Standard Design and Mass Balance of 10 KLF FSTP, R0

The document provides calculations for the design of a 10 KLD fecal sludge treatment plant based on Tiger Bifilter technology. It includes sizing calculations for key components like the landing platform, screen chamber, sludge storage tank, anaerobic stabilization reactor, and mixing chamber.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
329 views10 pages

Standard Design and Mass Balance of 10 KLF FSTP, R0

The document provides calculations for the design of a 10 KLD fecal sludge treatment plant based on Tiger Bifilter technology. It includes sizing calculations for key components like the landing platform, screen chamber, sludge storage tank, anaerobic stabilization reactor, and mixing chamber.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

10 KLD FECAL SLUDGE TREATMENT PLANT BASED ON TIGER BIFILTER TECHNOLOGY

PROCESS CALCULATIONS
Sr. No. Description Data Input Unit Remarks

Design Flow = 10.00 KLD 1-100


= 10.00 Cum/Day
Plant Operating Hours = 8.00 Hr/Day 8-16 Hrs

1 Landing Platform
No of Platform = 1.00 Nos.
Length of Platform = 5.00 m
Widthof Platform = 3.00 m
Sizing of Landing Platform is 5 M X 3 M X - 1 Nos.

2 Screen Chamber
No. of Manual Screen = 1.00 Nos. Mendatory for All KLD
No. of Mechanical Screen = - Nos. only for =>25 KLD if required
Vehicle load (1 Vehicle-5 Cum) = 5.00 Cum 1-10

Design Flow rate for Discharge 30.00 Cum/Hr Standard Value is 30


Discharge time = 10.00 Min
Design Flow rate = 500.00 Litres/min
Design Flow rate = 8.33 Litres/sec

Average Flow = 0.72 MLD


Peak Flow Factor = 1.00 Standard Value for Vehicle
Design Flow = Peak Flow
= 0.72 MLD
= 30.00 m3/hr
= 0.008 m3/sec

Average Flow = 0.72 MLD


= 30.00 m3/hr
= 0.008 m3/sec

Design Flow in each Screen = 0.008 m3/sec


1 No.

= 0.008 m3/sec

Average Flow in each Screen = 0.008 m3/sec


1 No.

= 0.008 m3/sec

Maximum Velocity through = 1.2 m/sec Standard Value


Screen at Peak Flow
Minimum Velocity through Screen = 0.6 m/sec Standard Value
at Average Flow

Design Flow = 0.008 m3/sec


Maximum Velocity through = 1.2 m/sec
Screen at Peak Flow
Clear Area of Opening through = 0.007 m2
Screen at Peak Flow

Average Flow = 0.008 m3/sec


Minimum Velocity through Screen = 0.6 m/sec
at Average Flow
Clear Area of Opening through = 0.013 m2
Screen at Average Flow

Considering maximum Area of = 0.013 m2


Opening through Screen
Clear Spacing of Bars = 10 mm Typically 10, Range 6-20
Thickness of Bars = 10 mm Typically 10, Range 5-20
Gross Area of Screen = 0.013x(10+10)/10
= 0.043 m2
Assuming Depth of Screen = 0.100 m 0.100 m-Standard Value
Channel
Gross Width of Screen = 0.043/0.1
Calculated Width = 0.43 m
No. of Bars = (Gross Width of Screen
/ Center to Center
Spacing of Bars) - 1

= 0.43/((10+10)/1000)-1

= 20.5 Nos.
Say = 21 Nos.
Width of Screen provided = (Number of Bars+1) x
Clear Spacing +
(Number of Bars x Bar
Thickness)
= (21+1)x10+(21x10)
= 430 mm
Width of screen chamber Say = 500 mm
Width of screen chamber Say = 0.50 M
Height of Blind Plate at Bottom of = 100 mm
Screen provided
Liquid Depth of Screen Channel = 200 mm
provided
Liquid Depth of Screen Channel 0.20 M
provided
Length of Screen Channel = 3000 mm Minimum 3000 mm
provided
Length of Screen Channel 3.00 M
provided
Freeboard provided = 800 mm
Freeboard provided 0.80 M
Total Depth = 1000 mm
Total Depth 1.00 M

