01log
01log
Referenced documents
Not all documents referred to in this document are part of the scope of delivery for
the equipment. Elekta reserves the right to determine which documents are delivered
with a product.
Contact information
TEL +86 10 8012 5400 – FAX +86 10 8012 5401 – e-mail: [email protected]
Elekta Limited
Linac House
Fleming Way, Crawley
West Sussex RH10 9RR
United Kingdom
Tel: +44 1293 544 422
Fax: +44 1293 654 118
Table of content
1 Installation log book
1.1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.2 Scope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.3 Location of log book . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.4 Installation log . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5 Field Change Orders (FCO). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.6 Linear accelerator installation information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.7 Installation Engineers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.8 Test equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.9 Control the use of Electrostatic Discharge (ESD) sensitive devices. . . . . . . . . . . . . . . . . . . . . . . 1-6
1.10 Installation site delays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6
2 Installation checklists
2.1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
2.2 Installation checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
2.3 Setting to work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
2.4 Earth bonding (grounding) tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
3 Installation log
4 Service tables
4.1 Test equipment used (Elekta® PSC, BU or hospital) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4.2 Electrostatic Discharge (ESD) sensitive devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
4.3 Installation site delays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
1.9 Control the use of Electrostatic Discharge (ESD) sensitive devices ...................1-6
1.1 Overview
This document is for the sole use of Elekta installation engineers and representatives
of Elekta, installing an Elekta Compact™ linear accelerator. This document provides
a mechanism for installation engineers to document problems encountered during an
installation, and their proposed solution.
This document comprises.
Associated documentation
• Linear Accelerator, Installation manual.
• Linear Accelerator, Installation log book (this manual).
1.2 Scope
A comprehensive range of tests are completed in the factory to make sure the linear
accelerator is within specification, according to Elekta quality requirements.
These tests are supplemented further by a larger number of tests as described in the
Installation manual. These tests are completed at various stages of the installation to
make sure that parameters, which may be affected by the installation process, are
maintained and within specification.
Some tests in the setting to work (STW) section of the Installation manual are
replicated in the Customer Acceptance Test (CAT) manual. The tests in the CAT are
intended to provide the customer with familiarization and confidence in the
configuration of the system. These tests are completed upon the completion of the
installation process, and should not be confused with tests in the setting to work of
the equipment.
Machine Type:
Table Type:
Hospital name:
City:
County:
Table 1.2
Always wear a wrist strap when handling printed circuit boards (PCBs) and
other electronic sub-assemblies. The wrist strap and lead must be tested
prior to use. Failure to do so can lead to component failure.
CAUTION 1.1
Note: The recording of installation site delays is only applicable in China. Recording
information on site delays in other regions is not necessary.
Category Reason
This category covers time lost because the site was not in an
SR acceptable condition to commence installation, as specified in the
Linear Accelerator Site Planning Guide.
This category covers time lost due to problems that were outside the
SD control of Elekta, for example: a burst water pipe, or a power cut
not attributed to site preparation, etc.
This category covers time lost due to the fault of Elekta®, for
PQ example: design flaws, poor manufacturing, late delivery of service
parts, etc.
PF This category covers time that was lost that due to part failure.
TR This category covers time taken to travel to and from the site.
Record all delays, the date the delay occurred, a delay code, a brief description, the
time taken, and a Customer Feedback Report (CFR) number if applicable.
2 Installation checklists
Section Title Page
2.1 Overview
This chapter provides a checklist for the installing engineer to record that the required
procedures during an installation of a linear accelerator have been carried out
successfully.
Upon completion of a procedure, the installing engineer should indicate, against the
appropriate section, confirming that the check was carried out successfully, and
within specification. The installing engineer can either initial or stamp, and date, the
checklist.
Alternatively, depending upon local regulations, QA practices and procedures, it may
be acceptable to ‘tick’ the appropriate box to record that the check was completed,
and sign at the end of each checklist. It is not mandatory to initial all of these checks.
The installing engineer can be a representative of the customer, the local BU or Agent,
or an Elekta engineer (when applicable).
Installation procedures:
Name: Date:
Installation Engineer:
Installation Engineer:
Installation Engineer:
Installation Engineer:
Test Measured
Resistance
Test location current voltage Remarks
(Ω)
(Amp) (V)
Beam limiting device (BLD)
PSS column
PSS floor pan
HHC bracket left
Monitor bracket left
HHC right
Monitor right
Gantry
Stand
Base frame
Gun filament PSU
Vacuum pump PSU
Magnetron filament PSU
Pulse transformer
Treatment room cabinet
(TRC)
Main control cabinet
(MCC)
EIM
Modulator
Discharge stick
Fascia posts
Front-end computer (FEC)
Note: There is no requirement to test the touchguard ring and the table top, as these items
are isolated and not intended to be earthed.
3 Installation log
Record problems encountered which may affect the installation, and if necessary,
make a note of the solution. Record significant deviation in settings, from the factory
settings.
Write the date and the name of the installating engineer, at the start of each record.
Make sure that this is clearly written at the top of each record. If more than one
installation engineer works on the equipment, make sure their names are added to the
log.
Record exceptions to the expected results of tests undertaken, corrective actions taken
or needed (repairs, Customer Feedback Report CFRs), and items that need to be
followed up if more than one engineer is assigned to the installation, or an engineer is
replaced.
4 Service tables
Section Title Page
Table 4.1 Product Support Center (Crawley) / Business Unit test equipment
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Work surface
Wrist strap
Delay code
Date Time taken CFR number
(see Brief description
occurred (Man hours_ (if applicable)
Section 1.10)
Delay code
Date Time taken CFR number
(see Brief description
occurred (Man hours_ (if applicable)
Section 1.10)
North America Europe, South & Central America, Japan China Asia Pacific
Atlanta, GA Africa, Middle East & India Kobe Beijing Hong Kong, SAR China
Tel +1 770 300 9725 Tel +44 1293 654068 Tel +81 78 241 7100 Tel: +86 10 8012 5012 Tel +852 2891 2208
Fax +1 770 448 6338 Fax +44 1293 654655 Fax +81 78 271 7823 Fax: +86 10 8012 5000 Fax +852 2575 7133
[email protected] [email protected] [email protected] [email protected] [email protected]