0% found this document useful (0 votes)
289 views61 pages

MCC Company Profile

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views61 pages

MCC Company Profile

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 61

CONTENT

1. COMPANY INTRODUCTION

2. WORLD RANKING DESCRIPTION

3. COMPANY QUALIFICATIONS

4. GLOBAL LAYOUT MAP

5. CORE COMPETENCE & SERVICES

6. PROJECT PERFORMANCE
BRIEF INTRODUCTION
• A large-sized state-owned enterprise under the supervision
of SASAC.
• Listed on Shanghai and HKG stock exchanges in 2009.
• A large conglomerate operating four core businesses
including construction and engineering, equipment
manufacturing, resource development, and property
development.
• A renowned EPC contractor at home and abroad.
• The largest metallurgical engineering contractor in China.
• Nearly 70 subsidiaries with domestic competitiveness and
global presence.
• 160,000 Employees including 53,000 technical and
management personnel.
• MCC International Incorporation Ltd. (MCCI) is the
integrated platform company of MCC authorized to manage
and operate its overseas business
• MCC Last year Revenue around USD 180 Billion
2. WORLD RANKING DESCRIPTION

RANK 58th on RANK 6th on RANK 542st on


Top 500 Global Top 250 Global Top 1000 Global
Company Best Contractor Listed Company

Listed on:
3. COMPANY QUALIFICATIONS - CHINA CERTIFICATE
Superfine Grade General Contracting Qualification Subsidiaries
Superfine Grade Qualifications in the metallurgical industry 8

Superfine Grade Qualifications in housing and building contracting 8

Superfine Grade Qualification in mineral resources development 1

Grade A qualification in engineering design 4


3. COMPANY QUALIFICATIONS – CONSULTING CAPABILITY
• Iron Steel Plant development planning
• Industrial Park development planning
• Feasibility Study Report
• Investment Opportunity Study
• Market Survey
• Risk Evaluation
• Environmental Impact Assessment
• Project Proposal
The twelfth five -years Development Planning for Wuhan Iron & Steel
Holding Co. Ltd.

Wuhan Iron & Steel Plant Fengchenggang Steel Base

The Plant Planning of Kunming Iron & Steel Holding Co. Ltd.
The Environment Assessment for Zhanjiang Industrial Park
3. COMPANY QUALIFICATIONS
Enterprise Qualification Items
Class A consultation 59

Class A investigation 8

Class A design 96

Special class construction 23

Class 1 construction 165

Class 1 design and construction integration 3

Class A supervision 21

Class 1 real estate development 2

• 97 engineering consultation qualifications including steel, construction, nonferrous metallurgy, municipal utilities…
• 13 engineering investigation qualifications relating to geotechnical engineering, hydrogeology and engineering surveying…
• 168 engineering design qualifications in design industry, building, municipal utilities, metallurgy, power…
• 433 engineering construction qualifications related to housing construction, smelting, municipal administration…
• 10 design-construction integration qualifications including fire engineering, architectural decoration engineering…
• 35 supervision qualifications relating to smelting engineering, housing construction engineering…
• 8 engineering bidding agency qualifications
• 39 real estate development qualifications in Classes I,II,III and others
• 37 overseas contracted engineering qualifications
3. COMPANY QUALIFICATIONS
4. GLOBAL OFFICE LOCATION

UAE Kuwait Russia Kazakhstan India Mongolia Bangladesh Myanmar Hong Kong Korea Japan

Turkey Canada
Algeria
Egypt
Cuba
Pakistan
Mexico
Mauritania
Tanzania Venezuela
Columbia
Zimbabwe
Brazil
Botswana
Peru
Mozambique
Uruguay
South Africa

Papua New
Mauritius Sri Lanka Malaysia Singapore Vietnam Indonesia Saipan Australia New Zealand Guinea Chile Argentina
5. CORE COMPETENCE