Velocity in Channel at Average = Average Flow / Cross


Flow Sectional Area of
Screen Channel
= 0.008/((500x200)/1000
000
= 0.080 m/sec
< 0.3 m/sec

Head Loss across Screen


Head Loss across Screen = 0.0728 (V2 - v2)
V = Velocity through Screen at = Peak Flow through
Peak Flow Screen Channel / Clear
Area of Opening
through Screen

= 0.189 m/sec
v = Velocity in approach Channel = Peak Flow through
at Peak Flow Screen Channel / Cross
Sectional Area of
Screen Channel
= 0.194 m/sec
Head Loss across Screen at Peak = 0.000 m
Flow

Head Loss across Screen at 50%


Clogged Condition
Velocity through Screen at 50% = 0.379 m/sec
Clogged Condition at Peak Flow

> 0.3 m/sec


Velocity Check = OK
Head Loss across screen at 50% = 0.008 m
Clogged Condition at Peak Flow

Sizing of Screen Chamber is 3 M X 0.5 M X 1 M - 1 Nos.

3 Sludge Storage Tank


Numbers = 1.00 Nos Manually Input
Flow = 10.00 Cum
Retention Time = 2.00 Days 2 Days=<20 KLD<1 Day
Volume = 20.00 Cum
Volume of each tank = 20.00 Cum
Depth = 2.50 m 1.5M ≤ 10 KLD ≤ 2.5 M
Required Area = 8.00 Sqm
Length = 3.00 m Assume L >2 M
Width = 2.75 m
Provided Area = 8.25 Sqm
Check = OK Not more than 10% extra
Hydraulic Volume = 20.63 Cum
FB = 0.50 m Typically 0.5, Range 0.2-1.0
Total Depth = 3.00 m
Total Volume = 24.75 Cum

Sizing of Sludge Storage Tank is 3 M X 2.75 M X 3 M - 1 Nos

4 Anaerobic Stabilisation Reactor

Flow = 10.00 Cum/day


Nos. of ASR = 2.00 Nos 2 Nos.<50 KLD< 4 Nos.
Nos. of working Hrs = 4.00 Hrs Typically 4, Range- 1-8 Hrs
Design Flow rate 5.00 Cum
Inlet Flow rate = 1.25 Cum
Sludge Feeding Time = 10.00 Minutes
Pump flow Rate = 0.13 Cum/Min
Calculated flow Rate = 125.00 Litres/Min
Proposed flow Rate = 300.00 Litres/Min
Check = OK
A Mixing Chamber
Nos. of Mixing Chamber = 2.00 Nos.
Max Flow Rate = 7.50 Cum/Hr
Upflow velocity = 4.00 m/Hr Typically 4, Range 3-4
Calculated Surface Area = 1.88 Sqm
Length of chamber = 1.25 m
Width: Length Ratio = 1.50 Range 1-2
Calculated Width of chamber = 2.00 m
Provided Surface Area = 2.50 Sqm
Area Check = OK Provided ≥ Calculated
Calculated Upflow Velocity = 3.00 m/Hr
Upflow Velocity Check = OK 3 ≤ Upflow Velocity ≥ 4

Retention Time = 1.00 Day Typically 1, Range 1-2


Volume of chamber = 5.00 Cum
Depth = 2.00 m
Check = OK Depth ≤ 2.5
Free Board = 0.50 m Typically 0.5, Range 0.2-1.0
total depth = 2.50 m
Sizing of Mixing Chamber is 1.25 M X 2 M X 2.5 M - 2 Nos.

