INFORMATION TECHNOLOGY
AND SIX SIGMA IMPLEMENTATION
CHANG-TSEH HSIEH BINSHANLIN BILL MANDUCA
University of Southern Mississippi Louisiana State University Northrop Grumman Corporation
Hattiesburg, MS 39406 in Shreveport Ship Systems Sector
Shreveport, LA 71115 Pascagoula, MS 39568-0149
ABSTRACT This paper will briefly discuss the basic concepts of the Six
Sigma Process Improvement Methodology, present various
The Six Sigma methodology for quality improvement is computer applications to demonstrate the value of ISIIT in this
a system of many concepts, tools, and principles. This paper methodology, and finally, present an actual case where some
discusses the basic concepts of the Six Sigma Process Improve- of these applications were used to help a major corporation to
ment Methodology, presents various computer applications to achieve significant cost savings.
demonstrate the value of information systems and information
technology (ISlIT) in this methodology, and finally, presents an THE SIX SIGMA METHODOLOGY
actual case where some of these applications were used to help
a major corporation save over $2 million. It is hoped that the Ever since Lean and Six Sigma was first introduced to
focus on ISIIT shows how powerful Six Sigma can be when aided the business community by Motorola in 1985, this concept
by the latest computer hardware and software technology. The has primarily been applied to manufacturing. These days, the
strategic use of ISIIT within the Six Sigma methodology will go application of Six Sigma can be found in areas ranging from
a long way in making things easy for professionals to incorporate facility management and maintenance functions (12), online
the principles as part of their everyday work routine. market research (22), supply chain improvement (14), to such
Keywords: Six sigma methodology, Process improvement, non-manufacuturing areas as healthcare management (21),
Strategic use of ISIIT. managerial accounting (2), and human resources management
(25). And, the formulation and identification of useful theories
INTRODUCTION related to Six Sigma development have also been proposed (16).
The strategic value of the Six Sigma methodology has also
Six Sigma is a quality improvement management doctrine become the focus of studies by both academes and practitioners.
developed by Motorola in 1985. (3, 8, 20). It was proclaimed It has been treated as a vehicle for improving competitive
as a new approach to improving quality through statistical mea- advantage by some business executives (7), and the expanded
surements and benchmarking. In the words of Pande, Neuman, and Six Sigma system, commonly known as Keki Bhote's Proven
Cavanagh, it is because being successful and staying successful System, can even help business move from quality excellence to
in business is more challenging today than ever before (18). The total business excellence (15). It is the strategic value that makes
Six Sigma method attempts to improve such aspects within the the Six Sigma methodology even more important, especially in
operation as profit and speed increment. the global environment.
In today's economy, most people provide services rather than
making goods and products. Most of these services operate very STRATEGIC MANAGEMENT SYSTEM
inefficiently, and if the same thing happens in a factory, many
factories would produce too many defective products and they The Six Sigma approach to managing is all about identifying
would be closed down quickly. Six Sigma provides powerful what is known and not known about the various processes that
tools to improve those services to levels of accuracy and quality a company relies upon to conduct its business, and then taking
seen so far only in precision manufacturing. action in the form of problem solving teams working on projects
Six Sigma took the business community by storm in the 1990s in targeted areas, to reduce the errors and rework within these
when General Electric CEO Jack Welch incorporated it in his processes - errors that cost time, money, opportunities, and
management philosophy (9). To date, at least 25% of the Fortune customers. It must be kept in mind, however, that a successful
200 companies have a serious Six Sigma program implemented Six Sigma initiative is not just about data tools and defect
(23). Most of these implemented programs, however, focus on calculations. Pande, Neuman, and Cavanagh (18, 19) define it as
large scale improvements in defect and process measures, which a broad and comprehensive system for building and sustaining
may also involve employee motivation (17). The increasing business performance, success, and leadership. It must be viewed
popularity of the Six Sigma approach has been paralleled with as a context within which the organization will be able to integrate
the evolution of information technology, in particular those many valuable but often disconnected management "best
related to personal computers and networking technologies practices" and concepts, including systems thinking, continuous
since 1980s. Nevertheless, impacts of information systems improvement, knowledge management, mass customization, and
and information technology (ISIIT) on the Six Sigma initiative activity-based management.
has barely been mentioned, especially in the academic com- The importance of a Six Sigma initiative being part of an
munity. overall strategic vision by a business cannot be over emphasized.
700 ,000
600,000
500 ,000 -
400,000
DPMO
300 ,000 -
200 ,000
100 ,000
o
2 3 4 5 6
Sigma Level
Figure 2
~~
between requirements down the left side and the char-
omlldon ofD88ign acteristics of each level of detail across the top. Each
Requirements relationship is rated on a scale of I (weak), 3 (moderate).
or 9 (strong). A blank represents no relationship at all (a
D_gn Requirements zero rating). The results then become the prioritized Cl'C's
that form the left side of the next matrix. Sources of data
m and information to start the QFD regarding customer
expectations are typically gathered from:
PrIo~ed Customer ReI8lIonshlp of Custom... Rilling of
Need. ~e.lgn tI:J Need. Compelltorw f4 • Targeted and multi-level interviews and surveys
In • Customer scorecards
• Data warehousing and data mining
TechnlClll
Benchm....
