 Intermediate
12 Dimethyl Sulfoxide 26.3 6.8 Light
F& E index value calculated considering the maximum storage capacity of chemical and
values are found to be Intermediate for most of the chemicals stored in bulk quantity,
moderate for acetone storage, light for dimethyl formamide and dimethyl sulfoxide, while
heavy for cyclohexane storage reflecting the threshold limits as prescribed in MSHC rules.
The preparative work for HAZOP studies consisted of four stages i.e., obtaining the data,
converting into usable form, planning the sequence of the study and arranging the
necessary meetings. The documents referred to for the study include process description,
process flow diagrams, P&I diagrams plant layout, operating manuals including startup
& shutdown, safety instructions etc., The parameters such as temperature, pressure, flow,
level were investigated for deviation and hazard situations are identified.
Some basic definitions of terms frequently used in HAZOP studies are deviation, causes,
consequences and guide words etc., Deviations are departures from the design intent
which are discovered by systematically applying the guide words. Causes are the reasons
why deviations might occur. Consequences are the reasons why deviations should they
occur. Guide words are simple words used to understand a particular plant section in
operating condition in order to guide and simulate the creative thinking process and so
discover deviations. NO, less, more, as well as, part of, reverse, other than are guide
words used.
Often, human errors are not analyzed while accident reporting and accident reports only
provide information about equipment or component failures. Hence, a great deal of
uncertainty surrounds analysis of failure of human systems and consequent damages.
The number of persons/materials are potentially exposed to a specific hazard zone is a
function of the population density and distribution near the accident location. The failure
rate data and ignition sources of major fires are presented in the following Tables 7.12
and 7.13.
Table 7.12 Failure Rate Data
S.No Item International Data
1. Process Controllers 2.4 x 10-5 hr-5
2. Process control valve 2.0 x 10-6 hr-1
3. Alarm 2.3 x 10-5 hr-1
4. Leakage at biggest storage tank 5.0 x 10-5 yr-1
5. Leakage of pipe line 1 x 10-7 m-1 yr-1
6. Human Failure 1 x 10-4 (demand)-1
7.6.1 Methodology
MCACA aims at identifying the unwanted hazardous events, which can cause maximum
damage to plant and personnel. At the first instance, all probable accident scenarios are
developed. Scenarios are generated based on properties of chemicals, physical conditions
under which reactions occur or raw materials stored, as well as material strength of
vessels and conduits, in-built valves and safety arrangements, etc. Creating a scenario
does not mean that it will occur, only that there is a reasonable probability that it could. A
scenario is neither a specific situation nor a specific event, but a description of a typical
situation that covers a set of possible events or situations.
The following steps are involved in identifying the maximum credible accident scenarios.
a. A detailed study of the process and plant information including process flow diagrams
and piping & instrumentation diagrams.
b. Hazard classification of chemicals, operations and equipment.
c. Identification of representative failure cases of vessels and the resulting release
scenarios
d. Establishment of credibility of visualized scenarios based on past accident data.
and other low inventory liquids are stored in ware house based on compatibility,
reactivity, toxicity etc. with appropriate safety and firefighting facilities to handle any
kind of emergencies. The solvent tank farm and the capacity of each tank is presented in
Table 7.14.
Table 7.14 Details of Solvent Tank Farm
S.No Name of Solvent Tank Capacity Dimensions (m) Tank Volume in
(KL) Height Diameter KL
1 Acetone 50 3.6 5.0 51
2 Acetic Acid 30 3.1 4.0 30
3 Acetonitrile 50 3.6 5.0 51
4 Cyclohexane 30 3.1 4.0 30
5 Dimethyl Formamide 30 3.1 4.0 30
6 Dimethyl Sulfoxide 30 3.1 4.0 30
7 Ethylene Dichloride 30 3.1 4.0 30
8 Hexane 30 3.1 4.0 30
9 Isopropyl alcohol 10 2.1 3.2 11
10 Methanol 50 3.6 5.0 51
11 Dichloromethane 50 3.6 5.0 51
12 Tetrahydrofuran 30 3.1 4.0 30
13 Toluene 50 3.6 5.0 51
14 Xylene 30 3.1 4.0 30
Failure Frequency:
The release scenarios considered above can be broadly divided in to two categories
(i) Catastrophic failures which are of low frequency and
(ii) Ruptures and leaks which are of relatively high frequency
Vapor or liquid release from failure of gasket, seal and rupture in pipe lines and vessels
fall in second category whereas catastrophic failure of vessels and full-bore rupture of
pipe lines etc., fall in to first category. Typical failure frequencies are given in Table 7.15.
7.2. In the present study ALOHA software from USEPA is used. These models for various
steps are described in the following sub-sections.
The following criteria tables present heat radiation intensities (Table 7.16), radiation
exposure and lethality (Table 7.17), and damage due to peak over pressure is presented
in Table 7.18
Table 7.16 Damage Due to Incident Radiation Intensities
S. No Incident Type of Damage Intensity
Radiation Damage to Equipment Damage to the People
(KW/m2)
1 37.5 Damage to process Equipment 100% lethality in 1 min.
1% lethality in 10 sec.
2 25.0 Minimum energy required 50 % lethality in 1min.
to ignite wood at indefinitely long
Significant injury in 10 sec.
exposurewithout a flame
3 19.0 Maximum thermal radiation ---
intensity allowed n thermally
unprotected adjoining equipment.
4 12.5 Minimum energy to ignite with 1% lethality in 1 min.
a flame, melts plastic tubing
5 4.0 -- Causes pain if duration is
longer than 20 sec, however
blistering is unlikely ( First degree
burns)
6 1.6 -- Causes no discomfort on
Longer exposure
Source: Techniques for Assessing Industrial Hazards by World Bank
7.7.2.1.1 Heat radiation effects (Terms of Reference No. Sp. TOR (13))
When a non-boiling liquid spills, it spreads into a pool. The size of the pool depends on
the availability of the bund and obstacles. The heat load on objects outside a burning pool
of liquid is calculated with the heat radiation model. The average heat radiation intensity,
the diameter-to-height ratio dependent on the burning liquid, geometric view, distance
from the fire, relative humidity of air, horizontal or vertical orientation of the object
radiated with respect to fire are factored. All storage tanks in tank-farm area are provided
with dykes. For each of the hazardous chemicals involved various scenarios such as pipe
line leaks of 5mm or pipeline ruptures or catastrophic vessel ruptures of the inventories
as outlined have been considered and damage distances for Lower Flammability Limits
(LFL) and heat radiation effects for the three levels of intensity are calculated and
presented in Table 7.19. Heat radiation damage distances for most of the scenarios are
not occurring in the case of release from 50 mm holes at a height of 0.1 m from the bottom
of the tank for one hour, in the storage tanks. In case of pipeline leaks, 5 mm leaks are
considered for 15 mm and 50 mm pipe sizes. The release rates from 5 mm leaks are
observed to be low, and these leaks have low incident hazard. The concentration of the
flammable material in the vapor cloud was found to be below the lower flammability
limits.
Table 7.19 Heat Radiation Damage Distances – Tank Farm (Pool Fire)
S.No Name of Raw material Tank Dia Height Hole Release Heat radiation
(KL) (m) (m) Dia Rate damage
(mm) (Kg/min) distances in m
(Kg/sec) for KW/m2
37.5 12.5 4.0
1 Acetone 50 3.6 5.0 50 90.4 <10 13 19
2 Acetic Acid 30 3.1 4.0 25 104.0 <10 10 13
3 Acetonitrile 50 3.6 5.0 25 95.5 11 14 19
4 Cyclohexane 30 3.1 4.0 50 89.7 <10 15 20
5 Dimethyl Formamide 30 3.1 4.0 50 99.2 <10 13 18
6 Dimethyl Sulfoxide 30 3.1 4.0 50 107.0 <10 12 16
7 Ethylene Dichloride 30 3.1 4.0 50 107.0 12 14 27
8 Hexane 30 3.1 4.0 50 82.6 11 14 19
9 Isopropyl alcohol 10 2.1 3.2 50 90.2 <10 12 18
10 Methanol 50 3.6 5.0 50 90.6 <10 11 15
11 Dichloromethane 50 3.6 5.0 50 48.7 12 14 24
12 Tetrahydrofuran 30 3.1 4.0 25 95.7 <10 13 19
13 Toluene 50 3.6 5.0 50 94.2 11 15 26
14 Xylene 30 3.1 4.0 25 95.7 <10 15 22
The storage of toxic chemicals was evaluated with respect to failure of containment
resulting in toxic dispersion and the toxic damage distances were calculated using
ALOHA software. The results of the same are presented in Table 7.21.
Table 7.21 Toxic Dispersion Damage Distances
S. Scenario IDLH Release Distance Storage Tank Details
No. Description (ppm) Rate (m) Height Dia Total Storage
Kg/sec (m) (m) Volume Pressure
(m3)
1 Chlorine Tonner 10 0.30 640 2.1 0.8 1 7atm
2 Ammonia (20%) 300 0.48 187 3.2 2.0 10 9.68atm
3 Bromine 3 5.13 3500 5.0 3.6 50 Atmospheric
4 30% 50 0.01 42 5.0 3.6 50 Atmospheric
Hydrochloric
Acid (Puddle)
When an unignited gas cloud mixes with air and reaches the flammable range and if the
cloud ignites wither a flash fire or flash fire explosion can occur. Since the burning time is
shorter, instead of heat radiation from a flash fire, peak overpressure as a function of
distance from the centre of the cloud is derived. In case of pipeline leaks, damage
distances due to overpressure effects are not observed. The values are found to be similar
as there are no pressurized storage tanks in the tank farm, and the over pressure
distances are contingent on the tank capacity.
7.7.3 Observations:
From the previous incident records published in literature and hydrocarbon release data
bases, it has been observed that pinhole leaks contribute highest percentage whereas the
second cause is small sized leaks of 50 mm diameter in tank farm. Accordingly, the
consequence analysis was carried out for 50 mm sized leaks in the tank farm.
7.7.4 Recommendations:
The following are the recommendations to minimize the hazards and improve the safety
of the proposed plants. Plants of this nature, which handle a variety of chemicals, face
problems of fire and vapor cloud explosions. It has been observed that the damage
distances are more or less confined to the plant area only. Taking precautionary safety
measures as outlined below can further minimize these effects.
1. As the new products would be introduced along with exiting products, adequacy of
emergency facilities (like fire protection, scrubber capacity etc.) are to be re-evaluated.
2. Water reactive Chemicals should be segregated from the RM Stores and must be
stored in a dedicated isolated shed having Auto Operated DCP Skid to extinguish
fire.
6. The redundancy of Temperature gauge for critical reaction w.r.t. temperature rise/ or
of exothermic nature must be provided.
8. Special arrangement to prevent entry of escaping chemicals and its compatibility with
existing arrangements are also to be evaluated. Especially this is relevant for vacuum
system, AHUs etc.
10. Skid Mounted Auto Modular DCP type fire protection is to be installed over reactor
areas or other unit operations wherever Hydrogenation is done, over Leaf filter, Over
Nutch filter area etc.
12. The scrubber vent terminal, vented contents are to be monitored to ensure that
neutralization is adequate.
13. All flammable solvents would be transferred to charge tanks by pumping and manual
transfer would be avoided wherever being done presently.
14. Suggested to provide suitable fire suppression system over Hydrogenator &
Hydrogen Battery Manifold area.
17. As the over- exposure to intermediates, chemicals and finished products can be
injurious to health, awareness of such conditions, avoidance of such conditions, use
of suitable personal protection, early detection of undesirable health conditions and
medical management measures are to be developed and included as procedures.
7.7.5 Toxic Management Plan (Terms of Reference No. Sp. TOR (14))
Handling: Storage & handling in compliance with MSDS. The transfer of solvents shall be
mainly by closed pipeline systems, while solvents are transferred from drums by using
air operated diaphragm pumps in closed hoods. Solid raw materials are charged by
using hoppers to avoid dust emissions and hazard of static electricity. SOP’s are used for
better operational control.
7.7.5.1 Tanker Loading and Unloading: Solvents and liquid raw materials are stored in
bulk storage tanks. Imported liquid raw materials in ISO tankers and indigenous raw
materials in tankers are transferred to bulk storage tanks as indicated below;
1. Material of construction of tanks is SS, MS, Glass Lined depending on the
compatibility with the liquid raw materials stored. All tanks are above ground
with impermeable concrete floors. Dykes are provided to contain leaks if any from
storage tanks. Volume of the Dyke is 20 % more than that of Storage tanks.
2. All liquids are transferred from tankers to Storage tanks using centrifugal pumps
with mechanical seals. SS , PEFE pipe lines and SS Flexible hoses with high
pressure rating are provided to transfer liquids under completely closed
conditions.
3. Dip pipes are provided inside bulk storage tank to avoid accumulation of static
electricity. Earthing provided to all storage tanks . Earthing is also provided with
earthing clips for tankers before unloading. Experienced persons trained in the
area handling of Hazardous chemicals are available round the clock to personally
supervise compliance with all safety issues such as earthing , proper connection of
metallic hoses to tanker , operation of the pump , Nitrogen Blanketing etc.
4. Markings are made on all Bulk Storage tanks indicating the name of the raw
material stored.
6. Breather valves with flame arrestors are provided for bulk storage tanks
containing volatile organic chemicals. Breather valves are set at high pressure to
minimize breathing losses.
7. Raw materials from Bulk Storage tanks are transferred to day tanks in the process
plant using pumps with mechanical seals through Pipe lines. All pipe lines pass
through the pipe bridge above ground.
9. Level transmitters with high level switch and automatic tripping of pumps at high
level provided for all day tanks to prevent overflow.
10. Products in liquid form are filled in ISO Tankers or drums. The product is stored
in a bulk tank under nitrogen blanketing and with earthing arrangements. ISO
container is flushed with Nitrogen and the finished product is transferred to the
tank with a pump. High precision level transmitters, flow meters are provided to
storage tanks with isolation valves on the transfer line to fill precise quantity in
ISO tanker. After filling the set quantity, isolation valves on transfer line
automatically closes and transfer pump also trips.
aprons etc., will be provided to employees depending on the work area allocated to them.
The PPE selection shall strictly follow the prescribed guidelines of MSDS.
Transportation of raw materials may result in accidents due to high speed collision, low
speed collision, overturning and non-accident-initiated release. The initiating and
contributing causes are presented in Table 7.23
Table 7.23 Truck Incidents – Initiating and Contributing Causes
Human Errors Equipment Failures System or Procedural External Events
Failures
Driver Non-dedicated trailer Driver incentives Vandalism/
Impairment Sabotage
Speeding RR crossing guard Driver training Rain
Driver Overtired Failure Carrier selection Fog
Contamination Leaking Valve Container Specification Wing
Overfilling Leaking Fitting Route selection Flood/washout
Other Vehicle's Brake Failure Emergency response Fire at rest
Driver training areas/parking
areas
Taking Tight Insulation/Thermal Speed Enforcement Earthquake
Protection Failure
Unsecured Load Relief device failure Driver rest periods Existing accident
Tire failure Maintenance Inspection
Soft shoulder
Overpressure Time of day Restrictions
Material defect
Steering failure
Sloshing
High center of gravity
Corrosion; Bad Weld;
Excessive Grade
Poor Intersection design
Suspension system
The scenarios presented for storages are calculated for transport related
incidents/accidents and presented in Table 7.24.
Table 7.24 Transportation Specific Concerns
Concern Road
Spill on Water Over or near a body of water
Unconfined Pools In an undisturbed flat area
BELVE-Induced catastrophic vessel Possible if sufficient quantity in car with small leak to
failure feed fire or if double tank trailer or burning fuel leak
Toxic products of combustion or Dependent on material and whether ignition occurs
reaction
Inform to electrical maintenance personnel to stop power supply to the Shift in-charge or Block in charge
effected sections
Shut down the operations in the affected area
Extinguish the fire with DCP or CO2. Extinguishers Electrical Staff (technician /engineer)
Inform to Block superintend or Head- Production about the status Shift in-charge
Replace the damaged electrical equipment or cable due to fire Electrical Staff
Restart the operations after thorough inspection of electrical MCC and Block in charge or Head- Production
earthing
TANK FARM
Pool Fire/ Tank fire / Shout “Fire, Fire, Fire and break the nearest fire manual call point. Operator/Incident Identifier (Who
Bund fire Inform to security, Head Production and Block In charge notices fire)
Shift in-charge
Ensure the usage of PPE’S by the concerned operators, workers Block Shift in-charge
Mobilize firefighting equipment like Fire extinguishers, Movable Block Shift in-charge
trolley mounted Fog nozzle to the spot and instruct firefighting team
and security to start fire water hydrant pumps
Instruct Mechanical and Electrical maintenance personnel to look after Block in charge or Head- Production
un interrupted water supply to cool adjacent tanks
Inform Head Production
If the fire turns into On-site, switch on, on site emergency procedures
WARE HOUSE
Material Spills Implementation of safe shutdown procedure and stop the material Operator / Incident Identifier
flows, inform to Stores in charge
Ensure proper usage of PPE by concerned operator/fitter/ workmen Stores in charge
Assess the quantity of material spill and inform to Head Production/ Stores in charge
Head Materials
Initiate salvage & cleanup operation Head Production / Materials
Give All Clear for restarting operations
Electrical fires Shout “Fire! Fire! Fire!” break the nearest fire manual call point and Operator / Incident Identifier Stores
inform to Stores in charge, security, Head Materials/production in charge
Instruct operator/ workman to pick up DCP/CO2 fire extinguisher Stores in charge
7.8.1 Introduction
A disaster is a catastrophic situation in which suddenly, people are plunged into
helplessness and suffering and, as a result, need protection, clothing, shelter, medical and
social care and other necessities of life.
Disasters can be divided into two main groups. In the first, are disasters resulting from
natural phenomena like earthquakes, volcanic eruptions, storm surges, cyclones, tropical
storms, floods, avalanches, landslides, and forest fires. The second group includes
disastrous events occasioned by man, or by man's impact upon the environment. Examples
are armed conflict, industrial accidents, radiation accidents, factory fires, explosions and
escape of toxic gases or chemical substances, river pollution, mining or other structural
collapses, air, sea, rail and road transport accidents and can reach catastrophic dimensions
in terms of human loss.
There can be no set criteria for assessing the gravity of a disaster in the abstract since this
depends to a large extent on the physical, economic and social environment in which it
occurs. However, all disasters bring in their wake similar consequences that call for
immediate action, whether at the local, national or international level, for the rescue and
relief of the victims. This includes the search for the dead and injured, medical and social
care, removal of the debris, the provision of temporary shelter for the homeless, food,
clothing and medical supplies, and the rapid re- establishment of essential services.
An emergency may be said to begin when operator at the plant or in charge of storage of
hazardous chemicals cannot cope up with a potentially hazardous incident, which may turn
into an emergency. The emergencies could be a major fire or explosion or release of toxic
gas or a combination of them.
The proposed expansion will store fuels, which are flammable in nature, and the storage
will be as per the Controller of Explosives and OISD norms. The hierarchy of the employees
is yet to be determined and the project is still in the initial stages of designing. Hence a
tentative disaster management plan is prepared to be suitably modified before
commissioning of the plant.
During Emergency: Is to provide basic guidance to the personnel for effectively combating
such situations to minimize loss of life, damage to property and loss of property.
• To keep the required emergency equipment in stock at right places and ensure
their working condition;
• To keep the concerned personnel fully trained in the use of emergency equipment;
• Preserving records, evidence of situation for subsequent emergency etc.
Earlier, a detailed Hazard Analysis and Risk Assessment were carried out for the plant
facilities and the hazards are quantified. The likely locations of hazards and consequences
are evaluated, duly following the standard procedure.
The other emergencies are asphyxiation of persons, apart from risks due to cyclonic
conditions, earth quake, lightning, floods (natural calamities), sabotage, bombing (social
and other reasons) etc. which are not under the management control.
Priority of protection in the event of an emergency is; Life and safety of personnel,
preservation of property, restoration of normalcy.
4. All Head of the Departments (HODs) are identified as Emergency Response Team
members.
5. Shift In-charge is always, the Incident Controller till DGM – Manufacturing reaches the
site, then the charge can be delegate to DGM - Mfg. He would directly report to Site main
controller for the purposes of Onsite Emergency Mitigation Measures. He is assisted by
the entire Block in charges in the Shift.
Firefighting System
Fire detection system (Heat Detectors) Water & foam monitors
Automatic foam & water sprinkler system Down comer pumps
Fire Hydrant system Two sets of fire hydrant pump system
Hose reel Portable Fire extinguishers
Sand buckets Wind Sock
Occupational Health Center (OHC)
Personnel Protective Equipment Fire Proximity Suits
Self-contained breathing apparatus Fall arrestors
Safety ladders Carbon dioxide cylinders
Eye wash / Body wash showers Multi gas analyzers
Oxygen Analyzers
Communication & Transport
Mega Phone DG sets
Walkie – Talkie’s Ambulance /Emergency Transport Vehicle
Public Address System
The following emergency equipment is made available at alternate ECC (Security point):
• Automatic Fire Detection system (Heat detectors)
• Automatic Fire Protection systems (water & foam sprinklers)
• Manual call points (MCP)
• Fire Hydrant system
• Eye /body wash showers are located in all Departments and tank Farm
• Self-contained breathing apparatus.
• Hose reels
• Portable fire extinguishers
• Sand buckets
• Water & foam monitors
b) Assembly points
➢ Assembly point is that location where the persons who are not connected with
emergency operations can await either for further instructions or for rescue,
transport and rehabilitation.
➢ Outside of the Admin Building & near Security Gate-II are considered as safe
assembly Points
c) Firefighting Facilities
The firefighting facilities which shall be provided are presented in Table 7.26.