Strong Government Financing Technical Expertise & Group


Relationships Solutions Know-how Synergies

Category No.
China Skill Award Winner 1

National Skilled Talents 38

SOE Skilled Talents 23

Chief In-house Skilled Talents 36

In-house Skilled Talents 157

Senior Engineeers 1289


Government Background Bridge between Client and Technicians 3247
•A large conglomerate Financial sector Synergy Effects: revenue
under the direct • Sound relations with Driving force of technical growth & cost reduction
administration of SASAC. SINOSURE,CDB and other Innovation & Upgrading • 14 design and engineering
•Member of CHINCA, commercial banks • Authorized to formulate: institutes
CCCME, other • Experienced in assisting the 26 national standards and 9 • 13 construction companies
chambers, associates, client in financing issues industrial standards; • Group-wide collaboration to
and academies under • Familiar with the procedural • Authorized to issue: enhance strengths
MOFCOM. requirements of Export 13 national standards and 21 • A large conglomerate
•Having sound relations Buyer’s Credit loans industrial standards. operating four core
with embassies, • 11,547 valid patents (by businesses.
economic & commercial 2013), including 2,214 • Number of existing
counselor's offices invention patents. employees: 111,576
5. CORE SERVICES-INTERGRATED ONE-STOP SERVICES

Engineering Phase Construction Phase Operation Phase

A B C D E F Diagnose
Feasibility
Planning Engineering Implementation Operation
Study Upgrade
Direct service to the client

A1 B1 Pre-feasibility /C1 Basic D1 E E1 EMS F1 Energy Efficiency


Commercial Feasibility Study Engineering Diagnose
Planning D2 EP+SV E2 Assets
C2 Detailed Management F2 Capacity Increase
A2 Market Engineering D3 EPCM
E3 Performance F3 Maintenance Improvement
Study Management
D4 EPC
A3 Overall Planning
D5 E4 ERP F4 Technology
A4 Project Proposal Equipment package supply
Upgrading
A5 Conceptual Study D6 Automation package supply
A6 CAPEX Analysis
A7 Enterprise M&A

Independent third-party services

B2 Evaluation of Feasibility D7 Project Supervision E5 Due-diligence


Study
B3 Evaluation of Energy Efficiency

B4 EIA
6. PROJECT PERFORMANCE
STADIUM

Beijing National Olympic Stadium (Bird’s Nest)

Nanjing Olympic Sports Center


6. PROJECT PERFORMANCE
INFRASTRUCTURE

Shanghai Pudong International Airport

Zhengzhou Xinzheng International Air port Siem Reap Cambodia International Air port
6. PROJECT PERFORMANCE
INFRASTRUCTURE

Guangzhou Baiyun International Airport Taiyuan Airport

Chengdu Shuangliu International Airport T2 Terminal Building Jieyang Airport


6. PROJECT PERFORMANCE
INFRASTRUCTURE

Yulin Fumian Airport Jinggangshan Airport

Nanjing Dashengguan Rail Bridge


6. PROJECT PERFORMANCE
INFRASTRUCTURE

Shanghai Hong Qiao High Railway Station


Tianjin West Railway Station

Chengdu New Ring 2 Elevated Road Colombo Airport Express Way, Sri Lanka
6. PROJECT PERFORMANCE
OVERSEAS RESOURCE DEVELOPMENT

China Bao steel

Pakistan, Copper and Gold Mineral Development Project SINO-IRON Project in West Australia
6. PROJECT PERFORMANCE
Overseas Equipment Manufacturing—Heavy mechanical equipment

Tundish Tanker Assembly Machine BGC-70B-type Slag Pot Carrier Vehicle Exported to the Pgilippines

1450 6-roll Reversible Cold Rolling Set Sintering Equipment Units Exported to Japan
6. PROJECT PERFORMANCE
OVERSEAS– FERROUS METAL

China, Baosteel Extension Project, 3rd Phase Australia, Sino Iron Project

USMINAS Coke Oven Project, Brazil. 0.75Mt/a The world's largest blast furnace 5860m3(sha-steeL)
6. PROJECT PERFORMANCE
OVERSEAS– NON FERROUS METAL

Nickel Smelting Plant, Tagaung Taung, Burma Shanghai Hong Qiao High – Speed Railway Station

Lead Project in India (E), 10t/a electrolytic lead, 10t/a vitriol and silver plate Laterite General Contracting Project in Papua New Guinea (EP)
6. PROJECT PERFORMANCE
OVERSEAS – WASTE WATER TREATMENT

Shenzhen, Guanlan Sewage Treatment Wuhan, Er Lang Miao Sewage Treatment Sewage Treatment Project (Phase I), Shanghai City
6. PROJECT PERFORMANCE
OVERSEAS– POWER & ENERGY

