RCC Detailing for Toilet Block Building

The document provides details on the beam reinforcement schedule for the third level of a building, including beam sizes, top and bottom reinforcement, and shear stirrups.

Uploaded by

krhimanshu0505
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views2 pages

RCC Detailing for Toilet Block Building

The document provides details on the beam reinforcement schedule for the third level of a building, including beam sizes, top and bottom reinforcement, and shear stirrups.

Uploaded by

krhimanshu0505
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

UPTO (2D) OR UPTO (2D) OR

FIRST SLAB BEAM LEVEL SCHEDULE (M25 : Fe500) (LEVEL: 3 m)


UPTO (2D) OR REMAINING AS L/4 WHICHEVER UPTO (2D) OR REMAINING AS L/4 WHICHEVER
BOTTOM REINFORCEMENT L/4 WHICHEVER
1 B1 2 B2 3 BEAM
SIZE TOP REINFORCEMENT
SHEAR STIRRUPS REMARKS
L/4 WHICHEVER
IS MAXIMUM AS
PER SCHEDULE IS MAXIMUM AS
PER SCHEDULE IS MAXIMUM AS
PER SCHEDULE IS MAXIMUM AS
PER SCHEDULE
NUMBERS B D STRAIGHT CURTAILED STRAIGHT EXTRA EXTRA PER SCHEDULE PER SCHEDULE
LEFT SUPP RIGHT SUPP

B1 230 380 2-T12 1-T12 2-T12 1-T10 1-T12 2L-T8@75,200,75 C/C -

-
LD+10Db
B2 230 380 2-T12 1-T12 2-T12 1-T12 1-T10 2L-T8@75,200,75 C/C

B3 230 380 2-T12 1-T12 2-T12 1-T10 1-T12 2L-T8@75,200,75 C/C -

S1 S1 B4

B5
230

230
380

380
2-T12

2-T12
1-T12

1-T12
2-T12

2-T12
1-T12

1-T10
1-T10

1-T10
2L-T8@75,200,75 C/C

2L-T8@75,200,75 C/C
-

-
L1/7 L1/7 L2/7 L2/7

B7
B5

B6
B6 230 380 2-T12 1-T12 2-T12 1-T12 1-T12 2L-T8@75,200,75 C/C - COL. COL. COL.
B7 230 380 2-T12 1-T12 2-T12 1-T10 1-T10 2L-T8@75,200,75 C/C -

SCHEDULE OF SLAB [AT FIRST LEVEL] TYPICAL DETAILS SHOWING STIRRUPS SPACING.
REINFORCEMENT ALONG
[ WHERE (D) = BEAM DEPTH ]
SLAB TYPE SLAB Thk. REMARK

4 B3 5 B4 6
SHORT SPAN LONG SPAN L1/3
EXTRA AT EXTRA AT EXTRA AT
T8 @ 125 C/C T8 @ 125 C/C TOP BARS
S1 125 TWO WAY CONTINUOUS A CONTINUOUS CONTINUOUS
ALT BENT UP ALT BENT UP SUPPORT. SUPPORT. SUPPORT.

FIRST SLAB LEVEL PLAN PLINTNH BEAM LEVEL SCHEDULE (M25 : Fe500) (LEVEL: 0 m)
SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
BEAM SHEAR STIRRUPS SFR REMARKS
NUMBERS B D STRAIGHT CURTAILED EXTRA EXTRA STRAIGHT EXTRA EXTRA L1/7 L2/7

PB1 1 PB2 2 PB3 3 PB4 LEFT RIGHT LEFT SUPP RIGHT SUPP A BOTTOM BARS
SPACER BAR (PIN) OF MAX.
BOTTOM CURTAILED
PB1 230 380 2-T12 - - - 3-T12 - - 5-2L-T8@100 C/C - CANTILEVERED BAR DIA. OR 16MM DIA.
COL. COL.
PB2 230 380 2-T12 - - - 2-T12 1-T12 - 2L-T8@75,200,75 C/C - -

