ESR 41 OSTIA 310KL 5m - Continuity Analysis
ESR 41 OSTIA 310KL 5m - Continuity Analysis
DATE
PROJECT: CUTTACK
32126-WSE-ESR-CV-DD-41 29-Jun-22
DESIGNED CHECKED
STRUCTURE: ESR 41 OSTIA 310KL 5m
AS MJ
For (B3 Middle beam, Conical wall) For ( B2 Bottom beam, Bottom dome)
radius of Beam = 4.70 m Width of ring beam = 0.6 m
Width of ring beam = 0.4 m Depth of ring beam = 0.90 m
Depth of ring beam = 0.3 m Thk of bottom dome = 0.3 m
Hoop tension at top OF Conical wall = 313.76 kN Radius of bottom dome R0= 3.101 m
Hoop tension at bottom Conical wall = 313.76 kN Central rise of dome = 1.2 m
Dia of conical wall at top = 9.20 m Theta θ = 79.59
Thk of conical wall = 0.3 m cos theta = 0.18
Dia of conical wall at bottom = 6.10 m sin theta = 0.98
Total vertical load on middle ring beam = 46.41 kN/m Net force = 26.05 kN/m
angle Φ = 45.00 degree
Vertical load on conical wall = 181.39 kN/m
inclined length of conical wall = 2.05 m
DOCUMENT NO. DATE
PROJECT: CUTTACK
32126-WSE-ESR-CV-DD-41 29-Jun-22
DESIGNED CHECKED
STRUCTURE: ESR 41 OSTIA 310KL 5m
AS MJ
(1) Effects of continuity at the junction of top-dome, ring beam (B1) and cylindrical portion:
(a) Membrane deformations and stiffnesses:
Solve Eq 1 and 2
ψ = net rotation = 1.22413465071408E-08
δ = net displacement = 2.8720169172022E-08
Member M (kN-m)
Dome =((-358274120683.19*0)+4616.577067)+((-20658442158.78*0)+364.37) 1.874
Beam =912.87*0 0.000
Wall =((50655.71*0)+-1.87)+(-70272.84*0) -1.874
Sum =1.874+0+-1.874 0.000
Member H (kN)
Dome =((-20658442158.78*0)+266.2)+((-3039795317.73*0)+53.62) -20.38
Beam =121716.12*0 0.00
Wall =((-70272.84*0)+2.6)+(194973.93*0) 2.60
Sum =-20.38+0+2.6 -17.77
Member Net hoop tension(kN/m)
DOCUMENT NO. DATE
PROJECT: CUTTACK
32126-WSE-ESR-CV-DD-41 29-Jun-22
DESIGNED CHECKED
STRUCTURE: ESR 41 OSTIA 310KL 5m
AS MJ
Dome =-((0*27386.13*1000)/(9/2))*125 -21.85
Beam =-((0*27386.13*1000)/(9/2))*(0.3*0.3) -0.02
Wall =-((0*27386.13*1000)/(9/2))*0.2 -0.03
(2) Effects of Continuity at the Junction of Cylindrical Portion, Beam B3 and Conical Dome:
(a) Membrane Deformations and Stiffnesses
DOCUMENT NO. DATE
PROJECT: CUTTACK
32126-WSE-ESR-CV-DD-41 29-Jun-22
DESIGNED CHECKED
STRUCTURE: ESR 41 OSTIA 310KL 5m
AS MJ
(i) Ring Beam B3
Width (m) = 0.40
Depth (m) = 0.30
Radial thrust to cause unit outward deflection, H(kN/m) = 148770.27 H = Ebd/R2
Radial moment to cause unit rotation of beam, M (kN-m/m) = 1115.78 M = Ebd3/12R2
(ii) Conical dome:
Hoop tension,top,T1(kN) = 313.76
Hoop tension,bottom,T1(kN) = 313.76
Outward defln δ,top(m) = 0.0001757 =(HTTop X DTop)/(E X Thk X 2)
Outward defln δ0,bottom(m)= 0.0001165 =(HTBot X DBot)/(E X Thk X 2)
Meridional thrust,T2(kN) = 65.63 T2Top=W1 X sec Φ
Slope at top edges,ψ(rad.) = -5.98185853406531E-05 Ψ = (-tanΦ/Et)*(2T2(top)+T1(top))
Meridional thrust,T2(kN)= 256.52 T2Bot=W2 X secΦ