B Digestion Chamber
Max Flow Rate = 7.50 Cum/Hr
Upflow velocity = 2.00 m/Hr Typically 2, Range 1-2
Calculated Surface Area = 3.80 sqm
Length of chamber = 2.00 m
Width: Length Ratio = 1.50 Range 1.5-2
Width of chamber = 3.00 m
Provided Surface Area = 6.00 Sqm
Area Check = OK Provided ≥ Calculated
Calculated Upflow Velocity = 1.25 m/Hr
Upflow Velocity Check = OK 1 ≤ Upflow Velocity ≥ 2

Depth of one chamber of = 2.00 m Typically 2, Range 1-3


digestion
Free Board = 0.50 m Typically 0.5, Range 0.2-1.0
total depth = 2.50 m
Volume of one digestion chamber = 12.00 Cum

Solids Retention Time = Day 3-5 Day (VS/TS= 0.3-0.4)


6.00 5-7 Days (VS/TS= 0.4-0.6)
7-9 Days (VS/TS= >0.6)
Total Volume of Digestion = 30.00 Cum
chamber
Calculated Nos. of chamber = 2.50 Nos
Provided Nos. of chamber = 3.00 Nos
Check = OK No of Chamber < 4
Provided Volume of Digestion = 36.00 Cum
Chamber
No. of ASR = 2.00 Nos
Provided Number of chamber = 6.00 Nos
Provided Volume of Digestion = 72.00 Cum
Chamber
Sizing of Digestion Chamber is 2 M X 3 M X 2.5 M - 6 Nos

5 Liquid Storage Tank-I


Numbers = 1.00 Nos Typically 1
Flow = 10.00 Cum/day
Retention Time = 12.00 Hrs 24 Hrs, Range 12-24
Required Volume = 5.00 Cum
Depth = 1.75 m Range 1-3
Area 2.86 Sqm
Length = 2.00 m Assume L ≥2 M
Width = 1.50 m
Provided Area = 3.00 Sqm
Area Check = OK Not more than 10% extra
Hydraulic Volume = 5.25 Cum
FB = 0.50 m Range 0.2-1.0
Total Depth = 2.25 m
Total Volume = 6.75 Cum
Sizing of Liquid Storage Tank-I is 2 M X 1.5 M X 2.25 M - 1 Nos

6 Tiger Bio Filter I


Total flow 10.00 cum/day
Inlet BOD = 500.00 mg/l TBF Standard Value
Inlet TSS = 700.00 mg/l TBF Standard Value

a Hydraulic Load Approach


Design flow to each tank 1.30 Cum/day Range 1-1.5
Number of BMF tanks calculated 7.69 Nos

Number of BMF tanks provided 8.00 Nos

Length of Bed 3.00 m TBF Standard Value


Width of Bed 3.00 m TBF Standard Value
Area of each Bed 9.00 Sqm
Calculated Surface Area 72.00 Sqm

b Organic Load Approach


BOD load applied = 5.00 kg/day
BOD uptake rate = 0.50 Kg of BOD / Kg of Typically 0.5, Range 0.5-1.0
worms
Worms required = 10.00 Kg worms
Organic Loading Rate = 0.20 Kg/Sqm/day Typically 0.2, Range 0.1-1.0
Area required for each bed = 25.00 Sqm
Safety factor 5.00% Typically 5%, Range 5%-10%
Calculated Surface Area = 26.25 Sqm
Provided Surface Area = 27.00 Sqm

c Solids Load Approach


TSS load applied = 7.00 kg/day
TSS uptake rate = 1.00 Kg of TSS / Kg of Typically 1, Range 1.0-2.0
worms
Worms required = 7.00 Kg worms
Solids Loading Rate = 0.15 Kg/Sqm/day TBF Standard Value
Area required = 46.70 Sqm
Safety factor = 5.00% Typically 5%, Range 5%-10%
Calculated Surface Area = 49.04 Sqm
Provided Surface Area = 50.00 Sqm

Considering Maximum area for = 72.00 Sqm


design as per (a,b,c)
Area Check = OK
Number of BMF tanks provided = 8.00 Nos

Area for 1 Tank = 9.00 Sqm


Length = 3.00 m Typically 3
Width = 3.00 m
Depth 0.70 m TBF Standard Value
Free Board 0.30 m TBF Standard Value
Total Depth = 1.00 m
Sizing of Tiger Bio Filter I is 3 M X 3 M X 1 M - 8 Nos

