Quotation for Air cond - 240108 - eng version (giá gốc)

The document is a quotation for HVAC installation work for three buildings totaling 7,760,988,800 VND excluding VAT. It includes a bill of quantities listing the equipment, materials, and labor costs to install air conditioners, piping, controls and related components for the buildings.

Uploaded by

NgoHongXuanHung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views3 pages

Quotation for Air cond - 240108 - eng version (giá gốc)

The document is a quotation for HVAC installation work for three buildings totaling 7,760,988,800 VND excluding VAT. It includes a bill of quantities listing the equipment, materials, and labor costs to install air conditioners, piping, controls and related components for the buildings.

Uploaded by

NgoHongXuanHung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Quotation

DATE 1/12/2024

PROJECT GWANGJIN VINA CO., Ltd

GWANGJIN VINA CO., Ltd


Company
Que Vo, Bac Ninh
Name

We quote as per below

AMOUNT : 7,760,988,800 VND[Excluded VAT]

DESCRIPTION SPECIFICATION Unit Q'ty UNIT PRICE PRICE [VND] REMARK


1. 전지동 ( A BUILDING ) LOT 1 6,839,306,000

2. 화성동 ( B BUILDING ) LOT 1 659,400,800

3.정문복지동 ( C BUILDING ) LOT 1 262,282,000

TOTAL 7,760,988,800

1) Amount excluding VAT


2) Construction Scope
A. Equipment: Installation of equipment is air conditioner installation company (excluding equipment foundation concrete)
B. Refrigerant piping: Refrigerant piping and piping insulation -> air conditioner installation company S

C. Drain piping: system air conditioner drain piping and piping insulation -> air conditioner installation company (excluding PAC main piping constructionof building)
D. Electricity: Multi-air conditioner Indoor to ondoor Power connection -> Air conditioner installer
Installation of distribution panels for indoor and outdoor air conditioners -> electricity contractors
Power wiring work from distribution Panel to multi-air conditioning outdoor unit and indoor unit -> electricity contractor
Installation of LCP (separate power panel) of package air conditioning -> air conditioning installer
Three-phase four-wire system connects : power from outdoor unit to indoor unit / Three-phase three-wire system connects : power from indoor unit separately
(Length of line: within 10M)
E. Communication: Outdoor unit to Indoor wire, wired remote control installation -> Air conditioner installation company
(Exclusion of piping construction (inside walls) that be installed wire remote controller -> Electricity contractor)

F. Includes equipment usage fees (crains, etc.) for roof and the inside of a building

WRITER TEL
BILL OF QUANTITY(BOQ)

