0% found this document useful (0 votes)
14 views

Assignment 2 SEP

The document provides instructions for Assignment 2 of a software engineering course. Students must model a medium-sized software system based on their SRS document from Assignment 1 using various diagrams including use case, sequence, activity, class, and process context diagrams.

Uploaded by

roman naeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

Assignment 2 SEP

The document provides instructions for Assignment 2 of a software engineering course. Students must model a medium-sized software system based on their SRS document from Assignment 1 using various diagrams including use case, sequence, activity, class, and process context diagrams.

Uploaded by

roman naeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

UIT University

ST-13, Block 7, Gulshan-e-Iqbal, Abul Hasan Isphahani Road


Off Main University Road, Karachi – 75300

Department of Computer Science

Assignment - 2 (CSE-101) Software Engineering

CLO-2: Apply the system modeling techniques to model a medium size software system

Submission Deadline: 6th June 2024


Max Marks: 10

General Instructions:

 Your Assignment File must have Title page with Course Title, Assignment Number, Group Id
and Group Member Details
 Your work should be original, not copied from internet or any other resource
 You can discuss with class fellows and research from internet but do not copy paste.
 Assignment should be submitted before due date.
 Use simple Font Calibiri/Times new roman or arial.
 Heading must be bold.

Task : You have completed your SRS Documents in Assignment-1, Now in this assignment you have
to model the System as per your project SRS document.

Your Team required to following diagrams

SNO Diagram Quantity Marks


1 Process context 1 1
2 Activity Diagram 4 1
3 Use Case Diagram 10 5
4 Sequence Diagram 4 2
5 Class Diagram 1 1

Assignment Instructions

This assignment is the follow/leading assignment of Assignment# 1, So groups will be the same as in
Assignment 1.

This is a Group based assignment

 There will be four Members in each group


 Members will be categorized in Four Types
o Software Engineer / Requirement Engineer
o Software House Manager
o Client Manager
o System End User
 All diagrams will be created as per SRS.
 Use any tool like lucidchart/Smart Draw /Visual Paradigm etc
 Hand made diagrams will not be accepted.
Software Projects.

1. Plant Protection system for Forest Department


2. Clinic Management System
3. Pharmacy Management System
4. Restaurant Management System
5. Peoples Bus Service Management System
6. Polio Vaccine Management System
7. Car Insurance Management System
8. Rental Vehicle Management System
9. Motor Garage Management
10. User Car Showroom management System
11. Electronics Shop Management System
12. Web Publishing System
13. E-Store Management
14. Grain Warehouse Management system
15. Cattle form Management System

Note: from above given tasks Software Projects each project can be selected by only group.

You might also like