Slope,bottom edges,ψ= -0.000110 Ψ = (-tanΦ/Et)*(2T2(bot)+T1(bot))
Inclined length of conical wall, l (m) = 2.05
L' (m) = 4.31 L' = RcosecΦ
L (m) = 6.36 L = l+L'
Δ= 3.40 Δ = (12*cot2Φ/t2)0.25
Solve Eq 3 and 4
ψ = net rotation = -4.02060023459335E-05
δ = net displacement = -0.000204551162168332
Member M (kN-m)
Wall =((50655.71*-0.00004)+-1.87)+((70272.84*-0.000205)+11.43) -6.85
Beam B3 =1115.78*-0.00004 -0.04
Coni.dome =((118854*-0.00004)+7.11)+((-158127.64*-0.000205)+-27.78) 6.90
Member H (kN)
Wall =((70272.84*-0.00004)+-2.6)+((194973.93*-0.000205)+31.72) -13.59
Beam B3 =(148770.27*-0.000205) -30.43
Coni.dome =((-158127.64*-0.00004)+-9.46)+((432501.66*-0.000205)+75.98) -15.59
Member Net hoop tens(kN/m)
Wall =-((-0.000205*27386.13*1000)/(9/2))*0.2 248.97
Beam B3 =-((-0.000205*27386.13*1000)/(9/2))*(0.4*0.3) 149.38
Coni.dome =-((-0.000205*27386.13*1000)/(9/2))*0.3 373.46
Design of Tank Wall Design Ring Beam RB2 (Middle ring beam)
Factored Hoop tension at Bottom = 373.46 kN Factored Hoop tension = 224.07 kN
Hoop Steel req= 933.64 mm2 Ast req = 560.19 mm2
Providing on both face = 466.82 mm2 Provide 12 mm 8 Nos 0 mm 0 Nos
Provide 12 mm 125 mm C/C 12 mm 125 mm C/C Avg spacing 36.25
Avg spacing 62.5 Ast Provided = 904.78 mm2 OK
Ast Provided = 1809.56 mm2 OK
BM 10.278 kN m BM = 0.07 kN m
Ast req 166.21 mm2 Ast req = 0.25 mm2
DOCUMENT NO. DATE
PROJECT: CUTTACK
32126-WSE-ESR-CV-DD-41 29-Jun-22
DESIGNED CHECKED
STRUCTURE: ESR 41 OSTIA 310KL 5m
AS MJ
Provide 10 mm 200 mm C/C 0 mm 200 mm C/C Provide 12 mm 8 Nos 0 mm 0 Nos
Ast Provided = 392.70 mm2 OK Ast Provided = 904.78 mm2 OK
Avg spacing 200 Avg spacing 155.00
Design Conical dome
Factored Hoop tension at top 560.19 kN BM = 10.35 kN m
Ast req = 1400.47 mm 2
Ast req 97.77 mm2
Providing on both face = 700.23 mm2 Provide 16 mm 200 mm C/C 0 mm 200 mm C/C
Provide 16 mm 175 mm C/C 16 mm 175 mm C/C Ast Provided = 1005.31 mm2 OK
Avg spacing 87.5 Avg spacing 200
Ast Provided = 2297.85 mm2 OK
Solve Eq 5 and 6
ψ = net rotation = -5.00763550781109E-05
δ = net displacement = -2.26271966019824E-05
DOCUMENT NO. DATE
PROJECT: CUTTACK
32126-WSE-ESR-CV-DD-41 29-Jun-22
DESIGNED CHECKED
STRUCTURE: ESR 41 OSTIA 310KL 5m
AS MJ
Member M (kN-m)
Conical dome =((136654.6*-0.00005)+15.07)+((218897.35*-0.000023)+25.5) 28.77
Beam B2 =(429228.43*-0.00005)+(-715380.71*-0.000023) -5.31
Bottom dome =((168195.21*-0.00005)+1)+((238459.42*-0.000023)+-10.65) -23.46
Member H (kN)
Conical dome =((218897.35*-0.00005)+24.14)+((725079.74*-0.000023)+84.46) 81.23
Beam B2 =(-715380.71*-0.00005)+(-0.000023*1589734.92) -0.15
Bottom dome =((238459.42*-0.00005)+1.42)+((661634.47*-0.000023)+-29.54) -55.03
Member Net hoop tension(kN/m)
Conical dome =-((-0.000023*27386.13*1000)/(6.1/2))*0.3 60.95
Beam B2 Negligible
Bottom dome =-((-0.000023*27386.13*1000)/(6.1/2))*0.3 60.95