The 2rd Phase


Expansion Works
for Hukeng Waste
Incineration Power
Plant, Baoan
District, Shenzhen

Mianning wind power Station, Sichuan

Ningxia Grid Connected Photovoltaic


6. PROJECT PERFORMANCE
STEEL STRUCTURE

Oriental Pearl TV Tower, Shanghai

Shanghai Pudong International Airport Wuhan Polar Ocean Steel Structure


6. PROJECT PERFORMANCE
STEEL STRUCTURE

CCTV News Building Chengdu Magic Cube


6. PROJECT PERFORMANCE
OVERSEAS– COMMERCIAL BUILDING

Beijing Yanqi Lake International Conference and Exhibition Cnter Beijing Phoenix International Media Ceter

Central Bank of Kuwait. Doha Gate, Qatar.


6. PROJECT PERFORMANCE HIGH RISE BUILDING PROJECT
Yan Tai Bay Tower (323m)

Chu Hai’s CBD Development include a super high-rise tower over 300m

Heyuan Affordable Housing Project in Tianjin Office Premises Of Beijing Fortune Centre
6. PROJECT PERFORMANCE HIGH RISE BUILDING PROJECT

Country Garden Residential Development Johor Baru , 170,000 m2


Kuala Lumpur W Hotel & Residence 53 Floor
Troika Kota Bahru Malaysia, 40 Floor

Meridien at Medini Iskandar Malaysia , 40 floor,


The Face Victory suites KL,51 Floor 180,000m2 Tropicana Avenue mixed Development Selangor, 40 floor , 170,000 m2
6. PROJECT PERFORMANCE
OVERSEAS – THEME PARK

Resort World, Sentosa, Singapore Universal Studio Singapore

Zhuhai Chimelong Ocean Kingdom Shanghai Disney Land


6. PROJECT PERFORMANCE
MCC INDONESIA PROJECT EXPERIENCES
SMELTER METALLURGICAL PROJECT NON METALLURGICAL PROJECT
1. KRAKATAU STEEL BLAST FURNACE PROJECT
1. CISUMDAWU TOLL ROAD PHASE-2 PROJECT (MCC brings Funding from
2. IMIP FERRO NICKEL INDUSTRIAL PARK CEXIM Bank )
3. FBLN GEBE FERRONICKEL PROJECT 2. CONCH CEMENT PLANT PROJECT

4. MSP FERRONICKEL PROJECT 3. PANASIA CEMENT PLANT PROJECT

5. SALIM GROUP IRON ORE CONCENTRATOR PLANT 4. SGM WULING SPAREPARTS WORKSHOP PROJECT

6. MEK SEMI-COKE EPC PROJECT 5. BIOTIS VACCINES PROJECT

7. DEXIN STEEL INDONESIA 3.5 MILLION T/A PLANT PILING PROJECT 6. CFLD LAVON SWANCITY PROJECT

8. NANSHAN INDUSTRIAL PARK 1MILLION T/A ALUMINA PROJECT 7. JAKARTA LIVING STAR PROJECT

9. RKEF FERRONICKEL PROCESSING PLANT CONSULTATION PROJECT

10. HARITA AND LYGEND MINING FERRONICKEL PROJECT

11. HUAYUE NICKEL-COBALT HPAL SMELTER PROJECT

12. QINGDAO ZHONGCHENG-MSS RKEF HIGH FERRONICKEL PROJECT

13. PT QMB NEW ENERGY LATERITE NICKEL ORE HPAL SMELTER PROJECT

14. INDONESIA DEXIN STEEL 6 MILLIONS TON STEEL PLANT PROJECT


METALLURGICAL PROJECT
EXPERIENCE
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

KRAKATAU STEEL
BLAST FURNACE PROJECT
Owner: PT Krakatau Steel Persero
Project Location: Cilegon, Banten
Project Period: 2012 - 2016
Status: 100% Completed

Project Outline:
Establishment of New Blast Furnace Complex to produce
1,200,000 MT/Y of Hot Metal & Pig Iron. MCC mainly
responsible for “One Stop Service Project “ starting from the
Project Design, Equipment Procurement, Debugging, until
Training.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

SMI RKEF FERRONICKEL PROJECT


Owner: PT Sulawesi Mining Indonesia
Project Location: Morowali, Central Sulawesi
Project Period: 2013 – 2018
Status: 100% Completed