Table 7.26 List of Fire Extinguishers
S.No Description of Item Quantity
1. DCP 10 kg 10 Nos.
2. Foam 50 ltrs 5 Nos.
3. CO2 22.5 kg 10 Nos.
4. CO2 6.8 kg 10 Nos.
5. ABC Soda Acid 5 kg 10 Nos.
6. ABC Soda Acid 1 kg 10 Nos.
7. Fire Buckets with stand 20 Nos.
e) Emergency siren
Emergency siren will be provided with 0.5 km range of audibility and the location will be
time office. The siren will operate on regular supply and also on emergency electrical
supply. Shift electrical engineer of plant on receipt of information from shift incharge, is
authorized to operate the siren.
f) Emergency escapes
Emergency escapes in the plant area and floor wise emergency escapes will be
conspicuously marked.
g) Wind sock
Wind socks to observe the wind directions will be installed on the top of Turbine Plant
house.
c) Emergency communication
a. Any person(s) in the common area or person(s) in the Production block or Utility can
identify emergency Situation. Whosoever sees such a situation; he has to immediately
communicate to the concerned Shift in-charge / Block in-charge Security by intercom or
walkie -talkie hand set. Shift in-charge / Block In-charge inform to incident controller.
d. Operating the Siren in nodes of waxing and waning as per emergency siren practice is
an indication of significant emergency situation in the Factory. SOperator (Security) is
given training of how to operate the same.
e. Emergency Siren is operated under the authority of Site Main Controller/ Emerghead.
3. Security person receiving the information from Intercom / Observer passes on the
same to Safety Head, Ambulance Driver & OHC Assistant.
9. Emergency Head / Site Main Controller in consultation with Incident Controller would
order for all clear siren indicating that emergency is overcome. Continuous operation of
siren for two minutes is an indication of All Clear.
b) Mock drill
Occasional mock drill is essential to evaluate that the ONSEP is meeting the objectives.
Adequate training is given to all staff members before conducting the mock drill. Mock
drills will be initiated with table top exercise, followed by pre-informed mock drills, and
few uninformed mock drills in the first phase. Functional exercises (communication,
Emergency shut down, fire fighting at different locations, rescue etc.) are carried out in
the second phase.
Mock drills will familiarize the employees with the concept and procedures and help in
evaluating their performance. These scheduled and unscheduled mock drills are
conducted during shift change, public holidays, in night shift once in 6 months.
Response time, strict adherence to discharge of responsibilities, difficulties and
inconsistencies experienced are recorded and evaluated. Fire officer will assists
Emergency coordinator in designing and extending such mock drills and in evaluating
the response.
c) Review
The Emergency plan is reviewed periodically to evaluate the effectiveness, and during
change in organizational structure, isolation of equipment for longer duration, and
during increase in inventory of fuel and other chemicals. Manger Electrical and
Emergency coordinator initiates and authorizes such review as and when required, and
the changes if any will be duly informed to all the employees concerned.
I. Failure of pipelines: feeding into the pipeline is stopped. Isolate the leaking
pipeline by closing the relevant valves. Transfer the material present to other
pipelines. Shutdown the pump. Close the suction and discharge valves of the
pump
II. Personal Protection: The people, who are assigned to the rescue operations,
must wear suitable personnel protective equipment such as self-contained
breathing apparatus and fire suit. They should remain in the incident area as
long as he can safely stay there. In spite of the wearing safety protective
equipment if he is unable to stay in the contaminated area, he should leave
immediately.
• Start water spray system at areas involved or exposed to fire risks to avoid domino
effects.
• In case of leakage of chemicals without fire and inability to stop the flow, take all
precautions to avoid source of ignition.
• Block all roads in the adjacent area and enlist police support for the purpose if
warranted.
• Exercise care to ensure that static charge is not generated in vapor cloud. For this
purpose solid jet of water must be avoided, instead fog nozzles must be used.
• If the only valve that can be used to stop the leakage is surrounded by fire, it may
be possible to close it manually. The attempt should be directed by trained
persons only. The person attempting closure should be continuously protected by
means of water spraying (thorough fog nozzles), fire entry suit, water jet blanket
or any other approved equipment. The person must be equipped with a safety
harness and manned lifeline.
M/s. NACL Industries Limited (formerly known as Nagarjuna Agrichem Ltd) proposed
to increase the manufacturing capacity of agrochemicals from 30 TPD to 70.1 TPD and
also include Captive Co-generation Power Plant of 6 MW in existing site area of 100 acres.
The capital cost for proposed expansion is Rs. 65 crores, towards additional facilities,
utilities and enhancement of zero liquid discharge facility.
The proposed expansion will provide additional employment to 200 people. It will be
spending approximately Rs. 24.5 lakhs of rupees every month on salaries providing
bread and succour to 200 families additionally. The proposed expansion will also
generate indirect employment to the locals during construction phase in the order of 100
people for a period of 18-24 months. The employers will contribute to the provident
fund, ESI and provide facilities as per the relevant labour act.
The TOR letter F.No. F.No. J-11011/75/2007-IA II (I) dated 24.06.2020, does not mention
Environment Cost Benefit Analysis and hence the same was not conducted.
SUBMITTED TO
ANDHRA PRADESH POLLUTION CONTROL BOARD,
REGIONAL OFFICE, SRIKAKULAM
M/s. NACL Industries Ltd.
Environment Management Plan
10.0 Introduction
Environment management plan can be effectively implemented to mitigate the
pollution levels by observing the following; avoidance, source reduction, on site
recycling, by product extraction, and offsite recycling as first choice followed by
treatment, release and disposal. The mitigation/control measures proposed to be
adopted for expansion in addition to the existing ones which include modification to
engineering design, inclusion of new technology, change in work practices during
operations and required personal protection equipment to minimize the residual
impacts that are predicted, are presented in the previous chapters. The management
plan is drawn in consultation with the R&D team, project team and environmental
consultants. During the review R&D team informed that increasing the product yields
by improving on reaction conditions or by using catalysts to ensure optimized usage of
raw materials resulting in low pollution load and better-quality product is a major
objective of their development wing.
The operation phase shall require a larger department for safety health and
environment headed by a General Manager who would report to the director
operations/Managing Director. The GM (SHE) will be a senior person with post-
Safety, Health and Environment (SHE) Division will be responsible for the compliance
of the environmental conditions laid down in Environment Clearance and adhere to
the Environmental Laws and Regulations. Six monthly compliance report with respect
to the conditions stipulated by MoEFCC will be submitted regularly to the Regional
Office of MoEFCC. Work instruction for reporting and addressing non-compliance
related to EC/CTE/CTO conditions is laid down in Standard Operating Procedure
(SOP). In case of any violation of any statutory conditions, the same will be reported
to the Managing Director and subsequently to Board of Directors and other
Stakeholders. The Board of Directors will review the non-compliance and its
corrective actions. Incident reporting mechanism is shown in Fig 10.2
Abstraction of ground water Rain water harvesting and roof run off storage EHS engineer
Process effluents Segregation of effluents, 1328 ETP Manager, operators and
Washings Treatment in effluent treatment plant and treated wastewater chemists
Scrubber effluents sent to marine disposal after achieving marine discharge
Utility blow downs standard prescribed.
R & D wastewater
Domestic washings wastewater
NOISE AND VIBRATION
Process area (Turbine) Attenuating screens 35 EHS Engineer followed by
Personal Protective Equipment (PPE) DG sets operators and Co-
Compressors and DG sets Acoustic enclosure generation power plant
Equipment, motors, pumps Casings and guard manager
Transport Limited vehicle movement in plant boundary
SOLID WASTE
I. Hazardous Waste
Process residue, solvent residue, Designated covered storage 12 Environment Engineer
stripper distillate, Spent carbon Labeled containers followed maintenance staff
Garland drain to storage facility
Disposal to Cement plants for co-incineration
Personal Protective Equipment (PPE)
ETP sludge, MEE salts Designated covered storage 6
Labeled containers
Garland drain to storage facility
Disposal to TSDF
Personal Protective Equipment (PPE)
II. Non-Hazardous Waste
Coal Ash Storage silo with ash conditioning facility 4 Environment Engineer
Disposal to brick/cement manufacturers followed maintenance staff
OTHERS
Storage of raw materials and Tank farm with vent condenser facility for low vapor pressure 30 EHS Engineer and
solvents solvents Production manager
Designated covered storage followed by operators
Closed transfer system for all liquids
Dedicated day tanks at production blocks
Employee exposure to chemicals Occupational Health Centre 20 EHS engineer, production
Self-contained breathing apparatus managers and operators
Standard operating procedure
Health checkup on recruitment
Periodic health checkup during employment
Engineering controls like closed transfer, hoods etc.
Employee rotation
Personal protective equipment
Education, training and periodic mock drill
Transport of raw materials and TREM cards 5 Logistics manager
finished products Driver training and briefing
The industry shall obtain the consent for operation (CFO) as required under section
25/26 of the Water Act, 1974 and under section 21/22 of Air Act, 1981 before trial
production and commissioning from the State Pollution Control Board. The CFO will be
renewed each year by the industry. The industry will obtain the necessary permissions
under Hazardous Waste (Management and Handling) Rules 1989, and Manufacture,
Storage and Import of Hazardous Chemicals Rules, 1989, issued by the Ministry of
Environment and Forests, New Delhi. The industry will submit environmental
statement every year before September 30, and monthly water cess returns. The
management ensures that it will comply with all the directions and regulations issued
by the Ministry of Environment and Forests, New Delhi, State and Central Pollution
Control Boards. The Consent for Establishment, Consent for Operation will be displayed
in a conspicuous location for the information of the inspecting authorities of different
departments.
Table 10.4 Item Wise Tentative Capital Cost Estimate for Environment Management
S.No Description Cost
(Rs. Lakhs)
I Air pollution
Electro Static Precipitator 85
Scrubbers 72
Condensers 315
Vacuum pumps 12
Ash handling system 8
Total - I 492
II Safety
Breather Valves 1.6
Rupture disks 2
Safety relief valves 5
Total - II 8.6
III Occupational safety
Self-contained breathing apparatus 75
Personal protective equipment 7.2
Total - III 82.2
IV Water
Effluent treatment system 1500
Effluent storage tanks 20
Rain water harvesting structures 5
Effluent and sewage transfer lines 12
Total - IV 1537
V Noise
Acoustic enclosures 9.7
Guards, casing, attenuating screens 13
Vibration control pads 4.5
Total - V 27.2
VI Solid waste
Storage area for hazardous waste 12
Detoxification area 6
Total - VI 18
VII Green Belt 11
Total - VIII 11
VIII Environmental monitoring
Laboratory 6
Monitoring equipment 5
Total - VIII 11
Total (I+II+III+IV+V+VI+VII+VIII) 2187
11.0 Introduction
M/s. NACL Industries Limited (formerly known as Nagarjuna Agrichem Ltd) obtained
environment clearance vide letter no. F.No. J-11011/75/2007-IA II (I) dated 30.07.2007 to
manufacture agrochemicals and environment clearance, which was transferred to NACL
Industries Limited vide letter no. J-11011/75/2007-IA II (I) dated 18.12.2020. The unit had
renewed consent for operation vide order No. APPCB/VSP/VZN/53/CFO/HO/2019
dated 04.10.2018 valid till 28.02.2021.
direction. The nearest habitation from the site is Kesavadasupeta located at distance of 0.3
km in northwest direction.
The nearest town is Srikakulam at a distance of 10.6 km in NE direction. The nearest railway
station is Ponduru at a distance of 10.5 km in north direction and nearest airport is
Visakhapatnam located at a distance of 85 km in southwest direction. Pedda gedda a
seasonal stream is at a distance of 4.2 km in SW direction. Chitti gedda a seasonal stream is
at a distance of 4.7 km in SW direction. There are no reserve forests, national Parks,
sanctuary, biosphere reserves, ecologically sensitive area, critically polluted area and
interstate boundary within the impact area of 10 km surrounding the site.
Agrochemicals Formulations
S.No Name of Product Unit Capacity
1 Granules MT/year 20000
2 Liquids Kl/Year 25000
3 Powders MT/year 5000
Total 50000 50000
11.4 Utilities
The proposed expansion requires additional steam for process, ZLD system and solvent
recovery system. It is proposed to establish coal fired boilers of capacity 1 x 50 TPH coal
fired boiler in addition to existing 1 x 16 TPH, 1 x 10 TPH coal fired and 1 x 6 TPH oil fired
boilers. It is proposed to keep existing boiler as standby after establishment of proposed 1
x 50 TPH boiler. It is proposed to establish 1 x 10 lakh k.cal/hr and 1 x 6 lakh k.cal/hr
thermic fluid heaters as part of expansion. The total power requirement is estimated to be
4.0 MW. The DG sets required for emergency power during load shut down is estimated at
2 x 2000 kVA proposed in addition to existing 1 x 1000 kVA and 2 x 500 kVA. The list of
utilities is presented in Table 11.3.
Table 11.3 List of Utilities
S.No Utility Existing Proposed
After
expansion
1 Coal Fired Boilers (TPH) 1 x 16 1 x 50 1 x 50,
1 x 10 1 x 16 *
1 x 10 *
2 Furnace oil boiler (TPH) 1x6 1x6*
3 Thermic Fluid Heaters (K.cal/hr ) 1 x 10 Lakh 1 x 10 Lakh
1 x 6 Lakh 1 x 6 Lakh
4 DG Sets (kVA)# 1 x 1000, 2 x 2000 2 x 2000
2 x 500 1 x 1000
2 x 500
* Standby after expansion #DG sets will be used during load shut down by Transco
11.7.1 Impacts on Air quality: The impacts on air quality is due to the emissions from, coal
fired boilers, and standby DG sets. The incremental concentrations are quantified using ISC-
AERMOD model based on ISCST3 Algorithm for proposed utilities of NACL Industries
Limited. The results indicate marginal increase in ambient air quality concentration. The
predicted values for PM, PM10, PM2.5, SO2 and NOx are 1.42, 0.57, 0.26, 2.23 and 3.11 g/m3
respectively and the maximum values are observed at a distance of 0.5 km in northeast
direction, and the cumulative values of baseline air quality combined with predicted values
are found to be within the prescribed limits of National Ambient Air Quality Standards.
The mitigative and control measures of air pollution shall ensure that the impact on air
quality is local – within the site area and its surroundings. The fugitive and diffuse
emissions were quantified and a box model was used to predict air borne concentrations,
and the results indicate work room concentrations, less than threshold limit values (TLV)
for various solvents.
11.7.2 Impacts on Water: Water is essentially used for process and utilities and domestic
purposes. The required water quantity after expansion will be met from ground water. No
11-6 Team Labs and Consultants
M/s. NACL Industries Ltd
Environmental Impact Assessment Report
impact on water quality is expected due to discharge of effluents as zero liquid discharge is
envisaged, which ensures reuse of treated wastewater for process, washings, scrubbers and
cooling towers makeup. There is no usage of treated wastewater for on land irrigation..
11.7.3 Impacts on Noise quality: The noise levels may increase due to turbine, compressors,
motors, DG set and other activities which emit noise levels ranging from 87 dB (A) - 104 dB
(A). The predicted cumulative noise levels (as calculated by the logarithmic model without
noise attenuation) ranged between 100-150 m. The impact due to increased noise levels
shall be restricted to the site area.
11.7.4 Impacts on Soil: The solid wastes generated from process, utilities and effluent
treatment plant may have significant negative impacts if disposed indiscriminately. The
total solid waste will be stored separately in Hazardous waste storage area. Solid waste will
be sent to cements plants for co-incineration based on calorific value or sent to TSDF. The
operational phase impacts observed to be negative, shall be neutral after mitigation due to
effective implementation of management measures in handling, storing and transferring of
solid waste, effluents and chemicals, and development of green belt.
11.7.5 Impacts on Flora and Fauna: There are no endangered species of flora and fauna in
the impact area. The impact on biotic environment is neutral with the effect confined mainly
to the site area.
11.9 Alternatives
The proposal is for expanding the existing unit, which obtained environmental clearance.
Hence there is no requirement of alternative site or additional site area.
scrubbing is sent to ETP. The other gas expected in the process is carbon dioxide is let out
into atmosphere following a standard operating procedure, while hydrogen gas is let out
into atmosphere through a water column.
Emissions are also released from various operations of manufacturing like centrifuge,
drying, distillation, extraction etc. These emissions mainly contain volatile contents of the
material used for processing. It is proposed to provide vent condensers in series to reactors,
distillation columns, driers and centrifuge etc. to mitigate VOC emissions release. Other
vents are connected to common headers and scrubbers.
enclosures, barriers, shields, and anti-vibrating pads are provided to ensure reduction of
noise levels and vibration. Employees working in noise generating areas shall be provided
with appropriate personnel protective equipment.
CONCLUSION
The study was conducted during the post monsoon season of 2020. It is observed that
negative impacts are anticipated on air quality, soil and water due to the emissions, effluents
and other discharges both intended and unintended. It is observed that positive impacts are
anticipated on socio-economic status due to employment generation. The hierarchy of
avoidance, reduction, reuse, recycle, treat, release, dispose was followed in preparing the
management plan, with a provision for adaptive management, considering, changing
statutory provisions, post project monitoring and post normal science paradigm of
uncertainty, ambiguity and ignorance.
The proponent assures to implement all the measures with an objective of ensuring least
difference between pre and post project environmental scenarios. It may be concluded that
the management measures proposed shall ensure mitigation of negative impacts and the
resultant residual impacts.
I, hereby, certify that I was a part of the EIA team in the following capacity that developed
the above EIA.
EIA coordinator:
Contact information: Team Labs and Consultants, B115 - 117, 509, Aditya Enclave,
Ameerpet, Hyderabad 500038.
I, G.V. Reddy, hereby, confirm that the above-mentioned experts prepared the EIA of
NACL Industries Limited and EIA Coordinator (EC) is fully aware of the content. The
consultant organization shall be fully accountable for any mis-leading information. No
unethical practices have been carried out and external data / text has not been used
without proper acknowledgement, while preparing this EIA report.
Certificate of Plagiarism check
Title of EIA Report: Expansion of Agrochemicals and inclusion of
and captive co-generation power plant.
Name of Accredited Organisation: Team Labs and Consultants
Unique Identification Number: 0321-17-01
Name of EIA Co-ordinator: G.V. Reddy
Date and Sign of EIA Co-ordinator:
Name: G.V. Reddy
Designation: Proprietor Signature:
SUBMITTED TO
ANDHRA PRADESH POLLUTION CONTROL BOARD,
REGIONAL OFFICE, SRIKAKULAM
No.J-11011/75/2007-IA II (I)
Goverment of India
Minister of Enviroment,Forest and Climate Change
Impact Assessment Division
***
To,
Tel.No.040-33185100; Email:[email protected]
Sir/Madam,
This has reference to the proposal submitted in the Ministry of Environment, Forest
and Climate Change to prescribe the Terms of Reference (TOR) for undertaking detailed EIA
study for the purpose of obtaining Environmental Clearance in accordance with the provisions of
the EIA Notification, 2006. For this purpose, the proponent had submitted online information in the
prescribed format (Form-1 ) along with a Pre-feasibility Report. The details of the proposal are
given below:
b. In case the existing project has not obtained environmental clearance, reasons for not
taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification
2006 shall be provided. Copies of Consent to Establish/No Objection Certificate and
Consent to Operate (in case of units operating prior to EIA Notification 2006, CTE and
CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance
report to the conditions of consents from the SPCB shall be submitted.
4) Site Details
i. Location of the project site covering village, Taluka/Tehsil, District and State, Justification
for selecting the site, whether other sites were considered.
ii. A toposheet of the study area of radius of 10km and site location on 1:50,000/1:25,000 scale
on an A3/A2 sheet. (including all eco-sensitive areas and environmentally sensitive places)
iii. Details w.r.t. option analysis for selection of site
iv. Co-ordinates (lat-long) of all four corners of the site.
v. Google map-Earth downloaded of the project site.
vi. Layout maps indicating existing unit as well as proposed unit indicating storage area, plant
area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout
of Industrial Area indicating location of unit within the Industrial area/Estate.
vii. Photographs of the proposed and existing (if applicable) plant site. If existing, show
photographs of plantation/greenbelt, in particular.
viii. Landuse break-up of total land of the project site (identified and acquired), government/
private - agricultural, forest, wasteland, water bodies, settlements, etc shall be included. (not
required for industrial area)
ix. A list of major industries with name and type within study area (10km radius) shall be
incorporated. Land use details of the study area
x. Geological features and Geo-hydrological status of the study area shall be included.
xi. Details of Drainage of the project upto 5km radius of study area. If the site is within 1 km
radius of any major river, peak and lean season river discharge as well as flood occurrence
frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the
project site and maximum Flood Level of the river shall also be provided. (mega green field
projects)
xii. Status of acquisition of land. If acquisition is not complete, stage of the acquisition process
and expected time of complete possession of the land.
xiii. R&R details in respect of land in line with state Government policy
5) Forest and wildlife related issues (if applicable):
i. Permission and approval for the use of forest land (forestry clearance), if any, and
recommendations of the State Forest Department. (if applicable)
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/
ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
ii. Landuse map based on High resolution satellite imagery (GPS) of the proposed site delineating
the forestland (in case of projects involving forest land more than 40 ha)
iii. Status of Application submitted for obtaining the stage I forestry clearance along with latest
status shall be submitted.
iv. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves,
Migratory Corridors of Wild Animals, the project proponent shall submit the map duly
authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location
and the recommendations or comments of the Chief Wildlife Warden-thereon
v. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State
Government for conservation of Schedule I fauna, if any exists in the study area
vi. Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the
Standing Committee of the National Board for Wildlife.