7 Liquid Storage Tank-II


Numbers = 1.00 Nos Typically 1
Flow = 10.00 Cum/day
RetentionTime = 12.00 Hrs 24 Hrs, Range 12-24
Required Volume = 5.00 Cum
Depth = 1.75 m Range 1-3
Area 2.86 Sqm
Length = 2.00 m Assume L ≥2 M
Width = 1.50 m
Provided Area = 3.00 Sqm
Area Check = OK Not more than 10% extra
Hydraulic Volume = 5.25 Cum
FB = 0.50 m Range 0.2-1.0
Total Depth = 2.25 m
Total Volume = 6.75 Cum
Sizing of Liquid Storage Tank-II is 2 M X 1.5 M X 2.25 M - 1 Nos

8 Tiger Bio Filter II


Flow 10.00 Cum/day
Number of pumping hours = 8.00 Hrs Typically 8 Hrs
Number of BMF tanks provided = 1.00 Nos

Design flow to each tank = 10.00 Cum/day


= 1.25 Cum/ Hr for 8 Hr
= 0.35 Litre/Sec

Inlet BOD = 250.00 mg/l TBF Standard Value


Inlet TSS = 250.00 mg/l TBF Standard Value
BOD load applied = 2.50 kg/day
BOD uptake rate = 0.50 Kg of BOD / Kg of (0.5 to 1.0)
worms
Worms required = 5.00 Kg worms
Sewage application rate = 1.25 Cum/Sqm/day Typically 1.25, Range 1-1.5
Calculated Surface Area = 8.00 SqM.
Provided Surface Area = 10.69 SqM.
ZA Tank Dia Provided = 3.69 M
Provided Surface Area 10.69 SqM.
Area Check = OK
Depth provided = 0.90 m TBF Standard Value
Free Board 0.22 m TBF Standard Value
Total Depth = 1.12 m
Sizing of Tiger Bio Filter II in ZA Tank is Dia 3.69 M X 1.12 M - 1 Nos

9 Filter Feed Tank


Numbers = 1.00 Nos Typically 1
Flow = 10.00 Cum/day
RetentionTime = 12.00 Hrs Range 12-24
Required Volume = 5.00 Cum
Depth = 1.75 m Range 1-3
Area 2.86 Sqm
Length = 2.00 m Assume L ≥2 M
Width = 1.50 m
Provided Area = 3.00 Sqm
Area Check = OK Not more than 10% extra
Hydraulic Volume = 5.25 Cum
FB = 0.50 m Range 0.2-1.0
Total Depth = 2.25 m
Total Volume = 6.75 Cum
Sizing of Filter Feed Tank-II is 2 M X 1.5 M X 2.25 M - 1 Nos

10 Treated Water Tank


Numbers = 1.00 Nos Typically 1
Flow = 10.00 Cum/day
RetentionTime = 12.00 Hrs Range 12-24
Required Volume = 5.00 Cum
Depth = 1.75 m Range 1-3
Area 2.86 Sqm
Length = 2.00 m Assume L ≥2 M
Width = 1.50 m
Provided Area = 3.00 Sqm
Area Check = OK Not more than 10% extra
Hydraulic Volume = 5.25 Cum
FB = 0.50 m Range 0.2-1.0
Total Depth = 2.25 m
Total Volume = 6.75 Cum
Sizing of Treated Water Tank is 2 M X 1.5 M X 2.25 M - 1 Nos
10 KLD FECAL SLUDGE TREATMENT PLANT BASED ON TIGER BIFILTER TECHNOLOGY

MASS BALANCE
Design Considerations
Design Flow = 10.00 KLD
BODin = 12,000.00 mg/l
CODin = 35,000.00 mg/l
TSSin = 18,000.00 mg/l

