0% found this document useful (0 votes)
43 views4 pages

Daily Report Homanzan 11 Feb 2024

The document provides a daily report from a ship during docking repair. It details 5 jobs for the day including lapping valves, cleaning bilges, renewing packings, and opening filter blowers and manholes. The report is signed by the superintendent and notes are provided.

Uploaded by

pak kong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views4 pages

Daily Report Homanzan 11 Feb 2024

The document provides a daily report from a ship during docking repair. It details 5 jobs for the day including lapping valves, cleaning bilges, renewing packings, and opening filter blowers and manholes. The report is signed by the superintendent and notes are provided.

Uploaded by

pak kong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Format No:

ABB - E28
Daily Report (during Docking Repair) Revision No. : 00
Laporan Harian (selama Docking Repair) Date of Issued :13/07/2020

Nama Kapal / Ship Name : MV.HOMANZAN Departemen / Department : DECK


Nama Galangan Kapal / Name of Shipyard : DOCK PANTAI LAMONGAN √ ENGINE
Hari & Tanggal / Day & Date : Minggu, 11 Februari 2024
Job Description Done by Working hours Progress Outstanding Request Catatan
No Uraian Pekerjaan Jam kerja Kemajuan Permintaan yg belum Remarks
Start Finish (%) terpenuhi (Photo, dll)
1 Technical meeting Crew Engine 7:30 8:00
2 Proses lapping valve sea chest & valve overboard
* Sea chest valve P/S of Main Engine Yard 8:00 12:00
* Sea chest valve Main Generator Yard 8:00 12:00
* Sea Chest valve Ballast Yard 8:00 12:00
* Sea chest valve Cargo compressor Yard 8:00 12:00
* Sea chest valve Air Condition cooling Yard 8:00 12:00
* Valve overboard Main Engine Yard 8:00 12:00
* Valve overboard Main Generator Yard 8:00 12:00
3 Continue cleaning bilge E/R portside ME area Yard 8:00 15:00
4 Buka filter blower T/C Main Engine Crew Engine 8:00 12:00
5 Renew packing Manhole MFO settling & MFO serv tk Crew Engine 8:00 12:00
& HSD service tk Crew Engine 8:00 12:00

Prepared by,
SUPERINTENDENT

Name : TANDUNDI
Catatan :
Dokumen dikirimkan ke Koordinator Docking Repair (cc. ke Dept.Teknik, Operatioanal & Safety)
Continue proses lapping valve sea chest & valve overboard

Continue cleaning bilge E/R portside Clean electric heater MFO settlink tk Buka cover mesh T/C ME
& MFO service tk

Re-Assy filter blower T/C Main Engine Brush manhole & renew packing manhole MFO settlink tk,
MFO service tk & HSD service tk