6) Environmental Status
i. Determination of atmospheric inversion level at the project site and site-specific micro-
meteorological data using temperature, relative humidity, hourly wind speed and direction
and rainfall.
ii. AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other
parameters relevant to the project shall be collected. The monitoring stations shall be based
CPCB guidelines and take into account the pre-dominant wind direction, population zone
and sensitive receptors including reserved forests.
iii. Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the
NAQQM Notification of Nov. 2009 along with - min., max., average and 98% values for
each of the AAQ parameters from data of all AAQ stations should be provided as an annexure
to the EIA Report.
iv. Surface water quality of nearby River (100m upstream and downstream of discharge point)
and other surface drains at eight locations as per CPCB/MoEF&CC guidelines.
v. Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF&CC, if
yes give details.
vi. Ground water monitoring at minimum at 8 locations shall be included.
vii. Noise levels monitoring at 8 locations within the study area.
viii. Soil Characteristic as per CPCB guidelines.
ix. Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials,
additional traffic due to proposed project, parking arrangement etc.
x. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area
shall be given with special reference to rare, endemic and endangered species. If Schedule-
I fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and
furnished.
xi. Socio-economic status of the study area.
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR
PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
xiii. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency Management
Plan including Risk Assessment and damage control. Disaster management plan should be
linked with District Disaster Management Plan.
8) Occupational health
i. Plan and fund allocation to ensure the occupational health & safety of all contract and casual
workers
ii. Details of exposure specific health status evaluation of worker. If the workers' health is being
evaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far
& Near vision, colour vision and any other ocular defect) ECG, during pre placement and
periodical examinations give the details of the same. Details regarding last month analyzed
data of above mentioned parameters as per age, sex, duration of exposure and department
wise.
iii. Details of existing Occupational & Safety Hazards. What are the exposure levels of hazards
and whether they are within Permissible Exposure level (PEL). If these are not within PEL,
what measures the company has adopted to keep them within PEL so that health of the workers
can be preserved,
iv. Annual report of heath status of workers with special reference to Occupational Health and
Safety.
9) Corporate Environment Policy
i. Does the company have a well laid down Environment Policy approved by its Board of
Directors? If so, it may be detailed in the EIA report.
ii. Does the Environment Policy prescribe for standard operating process / procedures to bring
into focus any infringement / deviation / violation of the environmental or forest norms /
conditions? If so, it may be detailed in the EIA.
iii. What is the hierarchical system or Administrative order of the company to deal with the
environmental issues and for ensuring compliance with the environmental clearance
conditions? Details of this system may be given.
iv. Does the company have system of reporting of non compliances / violations of environmental
norms to the Board of Directors of the company and / or shareholders or stakeholders at
large? This reporting mechanism shall be detailed in the EIA report
10) Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the
labour force during construction as well as to the casual workers including truck drivers during
operation phase.
11) Enterprise Social Commitment (ESC)
i. Adequate funds (at least 2.5 % of the project cost) shall be earmarked towards the Enterprise
Social Commitment based on Public Hearing issues and item-wise details along with time
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR
PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
***
TOR Compliances
Page 2
TOR Compliances
delineating the forestland (in case of projects land use map is presented in Chapter
involving forest land more than 40 ha) 3 of EIA report at Page No. 3-9
iii. Status of Application submitted for obtaining Not Applicable
the stage I forestry clearance along with
latest
status shall be submitted.
iv. The projects to be located within 10 km of the There are no reserve forests, national
National Parks, Sanctuaries, Biosphere Parks, sanctuary, biosphere reserves,
Reserves, Migratory Corridors of Wild ecologically sensitive area, critically
Animals, the project proponent shall submit polluted area and interstate boundary
the map duly authenticated by Chief Wildlife within the impact area of 10 km
Warden showing these features vis-à-vis the surrounding the site.
project location and the recommendations or
comments of the Chief Wildlife Warden-
thereon.
v. Wildlife Conservation Plan duly Not Applicable
authenticated by the Chief Wildlife Warden
of the State Government for conservation of
Schedule I fauna, if any exists in the study
area.
vi. Copy of application submitted for clearance Not Applicable
under the Wildlife (Protection) Act, 1972, to
the
Standing Committee of the National Board
for Wildlife.
6 Environmental Status
i. Determination of atmospheric inversion level Site-specific micrometeorological data
at the project site and site-specific presented in Chapter 3 of EIA report
micrometeorological data using temperature, at Page No. 3-20 to 3-22
relative humidity, hourly wind speed and
direction and rainfall.
ii. AAQ data (except monsoon) at 8 locations for AAQ data presented in Chapter 3 of
PM10, PM2.5, SO2, NOX, CO and other EIA report at Page No. 3-25 to 3-30
parameters relevant to the project shall be
collected. The monitoring stations shall be
based CPCB guidelines and take into account
the pre-dominant wind direction, population
zone and sensitive receptors including
reserved forests.
iii. Raw data of all AAQ measurement for 12 AAQ data is presented in Chapter 3 of
weeks of all stations as per frequency given EIA report at Page No. 3-25 to 3-30
in the NAQQM Notification of Nov. 2009
along with - min., max., average and 98%
values for
each of the AAQ parameters from data of all
AAQ stations should be provided as an
annexure to the EIA Report.
iv. Surface water quality of nearby River (100m Surface water Monitoring locations
upstream and downstream of discharge presented in Chapter 3 of EIA report
Page 4
TOR Compliances
Page 5
TOR Compliances
Page 6
TOR Compliances
i. Does the company have a well laid down Corporate Environment Policy is
Environment Policy approved by its Board of presented in Chapter 10 of EIA report
Directors? If so, it may be detailed in the EIA at Page No. 10-4.
report.
ii. Does the Environment Policy prescribe for Environment manager is responsible
standard operating process / procedures to to bring to focus to higher
bring into focus any infringement / management in case of deviation/
deviation / violation of the environmental or violation of the environmental or
forest norms / conditions? If so, it may be forest norms / conditions.
detailed in the EIA.
iii. What is the hierarchical system or Environment Management Cell is
Administrative order of the company to deal presented in Chapter 10 of EIA report
with the environmental issues and for at Page No. 10-2.
ensuring compliance with the environmental
clearance
Conditions? Details of this system may be
given.
iv. Does the company have system of reporting Yes. Details of Environment
of non compliances / violations of Management Cell is presented in
environmental norms to the Board of Chapter 10 of EIA report at Page No.
Directors of the company and / or 10-2.
shareholders or stakeholders at large? This
reporting mechanism shall be detailed in the
EIA report
10 Details regarding infrastructure facilities such as Presented in Chapter 1 of EIA report
sanitation, fuel, restroom etc. to be provided to at Page No. 1-7.
the labour force during construction as well as to
the casual workers including truck drivers during
operation phase.
11 Enterprise Social Commitment (ESC)
i. Adequate funds (at least 2.5 % of the project Corporate Social Responsibilities –
cost) shall be earmarked towards the Budget is presented in Chapter 4 of
Enterprise Social Commitment based on EIA report at Page No. 10-68 ,10-69.
Public Hearing issues and item-wise details
along with time bound action plan shall be
included. Socio-economic development
activities need to be elaborated upon.
12 Any litigation pending against the project and/or No Individual Court case against the
any direction/order passed by any Court of Law Project.
against the project, if so, details thereof shall also be
included. Has the unit received any notice under
the Section 5 of Environment (Protection) Act, 1986
or relevant Sections of Air and Water Acts? If so,
details thereof and compliance/ATR to the
notice(s) and present status of the case.
13 A tabular chart with index for points wise Enclosed at Compliance of Terms of
compliance of above TOR. Reference along with EIA & EMP.
B. SPECIFIC TERMS OF REFERENCE FOR EIA STUDIES FOR PESTICIDES INDUSTRY AND
PESTICIDE SPECIFIC INTERMEDIATES (EXCLUDING FORMULATIONS)
Page 8
TOR Compliances
Page 9
APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional
Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
Proposed capacity/area/length/tonnage to be
3. handled/command area/lease area/number or wells to Expansion of Agrochemicals from 30 TPD to 70.1 TPD ha.
be drilled
4. New/Expansion/Modernization Expansion
Proposal Number IA/AP/IND2/153325/1900
MoEF file number(Previous EC) J-11011/75/2007-IA II (I)
Uploaded EC letter Annexure-Uploaded EC letter
Nearest railway station along with distance in kms Chilakapalem Railway Station, 1.3 km
10.
Nearest airport along with distance in kms Vishakaptnam Airport, 85.7 km
21. Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance
No
under the Forest (Conservation) Act,1980?
(ii) Whether the proposal involves approval/clearance
No
under the wildlife (Protection) Act,1972?
(iii) Whether the proposal involves approval/clearance
No
under the C.R.Z notification, 2011?
(II) Activity
Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the
1
locality (topography, land use, changes in water bodies, etc.)
1.2 Clearance of existing land, vegetation and buildings? No The proposal is for expansion of agrochemicals manufacturing unit.
1.11 Dredging? No
1.14 Facilities for storage of goods or materials? No Raw materials and solvents shall be stored with safety precautions.
1.16 Facilities for long term housing of operational workers? No Local people shall be employed.
Influx of people to an area in either temporarily or The proposed project shall increase the employment potential and
1.28 Yes
permanently? hence may lead to migration to surrounding villages.
1.30 Loss of native species or genetic diversity? No No, as the proposed expansion is within existing unit.
Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially
2
any resources which are non-renewable or in short supply):
2.6 Energy including electricity and fuels (source, Yes The required energy shall be drawn from proposed co-generation
competing users) Unit: fuel (MT),energy (MW) power plant of 6MW capacity. Backup DG sets of 2 x 2000 kVA are
proposed in addition to existing 1 x 1000 kVA and 2 x 500 kVA to
cater to energy requirement during load shut downs. The other
energy source is proposed coal fired boiler of 1 x 50 TPH to meet the
steam requirement both for process and ZLD system, while existing 1
x 16 TPH, 1 x 10 TPH coal fired and 1 x 6 TPH oil fired boilers will be
kept as standby after expansio
Any other natural resources (use appropriate standard
2.7 No
units)
Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or
3
the environment or raise concerns about actual or perceived risks to human health
Affect the welfare of people e.g. by changing living Shall increase the employment potential for locals and affect the
3.3 Yes
conditions? living conditions for betterment.
Vulnerable groups of people who could be affected by No sensitive receptors are present in the immediate vicinity of the
3.4 the project e.g. hospital patients, children, the elderly No site. The project shall not have any significant impact on vulnerable
etc. groups of people.
Emissions from combustion of fossil fuels from Coal Shall be used as fuel. Quantity of fuel and emissions details are
5.1 Yes
stationary or mobile sources enclosed in Annexure V
HCl, SO2, NH3 will be sent to scrubbers and CO2, H2 and nitrogen
5.2 Emissions from production processes Yes
will be let out into atmosphere safely
Emissions from materials handling including storage or Material transfer takes place in closed pipeline systems using pumps
5.3 No
transport with mechanical seals.
5.4 Emissions from construction activities including plant Yes Dust may rise during transport of material and construction activity.
and equipment The dust emissions shall be mitigated by water spraying on the roads
within the premises.
6.5 From construction or operational traffic No The increased traffic shall not have any significant impact.
Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters,
7
groundwater, coastal waters or the sea:
From discharge of sewage or other effluents to water or All effluents generated in plant will be treated in the Zero Liquid
7.2 No
the land (expected mode and place of discharge) Discharge (ZLD) system. No contamination is expected.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
From explosions, spillages, fires etc from storage, All Inbuilt Safety precautions will be adopted and there will not be
8.1 Yes
handling, use or production of hazardous substances any damage to environment or human health
Factors which should be considered (such as consequential development) which could lead to environmental effects or
9
the potential for cumulative impacts with other existing or planned activities in the locality
7 Defence installations No
8 Densely populated or built-up area Yes Srikakulam town with population of about 2 lakhs.
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my
knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any
stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
SUBMITTED TO
ANDHRA PRADESH POLLUTION CONTROL BOARD,
REGIONAL OFFICE, SRIKAKULAM
Speed Post
To
Shri Ashok Kumar Pateshwary
Director, Member Secretary (Industry-II),
Ministry of Environment, Forest and Climate Change,
Indira Paryavaran Bhawan, Jorbagh Road, Aliganj,
New Delhi – 110 003.
E-mail: [email protected]
Sir,
I am directed to draw your kind attention to the subject and
reference letter cited above and to state that the above project has been
monitored undersigned on 20.02.2021 for issue of Certified Compliance
Report. Based on the observations made while monitoring of project, the
detailed Certified Compliance Report has been prepared and enclosed for
kind information and further needful action.
Yours faithfully,
Encl: as above
Copy to: The Unit Head, M/s Nagarjuna Agrichem Ltd., Arinam
Akkivalasa, Allinagaram, Etcherla, Srikakulam, Andhra Pradesh-
532410.E-mail: mailto:[email protected] for kind information and further
necessary action.
SN Item Details
प-रयोजना का "कार Industry-II (Pesticides)
1.
Type of Project
2. प-रयोजना का नाम Expansion of Pesticide Unit (12.5 TPD to
Name of Project 30 TPD), Change in Product Mix and
Captive Power Plant (4 MW) at Plot No.
177, Arinama Akkivalasa, Allinagaram,
Etcherla, Srikakulam, A.P. by M/s
Nagarjuna Agrichem Ltd.
3. प-रयोजना "ा5धकरण का पता The Unit Head, M/s Nagarjuna Agrichem
Address of project authorities Ltd., Arinam Akkivalasa, Allinagaram,
Etcherla, Srikakulam, Andhra Pradesh-
532410.
4. पया1वरणीय 9वीकृ;त प< सं0 एवं ;तथी J-11011/75/2007-IA II (I) dated
Env. Clearance Letter No. & Date 30.07.2007
5. Aे<ीय काया1लयप< सं0 IRO/VIJ/EPE/03-01/2021
Regional Office File No.
6. 9थल दौरा;तथी 20.02.2021
Date of Site Visit
7. प-रयोजना कE ि9थ;त Operational
Status of Project
Generator Stacks:
In addition, PAs have also installed three (03) continuous ambient air quality
monitoring stations (CAAQMS) located at ETP, Main Gate and Pond station for
monitoring of PM2.5, PM10, SO2, NOx and VOC. During the day of monitoring,
the AAQ levels are as follows:
PAs are also monitoring ambient air quality (AAQ) at four (04) locations viz.,
Near Safety Office, Near Canteen Area, Near ETP Area and Near Pond Area by
third party monitoring agency of M/s SV Enviro Labs & Consultants,
Vishakhapatnam which is approved by Ministry and accredited by NABL. As
per the monitoring conducted in the month of November, 2020, the AAQ levels
are as follows:
It has been stated that, in the event of failure of pollution control system(s)
adopted by the unit, the respective unit is not being restarted until the control
measures are rectified to achieve the desired efficiency.
It has been observed that the HCL, Cl2 and Br2 in gaseous emissions. Online
Br2 monitoring system is not available.
It is required to monitor HCL, Cl2 and Br2 in gaseous emissions and also
required to install online Br2 monitoring system.
It has been observed that the PAs are in process of following new pesticides
standards issued by the Ministry.
iii. Action shall be taken to reduce the air emissions in the work zone
environment as far as possible. All the materials shall be handled in
completely closed system to avoid fugitive emissions during handling and
transportation and regularly monitored. Water scrubber fallowed by the
caustic scrubbers shall be provided to control gaseous emissions. Action
shall be taken to reduce the emissions as far as possible. Vents of all the
storage tanks, batch tanks or reactors shall be connected to the
scrubbers to scrub acid mist and solvent vapors. Hoods shall be installed
in the drumming operations of HBr and HCl and connected to the
scrubber and scrubbed vapors shall be sent to ETP for further treatment.
It has been observed that the PAs are in process of reducing the air emissions
in the work zone environment as far as possible. As per the discussions held
during monitoring, the following air pollution control equipment’s are installed
in the plant operations.
S.No Description
1 Spray Dryer, Cyclone Separator, Ventury Scrubber and Packed
Scrubber For R/Kiln Incinerator -- All Process vents
2 Caustic Wet Scrubber for Block I & II
3 Caustic Wet Scrubber for Block - III
It has been stated that all reactor vents, storage tank vents and scrubber
vents wherever necessary are connected to incinerator through dump tanks
and analyzers installed to monitor the conditions. TREM card system
implemented during transportation of hazardous material. All raw material
movement inside the plant is through pipeline & closed drums to ensure zero
emissions. ANF's provided in place of centrifuges, where ever possible and
hoods provided for centrifuges and connected to scrubber.
iv. Solvent recovery shall not be less than 98%. All ventury equipment shall
have vapor recovery system. The solvent shall be condensed in
condensers using cooling tower, chilled and chilled brine to control odor.
All the solvents in used shall be monitored in the treated effluent.
As per the discussions held during monitoring, it has been observed that the
v. Bromine shall be recovered from NaBr, HBr and KBr solutions and
recycled. HCl and Para-Chloro Phenol shall be sold to authorized parties.
It has been observed that the PAs are recovering Br from NaBr, HBr and KBr
solutions and recycled. HCl and Para-Chloro Phenol are being sold to
authorized parties.
vi. ESP or bag filter shall provide to control gaseous emissions from the
captive power plant. Dust extraction system shall be provided to coal
crusher conveyors and coal charging point of the bin. The flue gas
emissions shall conform to the standards prescribed by the APPCB.
It has been observed that the PAs have provided bag filters were provided to
the boilers and dust extraction systems were provided. It has been stated that
the bags are being changed periodically. It has also been stated that the
extraction system and dust containing measures followed for one conveyor
system, other being stopped. As per the monitoring reports submitted, it has
been observed that the flue gas emissions are within limit.
vii. Total water requirement from Nagavali river shall not exceed 1380
m3/day. The waste water shall be segregated into different streams for
effective treatment and recycling purpose. All the High TDS and High
COD effluents shall be treated in multiple effect evaporators (MEE) and
discharged into sea through marine outfall. Treated water (condensate)
shall be recycled to cooling tower. MEE concentrate and ETP sludge shall
be treated in rotary kiln. Finally treated effluent shall be discharged to
the sea through pipe line at 1.25 km. A diffuser shall be provided at the
end of pipeline. TF-4 test shall be done before discharging treated
effluent into the sea. The quality of the treated effluent shall conform to
the standards prescribed by APPCB/EPA Rules.
It has been observed that, at present, PAs are using only ground water for
plant operations. PAs have also implemented Zero Liquid Discharge system
and the water consumption is being maintained below specified water. No
treated water is being discharged to the sea.
It has been observed that the PAs have installed multi effect evaporators in the
process and the effluent is being segregated as high TDS and low TDS and are
viii. Coal ash from coal-fired captive power plant shall be stored in ash and
sold to cement and brick manufacturers. ETP sludge, Evaporation salts,
Incineration ash, Rotary kiln salts shall be stored in secured landfill and
sent to TSDF. Spent solvents shall be recovered in the solvent recovery
plant and then sold to authorized agencies. Spent oil shall be given to
recyclers and used lead acid batteries shall be given back to dealers.
As per the discussions held during monitoring, it has been observed that the
coal ash from coal-fired captive power plant are being sold to cement and brick
manufactures. ETP sludge, evaporation salts, incineration ash, rotary kiln
salts are being sent to TSDF. Spent solvents are being recovered in the solvent
recovery plant and then sold to authorized agencies. Spent oil are being given
to recyclers and used lead acid batteries are being given back to dealers.
ix. All the organic waste shall be incinerated in the incinerator. Incinerator
shall be upgraded and meet the Central Pollution Control Board (CPCB)
guidelines. The incinerator shall have destructive efficiency of 99.9% and
destructive efficiency of the incinerator shall be assessed by an agency
like CPCB and report submit.
It has been observed that, all the organic waste is being incinerated in the
incinerator. It has been stated that the incinerator has been upgraded as per
the Central Pollution Control Board (CPCB) guidelines and the destructive
efficiency is 99.9%.
It has been observed that the PAs are in process of developing green belt in
and around the project premises and till date a decent amount of green belt
has been developed. As per the information provided, the plantation details for
the year 2019-2020 is as follows:
As per the discussions held during monitoring, it has been observed that the
PAs are in process of adopting waste minimization/cleaner production
techniques to reduce the pollution load.
xii. The company shall under take rain water harvesting measures to
recharge the ground water as well as reduce the consumption of fresh
water.
It has been observed that the PAs have implemented the rain water harvesting
measures to recharge the ground water as well as reduce the consumption of
fresh water. It has been stated that the PAs are also in process of expanding
the capacity of rain water harvesting system.
xiii. The project proponent shall comply with the environmental protection
measures and safe guards recommended in EIA/EMP Risk analysis
reports as well as the recommendations of the public hearing panel.
As per the discussions held during monitoring, it has been observed that the
PAs are complying the environmental protection measures and safe guards
recommended in EIA/EMP, Risk analysis reports as well as the
recommendations of the public hearing panel.
It has been observed that the PAs are in process of implementing eco-
development measures in and around the project area. It has been stated that
the plantation in villages of A. A. Valasa, Kesawadas puram, in surrounding
areas and R.O Drinking water supply to 4 villages, etc., are being implemented
under CSR. The details of CSR activities undertaken for the year 2019-20 are
as follows:
It has been observed that the PAs have spent around Rs. 70.377 Cores
towards capital cost to implement the conditions stipulated by Ministry and
APPCB, since 2005 onwards and around Rs.18.0 Cores per annum is being
spent towards environment control measures.
It has been observed that the PAs have implemented Zero Liquid Discharge
(ZLD) system for the project. The treated effluent is being reused in the
B. General Conditions
i. The project authorities must strictly adhere to the stipulations made by
the Andhra Pradesh Pollution Control Board (APPCB) and the State
Government.
It has been observed that the PAs are in process of strictly adhere to the
stipulations made by the Andhra Pradesh Pollution Control Board (APPCB)
and the State Government.
