The document proposes painting the exterior of a house including the molding, posts, grills, terraces, tubular balcony, fence, gates and walls. It provides a list of materials needed, total cost, downpayment amount, work duration, number of workers and daily reporting via pictures and videos.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views3 pages

Project Proposal

The document proposes painting the exterior of a house including the molding, posts, grills, terraces, tubular balcony, fence, gates and walls. It provides a list of materials needed, total cost, downpayment amount, work duration, number of workers and daily reporting via pictures and videos.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT PROPOSAL

OF VICTOR JAY BENITO

Information Control of Proposer

Name Victor Jay B. Benito

Age 52

Birthday: October, 24, 1971

Address Sitio Balza, Brgy. San Isidro Paniqui, Tarlac

ID No. 2681-6407-9289-0523

Contact No. 09516767027

Position of Work House Painting Contractor

Proposal of Project
Project Name: NIDA FOLEY’S HOUSE REPAINT

Mission: To paint houses with quality work

All exterior parts of house are need to repaint and other parts like:
 Moldura or Molding
 Poste at Biga
 Grills
 Terrace and Tubular in Balkunahe
Problem and Solution:
 Fence
 Main Gate
 Gate near the Stock Room
 Wall of Gate

Buying of materials right after we received the downpayment.


Deliveries of Materials:
Delivering of materials, the day we start to work the project.

5 Tin gloss
15 tin semi gloss
4 tin flat latex
5 bags skim coat
10 meters sanding paper 100
7 roller big with cotton
10 baby roller with cotton
10 paint brush ½
List of Materials to be 2 gallon emulsion
needed: 15 rawsena
4 gallon epoxy primer
1 gallon redoxide
4 gallon enamel white QDE
1 gallon paint thinner
5 gallon laquer thinner
5 tin green
Kawayan package deal

Total Labor and Materials 182,000


cost or Budget:
Downpayment: 130, 000 – for buying materials and salary of painters
Days of work 2 weeks or 14 days
No. of workers 6 workers
Rate: 800 per head
Reporting: We will send pictures and videos daily as we report what we finish.

Authorization:
Prepared by:
Victor Jay B. Benito
Date:

Witness/Received by:
Jade Inggal
Date: