JSR Updated
JSR Updated
Quantity
S. No. Description of item Unit Pump Staff Boundary Gate Total Rate Amount
House Quantit
15 HP Quarter wall y
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means in foundation
1 trenches or drains (not exceeding 1.5 m in width or 10 Cum 27.03 67.26 66.45 1.01 161.74 180 29113.2
sqm on plan), including dressing of sides and ramming of bottoms,
lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as
Providing and la yi ng in posit ion ce merit conc rete of
specified grade excluding the cost of centering and
2 shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse Cum 2.70 8.70 10.59 0.18 22.18 5600 124208
sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
10 centering, shuttering, finishing and reinforcement - All work 1:2:4 Cum 2.13 1.40 3.53 7800 27534
(1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate
20 mm nominal size)
11 Sqm 130.59 285.40 208.03 - 624.03 350 218410.5
12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand)
12 6 mm cement plaster of mix 1:3 (1 cement: 3 fine sand) Sqm 29.83 62.91 - - 92.74 250 23185
Pointing on brick work or brick flooring with cement
13 mortar 1:3 (1cement : 3 fine sand): Flush / Ruled/ Struck or Sqm - - 164.88 4.80 169.68 250 42420
weathered pointing
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
14 binding all complete Thermo-Mechanically Treated bars of grade KG 307.48 451.80 - 124.00 883.28 75 66246
Fe-500D or more (Reinforcement steel wil be supplied by NCC
from central store on Debitable Basis .)
Centering and shuttering including strutting, propping
15 etc. and removal of form for :Foundations, footings, bases of SQM - - - 1.92 1.92 350 672
columns, etc. for mass concrete
Quantity
S. No. Description of item Unit Pump Staff Boundary Gate Total Rate Amount
House Quantit
15 HP Quarter wall y
Centering and shuttering including strutting, propping
16 etc. and removal of form for Columns, Pillars, Piers, Abutments, SQM - - - 7.20 7.20 400 2880
Posts and Struts
Centering and shuttering including strutting, propping
17 etc. and removal of form for Lintels, beams, plinth SQM 5.37 6.03 11.40 700 7980
beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping
18 etc. and removal of form for Suspended floors, roofs, SQM 29.04 36.24 65.28 800 52224
landings, balconies and access platform
Structural steel work in single section, fixed with or
without connecting plate,including cutting, hoisting,
19 fixing in position and applying a priming coat of KG 92.52 92.52 30 2775.6
approved steel primer all complete (Reinforcement steel wil be
supplied by NCC from central store on Debitable Basis.)
Labour Charges for fixing M.S Doors/Windows
20 /Ventilators with M.S. Grills (Reinforcement steel wil Sqm 9.66 14.13 5.76 29.55 400 11820
be supplied by NCC from central store on Debitable Basis.)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse
sand : 4 gradedstone aggregate) finished with a floating
21 coat of neat cement, including cement slurry, but excluding the Sqm 19.08 59.23 78.31 5500 430705
cost of nosing of steps etc. complete. 40 mm thick with 20 mm
nominal size stone aggregate
Concrete screeding( 50 mm thick) and grading of roof
for water proofing treatment with Cement concrete
22 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate Sqm 18.90 40.78 59.68 550 32824
20mm nominal size) including 2 coats of cement slurry mixed with
water proofing cement
Finishing walls with Acrylic Smooth exterior paint of
required shade : New work (Two or more coat applied
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
23 @ 1.67 ltr/10 sqm over and including priming coat of exterior SQM 78.53 110.04 188.57 125 23571.25
primer applied @ 2.20 kg/10 sqm)
Finishing walls with water proofing cement paint of
24 required shade : SQM 334.34 334.34 150 50151
New work (Two or more coats applied @ 3.84 kg/10 sqm)
Distempering with oil bound washable distemper of
approved brand and manufacture to give an even
25 shade : New work (two or more coats) over and including water SQM 81.89 238.27 320.16 150 48024
thinnable priming coat with cement primer
Painting with synthetic enamel paint of approved brand
andmanufacture of required colour to give an even