Material Cost Labor Cost TOTAL


MODEL SPEC. UNIT Q'ty REMARK
UNIT PRICE Cost Sum UNIT PRICE Cost Sum UNIT PRICE Cost Sum
1. 전지동 ( A BUILDING )
1-1. Equipment
AM071AN4PKH/EU 4WAY 7.1kW (Wind-Free) EA 2 11,480,000 10,933,000 22,960,000 - 11,480,000 22,960,000
AM090AN4PKH/EU 4WAY 9.0kW (Wind-Free) EA 1 11,685,000 11,129,000 11,685,000 - 11,685,000 11,685,000
AM017NN1PEH/EU 1WAY 1.7kW (Wind-Free) EA 1 6,453,000 6,146,000 6,453,000 - 6,453,000 6,453,000
AM100MXVAGC/TS DVM S COOLING ONLY 10HP EA 1 66,322,000 63,164,000 66,322,000 - 66,322,000 66,322,000
PC4NUFMAN 4WAY PANEL EA 3 1,491,000 1,420,000 4,473,000 - 1,491,000 4,473,000
PC1MWFMAN 1WAY PANEL EA 1 1,904,000 1,813,000 1,904,000 - 1,904,000 1,904,000
MXJ-YA2512M Y-JOINT EA 3 1,802,000 1,716,000 5,406,000 - 1,802,000 5,406,000
MWR-WE13N Wired Remote controller EA 4 1,904,000 1,813,000 7,616,000 - 1,904,000 7,616,000
AM140RNPDKH/EU ( change: AC048BNPDKC/TC -
PAC 50,000 BTU SET 6 39,566,000 37,682,000 237,396,000 - 39,566,000 237,396,000
AC048BXPDNC/TC)
FVC85A/RC85B PAC 29,000 BTU SET 1 29,750,000 29,750,000 29,750,000 - 29,750,000 29,750,000
FVGR8PV1 / RN80H(E)Y18 PAC 80,000 BTU SET 1 86,450,000 86,450,000 86,450,000 -
FVGR15PV1 / RCN150H(E)Y18 PAC 153,000 BTU SET 12 138,700,000 138,700,000 1,664,400,000 - 138,700,000 1,664,400,000
FVGR13PV1 / RCN125H(E)Y18 PAC 121,000 BTU SET 4 118,920,000 118,920,000 475,680,000 -
FVGR10PV1 / RCN100H(E)Y18 PAC 100,000 BTU SET 12 86,150,000 86,150,000 1,033,800,000 - 86,150,000 1,033,800,000
LCP PANEL EA 2 9,360,000 18,720,000 - 9,360,000 18,720,000 connet wire to outdoor unit from this.