The cascading of customer requirements into design
151 parameters for the product, process, and control function
is the essence ofQFD. QFD is the tool used to translate the
TechnlClll EVlllullllon
Voice of the Customer into system design parameters. Most
m of the other ISIIT tools associated with this phase consist
of worksheets and other computerized templates aimed at
planning the project.
Pertonnence TargellS
Figure 5
On....mpl. t-teat Two... mpl. tot.at Pallll t-teat One·Way AWJVA Two-Way AWJVA
Figure 6
There are various stand alone, web-based, or MS Excel add- 11. Determine the action(s) to be taken.
on software packages that are available to perform hypothesis 12. Re-calculate the RPNs based on the action plans.
testing. One other advanced statistical method that is beyond the
scope of this paper but bears mentioning as part of the ISIIT that is In this phase, the tools presented help project participants
available for use on Six Sigma projects is Design of Experiments discover the root cause(s) of the problem and the relationship
(DOE). DOE is based on simultaneously testing multiple factors between variables and what some of the key process indicators
that affect a process, service, or product. It avoids the pitfalls are. The result of the Analyze Phase should leave us with several
normally associated with testing many factors at once by using opportunities for improvement to work with in the Improve
very specific combinations of factors in very specific patterns Phase.
(I).
Finally, one other computer-based decision tool that is used Improve Phase
extensively in the Analyze Phase is called a Failure Mode Effect
Analysis (FMEA). This quality-planning tool is used to identify Potential problem solutions are tested in the Improve Phase.
and eliminate potential product or process failures or defects. The task here is to select the best possible solution and then predict
It becomes a very valuable decision tool as it helps a manager the new capability of the process and/or value stream. One of the
systematically identify, analyze, prioritize and document best ways this is done is through a planned Design of Experiment
potential failure modes, their consequences on a system, product as mentioned previously. Essentially the Measurement and
or process, and prevent future failures from occurring. The twelve Analyze Phases are repeated with the new process in place and
steps to conduct an FMEA are as follows (1): the results compared to the previous process. These results are
typically presented to decision makers and the new process is put
l. Study the system, product or process to be analyzed. into place permanently.
2. Brainstorm, over multiple brainstorming sessions, the
possible range of failure modes. Control Phase
3. List the potential consequences of each failure mode.
4. Assign severity (SEV) scores for each failure mode. The objective in the Control Phase is to implement the
5. Identify the cause(s) of each failure mode. accepted solution and ensure that the gains derived from the
6. Assign occurrence (OCC) scores for each cause. improvement are maintained. The two basic tools here that
7. Identify current controls to detect the failure modes. lend themselves very well to ISIIT application are run charts
8. Assign an escaped detection (DET) score for each and Statistical Process Control (SPC) charts. Control charts are
cause and control. used to track a performance measure or key process indicator
9. Calculate the Risk Priority Number (RPN) for each variable over time. This is sometimes referred to as "listening to
line in the FMEA. the voice of the process." When a process measure is in control,
10. Prioritize the failure modes and causes based on the its behavior on a control chart exhibits random variation when
RPN. its distribution is stable. A distribution is said to be stable when
r
A /
~.
e
:::I
,
¥/ <, I
UCL'"
;
.i l/\rI\ /\ r: r"M , rr- I
1"1
Control Region ~ptures
Variation Natural to the
>-
=
"=
V\/ 1/
\\ \A /\ 1\
A"
;\ 1\ A I Original Process
" \
\
Control Lll1'lltsEstablished
_. ,
... , .ti
\: _u_
T: __
Figure 7
its average and standard deviation is not shifting. A control chart design engineering transactional process. It is presented following
is used to distinguish random (or common cause) variation from the Six Sigma DMAIC format,
special cause variation and thus will indicate when action is to be The primary motivating factors in initiating this Lean/Six
taken and when action is not to be taken. They are designed to Sigma project were excessive time in getting a Technical In-
detect outliers, shifts, and trends. It is a run chart with statistically struction (TI) package approved (placed into Configuration
generated control limits. Management where Procurement can issue a purchase order)
Twenty data points are typically considered to be a sufficient and defects in TI package preparation. The purpose of this re-
number to establish control limits. Control limits are calculated port is to compile the results of this project into one concise
on the basis of the variation within the process and are typically document to be used as a reference for future Lean/Six Sigma
placed three standard deviations above and below the mean of activities.
the data. This placement marks the bounds of common cause or
random variation. In contrast, specifications limits represent the IMPROVEMENT GOALS
Voice of the Customer and are placed on capability charts but
not on control charts. Control charts represent the Voice of the • Improve quality and eliminate rework by standardizing
Process (I). Many manufacturing processes, such as chemical TI package development.
plating baths, use real-time control charts with touch screen • Solidify TI development/release schedule utilizing the
controls to give plating line operators up-to-the-minute status program's Integrated Master Schedule (lMS).
of the process. Alarms sound when an out of control situation • Reduce Engineering Development to Vault average
occurs so the operators can act quickly before there is a really cycle time from -40 days to <7 days by August 30, 2003
significant problem that interrupts production. Figure 7 shows the «70 days overall with Procurement added.).
components of a basic control chart. • Improve the program's overall funding expenditure
Once improvements to the process become permanent and profile by providing Tis to Procurement in a timely
stable, it can now be monitored closely to control the gains. manner.
