Setting Out Project
Setting Out Project
The process of setting out is done by a surveyor, contractor, and overseen by the lead project consultant engineer,
architect, or any other qualified member of the project team.
This is sample , Edit and
use your own word and Setting Out Project
sentences
Objectives :
1) To establish the positions of building points (building corners)
based on their respective coordinate.
2) To prepare a video report (continue with your own words)…..
3) To build up knowledge and skill in AutoCAD and Total Station
handling as well as setting out survey….
Describe
more details
about
instruments
used
Instruments used:
instrument used for traverse survey is :
1) Total Station – 1 unit
2) Prism Reflector – 1 unit
3) Tripod – 2 unit
4) Hammer – 1 unit
5) Wooden peg (15cm) – ___ unit
6) Fine nails - ___ unit
7) Measuring tape (30meter) – 1 units
8) Mini Prism Pole – 2 units
9) Mini Prism – 2 units
Draw workflow
diagram of this
procedure then Methodology This is normal
explain one by one procedure for
later.
Procedure setting out survey
For example:
https://readcivil.com/temporary-and-permanent-adjustment-
of-theodolite/
CONDUCTING A SETTING OUT SURVEY WORK – FIELD OPERATIONS
Stn 6
Stn 4
Stn 1
Stn 3
Stn 2
Stn 4
Building point
Stn 3
Diagram 5 Diagram 4 Diagram 3
CONDUCTING A SETTING OUT SURVEY WORK
1) Traverse survey must be done earlier to establish control traverse stations and site plan (diagram 1). Final
bearing, final distance, coordinate and site plan
2) Create setting out plan and layout plan using site plan and proposed scheme drawn (architectural plan)
3) Obtain the building points coordinate from the layout plan. By using coordinates from traverse control points
and building points calculate all the bearing and distances. (We may select only one or two control points
coordinates to perform this calculation)
4) Setup the Total Station (TS) equipment and perform temporary and permanent adjustment. Also setup the
prism reflector at selected reference station.
5) To start the observation target and lock to the chosen reference point, set TS into FACE LEFT and key in the
bearing (from the previous control traverse bearing) of selected reference station (diagram 2)
6) Then unlock the TS and slowly find the bearing of the desired building points. After the bearing is found, use the
mini prism with pole and measuring tape* (option) to find the exact location of the desired building points.
Adjust the TS telescope to eliminate parallax. (diagram 3)
7) As after the building position is found, carefully mark it with wooden pegs (and sometimes sprayed with red
paint).
8) This process (step 6-7) is repeated until all the building points are found (diagram 4).
9) To check the accuracy of the setting out work, setup the TS at another station and repeat step 5 &6. Check if
there are any differences between the earlier marked positioned with the new one. Usually a minimum 1cm
tolerance is allowed, but if the error exceed the limit then repeat the observation or check the lay out plan and
their calculation. (diagram 5)
Attention:
Adjust all the steps using your own words and understanding. Watch setting out building videos on YouTube and read
some materials from any suitable website
Virtual Field operation : This is virtual
procedure (covid—19
1) Go to Google earth web (install it on your pc). semester only) please
2) Create new project do not put this
3) Scroll to Langkawi island in Kedah operation into your
4) Go to tools and hit options virtual video.
5) At show Lat/Long select Universal Transverse Mercator (UTM). Click
apply and ok.
6) Click placemark button on toolbar rename the point by stations names
and put the value of coordinates (easting, northing) of each station one
by one manually (6 stations) (refer to your group coordinate data). Coordinate from
7) Create traverse lines by click polygon button on toolbar. You can adjust traverse adjustment
style, colour (select area by outline only) rename the polygon. Start to form.
draw from station 1 until it closed at station 6. (connect each of traverse
station with traverse lines).
8) Repeat step 6 and 7 but this time for building points coordinate. The
building points coordinate were obtained from AutoCAD line properties.
9) Then copy and crop image using ms paint or other apps then copy to
power point slide.
10) Edit the images
This is some of the YouTube links for google earth coordinate entering
https://www.youtube.com/watch?v=Jr0pLZTw8z4
https://www.youtube.com/watch?v=1HgDNcyebJ0
https://www.youtube.com/watch?v=mpbj8b_s20o
https://www.youtube.com/watch?v=fjHS2SutUI0
Find building floor plan with dimensions from any source and draw it in
AutoCAD traverse plan
Always start
drawing and put
value according
to clockwise
direction
W N
X
Latit + Latit +
Dept - φ θ
Dept +
W A E
Latit - ω Latit +
Φ
Dept - Dept -
Z S Y
To find the coordinate of building corners, simply right click on the lines of proposed building and click the
properties in AutoCAD. Check the coordinate at Start Line X and End Line Y (X east-west and Y is north-
south). *Start line is the first coordinate appear for the line and end line is the last coordinate appear for the
line. Carefully choose one of them, usually we select the start line coordinate. Make sure the proposed
building drawing were drawn according to clock wise direction from building corner 1,2,3, and so on… Copy
all the coordinates into the above table.
• P to B1
• N = 1465.000 – 1910.000 = – 445.000 (ΔL)
• E = 1850.000 – 2120.000 = –270.000 (ΔD)
• P to B2
• N = 1466.000 – 1910.000 = – 444.000 (ΔL)
• E = 1900.000 – 2120.000 = – 220.000 (ΔD)
• Bearing P to B1
• Tan -1 = ΔD/ ΔL
• Tan -1 = 270.000 / 445.000
• = 310 14’ 48.95”
Distance
√(ΔL)2+(ΔD)2
P to B1
=√(445)2+(270 )2
= 520.505
Bearing P to B2
Tan -1 = ΔD/ ΔL
Tan -1 = 220.000 / 444.000
= 26021’ 29.55”
= 26021’ 29.55” Quadrant 3180o + 26021’ 29.55”
= 2060 21’ 29.50”
Distance
√(ΔL)2+(ΔD)2
P to B2
=√(444)2+(220 )2
=495.516
Example Proposed building structure
Table 1
B4 B1
LINE DISTANCE
(m)
B1 – B2 80
B2 – B3 90
B3 – B4 80
B4 – B1 90
B3 B2
B3 B2
139.433m
4” Stn 3
GROUP MEMBERS NAME: 2640 35’ 3
1) _________ 4) __________ Stn 4
800.000
2) _________ 5) __________
3) _________ 6) __________
APPROVED BY:
700.000
800.000
900.000
SR MOHD NAJIB BIN HUSAIN
Data analysis;
Firstly explain the data achieved from the previous traverse.
How many stations? What is the shortest and longest distance in the traverse?
What is the traverse accuracy (miss closure) ?
Explain more and more…….