It has been observed that the EC dated 30.07.2007 has been granted by
Ministry for production of following products:
However, it has been observed that the PAs have obtained Consent for
operation (CFO) vide letter no. APPCB/VSP/VZN/53/CFO/HO/2019 dated
04.10.2019 for production of following 48 products:
In addition to the above, PAs have also obtained Consent for establishment
(CFE) vide letter no. APPCB/VSP/VZN/53/CFE/HO/2010 dated 06.02.2019
and APPCB/VSP/VZN/53/CFE/HO/2010 for 01.04.2019 for change in the
product mix. As per CFE dated 01.04.2019, the change in the production mix
is as follows:
Quantity
S. Name of the (TPD)
No Product Group - Group Group Grou Grou Grou Grou Gro
1 -2 -3 p- 4 p -5 p-6 p–7 up
-8
1. Profenofos 9.5 6.0 5.5 7.5 9.0 5.0 15.5 15.0
Propiconazole
2. Bromoketal 2.0 3.5 3.0 1.0 1.0 0.5 0.0 0.0
(Intermediate)
3. Tricyclazole 1.0 2.5 2.0 1.0 1.0 0.5 0.0 0.0
4. Myclobutanil 0.3 0.3 0.3 0.3 0.3 0.1 0.0 0.0
5. Pretilachlor 4.3 4.7 6.5 4.0 6.0 5.0 0.0 0.0
6. Thifluzamide 0.5 0.1 0.5 0.4 0.5 0.6 0.5 0.65
7. Flucarbazon 0.5 0.2 0.185 0.7 0.4 0.6 0.0 0.0
e Sodium 5
Tebuconazole/
8. Oxirane 0.0 0.25 0.2 0.1 0.0 0.2 0.0 0.75
(Intermediate
)
9. Hexaconazole 0.0 0.1 0.2 0.1 0.0 0.1 0.0 0.0
10. Difenthiuron 0.0 0.1 0.2 0.1 0.0 0.1 0.0 0.0
11. Imidacloprid 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0
12. Epoxiconazole 0.0 0.1 0.5 0.1 0.1 0.1 0.0 0.0
13. Cyproconazole 0.0 0.5 0.1 0.1 0.1 0.1 0.0 0.0
14. Omethoate 0.5 0.7 0.6 0.7 0.8 0.4 0.0 0.0
35. (8E,10E) – 0.0 0.15 0.0 0.1 0.1 0.15 0.0 0.0
Dodoca-8, 5
10- dyen-1-ol
36. 7Z,11Z 0.05 0.15 0.09 0.1 0.1 0.15 0.0 0.0
hexadeca
dienyl
acetate
37. 7E, 9Z dodoca 0.05 0.1 0.09 0.1 0.1 0.15 0.0 0.0
dienyl acetate
38. 8Z Dodecinyl 0.05 0.1 0.15 0.1 0.1 0.1 0.0 0.0
acetate
(Z)-Octadeca –
39. 0.05 0.1 0.09 0.1 0.1 0.15 0.0 0.0
13 – enyl
acetate
40. R&D 0.05 0.05 0.05 0.05 0.05 0.05 0.0 0.05
products
Triazinone /
Thricarbohydra
41. zi de / Dichloro 10.0 7.84 7.0 8.9 6.0 9.4 7.0 9.5
Pinacolene /
Pinacolene
As per the discussions held during monitoring, it has been observed that
the PAs have increased number of products from 13 (as per EC dated
30.07.2007) to 46 (as per CFO 23.08.2018) and also obtained CFE (dated
01.04.2019) and CFO (dated 04.10.2019) for production of 48 products
without obtaining prior approval from Ministry. It is required to provide
detailed explanation in this regard.
It has been observed that the PAs are monitoring effluent flow through
monitoring station. The influent and effluent parameters are being monitored
by third party monitoring agency of M/s SV Enviro Labs& Consultants,
Vishakhapatnam which is approved by Ministry and accredited by NABL. As
per the monitoring conducted in the month of November, 2020, the influent
and effluent parameters are as follows:
iv. The project authorities must strictly comply with the rules and
regulations under the Manufacture, Storage and Import of Hazardous
Chemicals Rules, 2000. Prior approvals of Chief Inspector of Factories,
Chief Inspector of Explosives, Fires Safety Inspectorate etc, must be
obtained.
It has been observed that the PAs are in process of complying the rules and
regulations under the Manufacture, Storage and Import of Hazardous
Chemicals Rules, 2000. As per the information provided, the following
approvals have obtained by PAs:
1. Certification for use of Boiler: vide no. 10799 dated 02.01.2021 from
Andhra Pradesh Boiler Inspection Department.
2. Director of Factories: Letter No. LAE05-14023/25/2019-D SEC – DOF
dated 29.03.2019 from Factories Department, Govt. of Andhra Pradesh.
3. Fire Certificate: Letter No. 9694/IISB/EWRFO/SRIV20I2 dated
24.09.2020 from A.P. State Disaster Response and Fire Services
Department, Govt. of Andhra Pradesh.
4. Public Liability (Act) Insurance Policy: Policy No.
181632027120000004
5. PESO Licence: Vide No. P/HQ/AP/15/1396(P4846) dated 02.12.2020.
In addition to above, PAs have obtained CFO and Hazardous waste
authorization vide letter no. APPCB/VSP/VZN/53/CFO/HO/2019 dated
04.10.2019.
v. The project authorities must strictly comply with the rules and
regulations with regard to handling and disposal of hazardous wastes in
accordance with the Hazardous Wastes (Management and Handling)
Rules, 2000. Authorization from the APPCB muse be obtained for
collection, storage, treatment and disposal of hazardous wastes.
As stated above, it has been observed that the PAs are in process of complying
the rules and regulations under the Manufacture, Storage and Import of
Hazardous Chemicals Rules, 2000. PAs have obtained CFO and Hazardous
waste authorization vide letter no. APPCB/VSP/VZN/53/CFO/HO/2019 dated
04.10.2019.
vi. The overall noise levels in and around the plant area shall be kept well
within the standards (85 dBA) by providing noise control measures
As per the discussion held during monitoring, it has been observed that the
PAs are in process of taking control measures including acoustic hoods,
silencers, enclosures etc. on all sources of noise generation to keep the overall
noise levels in and around the plant area within the standards (85 dBA). The
noise levels are being monitored by third party monitoring agency of M/s SV
Enviro Labs& Consultants, Vishakhapatnam which is approved by Ministry
and accredited by NABL. As per the monitoring conducted in the month of
November, 2020, the noise levels were monitored at 14 locations and the levels
are within the prescribed limits.
It has been observed that the PAs are regularly conducting occupational
health surveillance of the employees, specifically for those engaged in handling
hazardous substances. First aid facilities in the Occupational Health Care
Center have been strengthened and medical records of each employee are
being maintained separately.
It has been observed that the PAs have a separate Environment Management
Cell equipped with laboratory facilities to carry out the Environmental
Management and monitoring functions.
ix. The project proponent shall also comply with all the environmental
protection measures and safeguards recommended in the EIA/EMP
report.
It has been observed that the PAs are in process complying all the
environmental protection measures and safeguards recommended in the
EIA/EMP report.
xi. The Project Proponent should advertise in at least two local newspapers
widely circulated in the region around the project, one of which shall be
in the vernacular language of the locally concerned informing that the
project has been accorded environmental clearance by the Ministry and
copies of the clearance letter are available with the APPCB / Committee
and may also be seen at Website of the Ministry and Forests at
http://envifor.nic.in. The advertisement shall be made within 7 days
from the date of issue of the clearance letter and a copy of the same shall
be forwarded to the Ministry’s Regional Office at Bangalore.
As per the discussions held during the monitoring, it has been observed that
the PAs are not submitting the compliance of general conditions. It has been
stated that the condition has been complied.
xii. The Project Authorities shall inform the Regional Office as well as the
Ministry the date of financial closure and final approval of the project by
the concerned authorities and the date of start of land development
work, if any.
As per the discussions held during the monitoring, it has been observed that
the PAs are not submitting the compliance of general conditions.
• Compliance status could not be judged as the project was shut down / not in
operational during the site visit.
• No non-compliances detected. No any further action is required.
Ö Minor non-compliances detected (not of immediate danger to health &
safety of the people). Letter issued to project authorities for taking
corrective measures.
5. ANNEXURES
SUBMITTED TO
ANDHRA PRADESH POLLUTION CONTROL BOARD,
REGIONAL OFFICE, SRIKAKULAM
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
RED CATEGORY
RENEWAL OF CONSENT & HAZARDOUS AUTHORISATION
CONSENT is hereby granted for Operation under section 25/26 of the Water (Prevention &
Control of Pollution) Act, 1974 and under section 21 of Air (Prevention & Control of
Pollution) Act 1981 and amendments thereof and Authorisation under Rule 6 of the
Hazardous & Other Wastes (Management and Transboundary, Movement) Rules, 2016 and
the rules and orders made there under (hereinafter referred to as 'the Acts’, `the Rules’)
to:
Outlet Quantity
Outlet Description Point of Disposal
No. (KLD)
1 Process Effluents – HTDS 75 • To Steam stripper followed by
evaporation in Multiple Effect
Evaporators
• MEE condensate shall be sent to
Incinerator / Rotary Kiln / biological ETP.
2 35 • MEE concentrate shall be sent to
All Wet Scrubbers Bleed Off
ATFD.
• Salts shall be disposed to the
TSDF.
3 Process Effluents – LTDS 40.5 • After biological treatment,
treated effluents shall be sent to
Boiler Blow Down & Cooling RO plants.
4 184
Tower Blow Down – LTDS • RO Rejects to MEE followed by
ATFD / Spray Drier.
Domestic Effluent After
5 25 • RO Permeate to reuse for
pretreatment
process / cooling tower makeup.
m.
1400
Nos/Annu
m
5 Spent Solvents 29.4 of 1347.9 Shall be recovered in solvent recovery
Schedule - TPM plant within the premises / shall be routed
I through M/s. APEMC so as to send to
cement industries for co processing. (as
utilizable waste)
This consent order is valid for manufacture of the following products along with
quantities indicated below only:
Quantity
(TPD)
S Gro
. Grou Grou u Gro
N Name of the p- p Grou Grou Grou Grou p – up -
o Product 1 -2 p -3 p- 4 p -5 p - 6 7 8
1
. Profenofos 9.5 6.0 5.5 7.5 9.0 5.0 15.5 15.0
Propiconazole
2
. Bromoketal 2.0 3.5 3.0 1.0 1.0 0.5 0.0 0.0
(Intermediate )
3
. Tricyclazole 1.0 2.5 2.0 1.0 1.0 0.5 0.0 0.0
4
. Myclobutanil 0.3 0.3 0.3 0.3 0.3 0.1 0.0 0.0
5
. Pretilachlor 4.3 4.7 6.5 4.0 6.0 5.0 0.0 0.0
6
. Thifluzamide 0.5 0.1 0.5 0.4 0.5 0.6 0.5 0.65
7 Flucarbazone Sodium
. 0.55 0.2 0.185 0.7 0.4 0.6 0.0 0.0
Tebuconazole/
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
8
. Oxirane 0.0 0.25 0.2 0.1 0.0 0.2 0.0 0.75
(Intermediate )
9
. Hexaconazole 0.0 0.1 0.2 0.1 0.0 0.1 0.0 0.0
1
0
. Difenthiuron 0.0 0.1 0.2 0.1 0.0 0.1 0.0 0.0
1
1
. Imidacloprid 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0
1
2
. Epoxiconazole 0.0 0.1 0.5 0.1 0.1 0.1 0.0 0.0
1
3
. Cyproconazole 0.0 0.5 0.1 0.1 0.1 0.1 0.0 0.0
1
4
. Omethoate 0.5 0.7 0.6 0.7 0.8 0.4 0.0 0.0
1
5
. Metribuzin 0.3 0.5 0.5 0.5 0.1 0.2 0.0 0.0
1
6
. Pendimethalin 0.0 0.1 0.1 1.0 0.1 0.1 0.0 0.0
1
7
. Clodinafop 0.0 0.0 0.2 0.0 0.0 0.2 0.0 0.0
1
8
. Difenoconazole 0.0 0.2 0.05 0.1 0.1 0.1 0.0 0.0
1 Quizalafop P
9
. 0.0 0.1 0.1 0.3 0.5 1.25 0.0 0.0
Ethyl
2
0
. Thiamethoxam 0.0 0.2 0.1 0.3 1.5 0.2 0.0 0.0
2 Bispyribac Sodium
1
. 0.0 0.1 0.095 0.2 0.0 0.1 0.0 0.0
2
2
. Tefluthrin 0.0 0.0 0.0 0.45 0.1 0.2 0.0 0.0
2 Cloquintocet Mexyl
3
. 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0
2 2,3 Dichloro Pyrydine 0.15 0.06 0.06 0.4 0.5 0.3 0.0 0.0
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
4
.
2
5
. Cypermertharin 0.0 0.35 0.0 0.15 0.1 0.1 0.0 0.0
2
6
. Carbendazim 0.0 0.0 0.08 0.35 0.0 0.1 0.0 0.0
2
7
. Trifloxystrobil 0.0 0.0 0.0 0.0 0.15 0.15 0.0 0.0
2
8
. Azoxystrobin 0.0 0.1 1.0 0.15 0.2 0.1 0.0 0.0
2
9
. Bifenthrin 0.05 0.0 0.08 0.15 0.15 0.1 0.0 0.0
3 Thiophanate Methyl
0
. 0.0 0.05 0.05 0.05 0.05 1.75 0.0 0.0
3
1
. Verbenone 0.05 0.15 0.0 0.0 0.15 0.15 0.0 0.0
(Z)-hezatec –
3
2
. 11-en-1-yl 0.05 0.15 0.0 0.15 0.1 0.15 0.0 0.0
acetate
3 (Z)-hezatec – 9-
3
. 0.05 0.15 0.09 0.0 0.15 0.15 0.0 0.0
enal
3
4
. Trimedlure 0.05 0.15 0.09 0.1 0.1 0.1 0.0 0.0
3
5
. (8E,10E) –Dodoca-8, 10- dyen-1-ol 0.05 0.15 0.0 0.1 0.1 0.15 0.0 0.0
3
6
. 7Z,11Z hexadeca dienyl acetate 0.05 0.15 0.09 0.1 0.1 0.15 0.0 0.0
3
7
. 7E, 9Z dodoca dienyl acetate 0.05 0.1 0.09 0.1 0.1 0.15 0.0 0.0
3
8
. 8Z Dodecinyl acetate 0.05 0.1 0.15 0.1 0.1 0.1 0.0 0.0
3 (Z)-Octadeca –13 – enyl acetate 0.05 0.1 0.09 0.1 0.1 0.15 0.0 0.0
9
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
.
4
0
. R & D products 0.05 0.05 0.05 0.05 0.05 0.05 0.0 0.05
Triazinone / Thricarbohydrazi
4 de / Dichloro Pinacolene /
1 Pinacolene 10.0 7.84 7.0 8.9 6.0 9.4 7.0 9.5
4
2
. Lambda- cyhalothrin 0.0 0.0 0.0 0.0 0.0 0.0 1.5 0.55
4
3
. Fipronil 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5
4
4
. Ethephon 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0
4
5
. Glufosinate- ammonium 0.0 0.0 0.0 0.0 0.0 0.0 1.0 1.0
4
6
. Clethodim 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0
4
7
. S-Metolachlor 0.0 0.0 0.0 0.0 0.0 0.0 1.0 1.0
4
8
. Tribenuron methyl 0.0 0.0 0.0 0.0 0.0 0.0 1.0 1.0
Total (TPD) 29.65 30.0 29.95 30.0 30.0 29.15 30.0 30.0
No. of Products 22 35 35 36 35 41 10 10
The industry shall manufacture only one group at any point of time.
By-products:
Grou Grou Grou Grou Grou Grou Grou
S. Product Bi- p Group p p p p p p
No
. Products 1 2 3 4 5 6 7 8
25% HBr
1 Profenophos 9.04 5.71 5.23 7.14 8.56 4.76 14.75 14.27
Solution
25%
NaBr 18.48 11.67 10.70 14.59 17.50 9.72 30.14 29.17
Solution
25% HBr 0.0 0.0
2 Propiconazole 2.36 4.13 3.54 1.18 1.18 0.59
Solution
3 Tricyclazole 25% HCl 0.81 2.02 1.61 0.81 0.81 0.40 0.0 0.0
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
6 Hexaconazole 30% HCl 0.00 0.04 0.08 0.04 0.00 0.04 0.0 0.0
Tribenuron
11 Ethanol 0.00 0.00 0.00 0.00 0.00 0.00 0.13 0.13
Mythyl
This order is subject to the provisions of `the Acts’ and the Rules’ and orders made there
under and further subject to the terms and conditions incorporated in the schedule A, B &
C enclosed to this order.
This combined order of consent & Hazardous Waste Authorisation shall be valid for a period
ending with the 28th day of February, 2025.
Copy to:
1. The Joint Chief Environmental Engineer, Zonal Office, Visakhapatnam for
information and necessary action.
2. The Environmental Engineer, Regional Office, Srikakulam for information and
necessary action.
SCHEDULE – A
1. Any up-set condition in any industrial plant / activity of the industry, which result
in, increased effluent / emission discharge and/ or violation of standards stipulated
in this order shall be informed to this Board, under intimation to the Collector and
District Magistrate and take immediate action to bring down the discharge /
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
SCHEDULE - B
1. The industry shall comply with the following conditions within stipulated time,
failing which the bank guarantee of Rs. 2 lakhs submitted by the industry will be
forfeited without any notice:
i. The ash collection silo provided for the boiler is not functional and the ash is
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
WATER POLLUTION:
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
2. The source of water is Ground Water (Bore wells)*. The industry shall take steps to
reduce water consumption to the extent possible and consumption shall NOT
exceed the quantities mentioned below:
Quantity
S. No. Purpose
(KLD)
a) Process 83.0
b) Boiler Feed 158.0
c) Cooling (Makeup) for process and utilities 279.0
d) Domestic 30.0
e) Gardening 40.0
Total : 590.0
* The industry shall obtain necessary amendment in the Environmental Clearance from
the MoEF&CC, New Delhi regarding the source of raw water.
3. The industry shall provide separate electromagnetic flow meters for assessing the
water consumption used and waste water generation for process, reactor & floor
washings, scrubber, boiler blow down, cooling tower blow down, RO/DM Plant and
Domestic purposes and maintain records for the same.
4. The industry shall segregate the effluents into i) High TDS & High COD, ii) Low TDS
& Low COD, iii) utility blow down streams and shall be treated as stipulated streams
at source & adopt requisite treatment to maintain zero liquid discharge (ZLD).
5. The industry shall collect the above mentioned effluent streams in above ground
level collection tanks separately.
6. The industry shall maintain magnetic digital flow meters with totalisers at following
points: a. Inlet of Stripper. b. Inlet of MEE. c. Outlet of MEE. d. Inlet and outlet of
ETP, e. Inlet and outlet of RO Plants.
7. The industry shall ensure that effluents shall not be discharged onland or any water
bodies or aquifers or outside under any circumstances. Floor washings shall be
admitted into effluent collection system only and shall not be allowed to find their
way into storm water drains or open areas.
8. Container & Container liners shall be detoxified at the specified covered platform
with dyke walls and the wash wastewater shall be routed to collection tank after
characterization.
9. The wash water/rain water from the MEE, incinerator & RO plant areas shall be
routed to the ETP for treatment and shall not be allowed to mix with storm water.
10.The industry shall construct rainwater runoff tank for collection and storage of first
flush storm water. The industry shall maintain dry condition outside drains in non-
rainy season. Storm water shall be channelized through separate drains passing
through a HDPE lined pit having capacity of 10 minutes (hourly average) of rainfall.
11.The industry shall maintain 3 Nos. of piezo wells in the industrial premises to check
the ground water quality at regular intervals and submit the report to RO,
Srikakulam.
12.The industry shall carry out the monitoring for all Pesticides which are being
produced or proposed to be produced in the ground water at regular intervals in the
upstream and down streams of the industry. The consolidated monitoring results
shall be submitted to the concerned Regional Office, APPCB.
13.The industry shall maintain flow meter and web camera at the outlet of RO
permeate as per CPCB directions dated 05.02.2014 / 02.03.2015 and guidelines
issued regarding online monitoring systems issued from time to time and same
connected to CPCB and APPCB
AIR POLLUTION:
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
14.The emissions shall not contain constituents in excess of the prescribed limits
mentioned below.
Chimney Parameter Emission Standards
No.
1 to 3 Particulate Matter 115 mg/Nm3
Particulate Matter 50 mg/Nm3
Hcl 50 mg/Nm3
SO2 200 mg/Nm3
CO 100 mg/Nm3
Total Organic Carbon 20 mg/Nm3
HF 4 mg/Nm3
4 & 5* NOX 400 mg/Nm3
Hydrocarbons 10 PPM
Dioxins/Furans 0.1 ng TEQ/Nm3
Metals
Cd + Th (and its compounds) 0.05 mg/Nm3
Hg (and its compounds) 0.05 mg/Nm3
Sb + As +Pb + Cr + Co + Cu + Mn + Ni + V (and its 1.5 mg/Nm3
compounds)
* All monitored values shall be corrected to 11 % Oxygen on dry basis. The CO2
concentration in tail gas shall not be less than 7 %
HCl 20 mg/Nm3
Cl2 5 mg/Nm3
H2S 5 mg/Nm3
P2O5 (as H3PO4) 10 mg/Nm3
6
NH3 30 mg/Nm3
Particulate matter with pesticides compounds 20 mg/Nm3
CH3Cl 20 mg/Nm3
HBr 5 mg/Nm3
15.The industry shall comply the standards for emission and discharges for all other
parameters as per the standards notified by MoEF, Vide GSR No. 446 (E),
Dt.13.06.2011. and amendments thereof, for Pesticides manufacturing &
Formulation industry.
16.The industry shall comply with emission limits for DG sets upto 800 KW as per the
Notification G.S.R.520 (E), dated 01.07.2003 under the Environment (Protection)
Amendment Rules, 2003 and G.S.R.448(E), dated 12.07.2004 under the Environment
(Protection) Second Amendment Rules, 2004. In case of DG sets more than 800 KW
shall comply with emission limits as per the Notification G.S.R.489 (E), dated
09.07.2002 at serial no.96, under the Environment (Protection) Act, 1986.
