0% found this document useful (0 votes)
14 views2 pages

0001-240516 Ihsan SHB F-7

The document provides a quotation for windows and doors installation at a site location in Islamabad, Pakistan. It includes details of the materials, descriptions of the windows and doors, quantities, areas, rates and amounts. It also provides the payment schedule and terms of the quotation.

Uploaded by

walidisplay72
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views2 pages

0001-240516 Ihsan SHB F-7

The document provides a quotation for windows and doors installation at a site location in Islamabad, Pakistan. It includes details of the materials, descriptions of the windows and doors, quantities, areas, rates and amounts. It also provides the payment schedule and terms of the quotation.

Uploaded by

walidisplay72
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CLIENT NAME : IHSAN SHB QUOTATION DATE : 16-MAY-2024

CONTACT NO: 0300-5266989 QUOTATION NO: 0001-240516-ISB


SITE LOCATION: H-14 ST-42 F-7/1 TEAM LEADER:

CITY: ISB LEAD CREATED BY:

QUOTATION BY: DISPLAY LEAD GENERATED BY:


QUOTATION TYPE: ROUGH SURVEYOR NAME:
EXPECTED DELIVERY IN: 4 TO 6 WEEKS NEGOTIATOR:

QUOTATION VALIDITY 3-DAYS


PROFILE TYPE: PRULINE
MATERIAL DETAILS PROFILE COLOUR: WHITE

HADWARE TYPE: CRECENT LOCK,ROLLER

DESCRIPTION NO OF UNITS SQ.FT AREA RATE PER SQ.FT AMOUNT

WINDOWS
3' X 4' SLIDING WINDOWS WITH DOUBLE CLEAR GLASS WITH
DECORATIVE BARS INCLUDING INSTALLATION CHARGES 1 12 2750 33,000

2' X 2' SLIDING WINDOWS WITH SINGLE CLEAR GLASS INCLUDING


INSTALLATION CHARGES 1 4 4500 18,000

CARRIAGE CHARGES (ONE TIME) FREE

Total 51,000
DOORS

SINGLE LEAF DOOR HALF PANAL HALF CLEAR SINGLE GLASS


INCLUDING INSTALLATION 1 21 1860 39,060

Total 39,060
Grand Total 90,000

CARRIAGE IF NOT CHARGED IN THE QUOTE, SHALL BE PAID BY CLIENT AS PER ACTUAL COST OF
DELIVERY.
PAYMENT SCHEDULE DATE AMOUNT
ADVANCE (80% OF AMOUNT) 72,000
BEFORE DELIVERY (15% OF AMOUNT) 13,500
AFTER INSTALATION (05% OF AMOUNT) 4,500
STANDARD DILIVERY TIME FOR SINGLE GLAZED WINDOWS IS 4 WEEKS AND DOUBLE GLAZED/TEMPERED GLASS WORK
DELIVERY TIME IS MINIMUM 6 WEEKS (OR AS OTHERWISE AGREED).

DELIVERY TIME IS SUBJECT TO ABOVE PAYMENT SCHEDULE AND SITE READYNESS FOR FINAL MEASUREMENT OF THE UNITS
QUOTED ABOVE. IF THERE ARE SOME UNITS PENDING FOR FINAL MEASUREMENT, THOSE UNITS WILL NOT BE DELIVERED ON
SPECIFIED DELIVERY DATE OF PROJECT.

FOR OUT STATION PROJECTS, INSTALLATION STAFF ACCOMODATION & FOOD REQUIREMENTS TO BE MET BY CLIENT.

ANY WINDOW CLEANING OR COVERING JOB ( IF REQUIRED BY CLIENT) SHALL BE CHARGED @ RS 20/SQFT

ANY CHANGES IN DESIGN/SIZES/NUMBER/COLOR GAUGE OR ADDITION IN SIGNED WORK ORDER SHALL BE CHARGED IN
ACCORDANCE WITH THE CHANGE PROPOSED

FOR SITE ACCESS IF LEDDER/SCUFFHLDING OR ANY EQUIPMENT IS REQUIRED, THAT SHALL BE CHARGED PROVIDED BY THE
CLIENT.
ABOVE QUOTED RATES DOES NOT INCLUDE ANY FEDERAL OR PROVINCIAL TAXES. NO WITH HOLDING TAX SHALL BE
WITHHELD BY CLIENT.

Team Leader _____________________ Accounts _____________________

Customer Sign: _____________________


SNO DESCRIPTION LOCATION WIDTH(inch) HEIGHT(inch) WIDTH(ft) HEIGHT(ft) RFT ACT AREA Rate/ Amount/ Avg.
Window Window Rate
1 2PSL KITCHEN 3.0 4.0 14 12 1150 16100
1341.6667

1 2PSL KITCHEN 2.0 2.0 8 4 1150 9200


2300

HALF PANAL
1 HALF GLASS KITCHEN 3.0 7.0 20 21 1300 26000

1238.0952

You might also like