PB3 230 380 2-T12 - - - 2-T12 - 1-T12 2L-T8@75,200,75 C/C - -

PB4 230 380 2-T12 - - - 3-T12 - - 2L-T8@75,200,75 C/C - CANTILEVERED

PB5 230 300 2-T12 - - - 2-T10 - - 7-2L-T8@175 C/C - -


TYPICAL BEAM INTERIOR-SPAN DETAILS
PB6 230 300 2-T12 - - - 2-T10 - - 7-2L-T8@175 C/C - -
PB12

PB13
PB11

PB15
- - - - - 5-2L-T8@100 C/C -

PB14
PB7 230 380 2-T12 4-T12 CANTILEVERED L1/4 L2/4 L2/4 L3/4

SLAB THK
PB8 230 380 2-T12 - - - 2-T12 2-T12 - 2L-T8@75,200,75 C/C - -

PB5 PB6 PB9 230 380 2-T12 - - - 2-T12 - 2-T12 2L-T8@75,200,75 C/C - -

PB10 230 380 2-T12 - - - 4-T12 - - 2L-T8@75,200,75 C/C - CANTILEVERED

PB11 230 300 2-T12 - - - 2-T12 - - 2L-T8@75,200,75 C/C - -


L1/7 L1/5 L2/5 L2/5 L3/5
PB12 230 380 2-T12 - - - 2-T12 - - 2L-T8@75,200,75 C/C - -
BEAM BEAM BEAM
PB13 230 380 2-T12 - - - 2-T12 - - 2L-T8@75,200,75 C/C - - CLEAR SPAN L1 CLEAR SPAN L2 CLEAR
- - - - - - -
SPAN L3
PB14 230 380 2-T12 2-T12 2L-T8@75,200,75 C/C

PB15 230 380 2-T12 - - - 2-T12 - - 2L-T8@75,200,75 C/C - -


TYPICAL BAR BENDING PROCEDURE FOR SLABS
PB7 4 PB8
5 PB9 6 PB10
COLUMN AND FOOTING SCHEDULE
(SCALE 1:25)
M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm

PLINTH BEAM LEVEL PLAN 0M


TERRACE ROOF SLAB
TO

300

300

300

300

300

300
3M
1 2 3
300 300 300 300 300 300 GROUND PLINTH
300X300 300X300 300X300 8-T12
T12

8-T12
T12

8-T12
T12

8-T12
T12

8-T12
T12

8-T12
T12

G.L.
M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm M25 : Fe500 , COVER = 40mm

-1.5 M

TO

300

300

300

300

300

300
0M
300 T12
300 T12
300 T12
300 T12
300 T12
300 T12
LINE DIAGRAM
8-T12 8-T12 8-T12 8-T12 8-T12 8-T12 TOP BARS
COLUMN MARKED C1 C2 C3 C4 C5 C6
PINS
SHORT DIR T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C EXTRA BARS AT CONT.
M25:Fe500

LONG DIR T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C STIRRUPS NOTES :
FOOTING 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE AS PER IS:456-2000
D,d 350 350 350 350 350 350 BOTTOM CURTAILED BARS 2. ALL CONCRETE SHALL BE MACHINE MIXED, MECHANICALLY VIBRATED AND
PINS PROPERLY CURED.
SIZE 900 x 900 1000 x 1000 900 x 900 1000 x 1000 1000 x 1000 1000 x 1000 3. Ø MILD STEEL REINFORCEMENT - Fe= 250 N/mm2
BOTTOM CONT. BARS TOR STEEL REINFORCEMENT - Fe= 500 N/mm2
M15