DRAIN PUMP 10M EA 36 3,200,000 115,200,000 - 3,200,000 115,200,000


[SUB TOTAL] 3,788,215,000 - 3,226,085,000
1-2. Piping Installation Work(DVM)
Copper Pipe 34.9M/M M 1,571 422,100 663,119,100 - 422,100 663,119,100
Copper Pipe 28.58M/M M 330 295,400 97,482,000 - 295,400 97,482,000
Copper Pipe 25.4M/M M 1,571 263,800 414,429,800 - 263,800 414,429,800
Copper Pipe 22.2M/M M 105 232,100 24,370,500 - 232,100 24,370,500
Copper Pipe 19.05M/M M 6 175,400 1,052,400 - 175,400 1,052,400
Copper Pipe 15.88M/M M 2,004 145,300 291,181,200 - 145,300 291,181,200
Copper Pipe 12.7M/M M 1,943 92,200 179,144,600 - 92,200 179,144,600
Copper Pipe 9.52M/M M 511 69,400 35,463,400 - 69,400 35,463,400
Copper Pipe 6.35M/M M 8 44,400 355,200 - 44,400 355,200
Copper pipe fitting Copper Pipe of 10% LOT 1 171,000,000 171,000,000 - 171,000,000 171,000,000
Copper sub-material Copper Pipe of 5% LOT 1 85,000,000 85,000,000 - 85,000,000 85,000,000
Addition refrigerant R410 410A(USA) kg 269 - - - -
Addition refrigerant R32 R32 kg 6 - - - -
Copper pipe insulation Φ34.9x25T M 1,571 70,400 92,000 110,598,400 - 70,400 110,598,400
Copper pipe insulation Φ28.58x25T M 330 59,600 78,000 19,668,000 - 59,600 19,668,000
Copper pipe insulation Φ25.4x25T M 1,571 57,400 75,000 90,175,400 - 57,400 90,175,400
Copper pipe insulation Φ22.23x25T M 105 54,300 71,000 5,701,500 - 54,300 5,701,500
Copper pipe insulation Φ19.05x25T M 6 49,700 65,000 298,200 - 49,700 298,200
Copper pipe insulation Φ15.88x25T M 2,004 45,900 60,000 91,983,600 - 45,900 91,983,600
Copper pipe insulation Φ12.7x25T M 8 37,900 49,500 303,200 - 37,900 303,200
Copper pipe insulation Φ28.58x13T M - 26,400 34,500 - - 26,400 -
Copper pipe insulation Φ12.7x13T M 1,934 15,600 20,400 30,170,400 - 15,600 30,170,400
Copper pipe insulation Φ9.52x13T M 511 13,200 17,300 6,745,200 - 13,200 6,745,200
Copper pipe insulation Φ6.35x13T M 8 11,900 15,600 95,200 - 11,900 95,200
insulation sub-material Insulation of 10% LOT 1 36,000,000 36,000,000 - 36,000,000 36,000,000
PVC pipe insulation Φ75 M - - - - -
PVC pipe insulation Φ48 M 86 28,200 25,596 2,425,200 - 28,200 2,425,200
PVC pipe insulation Φ34 M 21 17,200 15,660 361,200 - 17,200 361,200
PVC pipe fitting 3% LOT 1 80,000 80,000 - 80,000 80,000
PVC sub-material PVC fitting of 10% LOT 1 280,000 280,000 - 280,000 280,000
PVC pipe insulation Φ48x10T M 86 31,200 39,000 2,683,200 - 31,200 2,683,200
PVC pipe insulation Φ34x10T M 21 20,100 25,100 422,100 - 20,100 422,100
PVC pipe insulation sub-material Insulation of 10% LOT 1 310,000 310,000 - 310,000 310,000
Flexible metal conduits 16C m 9,320 19,200 16,000 178,944,000 - 19,200 178,944,000
Power Supply Cable CV2.5M/M*3P m 4,427 32,500 24,069 143,877,500 - 32,500 143,877,500
Transmission Cable VCTF 0.75/2C m 4,830 10,400 6,949 50,232,000 - 10,400 50,232,000
Transmission Cable(Remote control) VCTF 0.75/2C m 63 10,400 6,949 655,200 - 10,400 655,200
Cable sub-material Cable of 10% LOT 1 19,480,000 19,480,000 - 19,480,000 19,480,000
Copper pipe hanger EA 2,683 3,500 9,390,500 - 3,500 9,390,500
Anchor/'Hanging bolt EA 2,699 7,200 19,432,800 - 7,200 19,432,800
Copper pipe trunking outside galvanized steel sheet 1.0T LOT 1 27,000,000 27,000,000 - 27,000,000 27,000,000
Pipe tray LOT 1 23,000,000 23,000,000 - 23,000,000 23,000,000
Pressuer guage EA 76 360,000 27,360,000 - 360,000 27,360,000
Nirogen Bot 537 1,350,000 1,299,000 724,950,000 - 1,350,000 724,950,000
Crane LOT 1 15,000,000 15,000,000 - 15,000,000 15,000,000
Rental LOT 1 3,000,000 3,000,000 - 3,000,000 3,000,000
Tool damage fee 3% LOT 1 10,000,000 10,000,000 - 10,000,000 10,000,000
[SUB TOTAL] 3,613,221,000 - 3,613,221,000
TOTAL 7,401,436,000 - 6,839,306,000
2. 화성동 ( B BUILDING )
2-1. Equipment
AM071AN4PKH/EU 4WAY 7.1kW (Wind-Free) EA 1 11,480,000 10,933,000 11,480,000 - 11,480,000 11,480,000
AM017NN1PEH/EU 1WAY 1.7kW (Wind-Free) EA 1 6,453,000 6,146,000 6,453,000 - 6,453,000 6,453,000
AM028NN1DKH/EU 1WAY 2.8kW (Wind-Free) EA 1 8,478,000 8,074,000 8,478,000 - 8,478,000 8,478,000
PC4NUFMAN 4WAY PANEL EA 1 1,491,000 1,420,000 1,491,000 - 1,491,000 1,491,000
PC1MWFMAN 1WAY PANEL EA 1 1,904,000 1,813,000 1,904,000 - 1,904,000 1,904,000
PC1NWFMAN 1WAY PANEL EA 1 1,836,000 1,749,000 1,836,000 - 1,836,000 1,836,000
MXJ-YA1509M Y-JOINT EA 2 1,371,000 1,306,000 2,742,000 - 1,371,000 2,742,000
MWR-WE13N Wired Remote controller EA 3 1,904,000 1,813,000 5,712,000 - 1,904,000 5,712,000
AM140RNPDKH/EU ( change: AC048BNPDKC/TC -
PAC 50,000 BTU SET 6 39,566,000 37,682,000 237,396,000 - 39,566,000 237,396,000
AC048BXPDNC/TC)
FVGR8PV1 / RN80H(E)Y18 PAC 80,000 BTU SET 1 86,450,000 86,450,000 86,450,000 - 86,450,000 86,450,000
FVC85A/RC85B PAC 29,000 BTU SET 1 29,750,000 29,750,000 29,750,000 - 29,750,000 29,750,000
FVC85A/RC85B PAC 29,000 BTU SET 1 29,750,000 29,750,000 29,750,000 - 29,750,000 29,750,000
LCP PANEL EA 1 9,360,000 9,360,000 - 9,360,000 9,360,000 connet wire to outdoor unit from this.