17.The industry shall comply with ambient air quality standards of PM10 (Particulate
Matter size less than 10 micro grams) - 100 micro gram/ m3; PM2.5 (Particulate
Matter size less than 2.5 micro grams) - 60 micro gram/ m3; SO2 - 80 micro gram/
m3; NOx - 80 micro gram/ m3, Ammonia – 400 micro gram/ m3; Benzene- 5 micro
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
gram/ m3; at the periphery of the industry. Standards for other parameters as
mentioned in the National Ambient Air Quality Standards CPCB Notification No.B-
29016/20/90/PCI-I, dated 18.11.2009 Noise Levels: Day time - (6 AM to 10 PM) - 75
dB (A) Night time - (10 PM to 6 AM) - 70 dB (A).
18.The industry shall maintain dedicated multi stage scrubbers to the process vents to
control the process emissions, NH3, SO2, HCl, Bromine and other gaseous emissions.
The industry shall maintain online pH monitoring system to the scrubbers provided
to treat the process emissions. Scrubbed liquid shall be recycled as far as possible
and finally shall be sent to stripper, MEE followed by ATFD for terminal treatment.
The details of chemicals consumption used in the scrubber should be recorded and
kept accessible for the inspection officials of the Board.
19.The industry shall ensure that the emissions containing Bromine gases shall be
routed through water scrubber, caustic scrubber provided in series. The vent of the
caustic scrubber shall be dipped into dilute caustic soda lye for effective removal of
Bromine in the emissions. The industry shall evaporate the scrubber liquid from
Bromine recovery plant in the MEE system.
20.The industry shall maintain spent bromine recovery unit within the premises and
the recovery efficiency of Bromine recovery unit shall not be less than 99%.
21.The industry shall not use or generate odour causing substances or Mercaptans and
cause odour nuisance in the surroundings.
22.The industry shall maintain odour control measures such as scrubbers for TMA,
H2SO4 emissions, Dry vacuum pumps, Nitrogen blanketing for storage tanks,
Common ducting system with extraction system to production blocks for control of
odour.
23.The evaporation losses in solvents shall be controlled by taking the following
measures:
a. Chilled brine circulation shall be carried out to effectively reduce the
solvent losses into the atmosphere.
b. Transfer of solvents shall be done by using pumps instead of manual
handling.
c. Closed centrifuges shall be used to reduce solvent losses.
d. All the solvent storage tanks shall be connected with vent condensers to
prevent solvent vapours.
e. The reactor vents shall be connected with primary & secondary condensers
to prevent escaping of solvent vapour emissions into atmosphere.
24.The industry shall provide & maintain online continuous emission monitoring
system to the Boilers & incinerator stacks and shall connect the data to the APPCB.
Rotary kiln shall be maintained with online connection to APPCB website indicating
parameters like VOC, SOX, NOX, SPM values in the stack, temperature primary &
secondary combustion chambers.
25.The industry shall provide and maintain VOC analyser in the CAAQM stations. The
industry shall calibrate the online emission monitors, CAAQM stations, VOC monitors
and other sensors at regular intervals. The industry shall inform the RO, Srikakulam
about the calibration schedule and calibration shall be done in presence of the
Board officials.
GENERAL
26.The industry shall not manufacture new products and not exceeding the production
quantity without CFE / CFO of the Board.
27.The industry shall ensure that there shall not be any change in the process
technology, source of raw material and scope of working without prior approval
from the Board.
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
28.The industry shall provide separate energy meters for Effluent Treatment Plant
(ETP), and Air pollution Control equipments to record energy consumed.
29.Under no circumstances, the Hazardous Waste shall be burnt in the boiler.
30.Primary combustion chamber of the incinerator shall be maintained more than 850
±500C and Secondary Combustion temperature shall be maintained more than
1050±500C.
31.The industry shall store all raw materials in closed area and feed liquid raw
materials through closed pumping to reactors and tanks to reduce the odour
nuisance.
32.The industry shall maintain the following records and the same shall be made
available to the inspecting officers of the Board:
a. Daily production details (ER-1 Central Excise Returns).
b. Quantity of Effluents generated, treated, recycled/reused.
c. Log Books for pollution control systems.
d. Characteristics of effluents and emissions.
e. Hazardous/non hazardous solid waste generated and disposed.
f. Inspection book.
g. Manifest copies of effluents / hazardous waste.
33.The industry shall provide multi gas sensors with alarm in production blocks and
SRU.
34.The industry shall evaluate the performance of solvent recovery system for each
stream-wise and shall furnish plan of action to maintain the solvent recovery
efficiency more than 95% for every stream.
35.The industry shall comply with the following as per Standard Operating Procedures
of CPCB prescribed for SRP(Captive utilization):
a. The vent of the condenser shall be passed through VOC absorption media like
activated carbon.
b. Installation of online analyser for TOC at the vent out let in time bound manner
c. Online emission monitoring system for VOC emission should be installed in stack
attached to vent of the condenser and online emission data be connected to APPCB
Server.
36.The industry shall submit quarterly compliance report for the Standard Operating
Procedures of CPCB prescribed for SRP(Captive utilization) along with monitoring
reports carried out by NABL accredited or EPA approved Laboratories.
37.The industry shall contain the smell problem and shall avoid the accumulation of
hazardous wastes in their premises beyond the permitted limits. In case the
industry fails to comply, the Board will take action against the industry which may
include the reduction of production capacities drastically.
38.The industry shall isolate the storage of highly flammable chemicals, solvents &
other raw materials from the rest of facilities in the plant premises. Proper earthing
shall be provided in all the electrical equipment wherever solvent handling is done.
39.The industry shall develop green belt in all the vacant places within three months.
In future, excess green belt over and above 33 % of total area can be utilized for
industrial activity as per requirement of industry.
40.The industry shall renew the PLI policy which includes Environmental Relief Fund
(ERF) and submit copy to RO, Srikakulam on yearly base.
41.The industry shall conduct Health studies and Cholinesterase test for the
employees exposed by the National Institute of Occupational Health, (Ahmedabad,
Bangalore, and Kolkotta) and the results of the studies shall be submitted to Board
every six months.
42.Industry shall take action on recommendations on health studies carried out on the
employees of M/s. NACL Industries Ltd.,
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
43.The industry should submit mock drill report carried out at least once in six
months, as required under the Manufacture, Storage and Import of Hazardous
Chemicals Rules, 1989.
44.The industry shall submit the information regarding usage of Ozone Depleting
Substance once in six months to the Board.
45.The industry shall comply with the Regulation of Persistent Organic Pollutants
Rules,2018 notified by the MoEF&CC Notification vide G.S.R. 207 (E) dated
30.05.2018. As per the notification, the following 7 chemicals are prohibited to
manufacturer, trade, use, import and export:
a. Chlordecone,
b. Hexabromobiphenyl,
c. Hexabromodiphenyl ether and heptabromodiphenyl ether (commercial octa-
BDE),
d. Tetrabromodiphenyl ether and pentabromodiphenyl ether (commercial
penta-BDE),
e. Pentachlorobenzene,
f. Hexabromocyclododecane and
g. Hexachlorobutadine.
46.The industry shall update the information in OCEMS - Industry Information Data
Entry Software for Compliance Reporting Protocol in PART-II (Sections F & G) Every
Quarter on 1st January, 1st April, 1st July and 1st October through this software
system.
47.The industry shall submit half-yearly compliance report for the schedule A,B& C
conditions stipulated in CFO & HWA order audited through NABL / MoEF accredited
laboratories.
48.Any other directions / circulars / notices issued by CPCB, MoEF&CC and APPCB
shall be followed from time to time.
Special conditions:
49.The industry shall submit a copy of the NOC issued by the Andhra Pradesh State
Disaster Response and Fire Service Dept., (APSDRFSD) at concerned Regional Office,
APPCB.
50.The industry shall prepare a safety report and carry out an independent safety
audit report of the respective industrial activities including chemical storages /
isolated storages by an expert not associated with such industrial activity as
required under Rule 10 of MSIHC Rules, 1989 and get it approved by the Factories
Dept., and submit the compliance along with copy of the safety report, safety audit
report and safety certificate at concerned Regional Office, APPCB.
51.The industry shall identify major accident hazard chemicals & list out the
hazardous chemicals endangered to human health & environment, and the details
shall be furnished to the Factories Department and the Regional Office, APPCB time
to time duly certifying the same by the industry. Further, the industry shall extend
training to the working personnel while handling hazardous chemicals for the
prevention of accidents and necessary antidotes to ensure safety, as per the MSIHC
Rules, 1989.
52.The industry shall carryout calibration of safety equipment and leak detection
systems at regular intervals and shall certify the same with the Factories
Department. That certified copy shall be submitted to the APPCB, Regional Office.
53.The industry shall install fluorescent Wind Vane at the highest point in the industry
premises.
54.The industry shall inventory the hazardous wastes and its quantities stored within
the industry premises as per the Hazardous and Other Wastes (Management and
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
Transboundary Movement) Rules, 2016 (HOWM Rules, 2016) and shall furnish the
details to Regional Office, APPCB on a monthly basis duly certifying the same by the
industry.
55.The industry shall submit Risk analysis and risk assessment covering worst scenario
clearly describing impact within the industry premises and outside the industry
premises and emergency response system.
56.The industry shall inventorize the storage quantities of hazardous chemicals (raw
materials), products, as per the hazard nature of reactivity / toxicity / flammability
/ explosive stored/handling in the premises as defined in the Management of
Storage, Import of Hazardous Chemicals (MSIHC) Rules, 1989 and the details shall be
furnished to the Factories Department and to the Regional Office, APPCB on
monthly basis duly certifying the same.
57.The industry shall submit the copy of the safety audit report and On-Site / Off Site
Emergency Plans as applicable after being certified by the Factories Department to
the APPCB, Regional Office from time to time, if the storage quantity of hazardous
chemicals is equal to or, in excess of the threshold quantities specified in schedule
2 & 3 of MSIHC Rules, 1989.
58.The industries and isolated storages that are storing hazardous chemicals less than
the threshold quantities mentioned under MSIHC Rules, 1989 shall submit safety
certificate to the concerned Regional Office, APPCB
SCHEDULE – C
[see rule 6(2)
[CONDITIONS OF AUTHORISATION FOR OCCUPIER OR OPERATOR HANDLING HAZARDOUS
WASTES ]
1. The authorised person shall comply with the provisions of the Environment
(Protection) Act, 1986, and the rules made there under.
2. The authorisation shall be produced for inspection at the request of an officer
authorised by the State Pollution Control Board.
3. The person authorised shall not rent, lend, sell, transfer or otherwise transport the
hazardous and other wastes except what is permitted through this authorisation.
4. Any unauthorised change in personnel, equipment or working conditions as
mentioned in the application by the person authorised shall constitute a breach of
his authorisation.
5. The person authorised shall implement Emergency Response Procedure (ERP) for
which this authorisation is being granted considering all site specific possible
scenarios such as spillages, leakages, fire etc. and their possible impacts and also
carry out mock drill in this regard at regular interval of time;
6. The person authorised shall comply with the provisions outlined in the Central
Pollution Control Board guidelines on “Implementing Liabilities for Environmental
Damages due to Handling and Disposal of Hazardous Waste and Penalty”.
7. It is the duty of the authorised person to take prior permission of the State
Pollution Control Board to close down the facility.
8. An application for the renewal of an authorisation shall be made as laid down under
these Rules.
9. Any other conditions for compliance as per the Guidelines issued by the Ministry of
Environment, Forest and Climate Change or Central Pollution Control Board from
time to time.
Specific Conditions:
10.The industry shall not store hazardous waste for more than 90 days as per the
Hazardous and Other Wastes (Management & Transboundary Movement) Rules,
File No.APPCB-11022/114/2018-TEC-CFO-APPCB
2016.
11.The industry shall enter an agreement with the Cement industries for disposal of
incinerable waste or shall dispose to Alternative Fuel Raw material facility (AFRF)
OR to TSDF for co-incineration.
12.The industry shall transport the hazardous waste to cement industries through GPS
vehicle.
13.The industry shall store Used / Waste Oil and Used Lead Acid Batteries in a secured
way in their premises till its disposal to the manufacturers / dealers on buyback
basis.
14.The industry shall maintain 7 copy manifest system for transportation of waste
generated and a copy shall be submitted to concerned Regional Office of APPCB.
The driver who transports Hazardous Waste should be well acquainted about the
procedure to be followed in case of an emergency during transit. The transporter
should carry a Transport Emergency (TREM) Card.
15.The industry shall maintain proper records for Hazardous and Other Wastes stated
in Authorisation in Form-3 i.e., quantity of Incinerable waste, land disposal waste,
recyclable waste etc., and file annual returns in Form-4 as per Rule 20 (2) of the
Hazardous and Other Wastes (Management & Transboundary Movement) Rules,
2016.
16.The industry shall comply with the provisions of HWM Rules, 2016 in terms of
interstate transport of Hazardous Waste and manifest document prescribed Under
Rule 18 and 19 of the HWM Rules, 2016.
17.Hazardous Waste annual return shall be filed by June 30th for the period ensuring
31st March of the year.
The industry shall submit Half yearly compliance reports to all the stipulated conditions
in Environmental Clearance (EC), Consent for Establishment (CFE) and Consent for
Operation (CFO) through website i.e., https://pcb.ap.gov.in by 1st of January and 1st
July of every year. The first half yearly compliance reports shall be furnished by the
industry and second half yearly compliance reports shall be the audited through
MoEF&CC recognized and National Accreditation Board for Laboratory Testing
(NABL) accredited third party.
SUBMITTED TO
ANDHRA PRADESH POLLUTION CONTROL BOARD,
REGIONAL OFFICE, SRIKAKULAM
NACL Industries Limited Process Description
Stage II:
O O H O O
O O
N N
+
H 2 O
+
O H M o l. W t.: 1 8
C l C l
C 1 1 H 7 C lK N O 3 C 7H 16O C 18H 22C lN O 3
M o l. W t.: 2 3 7 .6 M o l. W t.: 1 1 6 .2 0 M o l. W t.: 3 3 5 .8 2
Process Description
Stage I: 5-chloro 8-hydroxy quinoline and dimethyl formamide are taken in round
bottom flask at room temperature. Reaction mixture temperature is raised to 30 to 35 °C
and potassium carbonate is added to the above mixture for 15- 20 minutes. Mono
chloroacetic acid is added for two hours at room temperature. The reaction mixture is
stirred at 45-50°C for 10 hours. The reaction mixture is monitored by GC. Checked the
un-reacted 5-Chloro 8-hydroxy quinoline, if un-reacted is < 0.5% reaction mixture is
taken for the next step
Stage II: Reaction mixture temperature is cooled to 30-35 °C. 2-Heptanol is added to the
reaction mixture over a period of 3 hours at 30--35 °C and maintained for half an hour.
Temperature is raised to 90-95 °C and maintained for 15 hours at 90- 95 °C. Checked the
unreacted stage-I by GC, if un-reacted Stage –I is < 0.5%., the reaction mass is filtered,
filter cake is washed with dimethylformamide. Dimethylformamide is removed
completely under vacuum at 60 °C for 2- 3 hours. Water is added slowly, reaction
mixture cooled to room temperature, then cooled to 0-5°C and maintained for 2-3 hours.
Reaction mixture is filtered and washed with water, to obtain Cloqintocet mexyl
Technical. Schematic diagram of Cloquintocet Mexyl shown in Fig 2.1 and material
balance for Cloquintocet Mexyl is presented in Table 2.1
CH3 O CH3 O
H3C
H3C
NH S
H3C OH O
N NH
N SH TCH HO Trimethylpyruvic aci
H2N NH NH2
Triazinone
S
S
+ H2N NH2
Process Description
Stage I: Isoamylene is converted to Pinacolone in presence acid catalyst and
formaldehyde, which is chlorinated to yield Dichloropinacolone. This dichloroderivative
is then oxidized to keto acid which is coupled with Thicarbanohydrazide (TCH) to give
Triazinone. Schematic diagram of Triazinone / Thiocarbohydrazide/Dichloro Pinacolone
/Pinacolone is shown in Fig 2.2 and material balance for Triazinone /
Thiocarbohydrazide/Dichloro Pinacolone /Pinacolone is presented in Table2.2
Stage II:
Stage III:
Stage IV:
Process Description:
Stage I: After charging chlorobenzene initially, ortho-chloro phenol is taken into a glass-
lined Reactor and bromine is added at a controlled rate from a batch tank. A temperature
range of 25-43oC is maintained. During addition, bromine reacts with ortho-chloro
phenol and forms hydrogen bromide and 4-bromo-2-chloro-phenol in the solvent media
of chlorobenzene.
Stage III: The EPT formed is reacted with 30% TMA under controlled conditions to
obtain Ammonium salt of EPT. The temperature is maintained at 70oC for 6 hours. The
excess TMA is distilled off and the water and organic layers are separated. The aqueous
layer is sent to ETP and the organic layer, which consists of the Ammonium salt of EPT,
is transferred to another reactor for Profenofos reaction.
Stage IV: The n-propyl bromide is added into the reactor where it reacts with the
concentrated ammonium salt of EPT and forms Profenofos and n-propyl-ethyl
ammonium bromide. After completion of the reaction, the reaction mass is maintained at
60oC for 4 hours. Process flowdiagram of get Profenofos is shown in Fig 2.3 and material
balance for get Profenofos is presented in Table 2.3.
Reaction Schemes
Stage I:
NO2
NO2 N
N
Cl
S
DMF N N
N NH + Cl KHCO3 + KCl
N S K2CO3
N +
+ O
O
Cl
C4H8N4O3 C4H3Cl2NS C8H10ClN5O3S
Mol. Wt.: 160.13 Mol. Wt.: 168.04 Mol. Wt.: 138.2 Mol. Wt.: 291.72 Mol. Wt.: 100.11 Mol. Wt.: 74.55
Process Description:
Reaction Schemes
Stage I:
F3C S CN
O
N F3C S CN
H2N N
Cl Cl H2N N
Ethylene dichloride N
H2O2 + H2SO4 Cl Cl + H2O + H2SO4
+
CF3
Fipronil Sulfide CF3
C12H4Cl2F6N4S H2O2 H2O4S Fipronil
Mol. Wt.: 421.15 Mol. Wt.: 34.01 Mol. Wt.: 98.08 C12H4Cl2F6N4OS H2O H2O4S
Mol. Wt.: 437.15 Mol. Wt.: 18.02 Mol. Wt.: 98.08
CAS No: 120067-83-6 CAS No:120068-37-3
Process Description:
Stage I:2,3-Dimethyl-4-Nitro-pyridine-1-oxide reacts with Trifluoro Ethanol in presence
of Potassium Carbonate, then acylation with Acetic Anhydride in presence of Acetic
acid, then followed by hydrolysis with Sodium Hydroxide and finally salt formation
with Isopropyl Alcohol Hydrochloride in presence of Methyl Isobutyl Ketone and
Toluene as solvent media and gets purified with Carbon and Hyflo to give 2- (Hydroxy
5-amino-3-cyano-1-(2,6-dichloro-4-trifloromethylphenyl)-4-trifluoromethyl thio pyrazole
and ethylene dichloride are charged in the reactor at RT. Reaction mixture is heated to
12-15ºC. 50% H2O2 and 90% H2SO4 are added simultaneously over a period of 3-4
hours. The reaction temperature is raised to 28-30°C and maintained for 2.0 hrs. Reaction
is monitored by chromatographic method. After completion of reaction, reaction mass is
send to work up. Reaction mass is slowly added to chilled water at 10-12°C for 2 hrs.
Eethylene dichloride (extra) is added to the above mixture. This mixture is heated to 60°C
and separated the organic and aqueous layers. The obtained organic layer is washed with
water and 5% NaHCO3 solution followed by water. Solvent is removed up to 50% from
organic layer under reduced pressure and remaining organic layer is cooled to 5-10ºC.
Crystals are formed in the organic layer and which are send to filtration. The solid
material is Fipronil technical. Process flowdiagram of Fipronil is shown inFig 2.5 and
material balance for Fipronil is presented in Table 2.5.
S,S-dimethyl-
Cl N N dithiocarbonate
NH condensation
N Cl + N Cl N
imine formation H
N
ammonia
H
N NO2
NO2
2-chloro-5-chloromethyl-
2-(nitroimino)- imidacloprid CH3
pyridine condensation CH3
NH cyclisationimidazolidine S nitration
S
acid
N NH2 O2N CH3 CH3
H concentrated HN S
N NO2 N S sulfuric acid
NH2
Process Description:
2-(nitroimino)-
dimethyl N-nitroimido- acetic
dimethylimido-
dithiocarbonate dithiocarbonate
imidazolidine ethylenediamine
Stage I: 6-methoxy-3-pyridine carboxaldehyde dimethyl acetal is chlorinated using
chlorine
Cl
gas to get 2-chloro -5 chloromethyl
NH
Pyridine, generated
condensation
N hydrochloric
N acid gas is
scrubbed
N Cl +
in water & dilutedHNsodium hydroxide solution, Cl Organic layer
N
N
His taken to the
N NO2
NO2
stage 2.
2-chloro-5-chloromethyl-
2-(nitroimino)- imidacloprid
pyridine
imidazolidine
Water
Toluene WORK UP
Aqueous
Water WORK UP
Aqueous
Toluene
FILTRATIONN
IMIDACLOPRIDE WET
DRYING
IMIDACLOPRIDE
TECHNICAL
NACL Industries
N-Cyano methyl Acetamidate Limited
(NCMA) Process
is reacted with 2-Chloro 5-(methyl amino Description
methyl)
Pyridine (CMAMP) in Methanol as solvent media at a sub-atmospheric temperature (10 –
15°C). After the reaction is completed the product is filtered and dried to obtain technical
2.1.7
gradeProcess
product.Description
The mother of Acetamiprid
liquor is distilled to recover Methanol solvent which is then
recycled.