P.C.C 150 THK 1200 x 1200 1300 x 1300 1200 x 1200 1300 x 1300 1300 x 1300 1300 x 1300
REINFORCEMENT SHALL CONFIRM TO DUCTILITY REQUIREMENTS OF IS: 13920
4. LAPPING / ANCHORAGE / DEVELOPEMENT LENGTH (Ld)
FOOTING MARKED F1 F2 F3 F4 F5 F6 SECTION AT A-A FOR A) BEAM & SLAB 60 x BAR DIAMETER
B) COLUMN 50 x BAR DIAMETER
LAPS SHALL BE STAGGERED AND NOT MORE THAN 50 % BARS TO BE LAPPED
PROVIDE LINKS T8 @
4 5 6 100 C/C AT JUNCTION OF
AT ANY SECTION. ANY DEVIATION IN LAP LOCATIONS SHALL BE GOT APPROVED
COLUMN AND BEAMS FIRST SLAB LEVEL FROM OUR OFFICE.
300X300 300X300 300X300 5. BEAMS OF WIDTH 6" (150mm) PROVIDE ONLY 2 BARS IN ONE LAYER AND
BEAMS OF WIDTH 9" (230mm) PROVIDE ONLY 3 BARS IN ONE LAYER AND
NOMINAL COVER TO REINFORCEMENT MILD
I FOOTINGS 50
SLAB LEVEL BEAM
FOUNDATION LEVEL PLAN CONFINING LINKS
T8 @ 70 C/C II
COLUMNS
(TO LINKS OF COLUMN)
40

iii SLABS 20

H =[HEIGHT FROM PLINTH LEVEL


BEAMS

LENGTH
iv

TO SLAB BEAM BOTTOM]


20

LAP
(TO STIRRUPS OF BEAM)
H/4 LINKS v LIFT WALLS 40
T8 @ 100C/C
H/2 LINKS
T8 @ 150C/C FOR MAIN REINF. UP TO 12mm DIA. BAR FOR MILD EXPOSURE THE NOMINAL
TOP BARS
NOTES - COVER MAY BE REDUCED BY 5mm FOR SLABS AND BEAMS ONLY.
EXTRA AT ENDS SUPPORT 1) FOUNDATION TO REST ON 7. BEAMS WITH DEPTH MORE THAN 750mm, PROVIDE SIDE-FACE REINFORCEMENT.
SOFT STRATA
8. FOR CANTILEVER BEAM TOP REINFORCEMENT TO BE ANCHORED BEHIND FOR
H/2

2) S.B.C. OF SOIL 20 T/ SQ. MT. (AS PER SBC REPORT)


CONFINING LINKS
'60 x BAR DIAMETER' OR SPAN OF CANTILEVER WHICHEVER IS GREATER.
T8 @ 70 C/C
3) FOUNDATION STRATA SHOULD BE APPROVED FROM OUR 9. BAR BENDING SCHOULD BE AS PER DETAILS GIVEN.
LD+10Db OFFICE BEFORE LAYING OF P.C.C. 10. MAXIMUM ALLOWABLE HEIGHT OF COLUMN WITHOUT ANY BRACER OR TIE
PLINTH LEVEL
4) BUILDING IS DESIGNED FOR GROUND UPPER FLOORS ONLY.
PROVIDE T8 LINKS @ WIDTH OF COLUMN ALLOWABLE HEIGHT WIDTH OF COLUMN ALLOWABLE HEIGHT
TIE BEAM 5) CONCRETE [AS PER DESIGN MIX] UNLESS SPECIFIED
100C/C AT JUNCTION OF

SITE CONDITION
8'-6"[2600 MM] 4] 12" [300 MM]

HEIGHT AS PER
COLUMN AND BEAMS
1] 6" [ 150 MM ] 16'-9"[5100 MM]
6) BASIC REFERENCE CODE IS IS 456-2000 2] 8" [ 200 MM ] 11'-3"[3400 MM] 5] 15" [380 MM] 21'-3"[6500 MM]
PROVIDE LINKS 7) REINFORCEMENT TOR STEEL 550 Fe= N/mm2
BOTTOM BARS T8 @ 150 C/C 3] 9" [ 230 MM ] 13'-3"[4000 MM] 6] 18" [450 MM] 25'-3"[7700 MM]
PROVIDE 4 NOS 8) GRADE OF CONCRETE: ALL COLUMNS SHOULD BE TIED IN BOTH DIRECTIONS BY TIE BEAMS/PLINTH
LINKS T8 @ 70 C/C
COL. i) FOOTINGS= M25 ii) COLUMNS = M25 BEAMS AT GROUND LEVEL/PLINTH LEVEL, EVEN IF HEIGHT OF COLUMNS IS
BELOW TOP OF
WITHIN MAXIMUM ALLOWABLE HEIGHT LIMITS.
FOOTING