26 shade : Two or more coats on new work over an under coat of SQM 21.25 28.16 12.67 62.08 100 6208
suitable shade with ordinary paint of approved brand and
manufacture
Providing precast cement concrete Jali 1:2:4 (1 cement :
2 coarse sand(zone-III) : 4 graded stone aggregate 6mm
nominal size ), reinforced with 1.6 mm dia mild steel
27 wire, including centering and shuttering, roughening SQM 0.27 0.36 0.63 1200 756
cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3
fine sand) etc. complete, excluding plastering of the jambs, sills
and soffits. 50 mm thick
28 Providing Precast cement concrete (1:1.5;3) Manhole Cover Size Nos. 1.00 - - - 1.00 750 750
of 1000 x 1000 x 100 mm
Providing and fixing on wall face unplasticised Rigid PVC
rain water pipes conforming to IS : 13592 Type A,
29 including jointing with seal ring conforming to IS : 5382, leaving 10 Rmt 9.90 13.20 23.10 250 5775
mm gap for thermal expansion, (i) Single socketed pipes. 110 mm
diameter
30 Supply and Fixing of Ball Bearing Pulley for Pump Room Nos. 1.00 - - 1.00
Quantity
S. No. Description of item Unit Pump Staff Boundary Gate Total Rate Amount
House Quantit
15 HP Quarter wall y
Providing and fixing white vitreous china pedestal type
water closet (European type W.C. pan) with seat and
lid, 10 litre low level white P.V.C. flushing cistern,
including flush pipe, with manually controlled device
31 (handle lever), conforming to IS : 7231, with all fittings and fixtures Each 1.00 1.00 4000 4000
complete, including cutting and making good the walls and floors
wherever required : W.C. pan with ISI marked white solid plastic
seat and lid
Providing and fixing wash basin with C.I. brackets, 15
mm C.P. Brass pillar taps, 32 mm C.P. brass waste of
32 standard pattern, including painting of fittings and brackets, cutting Each 1.00 1.00 3000 3000
and making good the walls wherever require
33 Providing and fixing C.P. brass bib cock of approved Each 3.00 3.00 300 900
quality conforming to IS:8931 : 15 mm nominal bore
Providing and fixing C.P. brass angle valve for basin
34 mixer and geyser points of approved quality conforming to IS:8931 Each - 3.00 - - 3.00 450 1350
15mm nominal bore
Providing and fixing Chlorinated Polyvinyl Chloride
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
Providing and fixing PVC ' P ' Or ' S ' trap/Floor Trap in
44 waste/drain pipe with all necessary fittings complete as per Nos. - 3.00 - - 3.00 700 2100
direction of Engineer .
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
45 Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink Nos. - 1.00 - - 1.00 4000 4000
as per IS:13983 with C.I. brackets and stainless steel plug 40 mm,
including painting of fittings and brackets, cutting and making good
the walls wherever required Kitchen sink without drain board
610x460 mm bowl depth 200 mm
46 Cement plaster skirting up to 30 cm height, with cement mortar Sqm - 6.12 - - 6.12 250 1530
1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat
cement. 18 mm thick
47 Providing and fixing Ist quality ceramic glazed wall tiles conforming Sqm - 30.81 - - 30.81 1800 55458
to IS: 15622 (thickness to be specified by the manufacturer), of
approved make, in all colours, shades except burgundy, bottle
green, black of any size as approved by Engineer-in- Charge, in
skirting, risers of steps and dados, over 12 mm thick bed of
cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with
grey cement slurry @ 3.3kg per sqm, including pointing in white
cement mixed with pigment of matching shade complete
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
Sluice valve
5.01 42.1 Sluice valve - 300 mm dia 2 Nos 70000 140000
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
7 44.01 Design and construct Thrust Block made in 0.5 CUM 12000 6000
Reinforced Cement concrete (1:1.5:3), with
graded stone chips (20 mm nominal
size)including all the materials excluding
shuttering and reinforcement, as per technical
requirements. (Design and drawing will be
provided by NCC)
8 44.02 Providing and fixing shuttering for Thrust block 2 SQM 450 900
using approved stout props and thick hard
wood planks of approved thickness with
required bracing for concrete works curved or
straight including fitting fixing and striking out
after completion of works.