Reaction Schemes
Process Reaction:
CH3
N C N CN
H3CO CH2NHCH3 CH2
C=NCN + CH3
N
Cl N
H3C Cl
NCMA CMAMP ACETAMIPRID
N-cyanomethyl [2-Chloro-5-(methyl amino methyl) MW. = 222.5
Acetamidate Pyridine
MW.= 98 MW.= 156.5 +
CH3OH
METHANOL
MW.= 32
Process Description:
N-Cyano methyl Acetamidate (NMCA) is reacted with 2-Chloro 5-(methyl amino methyl)
pyridine (CMAMP) in methanol as solvent media at a sub-atmospheric temperature (10-
15, Degree C). After the reaction is completed the product is filtered and dried to obtain
technical grade product. The mother liquor is distilled to recover solvent which is then
recycle. Process flow diagram of Acetamiprid is shown in Fig 2.7 and material balance
Acetamiprid is presented in Table 2.7.
NCMA 520
CMAMP 700 METHANOL 143
METHANOL 1800 CONDENSATION
2877
ACETAMIPRID
1000
Material Balance:
Fig 2.7 Process Flow Diagram of Acetamiprid
Material Balance for Acetamiprid
Input/MT of Product
S.No. Raw Materials
(KG)
1 NCMA 520
2 1-15
CMAMP Team Labs and Consultants
700
3 Methanol 1950
Total 3170
Output/MT of Product (KG)
Air
S. No. Liquid Solid Remarks
NACL Industries Limited Process Description
Process Description:
Meta Phenoxy Benzaldehyde is reacted with Sodium Cyanide to form Meta Phenoxy
Benzaldehyde Cyanhydrin as an intermediate. This o reaction with FluoroPropenyl Acid
Chloride (TFP Acid Chloride) form the Product Cyhalothrin. In this process n – Hexane
is used as solvent along with phase transfer catalyst.
The reaction mass of Cyhalothrin is washed by Soda Ash solution as well as water.
Solvent n-Hexane is stripped off to get pure Cyhalothrin oil. Finally Cyhalothrin oil is
epimerized to give Lambda Cyhalothrin of 85%. As aqueous layer which contains traces
of Sodium Cyanide is detoxifiedby the treatment of Sodium Hypochlorite solution (8-
10%) up to < 0.2 ppm level. Then it is mixed up with main ETP stream for further
treatment. Process flowdiagram Lambda Cyhalothirin is shown in Fig 2.8 and material
balance for Lambda Cyhalothirin is presented in Table 2.8.
Process Description:
It is manufactured in a single step reaction of 2-methyl-3-biphenyl methanol with 3-((E)-2-
chloro-3,3,3-trifluroprop-1-enyl)-2,2-dimethylcyclopropanecarboxylicacid chloride
(Cyhalothric acid chloride). Process flowdiagram of Bifenthirin is shown in Fig 2.9 and
material balance for Bifenthirin is presented in Table 2.9.
Cl
O + NaCl
O Cl
CN O
Cypermethrin Sodium chloride
C22H19Cl2NO3
Mol. Wt.: 416.30 Mol. Wt.: 58.44
Process Description:
A solution of sodium cyanide is prepared in SS reactor and further n-hexane is charged
along with Catalyst and soda ash. In another reactor a mixture of cypermethric acid
chloride, m-phenoxy benzaldehyde and n-hexane is prepared and kept at 10-15ºC. This
mixture is added to the first reactor at room temperature and maintained the same
temperature for 1 hour. The organic layer is then washed successively with plain water,
hypochlorite solution, aqueous acetic acid and again with plain water. It is then passed
through sparkler filter and hexane is distilled out first at normal pressure and then under
vacuum to remove the traces to get cypermethrin technical. Process flowdiagram of
Cypermethrin is shown in Fig 2.10 and material balance for Cypermethrin is presented in
Table 2.10.
Process Description:
Stage I: Calcium cyanamide and water are charged in the reactor at RT. The resulting slurry
is heated to 40-450C and maintained at this temperature for 1.0 h. Methyl chloroformate is
added slowly over a time of 1.0 h at 40-450C. The reaction mixture is further maintained at
40-450C for 1.0 h. The reaction mixture subjected to filtration. The mother liquor obtained by
filtration is taken in another reactor at RT and O-Phenylenediamine is charged at RT. The
reaction mixture is heated to 90-950C. 6N HCl was added drop wise so that, pH of the RM is
in the range of 3-4. RM is filtered, obtained cake. Cake is our desire Carbendazim-Technical.
Process flowdiagram of Carbendazim is shown in Fig 2.11 and material balance for
Carbendazim is presented in Table 2.11.
Water
Charged at RT
Calcium Cyanamide
Filter Mls
O-Phenylenediamine Charged at RT
6 N HCl
Note: Addn such that pH 3.0- Heat to 90-950C, & Maintain for 4-5 h
4.0
Carbendazim-Technical
Reaction Schemes
Once the reaction completes, distil half of the toluene and cool to crystallize the mass.
Centrifuge and dry the crude mass to get technical grade Pymetrozine. Recover the toluene
from the ML by distillation.
Stage I:
Process Reaction:
O
H3C NH2
N
H
+
N
N N O
3 Pyridinecarboxaldehyde H
M.W.- 107 1,2,4- Triazin - 3(4H) 1,4- Amino
-5,6- Dihydro-6-Methyl
M.W.- 128
H3C N
HO
CH N
+ 2
N
N
H
PYMETROZINE
MW.= 217
Process Description:
Charge 3- Pyridine carboxaldehyde, 1,2,4-Triazine-3(4H)-1,4 Amino-5,6-dihydro-6-methyl
and Toluene in a reactor under stirring. Raise the temperature to 65°C and maintain for 6
Hrs. Once the reaction completes, distil half of the toluene and cool to crystalize the mass.
Centrifuge and dry the crude mass to get technical grade Pymetrozine. Recover the
toluene from the ML by distillation. Process flowdiagram of Pymetrozine is shown in Fig
2.12 and material balance for Pymetrozine is presented in Table 2.12.
3 PYRIDINE
519
CARBOXALDEHYDE
1,2,4 TRIAZINE-3 (4H) 1,4 -
AMINO-5,6 -(DIHYDRO-6- 639
METHYL) REACTOR
TOLUENE 2000
3158
DISTILLATION LOSS 15
2010
DRYING LOSS 20
DRYING
PYMETROZINE
1000
Process Description:
It is a composite mixture of 90% emamectin B1a and 10% emamectin B1b as their benzoate
salts. It is isolated from fermentation of streptomycessavermitis with an anthelminic and
acaricidal. Then methylamine is added in the mixture. Finally, benzoate salt is prepared by
reaction with methyl benzoate. Process flowdiagram of Emamactin Benzoate is shown in Fig
2.13 and material balance for Emamactin Benzoate is presented in Table 2.13.
Mass Balance
Mass balance of Emamectin benzoate
Methyl benzoate 25
Benzylation
Water 90
S H
N S C N-
Solvent C-9
H2N
165oC
O O
Stage II:
S H
S C N- N
acetonitrile
NH
t-butylamine
O
C4H11N
O
Mol. Wt.: 73.14
Process Description:
Stage I: The dried DIPPT is maintained at 165oC in solvent C-9 for 16 hours with
liberation of ammonia gas. After completion of the reaction conversion, the reaction
mass is cooled to 90oC and water is charged. The mass is cooled to 60oC and the organic
layer is separated. The organic phase is washed with water at 60oC. The washed organic
is distilled out under reduced pressure to recover solvent C-9, leaving the intermediate
ITC.
The intermediate ITC is reacted with tert-butylamine in solvent acetonitrile at 60oC for 8
hours. After completion of the reaction, the reaction mass is cooled to 0oC and the slurry
mass is filtered. The cake is washed with chilled acetonitrile and the washed wet cake is
dried to get Diafenthiuron-technical. Process flowdiagram of Diafenthiuron is shown in
Fig 2.14 and material balance for Diafenthiuron is presented in Table 2.14.
Stage II:
Process Description:
Stag I:
2,4- Dichloroacetophenone (DiCAP) is reacted with pentane 1,2 diol (1,2PDL) to form
acetal compound in the presence of 1,2 - dichloroethane. Para toluene Sulphonic Acid
(PTSA) is used as a catalyst. Water, which is formed during the reaction, is removed and
PTSA remains in the aqueous layer.
Stage II:
The acetal compound is reacted with bromine to form Bromoketal. A batch tank is used
to add bromine slowly to the acetal compound in 1,2-dichloroethane. The required
quantity of bromine is pumped from the bulk storage tank to the batch tank. Hydrogen
bromide gas evolves during the reaction and it is scrubbed with water to obtain 30% HBr
solution, which is sent to bromine recovery unit. The bromoketal mass is neutralized
with aqueous NaOH and the unreacted bromine reacts with NaOH to form NaBr. Then,
the layers are separated. The aqueous layer is sent to ETP for treatment. 1,2
dichloroethane is distilled off from the organic layer. Process flowdiagram of
Propiconazole / Bromoketal (Intermediate)is shown in Fig 2.15 and material balance for
Propiconazole / Bromoketal (Intermediate) is presented in Table 2.15
Process Description:
Stage I: Orthotoluidine is dissolved in chlorobenzene and is reacted with ammonium
thiocyanate under reflux to form ortho toulyl urea. The liberated ammonia reacts with
sulfuric acid and ammonium sulfate is formed. The reaction mass is reacted with chlorine
to form 2-amino-4-methyl benzo thiazole. The off gas, HCl, is scrubbed with water and is
sold out as dilute hydrochloric acid. The product is filtered and the solid product is taken
for Tricyclazole reaction. The chlorobenzene in the filtrate is separated and recovered by
distillation and aqueous salts are disposed as fertilizer. Process flowdiagram of
Tricyclazole is shown in Fig 2.16 and material balance for Tricyclazole is presented in
Table 2.16.
Stage II:
Stage III:
Process Description:
Stage I:
The reaction is complete in a matter of minutes at 70-90oC. The DMSO is striped off.
The excess BC is removed by steam distillation and the residue Intermediate I product is
dissolved in dichloromethane (DCM). The organic phase is then washed with water.
The 53% solution of intermediate I in DCM is transferred to the next step.
Stage II:
The second step is the alkylation of intermediate I with DCM to make intermediate II
using phase transfer catalysis. The DCM solution of intermediate I from the first step is
slowly added to a mixture of DCM, and a phase transfer catalyst. The DMSO is stripped
off, the crude product is dissolved in xylene at 80oC.
Stage III: The final purification step is crystallization form the xylene by cooling below
5oC. The product is recovered by filtering washing first with xylene then isopropanol.
The normal purity of technical fenbuconazole is 97% coming out. Process flowdiagram of
Fenbuconazole is shown in Fig 2.17 and material balance for Fenbuconazole is presented
in Table 2.17.
Stage II:
Stage III:
Process Description:
Stage I: Para Chloro phenyl acetonitrile (PCAN) is reacted with N Butyl Bromide (NBB)
in presence of sodium hydroxide 48 % solution in water media to produce 2-Butyl-2-(4-
chlorophenyl) acetonitrile - (BCPA) After reaction, extra water is added, stirred and
organic is separated out. The crude BCPA is taken for next step. Aqueous sodium
bromide solution is sold out for bromine recovery.
Stage II: BCPA is then reacted with Dibromo methane (DBM) in presence of sodium
hydroxide 48% solution in water as solvent media; to produce 2-Butyl -2-chloromethyl-2-
(4-chlorophenyl) acetonitrile (BCAN) BCAN is worked up by addition of water and
layers separated. The aqueous layer is sold to outside parties for Bromine/Bromide
recovery. The organic layer containing BCAN is isolated and taken for final Myclobutanil
reaction.
Stage III: BCAN is reacted with sodium 1,2,4 Triazole in solvent media dimethyl
formamide (DMF) to produce final product Myclobutanil. Process flowdiagram of
Myclobutanil is shown in Fig 2.18 and material balance for Myclobutanil is presented in
Table 2.18.
Stage II:
Stage III:
Stage IV:
Stage V:
Process Description:
Stage I: The first step in the synthesis of Thifluzamide is chlorination of freshly distilled
ETFAA. The ETFAA needs to be distilled slowly before use because the molecule tends
to form a dimer upon standing.
Stage II: The ETFAA is reacted with chlorine gas in the absence of any solvent. After
warming to ambient temperature and purging dissolved HCl with nitrogen, the CI-
ETFAA is isolated without further purification as a colorless oil
Stage III: The CI-ETFAA is then reacted with thioacetamide in acetonitrile using
triethylamine as an acid scavenger to form the thiazole ester which is converted, without
isolation, to the thiazole acid by reaction with NaOH followed by acidification
Stage IV: The thiazole acid is recovered as a beige solid by filtration, washing and
drying. The thiazole acid is then converted to the thiazole acid chloride by reaction with
thionyl chloride in toluene.
Stage V: The final step of the synthesis is the reaction of the thiazole acid chloride with
DBTFMA in acetonitrile. The thifluzamide final product is precipitated form the solvent
by addition of water. Product recovery is filtration. Process flowdiagram of
Thifluzomide is shown in Fig 2.19 and material balance for Thifluzomide is presented in
Table 2.19.
O Al+++ Cl-
-
Cl
+
Cl
Cl Cl Cl Cl
Stage II:
O
O
S dimethyl sulfate
+ KOH
Cl Cl Cl Cl
Stage III:
N N
O HO N
NH
K2CO3
+ N N DMF
Cl Cl Cl Cl
Process Description:
Stage I: n-valeroyl chloride is added to 1,3-dichlorobenzene and anhydrous aluminium
chloride at 60oC for 2 hours. The addition of Lewis acid is an exothermic and the
temperature goes to 90oC. The reaction mass is maintained at 90oC for 3 hours and is
drowned into chilled water, maintaining the temperature below 10oC. The mass is
stirred, settled and separated. The organic phase is washed with water twice. The
washed organic layer is distilled out under reduced pressure to recover 1,3-
dichlorobenzene and finally the product, 2,4-dichloro valerophenone.
Stage II: Dimethyl sulfate is added to a solution of water, dimethyl sulfide and phenone
at 40oC for 1 hour. The reaction mass is maintained for 6 hours at 40-42oC and cooled to
30oC. Potassium hydroxide is added slowly at 38-42oC and the reaction mass is
maintained for 10 hours at 42oC. After completion of the reaction, the temperature is
raised to recover dimethyl sulfide till 80oC. The mass is cooled to 40oC and water is
added. The reaction mass is extracted with dichloromethane for 4 times at room
temperature. All the dichloromethane extracts are combined and distilled out under
reduced pressure till temperature 85oC to recover dichloromethane and leaving oxirane.
Stage III: Oxirane is added to a mixture of N,N-dimethylformamide, potassium
carbonate and 1,2,4-triazole at 135oC. The reaction mass is maintained at 145oC for 12
hours. After completion of the reaction, the mass is cooled to 40oC and filtered to
remove excess reactants. The filtered mass is distilled out to recover N,N-
dimethylformamide at 80oC under reduced pressure. After completion of the recovery
of DMF, the molten mass is added to water at temperature below 20oC. The slurry mass
is filtered at 10oC to obtain wet product, which is dried at 50oC to get Hexaconazole-
technical. Process flowdiagram of Hexaconazole is shown in Fig 2.20 and material
balance for Hexaconazole is presented in Table 2.20
O water
S
+
O
Cl KOH
Cl
Stage II:
N
N
N
HO
NH
NaOH
+ N N
O NMP
Cl
Cl
1-(4-chlorophenyl)-4,4-dimethyl-3-(1H-1,2,4-
2-(4-chlorophenethyl)-2-tert-butyloxirane 1,2,4-triazole triazol-1-ylmethyl)pentan-3-ol
C14H19ClO C2H3N3 C16H22ClN3O
Mol. Wt.: 238.75 Mol. Wt.: 69.1 Mol. Wt.: 307.82
Process Description:
Stage I: Dimethyl sulfate is added to a solution of water, dimethyl sulfide and
pentanone at 40oC for 1 hour. The reaction mass is maintained for 6 hours at 40-42oC
and cooled to 30oC. Potassium hydroxide is added slowly at 30-35oC and the reaction
mass is maintained for 18 hours at 42oC. After completion of the reaction, the
temperature is raised to recover dimethyl sulfide till 80oC. The mass is cooled to 40oC
and water is added. The reaction mass is extracted with dichloromethane for 3-4 times at
room temperature. All the dichloromethane extracts are combined and distilled out
under reduced pressure till temperature 85oC to recover dichloromethane and leaving
oxirane.
Stage II: Oxirane and N-methyl pyrrolidinone are charged and the temperature of the
mass is raised to 120oC. Sodium hydroxide flakes , 1,2,4-triazole and water are added
to the reaction mass at 120oC. The reaction mass is maintained at 120oC for 4 hours.
After completion of the reaction, the solvent is removed at 80oC under reduced pressure.
Water is added to the molten mass at 70-80oC and the mass is slowly cooled to 20oC.
The slurry mass is filtered at 20oC to obtain wet product. The wet product is charged
into cyclohexane and the mass is maintained at 70oC for 1 hour. The mass is cooled to
20oC, filtered and dried at 50oC to get Tebuconazole-technical. Process flowdiagram of
Tebuconazole / Oxirane (Intermediate) is shown in Fig 2.21 and material balance for
Tebuconazole / Oxirane (Intermediate) is presented in Table 2.21.
Cl
Cl
Mol. Wt.: 239.10 Mol. Wt.: 112.94 Mol. Wt.: 315.58 Mol. Wt.: 36.46
Stage II:
Cl
Cl
O
O O HO O
PTSA O
Cl +
Cl
HO H2O
+
Cl
Cl
C14H9Cl3O2 C3H8O2
C17H15Cl3O3
Mol. Wt.: 315.58 Mol. Wt.: 18.02
Mol. Wt.: 76.09
Mol. Wt.: 373.66
Stage III:
Cl
Cl
Cl
H
N O
Cl
O + N + K2CO3
N O
+ KCl + KHCO3
O
Cl N
N
C14H9Cl3O2 C2H3N3 N
Mol. Wt.: 315.58 Mol. Wt.: 69.07 M. Wt:138 C17H15Cl3O3 ClK CHKO3
Process Description:
Stage I: AlCl3 is charged to Dichloroethane, followed by choroacetyl chloride at 20 ~ 25 °
and maintained for 30 minutes. Reaction mixture cooled to 0 ~ 5 ° C. To it, cold solution
of 3,4 '- Dichloro Diphenyl ether is added slowly. The reaction is exothermic. It is
maintained for 2 hours and then slowly heated to 25 ° C ~ 30 ° C and kept for for 2 hours.
The reaction solution is poured next into ice water, organic layer is separated and
washed with water.
Stage II: The residue of stage-1 is charged in cyclohexane and chlorobenzene, PTSA, 1,2 -
propylene glycol are added at room temperature. Reaction mixture is heated to reflux
and water is collected by azeotropic distillation (dehydration). Reaction mixture is cooled
to room temperature. Reaction mixture washed with aq NaHCO 3 and then the organic
layer is washed with water once again. The solvent is removed under reduced pressure.
Stage III: The residue of stage 2 is charged in dichloroethylene and sulfolane and stirred
at room temperature. Potassium triazole was added to the reaction mixture and stirred
rapidly. Heated to 210 ° for 2 hours. Reaction mixture cooled to 60 ° C ~ 70 ° C and
filtered to remove KCl. The filter cake is washed with sulfolane. The combined filtrate
and washings were evaporated under reduced pressure to get Difenoconazole Technical.
Process flowdiagram of Difenconazole is shown in Fig 2.22 and material balance for
Difenconazole is presented in Table 2.22.
3 ,4 ' - D i c h l o r o D i p h e n y l e t h e r
A lC l3 F r i e d e l c r a f t s a c y l a t io n
D ic h lo ro eth a n e
C h l o r o a ce t y lc h l o r id e
w a te r w ork up
s o d i u m b ic ar b o n a t e s o l n
A q u e o u s was te
D i s t i l la t i o n
D ic h lo ro eth a n e
c rud e
C y c lo h ex a n e
PTSA D i o x o l a n e fo rm a t i o n
1 , 2 P r o p y l e n e g ly c o l
S o d iu m b i c arb o n a te
c y c lo h e x a n e w ork u p
D i s t i l la t i o n
S ulfola ne
P o t a s si u m t ri a z o l e C rude
e t h y le n e
sulfola ne
s a l t f il t r a ti o n
KCl
Filtrate
D i s t i l la t i o n
S u lf o l a n e
D i f e n oc o n a z o l e c a k e
D ry in g
D i f e n oc o n a z o l e T e c h n i c a l
NH
Cl NMP
+
N N
NaOH
N N
O O
Cl N Cl
Process Description:
Oxirane is added to solvent N-methyl pyrrolidinone. The temperature of the reaction
mass is raised to 120oC and sodium hydroxide flakes , 1,2,4-triazole and water are
added at 120oC. The reaction mass is maintained at 120oC for 4-6 hours. After
completion of the reaction, the mass is distilled out to recover NMP at below 80oC under
reduced pressure. After completion of the recovery of NMP, water is added to the
molten mass at 70-80oC. The mass is cooled to 20oC and the slurry mass is filtered to
obtain wet product. The wet product is purified in cyclohexane at 70oC for 1 hour and
the mass is cooled to 20oC. The slurry mass is filtered, washed with cyclohexane and the
washed wet product is dried at 50oC to get Epoxiconazole-technical. Process
flowdiagram of Epoxiconazole is shown in Fig 2.23 and material balance for
Epoxiconazole is presented in Table 2.23
Stage II:
Process Description:
Stage I: 1-(4-chlorophenyl)-2-cyclopropyl-propan-1-one (CPDP propanone)
is epoxidized to oxirane using dimethyl sulfide and potassium hydroxide. The converted
oxirane extracted into toluene and washed with water. The oxirane/toluene organic
layer is taken to the stage 2. The below is the chemical reaction with material balance.