FOOTING [TYPICAL]
DEPTH

LD LD iii) BEAMS= M25 iV) SLABS = M25 11. AT ANY LEVEL WHERE COLUMN SIZE GETS REDUCED IN EITHER DIMENSIONS,
FOR ALL FOOTINGS FOOTING
TIE OR PLINTH BEAMS ARE ESSENTIAL.
300 UPTO T16 DIA 9) CONSTANT COLUMN 12. IF FOOTINGS OVERLAP EACH OTHER, NECESSARY REVISION SHOULD BE
BAR & 450 ABOVE OBTAINED FROM OUR OFFICE.
3
T16 DIA BAR 10) MAX. DENSITY OF BRICK MASONARY ASSUMED=2000KG/M
150THK. P.C.C. 13. ANY R.C.C. WORK PRIOR TO CASTING HAS TO BE CHECKED AND CONFIRMED
50

TYPICAL BEAM END-SPAN DETAILS 600 THK SOLING INCLUDING 11) WHEN BOTTOMS OF TWO ADJACENT FOOTINGS ARE
BY OUR OFFICE.
HAND PACKING WITH MAXIMUM 14. COLUMNS ORIENTATION AS PER ARCHITECTURAL CENTER LINE PLAN.
AGGREGATE SIZE OF 150 MM NOT AT SAME LEVEL. THE LEVEL DIFFERENCE SHALL 15. DESIGN IS VALID FOR NUMBER OF FLOORS AS INDICATED IN THE DRAWING.
BE MADE-UP BY P.C.C [M15] . 16. SHUTTERING SHALL NOT BE REMOVED BEFORE THE PERIOD MENTIONED
SOFT STRATA BELOW FOR OPC IF AMBIENT TEMPERATURE DOES NOT FALL BELOW 15°C &
MAXIMUM LEVEL DIFFERENCE IS ALLOWED EQUAL TO
ADEQUATE CURING IS DONE.:
EDGE TO EDGE DISTANCE BETWEEN TWO FOOTINGS.
TYPICAL SECTION THROUGH FOOTING & COLUMN A] PROPS TO SLABS: 1) SPANNING UP TO 3.5M = 7 DAYS
2) SPANNING OVER 3.5M = 14 DAYS
B] PROPS TO BEAMS AND ALL CANTILEVERS = 21 DAYS

Client: Authority Engineer: Proof Checking Consultant: Project: TITLE:


DHRUV CONSULTANCY SERVICES LTD RANCON CONSULTANTS RCC DETAILING OF TOILET BLOCK BUILDING
NATIONAL HIGHWAYS AUTHORITY 501, PUJIT PLAZA , SECTOR- 11 , C.B.D. BELAPUR,NAVI MUMBAI- 400614 416, PRABHAT CENTER ANNEXE, REHABILITATION & UP-GRADATION TO FOUR LANING
OF INDIA Website: www.dhurvconsultancy.in
JV With
PLOT NO. 7, SECTOR-1A, CBD
CONFIGURATION OF THE HIGHWAY STARTING FROM JUNCTION
G-5 & 6, Sector 10, Dwarka, New Delhi. BELAPUR, NAVI MUMBAI- 400 614 DRAWN SSS AUTHORIZED SIGNATURE SCALE A2 @ 1: 2000
Yongma Engineering Co., Ltd. TeL:- +91 7021826695 (DESIGN DIRECTOR)
EPC Contractor: SHELKE CONSTRUCTION PRIVATE LIMITED
Associate with Email:- [email protected] / WITH NH-65 NEAR PATAS, VASUNDE PHATA, UNDEWADI KADE
[email protected] DESIGN TVP DATE 04_10_2022
OFFICE NO 101,102 ,1ST FLOOR, Cho & Kim Engineering Pvt. Ltd. Safety Consultant: PATHAR NH-965G AND PARTLY BARAMATI BYPASS IN THE
SUYOG FUSION APT,DHOLE PATIL ROAD JAIMAN CONSTRUCTION AND REV. DATE DESCRIPTION DRAWN DESIGN APPROVED
Design Consultant:
PUNE-411001 INNOVISION STUDIOS CONSULTANTS LLP STATE OF MAHARASHTRA ON EPC MODE. (FROM KM 0/000 TO REVISIONS
APPROVED ASD Rev. R0
JV WITH 15 A, RISHI COLONY,TONK ROAD,
KALYAN INFRASTRUCTURE LTD &
207, PUJIT PLAZA, OPPOSITE K STAR HOTEL,
JAIPUR,RAJASTHAN 302015 KM 41/369, TOTAL LENGTH = 41.369 KM) DRG No :: PB/MIS/920
SECTOR 11, CBD BELAPUR, NAVI MUMBAI 400 614.
P.C.C.COPING