13 9.00 Electrically operated Sluice Valve PN 1.0 dia 1 Nos 150000 150000
100 mm
13.1 9.01 Electrically operated Sluice Valve PN 1.0 dia 1 Nos 150000 150000
150 mm
13.2 9.02 Electrically operated Sluice Valve PN 1.0 dia 1 Nos 200000 200000
200 mm
13.3 9.03 Check Valve PN 1.0 DPCV dia 100 mm 1 Nos 30000 30000
13.4 9.04 Check Valve PN 1.0 DPCV dia 150 mm 1 Nos 60000 60000
13.5 9.05 Check Valve PN 1.0 DPCV dia 200 mm 1 Nos 90000 90000
13.6 9.06 Dismantling Joint PN 1.0 dia 100 mm 2 Nos 4500 9000
13.7 9.07 Dismantling Joint PN 1.0 dia 150 mm 2 Nos 7000 14000
13.8 9.08 Dismantling Joint PN 1.0 dia 200 mm 2 Nos 9000 18000
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
18 EI Supply and installation of battery bank 12V, 200 4 Nos 37000 148000
Ah for auxiliary load .
19 EI Spply and fixing of lamp post of 20 W with solar 6 Nos 14500 87000
panel accessories
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
4.1 51.01 B.O.E. surface (50% of existing bricks to be 500 SQM 450 225000
reused)
4.2 51.02 Bituminous surface 120 SQM 1300 156000
4.3 51.03 Interlocking Road 200 SQM 1250 250000
4.4 51.04 C.C. Road 200 SQM 1250 250000
5 52.00 Provision for following types of Culvert crossing
along the alignment of pipe line complete as per
instructions of Engineer -in -charge. ( casing of
pipe is done by concreting)
5.1 52.01 Nala/Culvert Crossing ( width -3.5 m) upto Dia 2 Nos 10500 21000
300 mm
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
16 42.22 Supply of under ground sluice value type fire 1 Nos 30000 30000
hydrant consisting of 80 mm dia sluice valve,
80mm dia tail pieces, 80mm dia duck foot bend
and 80 mm dia standard makes iron coupling
with cap and etc. complete conforming to
latest/relevent I.S.specifications including all
taxes and insurance up to site of work and
lowering them into the trenches, fixing in
position and jointing them with pipelines and
testing etc. complete (including supply of
jointing materials and Valve fittings
etc.complete as per instructions of Engineer -in -
charge
NCC Limited
SWSM - BAREILLY-
U.P
Schedule of
Quantity for
Proposed Staff
Quarter
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
4.01 2x 2.5 sqmm + 1x1.5 sqmm as ECC Meter 300 220 66000 Wire rate:-
ANCHOR
4.02 2x4 sqmm + 1x2.5 sqmm as ECC Meter 300 300 90000 Wire rate:-
ANCHOR
4.03 2x10 sqmm + 1x6 sqmm as ECC Meter 100 600 60000 Wire rate:-
ANCHOR
5.0 Supplying and fixing of following sizes of medium class PVC
conduit along with the accessories in surface / recess including
cutting the wall and making good the same in case of recessed
conduit as required.
5.01 25 mm Meter 200 115 23000 Conduit &
accessories:-
AKG
5.02 32 mm Meter 50 165 8250 Conduit &
accessories:-
AKG
6.00 Supply & Fixing 240V, Modular Socket (2 Module) type fan Each 1 450 450 Wire rate:-
regulator (Step type) (Brand approved by EIC) on existing Modular ANCHOR
GI switch board with top cover plate incl. making necy.
connections etc.
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
7.00 Supplying & Fixing GI Modular Switch Board of the following sizes
complete top cover flushed in wall for housing the board after
cutting the brick wall incl. making earthing attachment, painting
and mending good damages to building works.
8.04 Supply & Fixing 240 V, 16 A, 3 pin Modular type plug socket Each 4 250 1000
(Brand approved by EIC), without plug top and switch, on existing
GI Modular type switch board with top cover plate and making
necy. connections with PVC Cu wire and earth continuity wire etc.
12.00 Supply and fixing of 1400mm sweep ceiling fan with double ball Each 1 2500 2500 Fan:- Crompton
bearing without conventional regulator, 3' long down rod and
canopy including giving connections etc., complete as specified
and directed by PM. Make Hevells velocity model or its equivalent.
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
NCC Limited
SWSM - BAREILLY-
U.P
Schedule of
Quantity for
Proposed Staff
Quarter
DISTRIBUTION BOARDS
Supplying and fixing double-door SPN MCB Distribution Board with
IP-42/43 protection,
14.0 concealed in wall after cutting the wall & mending good the
damages to original finish
incl. Inter connection with suitable size of copper wire and neutral
link & provision for earthing attachment.