Stage II: The oxirane/toluene is condensed with 1,2,4-triazole using catalyst potassium
carbonate. After completion of the reaction, the mass is washed with water and distilled
out to recover toluene partly and cooled. The cooled mass is filtered and dried to obtain
Cyproconazole-technical. The mother liquor is distilled out to recover toluene, which is
recycled in the next batch. Process flowdiagram of Cyproconazole is shown in Fig 2.24
and material balance for Cyproconazole is presented in Table 2.24
Pentanone
Dimethyl sulfide EPOXIDATION
Potassium hydroxide
Water
Toluene WORK UP
Aqueous
1,2,4-triazole
Potassium carbonate CONDENSATION
Water WORK UP
Aqueous
Toluene
DISTILLATION
FILTRATION
CYPROCONAZOLE WET
DRYING
CYPROCONAZOLE
TECHNICAL
Process Description:
Stage I: Sodium thiocyanate and acetone are charged in the reactor at RT. The resulting
slurry is heated to 30-350C. Methyl chloroformate is added over a time of 0.5 h at 30-
350C. The Reaction mixture was cooled to at 0-50C. O-Phenylenediamine is added
portion wise into the reactor at 0-50C. The reaction mixture was allowed to RT and
stirred for 1.0h. The reaction mass is subjected to filtration and the obtained cake is
washed with water. The obtained cake is our desire Thiophanate methyl-Technical.
Process flowdiagram of Thiophanate-methyl is shown in Fig 2.25 and material balance
for Thiophanate-methyl is presented in Table 2.25
O O OH O O CN
O Cl CN 18-crown-6 ether O O
+ K2CO3 + KCl + KHCO3
N N + DMF N N
Mol. Wt.: Mol. Wt.:
Methyl-3-methoxy-2-(2-(6-chloro C7H5NO Mol. wt.: 138 74.55 100.12
pyrimidine-4-yloxy)phenyl) acrylate C22H17N3O5
Mol. Wt.: 119.12 Mol. Wt.: 403.39
C15H13ClN2O4
2-Cyanophenol
Mol. Wt.: 320.73 Azoxystrobin
CAS: 611-20-1
CAS: 131860-97-4
reaction mass. Water is charged at RT, separate the organic layer and distilled out to get
the crude product. The resulted crude product is crystallized in Methanol to get the
crystalline solid. Process flowdiagram of Azoxystrobin is shown in Fig 2.26 and material
balance for Azoxystrobin is presented in Table 2.26
Stage II:
OH
O N
Methanol
NH2OH. HCl NaOH + 2 H2O + NaCl
+ +
F F F F
F F
Hydroxyl amine Sodium Hydroxide 3-(Trifluromethyl)acetophenone
3-(Trifluromethyl)acetophenone Hydrochloride oxime
C9H7F3O HNaO C9H8F3NO Mol. Wt.: Mol. Wt.:
ClH4NO
Mol. Wt.: 188.15 Mol. Wt.: 40.00 Mol. Wt.: 203.16 18.02 58.44
Mol. Wt.: 69.49
2X18= 36
Stage III:
O O
N OH N
O O N O O
DMF
N
Br + + K2CO3 O
+ KBr + KHCO3
F F
F F
(E)-methyl-2-(2-bromomethyl 3-(Trifluromethyl)acetophenone Potassium Carbonate
phenyl)-2-methoxyiminoacetate oxime Trifloxystrobin F
F
C11H12BrNO3 C9H8F3NO
Mol. Wt.: 286.12 Mol. Wt.: 203.16 Mol. Wt.: 138.21 C20H19F3N2O4 Mol. Wt.: Mol. Wt.:
Mol. Wt.: 408.37 119.00 100.12
Process Description:
Stage I: To a solution of (E)-methyl-2-(2-methylphenyl)-2-methoxyimino acetate in MDC,
N-Bromosuccinimide (NBS), catalytic amount of AIBN are charged and the resulting
reaction mass is heated to reflux for 4-5 hrs. After completion of starting material, water
is charged at RT and separate the organic layer. Organic layer is distill out to get the
crude product. The resulted crude product is crystallized in 5% Ethyl acetate and n-
Heptane to get the crystalline solid.
Stage II: To a solution of 3’-(Trifluoromethyl)acetophenone, Hydroxyl amine
Hydrochloride in Methanol, aqueous Sodium Hydroxide solution is added slowly at RT.
The resulting reaction mass is stirred for 8-10 hrs. After completion of starting material,
distill out the aqueous Methanol completely. Water is charged into crude, stirred for 30
minutes and filtered the precipitated product. The resulted wet cake is dried in vacuum
oven at RT for 10 hrs.
Stage III: To a solution of 3-(Trifluoromethyl)acetophenone oxime in DMF, K2CO3 is
charged and stir for 30 mins at RT. To this solution (E)-methyl-2-(2-bromomethylphenyl)-
2-methoxyiminoacetate is charged and stirred for 24 hrs at 15- 20˚C . After completion of
starting materials, RM is filtered and distill-out the DMF completely to get crude. The
resulted crude is diluted with Toluene and wash with water. Separate the organic layer
and distilled out completely. The resulted crude crystallized in Methanol to get the
Trifloxystrobin as a white solid. Process flowdiagram of Trifloxystrobin is shown in Fig
2.27 and material balance for Trifloxystrobin is presented in Table 2.27
Stage I:
Stage II:
Stage III:
Process Description:
Stage I: NEPDA is charged to 1,2-dichloroethane at room temperature. Conc H2SO4 is
added to the reaction mixture at 20-25°C. 70% strength HNO3 is added slowly to the
reaction mixture at 20-25°C. Maintained for 1.0 h at 20-25°C and separated the layers.
Conc HCl is added to organic layer and stirred at room temperature for 2.0 h. The
organic layer is evaporated to give desired PENDIMETHALIN-TECHNICAL. Process
flowdiagram of Pendimethalin is shown in Fig 2.28 and material balance for
Pendimethalin is presented in Table 2.28
Stage II:
Process Description:
Stage I: 2,6 Diethylaniline (DEA) is reacted with Chloro Propoxy Ethane (CPE) to give
intermediate N Propoxy Ethyl 2,6 Diethyl Aniline hydrochloride (PEDA.HCl) at 130 deg
C. After the reaction, reaction mass is neutralised with caustic at room temperature upto
pH 7.0. Aq.layer containing NaCl is separated out and organic layer PEDA is washed
with water and taken to the Pretilachlor reaction.
Stage II: The crude PEDA is washed with water and caustic & NaCl solution is
separated. The organic layer (PEDA) is taken into solvent toluene and chloro acetyl
chloride is gradually added to form Pretilachlor at 60 deg C. After reaction, the mass is
filtered and the product is concentrated. Process flowdiagram of Pretilachlor is shown in
Fig 2.29 and material balance for Pretilachlor is presented in Table 2.29
C7H12N4OS C8H14N4OS
Mol. Wt.: 200.26 Mol. Wt.: 214.29
+
SO42-
96
Process Description:
Stage I: 88% H2SO4 is charged into the reactor and heated to 50-55°C. Butylthione is
added to the reaction mixture lot wise at 50-55°C. Dimethyl sulphate is added to the
reaction mass slowly for 1.0 hr at 50-55°C. The reaction is monitored by GC. When the
starting material is below 2%, reaction mass pH is adjusted to 8 to 8.5 by using 20%
NaOH solution. The mixture is maintained at RT for 3.0 hours. Reaction mass is filtered,
washed with water. Cake is purified with water and dried to get pure Metribuzin
technical. Process flowdiagram of Metribuzin is shown in Fig 2.30 and material balance
for Metribuzin is presented in Table 2.30.
BUTYTHION
SULPHURIC ACID S-METHYLATION
DMS
SODIUM HYDROXIDE
WORK UP
WATER
AQUEOUS
FILTRATION
METRIBUZIN WET
DRYING
METRIBUZIN TECHNICAL
Process Description:
Stage I: To the stirred solution of benzophenone in toluene was added sodium hydroxide
and N-acetyl morpholine reaction was then heated at 105 °C for 8h. After completion of
reaction water was added and layer was separated. Half of the toluene was recovered
and product was crystallized in toluene then filtered and dried to get dimethomorph.
Process flowdiagram of Dimethomorph is shown in Fig 2.31 and material balance for
Dimethomorph is presented in Table 2.31
Cl F O
O KO O
+ DMF
+ 2 K2CO3 + 2 + KF
KHCO3
N
N F O OH OH Cl O
C5H2ClF2N FK
C9H10O4 CK2O3 C14H11ClFNO4
Mol. Wt.: 149.53 Mol. Wt.: 182.17 Mol. Wt.: 311.69 Mol. Wt.: 100.15
Mol. Wt.: 138.21 Mol. Wt.: 58.10
Stage II:
F
F
O O O
O KO O + KCl
+ Cl
N
N Cl O
Cl O
CLODINOFOP-PROPARGYL
C14H10ClFKNO4 C3H3Cl
C17H13ClFNO4
Mol. Wt.: 349.78 Mol. Wt.: 74.51 Mol. Wt.: 349.74
ClK
Mol. Wt.: 74.55
Process Description:
Stage I: (R) –(+) -2-(4-Hydroxy phenoxy) propionic acid ( DHPPA ) and
dimethylformamide are taken in reactor at room temperature. Reaction mixture
temperature is raised to 30 to 35 °C and Potassium carbonate is added to the above
mixture over a period of 15- 20 minutes. During the addition slight exothermic nature of
reaction mass is observed. The reaction mixture is stirred at 100 to 105 °C for half an
hour. Reaction mixture is cooled to RT.
2,3 Difluoro 5-chloro pyridine is added to the reaction mixture at 30-35 °C for 2 hours
and maintained for 4 hours at 100-105 °C . If unreacted DHPPA is < 0.5% by HPLC area
then reaction should be terminated and used in the next step.
to the reaction mixture for 2 hours at 30--35 °C and maintained for half an hour.
Reaction temperature is raised to 40-45 °C and maintained for 10 hours at same
temperature. Monitored the reaction mass for un-reacted stage-I by HPLC and
propargyl chloride content by G.C. If un-reacted Stage –I is < 0.5%, reaction should be
terminated. The reaction mass is filtered and cake is washed with dimethylformamide.
Solvent is removed completely under reduced pressure at 60 °C for 2-to 3 hours. Water
is added to the crude mass, it is cooled to room temperature slowly. It is further cooled
to 0-5°C maintained for 2-3 hours. Reaction mass is filtered and washed with water to
obtain Clodinofop-propargyl Technical, which is dried. Process flowdiagram of
Clodinofop-Propargyl is shown in Fig 2.32 and material balance for Clodinofop-
Propargyl is presented in Table 2.32.
O
N
COOH O
COONa
O S O N
HO OH O
+ 2 CH3SOONa
N N + O
+ 2 3 NaOH
N
O O
N
O
3 H2O
+
H2O
Mol. Wt.: 18.02
Process Description:
Dihydroxybenzoic acid, toluene, TBAB and NaOH are charged at 25-30°C. Reaction
mixture is heated to 100°C and water collected by azeotropic distillation for 3-4hrs.
Sodium salt is formed in the reaction which is cooled to 70°C. 4,6dimethoxy-2-
methylsolphonyl pyridine(DMSP) and toluene are added to the reaction mixture, heated
to 80°C and maintained for 8-10 hours. Reaction mixture is cooled to 25-30°C and the
reaction mixture is filtered. The solid is washed with toluene. Product is further purified
in acetone. Process flowdiagram of Bispyribec Sodium is shown in Fig 2.33 and material
balance for Bispyribec Sodium is presented in Table 2.33.
TOLUENE WORK UP
AQUEOUS
WORKUP
FILTRATION
AQUEOUS
DRYING
BIS-PYRIBAC TECHNICAL
Process Description:
Stage I: Charge xylene and 4,6- Dimethoxy pyrimidine -2-amines and Heat the reaction
mass to 60 oC then Add solution of Methyl-2- {[Isocyanate sulfamoyl] Methyl} Benzoate
in xylene gradually over a period 2-3 hrs. at 60-65 oC then Maintain reaction mass at 60-
70 oC for 10 hrs. and check the unreacted 4-6 Dimethoxy pyrimidine -2-amine.
After completion of reaction, distill out xylene under vacuum 20 mm/Hg at 80 oC.and
To the residue, add methanol and heat reaction mass to 60 oC for one hrs. And cool it to
room temperature for 2 hrs and filter the solid and wash with methanol.Dry the solid at
70 oC for 3 hrs Rxn. of Methyl-2- {[Isocyanate Sulfamoyl] Methyl} Benzoate with 4, 6-
Dimethoxy pyrimidine -2- Amine to form Bensulfuran Methyl Tech. Process
flowdiagram of Bensulfuron Methyl is shown in Fig 2.34 and material balance for
Bensulfuron Methyl is presented in Table 2.34.
O O
P OH
+ 2 H3PO3 + 3NaCl + NH4Cl
OH
Cl
O S O
O
OH TEA O S O
O + O HCl
+
O O
ClH
M.Wt:118.3 M.Wt:190.65
M.Wt:272.3 Mol. Wt.: 36.46
Stage II:
Cl
Cl N
N
N OH
N
+ + 2 KOH
O + KCl + 2 H2O
Cl OH
HKO H2O
OK ClK
M.Wt:110 Mol. Wt.: 56.11 C14H8ClKN2O2 Mol. Wt.: 18.02
M.Wt:199 Mol. Wt.: 74.55 1
Mol. Wt.: 310.78
Stage III:
O
OK
O
O O
O
O
O S O O OK
N
+ O O
O S
N +
N
Cl N
Cl
Process Description:
Stage I: (-) L- Ethyl lactate, triethyl amine (TEA) are charged to the reactor at 25-30 °C.
Reaction mixture is cooled to 0-5°C. TBAB, DMF and p-Toluenesulfonyl chloride are
added to the reaction mixture at 0-5°C and stirred for 8-10 hours at the same
temperature. If reaction completed then added Toluene at 0-5° C and stirred for 15-30
minutes. H2O is charged at 0-5° C and raised temperature to 25-30° C. Layers are
separated, the organic layer is washed NaHCO3, water and followed by brine. Organic
layer is distilled completely under vacuum at 45° C, obtained the residue. The residue is
taken for the next step. The below is chemical reaction with material balance.
Stage II: 2, 6 Dichloroquinoxaline, Hydroquinone are charged in to the reactor at room
temperature. KOH solution (KOH dissolved in H2O) is added to the reaction mixture at
room temperature. The reaction mixture is heated to 88-90° C and stirred for 8-10 hours.
Reaction mixture is cooled to 45-50° C, H2O is charged to the reactor at 45-50°C and
Stirred for 1-2 hours at same temperature. Reaction mixture was filtered and washed
with H2O to obtain the solid. Solid was dried under reduced pressure at 50-55°C. The
solid is taken for the next step.
Stage III: Solid of stage-II material, K2CO3 are charged in cyclohexane at 25-30°C.
Reaction mixture is heated to 100°C and water collected by Azeotropic distillation at
100°C for 2-3 hours. The residue of stage-I is charged to the reaction mixture at 110°C
and stirred for 12-14 hours at 110°C. Reaction mixture is cooled to 80°C and filtered the
salts at 80°C. The solids are washed with hot cyclohexane. The filtrate is cooled to 10-
15°C and stirred for 6-8 hours at 10-15°C. Filtered the solid and washed with chilled
cyclohexane, obtained the solid. The solid is dried under reduced pressure to give
Quizalofop-P-ethyl Technical. The below is chemical reaction. Process flowdiagram of
Quizalofop-p-ethyl is shown in Fig 2.36 and material balance for Quizalofop-p-ethyl is
presented in Table 2.36.
O N N O O O
O + O O
N + OH
S O N N O S N
NH2 NH
O O N
N
C8H9NO4S C2H6O
C9H14N4O3 C15H17N5O6S
Mol. Wt.: 215.23 Mol. Wt.: 46.07
Mol. Wt.: 226.23 Mol. Wt.: 395.39
Process Description:
Stage I: Methyl 2-(aminosulfonyl)benzoate, acetonitrile are charged in the reactor at 25-
30° C and cooled to 0-5° C. 1,8-Diazabicyclo[5.4.0]undec-7-ene (DBU) is charged to the
reactor and stirred for 15 minutes. 2-Methoxy-4-methyl-6-(methylamino ethyl
carbamate)-1,3,5-triazine is dissolved in acetonitrile and charged to reaction mixture at
0-5° C, maintained for 4-5 hrs. Water and 1.0 N HCl are added at 0-5°C and stirred for 1
hour. Reaction mixture is filtered; Filter is washed with water. The solid is dried under
vacuum at 45-50° C for 5-6 hours to get Tribenuron-methyl Technical. The below is the
chemical reaction with material balance. Process flowdiagram of Tribenuron Methyl is
shown in Fig 2.37 and material balance for Tribenuron Methyl is presented in Table
2.37.
Methyl 2-(aminosulfonyl)benzoate
2-Methoxy-4-methyl-6-
(methylamino ethyl carbamate)-1,3,5-triazine COUPLING
Acetonitrile
DBU
Water
Workup
Hydrochloric acid
Filtration Aqueous
Drying
TRIBENURON-METHYL
S
C14H22O3S C3H7Cl2NO C17H26ClNO3S H2O ClH
Mol. Wt.: 270.39 Mol. Wt.: 144.00 Mol. Wt.: 359.91 Mol. Wt.: 18.02 Mol. Wt.: 36.46
Process Description:
5-[2-(Ethylthio) propyl]-3-hydroxy-2-propionyl-2-cyclohexen-1-one, hexane are charged
to the reactor at room temperature. O-(3-Chloro allyl) hydroxylamine hydrochloride is
added to the reactor at RT. Resulting mixture is heated to 30ºC and maintained for 8
Process Description:
To the mixture of trizolopyrimidine amine, DMSO and pyridine was added substituted
benzene sulphonyl chloride and reaction mixture was stirred for 8h. After completion of
reaction DMSO is distilled out completely. To the crude mixture water was added,
stirred and filtered. Filtrate was dried completely to afford desired product as
penoxsulam. Process flowdiagram of Pinoxsulam is shown in Fig 2.39 and material
balance for Pinoxsulam is presented in Table 2.39.
DMSO
Reaction
Trizole pyrimidine amine
Benzene sulphonyl Chloride
DMSO
Distillation
Water
Crystallization
MLR
Filtration
Drying
Product
Reaction Schemes
Stage I:
NH2
N
O
O + H2SO4 H2O H2SO4
+ + +
Stage II:
O
O
H
N
NH
Pd/C
+ H2 +
H2
C13H19NO Mol. Wt.: 2.02
Mol. Wt.: 205.30
C13H21NO
Mol. Wt.: 207.31
Stage III:
O O
O
H H
Cl
NH N
Cl O
+ + NaHCO3 NaCl + H2O
+ CO2 +
Cl
C13H21NO C2H2Cl2O C15H22ClNO2 CO2 ClNa H2O
CHNaO3
M. Wt.: 207.31 M Wt.: 112.94 M. Wt.: 84.01 M. Wt.: 283.79 M. Wt.: 44.01 M Wt.: 58.44 M. Wt.: 18.02
Process Description:
Stage I: Methoxyacetone, 2-methyl-6-ethyl aniline and hexane are charged in the
reactor at RT. H2SO4 is added catalytic amount to the mixture at RT. The resulting
mixture is heated to 80-85ºC and maintained at same temperature for 6.0 h. After
reaction completion, solvent is removed under reduced pressure at 80-85ºC to give
yellow oil. The yellow oil is used in the next reaction without further purification.
Stage II: Stage-I product (yellow oil product), ethylene chloride are charged in the
hydrogenation reactor at RT. Palladium on carbon is charged into reactor at RT. Reactor
is purged with nitrogen 3 times. Reactor is filled with H2 and evacuated and again H2
is filled freshly. The resulting mixture is heated to 40-45ºC and 3.0MPa pressure
maintained for 5.0 h. After reaction completion, the material is filtered to recover
1. 2-methyl-6-ethylaniline
2. Methoxy acetone Charge at RT
3. Hexane
H2SO4 Addition at RT
Solvent
Distillation
recovery
Gas filling at RT
H2 gas
Recovered
Filtered Pd/C
Recovered
Charged at RT Pd/C
Water
Recovered
Distillation
EDC
Solid (Stage-II)
1. Stage-II
2. Dichloroethane Charge at RT
3. NaHCO3
Cooled to -5°C
Layers separation
Aqueous waste
Organic Layer
S-Metolachlor
Technical
Process Description:
Stage I: Alpha Pinene reacts with TBHP (70%) in presence of Copper Iodide and
Oxygen using acetonitrile as solvent at ambient temperature. The reaction mass is then
diluted with water and extracted using MTBE solvent, distilled to yield the title
compound. Process flowdiagram of Verbinone is shown in Fig 2.41 and material
balance for Verbinone is presented in Table 2.41.
Process Description:
Stage I: Hexadecynol is reduced in presence of Nickel and Sodium borohydride
catalyst using Hydrogen and Methanol as solvent. The crude is then distilled to recover
solvent, diluted with MTBE and extracted suing MTBE and purified to yield the stage 1
compound. The stage 1 is then esterified using Acetic acid/Toluene mixture in presence
of acid catalyst, worked up to yield the title compound. Process flowdiagram of (Z)-
hezatec – 11-en-1-yl acetate is shown in Fig 2.42 and material balance for (Z)-hezatec –
11-en-1-yl acetate is presented in Table 2.42.
Process Description:
Stage I: Hexadecynol is reduced in presence of Nickel and Sodium borohydride
catalyst using Hydrogen and Methanol as solvent. The crude is then distilled to recover
solvent, diluted with MTBE and extracted suing MTBE and purified to yield the stage 1
compound. The Stage 1 compound is then oxidized in MDC as solvent using PCC,
distilled to yield the title compound. Process flowdiagram of (Z)-hezatec – 9-enal is
shown in Fig 2.43 and material balance for (Z)-hezatec – 9-enal is presented in Table
2.43.
Process Description:
Stage I: The chloro compound reacts with Magnesium in THF in presence of
copper/Lithium catalyst which then further reacted with acetate compound to yield
stage 1. It is then desalinated using acid catalyst in Methanol to yield the title
compound. Process flowdiagram of (8E,10E) – Dodoca-8, 10-dyen-1-ol is shown in Fig
2.44 and material balance for (8E,10E) – Dodoca-8, 10-dyen-1-ol is presented in Table
2.44.