Project Outline:
Sulawesi Mining Investment is a joint Indonesia -China venture, began
construction on its multi-billion dollar integrated smelter project in
Morowali Industrial Park, Central Sulawesi that produce annual
production of Nickel Iron Pig (NPI) reach 600.000 ton/year and the
Power Station. MCC was given the trust to be involved in the SMI
smelter work from Phase I until Phase III. The first phase included
300.000 Ton NPI production line and 2 x 65 MW coal plants, the second
phase 2 x 150 MW, and the third phase another 2 x 150 MW.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

FBLN GEBE FERRONICKEL


PROJECT
Owner: PT Fajar Bhakti Lintas Nusantara
Project Location: Gebe, Maluku
Project Period: 2014 – 2019
Status: 100% Completed

Project Outline:
Utilize the mineral resources at Gebe, Maluku, PT FBLN is
planning to made smelter development that adopting blast
furnace smelting technology with annual production reaching
800,000T ferronickel. This project contains of 1 set of 350
vertical lime kiln, 4 sets of blast furnace, nickel ore sintering
facility, eco-friendly facility, 2×4500KW blast furnace gas
power plant.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

RKEF FERRONICKEL PROCESSING


PLANT CONSULTATION PROJECT
Owner: PT Stargate Pasific Resources
Project Location: Sulawesi
Project Period: 2018 - 2019.
Status: 100% Complete

Outline of Project:
With the growing investment in mining in the Sulawesi area, PT
Stargate Pacific Resources is also not behind in the construction
and planning of smelter areas that using the RKEF Ferronickel
Processing Plant system. Following the owner's goals, MCC is
entrusted with making the Bankable Project Feasibility Study and
providing the best consultation for the owner in making this
ferronickel smelter.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

MSP FERRONICKEL PROJECT


Owner: PT Megah Surya Pertiwi
Project Location: Obi, Maluku
Project Period: 2014 - 2018
Status: 100% Completed

Project Outline:
PT MSP (a subsidiary of the Harita Group) planning to build the
smelter that consists of 3 x 33 KVA. To supply the electricity
needs, PT MSP will also build a electric steam power plant
(PLTU) independently consisting of 3 generating units with a
capacity of 3 x 40 MW according to the needs of the smelter.
The product to be produced from this smelter is Ferronickel
with a production capacity of 250.000 tons per year. With this
large capacity, this smelter will not only process nickel raw
materials from mining companies affiliated with Harita, but can
also receive supplies from other Nickel IUP-OP holding
companies in South Halmahera and its surroundings through
mutually beneficial business relationships.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
MSP FERRONICKEL PROJECT
Project Awards:
The project was awarded LUBAN Award (overseas project). MCC team overcame the local
shortage of materials and backward logistics and communication conditions in OBI Island
to complete the project on schedule.
MCC awarded “National Prime-Quality Project” for China Construction Engineering
Overseas Project.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

SALIM IRON ORE CONCENTRATOR


PLANT PROJECT
Owner: PT Servindo Jaya Utama
(a subsidiary company of Salim Group)
Project Location: Taliabu, Maluku
Project Period: 2016 - 2017
Status: 100% Complete

Project Outline:
The scope of project includes the installation work of long -distance
belt conveyor transportation system and concentration and tailing
system, installation of mechanical equipment, pipeline and electric
equipment, single and linkage commission, no -load and load test etc.
The main quantities of the bid include 7,650t mechanical equipment,
3,850t steel structures, 16,000m pipelines and 330km cables, in
which the pipe belt conveyor is 12km in length, known as the longest
record in Asia.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

MEK SEMI-COKE EPC PROJECT


Owner: PT Megah Energi Khatulistiwa
(subsidiary company of Harita Group)
Project Location: Tanjung Selor, Kalimantan
Project Period: 2018 – 2019
Status: 100% Complete