1 Screen Chamber
Numbers = 1.00 Nos
Volume = 10.00 KLD
BODin = 12,000.00 mg/Litre
Total BODin = 120.00 Kg
Reduction % = 0%
BOD out = 12,000.00 mg/Litre
BOD out = 120.00 Kg
CODin = 35,000.00 mg/Litre
Total CODin = 350.00 Kg
Reduction % = 0%
COD out 35,000.00 mg/Litre
COD out = 350.00 Kg
TSSin = 18,000.00 mg/Litre
Total TSSin 180.00 Kg
Reduction % = 0%
TSS out 18,000.00 mg/Litre
TSS out = 180.00 Kg
Screenings
Qty (m3/day) = Flow (KLD) x 0.05 (50 0.50 KLD
m3/1000 KLD) =
Non Bio Degaradable portion 30% = 0.15 KLD

2 Anarobic Digestion (all stages)


Numbers = 2.00 Nos
Volumein = 10.00 KLD
approximate Water loss
Volume Reduction % 0% during anaerobic digestion
= process
Volumeout = 10.00 KLD

= 12,000.00 mg/Litre
BODin
= 120.00 Kg
Approximate Reduction based
BOD Reduction % 85% on CPHEEO manual for Sludge
= Digestion
= 1,800.00 mg/Litre
BOD out
= 18.00 Kg

= 35,000.00 mg/Litre
CODin
= 350.00 Kg
Approximate Reduction based
Reduction % 85% on CPHEEO manual for Sludge
= Digestion
= 5,250.00 mg/Litre
COD out
= 52.50 Kg

= 18,000.00 mg/Litre
TSin
TSin
= 180.00 Kg

Approximate Reduction based


Reduction % 85% on CPHEEO manual for Sludge
Digestion considering TVS and
= TFS together
= 2,700.00 mg/Litre
TSS out
= 27.00 Kg

3 TIGER BIO FILTER I


Numbers = 1.00 Nos
Volumein = 10.00 KLD

= 1,800.00 mg/Litre
BODin
= 18.00 Kg

Reduction % 90% considering efficiancy based


= on Sewage Treatment
= 180.00 mg/Litre
BOD out
= 1.80 Kg

= 5,250.00 mg/Litre
CODin
= 52.50 Kg

Reduction % 90% considering efficiancy based


= on Sewage Treatment
= 525.00 mg/Litre
COD out
= 5.25 Kg

= 2,700.00 mg/Litre
TSin
= 27.00 Kg
considering efficiency based
Reduction % 90% on solid capture at TBF bed
= surface
= 270.00 mg/Litre
TSS out
= 2.70 Kg

4 TIGER BIO FILTER II


Numbers = 1.00 Nos
Volumein = 10.00 KLD

= 180.00 mg/Litre
BODin
= 1.80 Kg

Reduction % 85% considering efficiancy based


= on Sewage Treatment
= 27.00 mg/Litre
BOD out
= 0.27 Kg

= 525.00 mg/Litre
CODin
= 5.25 Kg

Reduction % 85% considering efficiancy based


= on Sewage Treatment
= 78.75 mg/Litre
COD out
= 0.79 Kg
= 270.00 mg/Litre
TSin
= 2.70 Kg

Reduction % 85% considering efficiency based


= on Sewage Treatment
= 40.50 mg/Litre
TSS out
= 0.41 Kg

5 TERTIARY TREATMENT FILTER


Numbers = 1.00 Nos
Volumein = 10.00 KLD

= 27.00 mg/Litre
BODin
= 0.27 Kg
Reduction % = 65%
= 9.45 mg/Litre
BOD out
= 0.09 Kg

= 78.75 mg/Litre
CODin
= 0.79 Kg
Reduction % = 65%
= 27.56 mg/Litre
COD out
= 0.28 Kg

= 40.50 mg/Litre
TSin
= 0.41 Kg
Reduction % = 65%
= 14.18 mg/Litre
TSS out
= 0.14 Kg

6 Treated Water Parameters


BOD out = 9.50 mg/l
COD out = 27.60 mg/l
TSS out = 14.20 mg/l
Treated Water Generated = 10.00 KLD
Vermicompost Generated = 5.00 kg/Day