Process Description:
Stage I: The Chloro olefinic compound reacts with Magnesium in presence of
Iodine/Dibromo ethane to yield the magnesium the magnesium complex which is then
further reacted with bromo compound to yield the Stage 1 Ester. It is then reduced
using Nickel and sodium borohydride catalyst using Hydrogen in Methanol which
after isolation yield the title compound. Process flowdiagram of 7Z,11Z hexadeca dienyl
acetate is shown in Fig 2.45 and material balance for 7Z,11Z hexadeca dienyl acetate is
presented in Table 2.45.
Process Description:
Stage I: The chloro aldehyde reacts with phosphonium bromide salt in presence of base
in THF to yield the Stage 1. This is isolated and then reaction with potassium acetate in
DMF to yield the title compound. Process flowdiagram of 7E, 9Z dodoca dienyl acetate
is shown in Fig 2.46 and material balance for 7E, 9Z dodoca dienyl acetate is presented
in Table 2.46.
Process Description:
Stage I: The Dodecynol is reduced using Hydrogen in Methanol using Nickel and
sodium borohydride /EDA to yield the Stage 1 alcohol. It is then esterified using Acetic
acid /Toluene using Acid catalyst, isolated to yield the title compound. Process
flowdiagram of 8Z Dodecinyl acetate is shown in Fig 2.47 and material balance for 8Z
Dodecinyl acetate is presented in Table 2.47.
Process Description:
Stage I: 13Octadecynol reacts with Sodium borohydride and Nickel acetate in presence
of Hydrogen gas using Methanol as solvent to yield Stage 1. It is then esterified using
Acetic acid and Toluene using a acid catalyst to yield Title compound. Process
flowdiagram of (Z)-Octadeca – 13 – enyl acetate is shown in Fig 2.48 and material
balance for (Z)-Octadeca – 13 – enyl acetate is presented in Table 2.48.
2-chloro 5 - (methyl amino methyl) 830 Methanol 143.8 Recovery & reuse
pyridine (CMAMP)
Methanol 1900 Solvents
Methanol
Methanol reovered 1843 Recovery & reuse
Methanol loss 9.5 Fugitive loss
Methanol residue 47.5 Solvent in residue
Organics
N-Cyano methyl Acetamide 79.6 Organic residue
(NCMA)
2-chloro 5 - (methyl amino 127.1 Organic residue
methyl) pyridine (CMAMP)
Total Input 3250.4 Total Output 3250.4
Table 2.8 Material Balance of Lambda Cyhalothrin
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
Meta Phenoxy Benzaldehyde 448 Lambda Cyhalothrin 1000 Final product
TP Acid Chloride 610 Solvent
Sodium Cyanide 122 n-Hexane
n-Hexane 2381 n-Hexane Recovered 2262 Recovery & reuse
catalyst 10 n-Hexane Loss 12 Fugitive loss
Soda ash 952 n-Hexane Residue 107 Solvent in residue
Iso propyl alcohol (IPA) 1000 IPA
Catalyst 2 152 IPA Recovered 950 Recovery & reuse
8-10% Sodium hypochlorite 1429 IPA Loss 5 Fugitive loss
Water 1400 IPA to Waste Water 10 To wastewater
IPA Residue 35 Solvent in residue
Organic Residue
Meta Phenoxy Benzaldehyde 180 To wastewater
TP Acid Chloride To wastewater
Sodium Cyanide To wastewater
catalyst 162 To Solid Waste
Inorganic Residue
Soda ash 952.0 To wastewater
8-10% Sodium hypochlorite 1429.0 To wastewater
Water 1400.0 To wastewater
Total Input 8504.0 Total Output 8504.0
Table 2.9 Material Balance of Bifenthrin
Chloro Propoxy Ethane (CPE) 414 Sodium chloride 128.7 To waste water
Sodium hydroxide 128.4 water 116.9 To waste water
chloro acetyl chloride (CAC) 381.9 Triethylamine hydrochloride 441.4 To waste water
Triethyl Amine (TEA) 341.3 Solvent
Toluene 1000 Toluene
Water 1300 Toluene Recovered 970 Recovered and reuse
Toluene loss 3.5 Fugitive loss
Toluene in residue 26.5 Solvent residue
Unreacted Organics
2,6 Diethylaniline (DEA) 25.2 To waste water
Chloro Propoxy Ethane (CPE) 20.7 organic residue
chloro acetyl chloride (CAC) 19.1 organic residue
Triethyl amine 17.1 To waste water
Unreacted Inorganis
Water 1300 To waste water
Total Input 4069 Total Output 4069
Table 2.30 Material Balance of Metribuzin
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
Butylthion 1099.1 Metribuzin 1000.0 Final Product
Dimethyl sulphate 346.3 Unreacted Organics
Sulphuric acid 1593.0 Butylthion 164.5 organic residue
Sodium hydroxide 1485.7 Dimethyl sulphate 51.8 To waste water
water 22000.0 Unreacted Inorganics
Sodium sulphate 2639.1 To waste water
water 22668.6 To waste water
Total Input 26524.1 Total Output 26524.0
Table 2.31 Material Balance of Dimethomorph
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
(4-chlorophenyl)(3,4- 751.0 Dimethomorph 1000.0 Final Product
dimethoxyphenyl)methanone
N-acetylmorpholine 350.5 water 46.4 To waste water
Sodium hydroxide 103.0 Solvent
Toluene 1500.0 Toluene
water 3000.0 Toluene Recovered 1455.0 Recovered & reuse
Toluene loss 5.3 Fugitive loss
Toluene in residue 39.8 Solvent residue
Unreacted Organics
(4-chlorophenyl)(3,4- 37.5 organic residue
dimethoxyphenyl)methanone
N-acetylmorpholine 17.5 organic residue
Unreacted Inorganics
Sodium hydroxide 103.0 To waste water
Water 3000.0 To waste water
Total Input 5704.5 Total Output 5704.5
Table 2.32 Material Balance of Clodinofop-propargyl
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
(R) –(+) -2-(4-Hydroxy phenoxy) 614.0 Clodinofop-propargyl 1000 Final Product
propionic acid (DHPPA)
Potassium carbonate 931.6 Potassium bicarbonate 572.8 To waste water
Dimethyl formaide (DMF) 3000 Potassium fluoride 166.1 To waste water
2,3 Difluoro 5-chloro pyridine 504 Potassium chloride 213.2 To waste water
Proargyl chloride 251.2 Solvent
water 1000 Dimethyl formaide (DMF)
DMF Recovered 2910 Recovered and reuse
DMF loss 10.5 Fugitive loss
DMF in water 30 To waste water
DMF in residue 49.5 Solvent residue
Unreacted Organics
(R) –(+) -2-(4-Hydroxy phenoxy) 93.1 organic residue
propionic acid (DHPPA)
2,3 Difluoro 5-chloro pyridine 76.4 organic residue
Proargyl chloride 38.1 organic residue
Unreacted Inorganics
Potassium carbonate 141.2 To waste water
water 1000 To waste water
Total Input 6300.8 Total Output 6300.8
Table 2.33 Material Balance of Bis-Pyribac Sodium
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
Dihydrobenzoic acid 474.0 Bis-Pyribac Sodium 1000.0 Final Product
Dimethylsulfonylpyrimidine 964.9 Sodium methanesulfinate 451.4 Organic Residue
Sodium hydroxide 265.3 Water 119.5 To Waste Water
Tetra-n-butylammonium 99.0 Organic
bromide (TBAB)
Toluene 9231.0 Toluene
Acetone 12308.0 Toluene Recovered 8769.5 Recovered & reuse
Toluene Loss 46.2 Fugitive loss
Toluene Residue 415.4 Solvent residue
Acetone
Acetone Recovered 11692.6 Recovered & reuse
Acetone Loss 61.5 Fugitive loss
Acetone Residue 553.9 Solvent residue
Organic
Dihydrobenzoic acid 133.3 Organic Residue
Tetra-n-butylammonium bromide 99.0 Organic Residue
(TBAB)
Total Input 23342.2 Total Output 23342.2
Table 2.34 Material Balance of Bensulfuran Methyl
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
4,6- Dimethoxy pyrimidine -2- 418 Bensulfuran Methyl 1000 Final Product
amines
Methyl-2- {[Isocyanate 617.7 water 43.9 carried along with
sulfamoyl] Methyl} Benzoate organic residue
carbon dioxide 118.5 Solvent
Xylene 1600 Xylene
Methanol 2000 Xylene Recovered 1552 Recovered and reuse
Xylene loss 5.6 Fugitive loss
Xylene in residue 42.4 Solvent residue
Methanol
Methanol Recovered 1940 Recovered and reuse
Methanol loss 7 Fugitive loss
Methanol in residue 53 Solvent residue
Unreacted Organics
4,6- Dimethoxy pyrimidine -2- 40 organic residue
amines
Methyl-2- {[Isocyanate sulfamoyl] 59 organic residue
Methyl} Benzoate
carbon dioxide 11.3 Let into the
atmosphere
Total Input 4754.2 Total Output 4754.2
Table 2.35 Material Balance of Glufosinate-ammonium
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
(3-amino-3-cyano-propyl)-methyl- 974 Glufosinate-ammonium 1000 Final product
phosphinic acid
Sodium Dihydrogen Phosphate 525 Phosphonic acid 828 Inorganic Residue
Sodium Hydrogen Phosphite 636 Sodium chloride 885 Inorganic Residue
Hydrogen Chloride 736 Ammonium chloride 270 Inorganic Residue
Water 182 Solvents
Ammonia 86 Methanol
Methanol 3000 Methanol Recovered 2850 Recovery & reuse
Methanol Loss 15 Fugitive loss
Methanol Residue 135.0 Solvent in residue
Organics
(3-amino-3-cyano-propyl)- 156 Organic Residue
methyl-phosphinic acid
Total Input 6138.2 Total Output 6138.1
Table 2.36 Material Balance of Quizalofop-P-Ethyl
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
p-Toluenesulfonyl chloride 983.5 Quizalofop-P-Ethyl 1000.0 Final Product
(-) L- Ethyl lactate 317.6 Hydrogen Chloride 97.9 To Scrubber by
product
TEA 295.3 Potassium Chloride 200.1 Inorganic Residue
TBAB 83.0 Water 97.2 Carried along with
organic residue
DMF 75.4 Potassium Toluenesulphonate 564.5 Organic residue
Toluene 3933.8 Solvent
Sodium bicarbonate 196.7 Toluene
2,6-dichloroquinaoxzaline 534.2 Toluene Recovered 3737.1 Recovery & reuse
Hydroquinone 444.9 Toluene Loss 19.7 Fugitive loss
KOH 300.7 Toluene Residue 177.0 Solvent in residue
K2CO3 1105.9 Cyclohexane
Cyclohexane 4470.6 Cyclohexane Recovered 4247.1 Recovery & reuse
Cyclohexane Loss 22.4 Fugitive loss
Cyclohexane Residue 201.2 Solvent in residue
Organic
p-Toluenesulfonyl chloride 471.7 Organic residue
TBAB 83.0 Organic residue
DMF 75.4 Organic residue
Hydroquinone 444.9 Organic residue
Inorganic
Sodium bicarbonate 196.7 Inorganic Residue
K2CO3 1105.9 Inorganic Residue
Total Input 12741.6 Total Output 12741.7
Table 2.37 Material Balance of Tribenuron-methyl Technical
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
2-Methoxy-4-methyl-6-(methylamino 665 Tribenuron-methyl Technical 1000 Final product
ethyl carbamate)-1,3,5-triazine
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
hexadec-9-yn-1-ol 1430 (Z)-hezatec – 9-enal 1430 Final Product
Nickel Acetate 740 Solvent
Sodium Borohydride 130 Methanol
Ethylene Diamine 360 Methanol Recovered 10726 Recovery & reuse
Methanol 11290 Methanol Loss 56.45 Fugitive loss
Methyl tert-butyl ether 3170 Methanol to Waste Water 112.9 To wastewater
Water 2860 Methanol Residue 395.2 Solvent in residue
HCl (35%) 630 Methyl tert-butyl ether
Sodium Chloride 430 Methyl tert-butyl ether Recovered 3012 Recovery & reuse
Sodium Sulphate 290 Methyl tert-butyl ether Loss 15.9 Fugitive loss
Hyflow 140 Methyl tert-butyl ether Residue 142.7 Solvent in residue
Stage-I 1430 MDC
Pyridimium chloro chromate 1910 MDC Recovered 10203 Recovery & reuse
MDC 10740 MDC Loss 53.7 Fugitive loss
Hexane 4690 MDC Residue 483.30 Solvent in residue
Celite 1910 Hexane
Hexane Recovered 4456 Recovery & reuse
Hexane Loss 23 Fugitive loss
Hexane Residue 211 Solvent in residue
Organic Residue
Nickel Acetate 740 Organic Residue
Ethylene Diamine 360 To wastewater
Stage-I 1430 Organic Residue
Pyridimium chloro chromate 1910 To wastewater
Celite 1910.0 To wastewater
Hyflow 140 To solid waste
Inorganic Residue
HCl (35%) 630 To wastewater
Sodium Borohydride 130 To wastewater
Sodium Chloride 430 To wastewater
Sodium Sulphate 290 To wastewater
Water 2860.0 To wastewater
Total Input 42150.0 Total Output 42150.0
Table 2.44 Material Balance of (8E,10E) – Dodoca-8, 10-dyen-1-ol
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
(6-chlorohexyloxy) trimethylsilane 1000 (8E,10E) – Dodoca-8, 10-dyen-1-ol 900 Final Product
Magnesium 140 Solvent
Iodine 10 Tetrahydrofuran
Dibromoethene 1 Tetrahydrofuran Recovered 3382 Recovery & reuse
(2E, 4E)-hexa-2,4-dienyl acetate 470 Tetrahydrofuran Loss 17.80 Fugitive loss
Lithium chloride 20 Tetrahydrofuran Residue 160.2 Solvent in residue
Copper(II) chloride 30 MTBE
Tetrahydrofuran 3560 MTBE Recovered 2090 Recovery & reuse
Ammonium chloride 200 MTBE Loss 11 Fugitive loss
MTBE 2200 MTBE Residue 99.0 Solvent in residue
Sodium Chloride 200 Methanol
Sodium Sulfate 200 Methanol Recovered 3002.0 Recovery & reuse
Water 4000 Methanol Loss 16 Fugitive loss
Stage-1 1000 Methanol to Waste Water 31.6 To wastewater
HCl (35%) 82 Methanol Residue 110.60 Solvent in residue
Methanol 3160 Organic Residue
Sodium bicarbonate 130 (6-chlorohexyloxy) trimethylsilane 100 Organic Residue
Sodium Chloride 400 Iodine 10.0 To wastewater
Dibromoethene 1.0 To wastewater
(2E, 4E)-hexa-2,4-dienyl acetate 470.0 To wastewater
Stage-1 1000.0 Organic Residue
Inorganic Residue
Lithium chloride 20.0 To wastewater
Magnesium 140.0 To wastewater
Sodium Chloride 600.0 To wastewater
Sodium Sulfate 200.0 To wastewater
Copper(II) chloride 30.0 To wastewater
Ammonium chloride 200.0 To wastewater
HCl (35%) 82.0 To wastewater
Sodium bicarbonate 130.0 To wastewater
Water 4000.0 To wastewater
Total Input 16803.0 Total Output 16803.0
Table 2.45 Material Balance of 7Z, 11Z Hexa deca dienyl acetate
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
(Z)-1-chlorooct-3-ene 1.5 7Z, 11Z Hexa deca dienyl acetate 1 Final product
Magnesium Turnings 0.3 Solvents
Tetrahydrofuran (THF) 6.8 Tetrahydrofuran (THF)
Iodine 0.01 THF recovered 7 Recovery & reuse
1,2 Dibromo ethane 0.01 THF loss 0.03 Fugitive loss
8-bromooct-7-ynyl acetate 2.8 THF wastewater 0.1 To wastewater
Curpous Iodide 0.1 THF residue 0.1 Solvent in residue
Ammonium Chloride 0.3 Methyl tert-butyl ether (MTBE)
Methyl tert-butyl ether (MTBE) 2.0 MTBE recovered 2 Recovery & reuse
Sodium chloride 0.4 MTBE loss 0.0 Fugitive loss
Sodium sulphate 0.3 MTBE to wastewater 0.0 To wastewater
Water 5.4 MTBE residue 0.0 Solvent in residue
Organics
Organic 0.4 Organic residue
1,2 Dibromo ethane 0.01 To wastewater
8-bromooct-7-ynyl acetate 2.8 Organic residue
Inorganics
Magnesium Turnings 0.3 Inorganic residue
Iodine 0.01 To wastewater
Curpous Iodide 0.1 To wastewater
Ammonium Chloride 0.3 To wastewater
Sodium chloride 0.4 To wastewater
Sodium sulphate 0.3 To wastewater
Water 5.4 To wastewater
Total Input 19.8 Total Output 19.8
Table 2.46 Material Balance of 7E, 9Z Dodeca dienyl acetate
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
(E)-9-choronon-2-enal 119 7E, 9Z Dodeca dienyl acetate 99 Final product
Propyl triphenyl phosphonium 345 Tri phenyl phosphine oxide 272 Organic residue
bromide
Potassium tert.butoxide 94.6 Solvents
Tetrahydrofuran (THF) 600 Tetrahydrofuran (THF)
Hexane 850 THF recovered 582 Recovery & reuse
Water 350 THF loss 3 Fugitive loss
Sodium sulphate 10 THF wastewater 6 To wastewater
Stage-1 98.8 THF residue 9 Solvent in residue
Potasium acetate 60.4 Hexane
Dimethylformamide (DMF) 300 Hexane recovered 825 Recovery & reuse
Sodium sulphate 10 Hexane loss 4.3 Fugitive loss
Hexane to wastewater 8.5 To wastewater
Hexane residue 12.8 Solvent in residue
Dimethylformamide (DMF)
DMF recovered 291 Recovery & reuse
DMF loss 1.5 Fugitive loss
DMF to wastewater 3 To wastewater
DMF residue 4.5 Solvent in residue
Organics
Organic 93.2 Organic residue
Stage-1 98.8 Organic residue
Potasium acetate 60 To wastewater
Potassium tert.butoxide 95 Organic residue
Inorganics
Sodium sulphate 10 To wastewater
Sodium sulphate 10 To wastewater
Water 350 To wastewater
Total Input 2837.9 Total Output 2837.9
Table 2.47 Material Balance of 8Z Dodecenyl acetate
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
8-dodecynol 100 8Z Dodecenyl acetate 95 Final product
Nickel acetate 55 Solvents
Sodium Borohydride 10 Methanol
Ethylene diamine 33 Methanol reovered 524 Recovery & reuse
Methanol 540 Methanol loss 2.7 Fugitive loss
Hyflow 7 Methanol to wastewater 5.4 To wastewater
Toluene 822 Methanol residue 8.1 Solvent in residue
Sodium sulphate 10 Toluene
Sodiumchloride 40 Toluene recovered 797 Recovery & reuse
Hydrochloric acid 17 Toluene loss 4.11 Fugitive loss
Stage-I 100 Toluene residue 20.6 Solvent in residue
Acetic acid 39 Organics
p-Toluenesulfonic acid (PTSA) 10 Organic 4.8 Organic residue
Water 900 Nickel acetate 55 To wastewater
Sodium Sulphate 10 Ethylene diamine 33.0 To wastewater
Sodium hydroxide 19 p-Toluenesulfonic acid (PTSA) 10.0 To wastewater
Stage-I 100.0 Organic residue
Acetic acid 39.2 To wastewater
Inorganics
Sodium Borohydride 10.2 To wastewater
Hyflow 7.0 To hyflow
Sodium sulphate 10.0 To wastewater
Sodiumchloride 67.2 To wastewater
Sodium Sulphate 10.0 To wastewater
Water 908.4 To wastewater
Total Input 2711.5 Total Output 2711.5
Table 2.48 Material Balance of (Z)-Octadeca-13-enyl acetate
Stage I
Input Quantity Output Quantity Remarks
(Kg/day) (Kg/day)
13-Octadecynol 1 (Z)-Octadeca-13-enyl acetate 1 Final product
Nickel acetate 0.4 Solvents
Sodium Borohydride 0.1 Methanol
Ethylene diamine 0.2 Methanol reovered 5.2 Recovery & reuse
Methanol 5.4 Methanol loss 0.03 Fugitive loss
Hyflow 0.1 Methanol to wastewater 0.1 To wastewater
Toluene 8.2 Methanol residue 0.1 Solvent in residue
Sodium sulphate 0.1 Toluene
Sodiumchloride 0.2 Toluene recovered 8.0 Recovery & reuse
Hydrochloric acid 0.4 Toluene loss 0.04 Fugitive loss
Stage 1 1.0 Toluene residue 0.2 Solvent in residue
Acetic acid 0.3 Organics
p-Toluenesulfonic acid (PTSA) 0.1 Ethylene diamine 0.2 To wastewater
Water 9.0 Stage 1 1.0 Organic residue
Sodium sulfate 0.1 p-Toluenesulfonic acid (PTSA) 0.1 To wastewater
Sodium hydroxide 0.4 13-Octadecynol 0.3 Organic residue
Inorganics
Nickel acetate 0.4 To wastewater
Sodium Borohydride 0.1 To wastewater
Hyflow 0.1 To hyflow
Sodium sulphate 0.1 To wastewater
Sodiumchloride 0.8 To wastewater
Sodium sulfate 0.1 To wastewater
Water 9.2 To wastewater
Total Input 26.94 Total Output 26.94
NACL INDUSTRIES LIMITED
SY.NO.177, ARINAMA AKKIVALASA VILLAGE,
ETCHERLA MANDAL, SRIKAKULAM DISTRICT,
ANDHRA PRADESH