DRAIN PUMP 10M EA 3 3,200,000 9,600,000 - 3,200,000 9,600,000


[SUB TOTAL] 442,402,000 - 442,402,000
2-2. Piping Installation Work
Copper Pipe 22.2M/M M 47 232,100 10,908,700 - 232,100 10,908,700
Copper Pipe 15.88M/M M 190 145,300 27,607,000 - 145,300 27,607,000
Copper Pipe 12.7M/M M 79 92,200 7,283,800 - 92,200 7,283,800
Copper Pipe 9.52M/M M 190 69,400 13,186,000 - 69,400 13,186,000
Copper Pipe 6.35M/M M 32 44,400 1,420,800 - 44,400 1,420,800
Copper pipe fitting Copper Pipe of 10% LOT 1 6,000,000 6,000,000 - 6,000,000 6,000,000
Copper sub-material Copper Pipe of 5% LOT 1 3,000,000 3,000,000 - 3,000,000 3,000,000
Addition refrigerant R410 410A(USA) kg 18 280,000 5,040,000 - 280,000 5,040,000
Addition refrigerant R32 R32 kg 2 202,000 404,000 - 202,000 404,000
Copper pipe insulation Φ22.23x25T M 47 54,300 71,000 2,552,100 - 54,300 2,552,100
Copper pipe insulation Φ15.88x25T M 190 45,900 60,000 8,721,000 - 45,900 8,721,000
Copper pipe insulation Φ12.7x25T M 79 37,900 49,500 2,994,100 - 37,900 2,994,100
Copper pipe insulation Φ9.52x13T M 190 13,200 17,300 2,508,000 - 13,200 2,508,000
Copper pipe insulation Φ6.35x13T M 32 11,900 15,600 380,800 - 11,900 380,800
insulation sub-material Insulation of 10% LOT 1 2,000,000 2,000,000 - 2,000,000 2,000,000
PVC pipe Φ48 M 50 28,200 25,596 1,410,000 - 28,200 1,410,000
PVC pipe Φ34 M 16 17,200 15,660 275,200 - 17,200 275,200
PVC pipe fitting 3% LOT 1 51,000 51,000 - 51,000 51,000
PVC sub-material PVC fitting of 10% LOT 1 169,000 169,000 - 169,000 169,000
PVC pipe insulation Φ48x10T M 50 31,200 1,560,000 - 31,200 1,560,000
PVC pipe insulation Φ34x10T M 16 20,100 321,600 - 20,100 321,600
PVC pipe insulation sub-material Insulation of 10% LOT 1 188,000 188,000 - 188,000 188,000
Flexible metal conduits 16C m 664 19,200 16,000 12,748,800 - 19,200 12,748,800
Power Supply Cable CV2.5M/M*3P m 296 32,500 24,069 9,620,000 - 32,500 9,620,000
Transmission Cable VCTF 0.75/2C m 323 10,400 6,949 3,359,200 - 10,400 3,359,200
Transmission Cable(Remote control) VCTF 0.75/2C m 45 10,400 6,949 468,000 - 10,400 468,000
Cable sub-material Cable of 10% LOT 1 1,340,000 1,340,000 - 1,340,000 1,340,000
Copper pipe hanger EA 179 3,500 626,500 - 3,500 626,500
Anchor/'Hanging bolt EA 191 7,200 1,375,200 - 7,200 1,375,200
Copper pipe trunking outside galvanized steel sheet 1.0T LOT 1 17,000,000 17,000,000 - 17,000,000 17,000,000
Pipe tray Squre Pipe LOT 1 9,000,000 9,000,000 - 9,000,000 9,000,000
Pressuer guage EA 8 360,000 2,880,000 - 360,000 2,880,000
Nirogen Bot 36 1,350,000 48,600,000 - 1,350,000 48,600,000
Crane LOT 1 5,000,000 5,000,000 - 5,000,000 5,000,000
Rental LOT 1 2,000,000 2,000,000 - 2,000,000 2,000,000
Tool damage fee 3% LOT 1 5,000,000 5,000,000 - 5,000,000 5,000,000
[SUB TOTAL] 216,998,800 - 216,998,800
TOTAL 659,400,800 - 659,400,800
3.정문복지동 ( C BUILDING )
3-1. Equipment
AM140RNPDKH/EU ( change: AC048BNPDKC/TC -
PAC 50,000 BTU SET 6 39,566,000 37,682,000 237,396,000 - 39,566,000 237,396,000
AC048BXPDNC/TC)
LCP PANEL EA 1 9,360,000 9,360,000 - 9,360,000 9,360,000 connet wire to outdoor unit from this.