GROUND FLOOR TOP 1.20m GROUND FLOOR TOP


1.20m PARAPET WALL
LVL+3.45M LVL+3.45m

R.C.C.BEAM

R.C.C.SLAB

DOOR
3.90m 3.0m
2.10m
BRICK WALL

PLINTH PLINTH GENTS LADIES


LVL+0.45M
- LVL+0.45m
- TOILET TOILET
GROUND GROUND P.C.C.BED
LVL+0.00M
- LVL+0.00m
-
GROUND BEAM

FRONT SIDE ELEVATION SECTION A-A


wc

WALL THICKNESS
0.23m

1.20m WC WC WC WC
1.3mx1.3m 1.3mx1.3m 1.3mx1.3m 1.3mx1.3m 1.20m

2.7m
WALL THICKNESS
0.23m
2.2m
GENTS TOILET LADIES TOILET
A 3.0m A
meter

1.3m

TOILET BLOCK

Client: Authority Engineer: Proof Checking Consultant: Project: TITLE:


DHRUV CONSULTANCY SERVICES LTD RANCON CONSULTANTS TOILET BLOCK SECTIONAL ELEVATION
NATIONAL HIGHWAYS AUTHORITY 501, PUJIT PLAZA , SECTOR- 11 , C.B.D. BELAPUR,NAVI MUMBAI- 400614 416, PRABHAT CENTER ANNEXE, REHABILITATION & UP-GRADATION TO FOUR LANING
OF INDIA Website: www.dhurvconsultancy.in
JV With
PLOT NO. 7, SECTOR-1A, CBD
CONFIGURATION OF THE HIGHWAY STARTING FROM JUNCTION
G-5 & 6, Sector 10, Dwarka, New Delhi. BELAPUR, NAVI MUMBAI- 400 614 DRAWN SSS AUTHORIZED SIGNATURE SCALE A2 @ 1: 2000
Yongma Engineering Co., Ltd. TeL:- +91 7021826695 (DESIGN DIRECTOR)
EPC Contractor: SHELKE CONSTRUCTION PRIVATE LIMITED
Associate with Email:- [email protected] / WITH NH-65 NEAR PATAS, VASUNDE PHATA, UNDEWADI KADE
[email protected] DESIGN TVP DATE 04_10_2022
OFFICE NO 101,102 ,1ST FLOOR, Cho & Kim Engineering Pvt. Ltd. Safety Consultant: PATHAR NH-965G AND PARTLY BARAMATI BYPASS IN THE
SUYOG FUSION APT,DHOLE PATIL ROAD JAIMAN CONSTRUCTION AND REV. DATE DESCRIPTION DRAWN DESIGN APPROVED
Design Consultant:
PUNE-411001 INNOVISION STUDIOS CONSULTANTS LLP STATE OF MAHARASHTRA ON EPC MODE. (FROM KM 0/000 TO REVISIONS
APPROVED ASD Rev. R0
JV WITH 15 A, RISHI COLONY,TONK ROAD,
KALYAN INFRASTRUCTURE LTD &
207, PUJIT PLAZA, OPPOSITE K STAR HOTEL,
JAIPUR,RAJASTHAN 302015 KM 41/369, TOTAL LENGTH = 41.369 KM) DRG No :: PB/MIS/921