14.01 2+8 way Each 1 1600 1600 Switch gear
Make:-
HAVELLS
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, 'C'
curve, miniature
circuit breaker suitable for inductive load of following poles in the
existing MCB DB
15.0 complete with connections, testing and commissioning etc. as
required.
15.01 Single pole Each 8 400 3200 Switch gear
Make:-
HAVELLS
15.02 Double pole Each 1 650 650 Switch gear
Make:-
HAVELLS
Supplying and fixing single pole, blanking plate in the existing MCB Each 1 20 20 Switch gear
15.03 DB complete etc. as required Make:-
HAVELLS
EARTHING
Material & labour for provision of Earthing complete with
galvanised steel earth plate
electrode 600x 600x 6mm thick, burried directly in ground (earth
pit not less than 1.5m
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
below ground level) with top edge of the plate not less than 1.5m
below normal
ground level, connected to galvanised earth lead 32 6mm by
means of bolts, nuts,
check nuts and washer of galvanised iron or steel and other end
connected to earthing
testing point including funnel with watering pipe of 20mm bore
medium grade
galvanised iron, wire mesh, charcoal or coke and common salt in Each
alternate layers of
16 0 15cm (compacted thickness) all around the earth electrode with 1 15000 15000
concrete earth pit in PCC (1:3:6) type C-1, 50 mm thick precast
RCC M20 nominal mix cover slab of size 450 x450mm reinforced
with 8mm dia TMT bar 10cm C/C and suitable handle of 10mm dia
round bar including necessary excavation, earth work in soft/loose
soil and disposal of spoil to a distance not exceeding 50 m and
necessary testing complete all as shown in Electrical Plate No 3 of
MES SSR part I complete as shown on drawing and as specified
and as directed at site by the PM.
16.01 Providing and laying 8 SWG G.I. wire in recess/surface for Meter 20 31 620
connection etc. complete as required.
TOTAL
NCC Limited
SWSM - BAREILLY-
U.P
Schedule of
Quantity for
Proposed Pump
House
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
Supply & Fixing 240 V, 6 A, 3 pin Modular type plug socket (Brand
approved by EIC)
with 6A Modular type switch, without plug top on 4 Module GI
Modular type switch
2.0 board with 3 Module top cover plate flushed in wall incl. S&F Each 4 1400 Modular item:-
switch board and cover plate and making necy. connections with Anchor
PVC Cu wire and earth continuity wire etc.
Supply & Fixing 240 V, 16 A, 3 pin Modular type plug socket
(Brand approved by EIC)
with 16A Modular type switch, without plug top on 4 Module GI
Modular type switch
3.0 board with top cover plate flushed in wall incl. S&F switch board Each 4 1600 6400 Modular item:-
and cover plate and making necy. connections with PVC Cu wire Anchor
and earth continuity wire etc.
Material and labour for Wiring for circuit/ submain wiring along with
earth wire of
4.0 FRLS PVC insulated copper conductor , single core cable in
surface/ recessed as required.
4.01 2x 2.5 sqmm + 1x1.5 sqmm as ECC Meter 200 220 44000 Wire rate:-
ANCHOR
4.02 2x4 sqmm + 1x2.5 sqmm as ECC Meter 150 300 45000 Wire rate:-
ANCHOR
4.03 2x10 sqmm + 1x6 sqmm as ECC Meter 100 600 60000 Wire rate:-
ANCHOR
Supplying and fixing of following sizes of medium class PVC
conduit along with the
5.0 accessories in surface / recess including cutting the wall and
making good the same in case of recessed conduit as required.
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
DISTRIBUTION BOARDS
Supplying and fixing double-door SPN MCB Distribution Board with
IP-42/43 protection,
11.0 concealed in wall after cutting the wall & mending good the
damages to original finish
incl. Inter connection with suitable size of copper wire and neutral
link & provision for earthing attachment.
11.01 2+4 way Each 1 900 900 Switch gear
Make:-
HAVELLS
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, 'C'
curve, miniature
circuit breaker suitable for inductive load of following poles in the
existing MCB DB
12.0 complete with connections, testing and commissioning etc. as
required.