DRAIN PUMP 10M EA 1 3,200,000 3,200,000 - 3,200,000 3,200,000


[SUB TOTAL] 249,956,000 - 249,956,000
1-2. Piping Installation Work
Copper Pipe 15.88M/M M 11 145,300 1,598,300 - 145,300 1,598,300
Copper Pipe 9.52M/M M 11 69,400 763,400 - 69,400 763,400
Copper pipe fitting Copper Pipe of 10% LOT 1 236,000 236,000 - 236,000 236,000
Copper sub-material Copper Pipe of 5% LOT 1 118,000 118,000 - 118,000 118,000
Addition refrigerant R410 410A(USA) kg 1 280,000 280,000 - 280,000 280,000
Copper pipe insulation Φ15.88x25T M 11 45,900 60,000 504,900 - 45,900 504,900
Copper pipe insulation Φ9.52x13T M 11 13,200 17,300 145,200 - 13,200 145,200
insulation sub-material Insulation of 10% LOT 1 65,000 65,000 - 65,000 65,000
Flexible metal conduits 16C m 25 19,200 16,000 480,000 - 19,200 480,000
Power Supply Cable CV2.5M/M*3P m 12 32,500 24,069 390,000 - 32,500 390,000
Transmission Cable VCTF 0.75/2C m 13 10,400 6,949 135,200 - 10,400 135,200
Cable sub-material Cable of 10% LOT 1 50,000 50,000 - 50,000 50,000
Copper pipe trunking outside galvanized steel sheet 1.0T LOT 1 2,000,000 2,000,000 - 2,000,000 2,000,000
Pipe tray Squre Pipe LOT 1 1,500,000 1,500,000 - 1,500,000 1,500,000
Pressuer guage EA 1 360,000 360,000 - 360,000 360,000
Nirogen Bot 2 1,350,000 2,700,000 - 1,350,000 2,700,000
Tool damage fee 3% LOT 1 1,000,000 1,000,000 - 1,000,000 1,000,000
[SUB TOTAL] 12,326,000 - 12,326,000
TOTAL 262,282,000 - 262,282,000
G.TOTAL 8,323,118,800 - 7,760,988,800