Metrics can now be reported at the desired frequency and a
database can be built to use the data for future reference. The critical questions to discuss during each stage in the DMAIC
The following section presents highlights from a real world model are summarized in Figure 8 (next page).
completed Six Sigma project. Excerpts from each phase of the
DMAIC are shown with examples of ISIIT tools in action. Calculated Process Capability
and Baseline Sigma Level
ISIIT DEMONSTRATED
After collecting the initial process information, the next
This section will present examples of how IS/IT was used in step in the Measure Phase was to calculate the baseline process
a Six Sigma project at a Fortune 500 company. It focuses on a capability and sigma level. Both of these measures indicate how
6. What kinds of waste and cost of poor quality exist in the value stream or process? What is the financial
and/or customer impact?
7. What are all the sources of variability in the value stream or process? Which of these are controlled by
W the stakeholders? How do we control them? What is the method of documenting and maintaining this
~
..oJ
control?
8. Are any sources of waste or variability supplier-dependent? If so, what are they, who are the suppliers,
<C and what effort is being made to eliminate waste and variability?
Z
<C
9. What are the key input variables that affect the average and de",ation of the measures of perfonnance?
10. What are the relationships between the measures of performance and the key input variables? Do any 0
the key input variables interact?
W
>
0
11. What settings or values for the key input Variables will optimize the measures of perfonnance?
a:::
a. 12. For the optimal settings of the key input variables, what kind of variability still exists in the perfonnance
-
:IE
..oJ
measures?
13. Has a process flow and control system been implemented to sustain the gains and continuously improve
0
a::: the process?
t-
Z 14. How much improvement has the value stream or process shown in the past six months? How much
0 time and/or money have our efforts sawd the company?
U
Figure 8
well the process is currently behaving with respect to the output fall completely within the specification limits. A value of 1.33 or
specifications. Process capability is usually expressed with two greater is usually desired.
indices, namely, Cpand Cpk. The sigma level is a commonly used measure of process
Cp is a capability index which shows the process capability capability that represents the number of standard deviations
potential but does not consider how centered (on the mean) the between the center of a process and the closest specification
process is. Cp may range in value from 0 to infinity, with a large limit. In other words, it compares the Voice of the Process
value indicating greater potential capability. A value of 1.33 or with the Voice of the Customer. It is correlated to the defect
greater is usually desired. rate and the complexity of the process. If a process is said to be
C pk is an index used to compare the natural tolerance of a Six Sigma Capable, our capability indices should read as fol-
process with the specification limits. Cpk has a value equal to Cp lows:
if the process is centered on the nominal; if Cpk is negative, the
process mean is outside the specification limits; if Cpk is between Cp 2: 2.0 (the higher the better)
o and I, then the natural tolerances of the process fall outside the Cpk 2: 1.5 (the higher the better)
specification limits. If Cpk is larger than I, the natural tolerances Defects Per Million (dpm) s 3.4 (the lower the better)
11Development Process
Current State capability Measurement
Mean - 39.224
StdDev - 40 .803 . In spec
USL - 14 • Out spec left
LSL - 7
Sigma Capability - .C • Out spec righ t
Cpk - -.2061
. LSL
Cp - .0 28 6
DPM - 946,613 . USL
N - 98
g N
~
,
lO lO
...... r-.:
N
N
o
N
m
......
,
~
N ~ l"l
~ ~
Figure 9
In this case, a negative Cpt indicates that the majority of the improve the process. This proved to be the solution that worked
sample data was outside the specification limits (7-14 days) best. Advantages of this approach were as follows:
set up by the customer (red areas under the curve in Figure 2).
The blue area under the curve indicates the small proportion of • Approval of the various elements of a TI package
sample data that was actually within the customer's specification was done at the same time the package was being
range. The poor performance of this process is also confirmed written by the engineer. This helped us achieve our
by the low Sigma Capability and C p Another confirmation is goal of working more steps in parallel rather than in
the extremely high defect rate of 946,613 DPM (Defects Per series;
Million).
• In addition to reducing cycle time, the new process also
HYPOTHESES AND CONCLUSIONS gave more flexibility to the personnel performing the
tasks. TIs were worked as they were received rather
This information confirmed what we suspected were the than allowing them to pile up into batches. Continuous
best areas for improvement: I) the Budget Adjustment Request flow of work was achieved.
(BAR) process handled by the CAM and Business Management
Department and 2) the role of the Program Office Project Engineer • Quality metrics were developed and therefore we saw
in obtaining approvals from the various directors. These two areas a dramatic increase in TI package quality. The rework
appeared to be bottlenecks in the process, but we felt we needed virtually disappeared.