NCC Limited
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
SWSM - BAREILLY-
U.P
Schedule of
Quantity for
Proposed Pump
House
EARTHING
13.0 Material & labour for provision of Earthing complete with Each 1 15000 15000
galvanised steel earth plate electrode 600x 600x 6mm thick,
burried directly in ground (earth pit not less than 1.5m below
ground level) with top edge of the plate not less than 1.5m below
normal ground level, connected to galvanised earth lead 32 6mm
by means of bolts, nuts, check nuts and washer of galvanised iron
or steel and other end connected to earthing testing point including
funnel with watering pipe of 20mm bore medium grade galvanised
iron, wire mesh, charcoal or coke and common salt in alternate
layers of 15cm (compacted thickness) all around the earth
electrode with concrete earth pit in PCC (1:3:6) type C-1, 50 mm
thick precast RCC M20 nominal mix cover slab of size 450
x450mm reinforced with 8mm dia TMT bar 10cm C/C and suitable
handle of 10mm dia round bar including necessary excavation,
earth work in soft/loose soil and disposal of spoil to a distance not
exceeding 50 m and necessary testing complete all as shown in
Electrical Plate No 3 of MES SSR part I complete as shown on
drawing and as specified and as directed at site by the PM.
13.01 Providing and laying 8 SWG G.I. wire in recess/surface for Meter 40 31 1240
connection etc. complete as required.
TOTAL
Construction of R.C.C. Over Head Tank of required capacity and staging above ground level with main
components
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
with approved cement, coarse sand and stone grit as per I.S.
11682 and I.S.456Seismic
effects and wind load should be taken into consideration as per
I.S. 1893 for earthquake
resistance and I.S. 875 part-III for wind load on structure and
including 1 M wide RCC
staircase, 1 m wide R.C.C. M30 balcony, M.S. ladder made of
50x50x6 mm angle section
and 20mm plain M.S. bars with hand rails of 20mm medium class
G.I. pipes, One
aluminum ladder inside the tank from top dome to bottom dome,
R.C.C. railing with
20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair
case, supported on
50x50x6mm M.S. angle section, spaced at intervals not more than
1.5m, Proper ventilator
at top dome in circular shape of 1.2 m dia, Water level indicator
fabricated with sensor
1.0 connecting to automation, Lightening conductor as per I.S.S.2309
or its latest amendments of latest electricity rules, consisting of
proper elevation rod with 5 or more fork points as prescribed in
ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm
size with locking arrangement, Supply, fixing, jointing of D.I. D/F
Pipes of appropriate size with D. I.D/F specials conforming to IS
8329/2000 as vertical pipes for inlet, outlet, overflow and washout
as per latest / relevant I.S. specifications with all jointing materials
for proper completion of work, Construction of bed blocks in 1:2:4
PCC with cement, coarse sand and approved stone grit ,
Construction of washout / overflow chamber and chambers for
sluice/ butter fly valves as per departmental type design and
drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000
for disposal of water from overflow and washout chamber to
suitable point outside the water works compound, Painting of all
concrete surface and steel pipe works with three coats of
approved cement and anti corrosive paints
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
Page 18
BOQ For
EXTERNAL
DEVELOPMENT
WORK near OHT
area for SWSM
water projects
4 27.00 Earth filling work for proper leveling of water cum 100 350 35000
work site, in accordance with the contour map
and Grid map of existing site enclosed
(Drawing no.D-1), including leveling, dressing,
excavation and filling of earth where necessary
and also including all labour, materials, T&P
etc.required for proper completion of works and
also including carriage of earth from within a
distance of about 8 km. from the site of works
as per instructions of Engineer -in - charge,
5 28.00 Provision for inside semicircular drain 200mm Rmt 100 650 65000
dia including supply of all materials, labour and
T & P etc. complete.
PAGE 3
PUMP ROOM ASSEMBLY, RISING MAIN AND BYPASS ARRANGEMENT FOR ONE VILLAGE
6 46.00 Water recharge Mechanism for rain water Sqm 8 1150 9200
harvesting with provision of rain water collection
pit within the water works campus as per
drawing attached and direction of EIC.
7 EI Ground Preparation with Manure and Area Sq.m 126 450 56700
Leveling for Plantation along the Boundary
8 EI Plantation of Sedar Plant including Nos 30 450 13500
Maintainence
EI Plantation of Flower Plants (Both Side of Nos 125 450 56250
9 Internal Roads) at 2m Interval including
Maintainence
10 EI Fixing of Display Board size(2 Mtx1Mt) supplied Nos 1 6500 6500
by NCC with required foundation work by
digging trench and concreteing the legs and
finishing as per direction of EIC
PAGE 3