Project Outline:
PT. Megah Energi Khatulistiwa (MEK) is a company engaged in the 2 X
30 MW Steam Power Plant (PLTU) and Coal Upgrading Plant (Semi-
Coke). With the Vertical Retort Carbonizer technology, MEK is able to
produce 600,000 tons of semi-coke per year with raw materials of 1
million tons of coal, as well as by-products in the form of tar as much
as 50 thousand tons per year and coke gas which can be used as a gas
power plant of 30 MW.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
DEXIN STEEL INDONESIA 3.5 MILLION T/A
EPC PROJECT
Owner: PT Dexin Steel Indonesia
Project Location: Morowali, Sulawesi
Project Period: 2018 – 2021
Status: 100% Complete
Project Outline:
As the implementation of Dexin Steel Indonesia to build stainless steel new
plant smelter, MCC been trusted to build the plan. The signing of the
project contract covers a total of steelmaking continuous casting and wire
rod and other tenders, including 2 x 120 tons of converter, 1.5 million tons
/ year rod, wire works and whole factory public auxiliary.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

HARITA AND LYGEND MINING


FERRONICKEL PROJECT
Owner: PT Halmahera Persada Lygend
Project Location: Halmahera, Maluku
Project Period: 2019 – recent
Status: 100% Complete

Project Outline:
Located in the mine area of Kawasi Village, Obi Town, west of
Obi Island, South Halmahera District, North Maluku Province,
Indonesia, the project is jointly invested and constructed by
Ningbo Lygend Mining Co., Ltd. and Indonesia's PT Harita
Group. Covering an area of 155 hectares, the project plans to
build a smelting factory capable of producing 870,000
tons/year of ferronickel, with eight 48-MVA RKEF processes
and four 150-MW power stations.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

HUAYUE NICKEL-COBALT HPAL


SMELTER PROJECT
Owner : PT HUAYUE NICKEL COBALT
Location : Morowali, Central Sulawesi
Project Status: On Construction

Project Outline:
Huayue Nickel-Cobalt HPAL Project is located in the Morowali, Central
Sulawesi. The annual production of the smelter is 61,000 tons of
nickel and 6,000-7,000 tons of cobalt. It is the world's largest laterite
nickel ore hydrometallurgy project. MCC was involved in the entire
process of the project as the general contractor adopts the most
advanced third-generation high-pressure acid leaching process,
integrating non-ferrous metal smelting and chemical refining, with
high capital investment, high technical threshold, high automation
control, ultra-low-cost output, and ultra-low carbon emissions.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

QINGDAO ZHONGCHENG-MSS RKEF HIGH FERRONICKEL PROJECT


Construction content:
The project is located in Indonesia Morowali Industrial Park and adopts RKEF technology. The ferronickel -iron smelting plant will build 8 x
33KVA nickel-iron smelting furnaces and supporting public and auxiliary facilities, directly to the stainless steel smelting wor kshop. After
the project is put into operation, the annual production reach 600,000 tons (including about 11.5% of Ni), and the average an nual
production days of submerged arc furnaces is 335 d/a, which can provide about 3,000 jobs opportunity to surrounding community . The
project is expected to be completed and put into production in June 2022.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT

PT QMB NEW ENERGY LATERITE NICKEL


ORE HPAL SMELTER PROJECT
Owner : PT QMB New Energy
Location : Morowali, Central Sulawesi
Project Status: On Construction

Project Outline:
The project is located in IMIP, Sulawesi. The project annual
production capacity is 50,000 tons nickel metal hydrometallurgy,
4,000 tons of cobalt metal hydrometallurgical, 50,000 tons of nickel
hydroxide. Meanwhile for the EV-Battery product annual
production reach 150,000 tons of battery-grade nickel sulfate
crystals, 20,000 tons of battery-grade cobalt sulfate crystals and
30,000 tons of battery-grade manganese sulfate crystals.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
INDONESIA DEXIN STEEL 6 MILLIONS
TON STEEL PLANT PROJECT
The project is located in IMIP, Sulawesi and divided to be 2 phase
with annual production reaching 6 millions ton.
1. The 1st phase consists of 2 sets blast furnaces, 2 sets 120t
converters, 2 sets of 8-strand billet continuous casting machines, 1
set of slab continuous casting machines and other equipment. The
first phase of the project completed and put into operation in
December 2021. The production capacity is: annual output 3.5
million tons of crude steel, 1 million tons of bar and 500,000 tons
of wire rod. 2. While the 2nd Phase project content is 1 set blast
furnace, 1 set 120t converter and bar re-routing project. It is
expected to be put into use in December 2022.
NON-METALLURGICAL PROJECT
EXPERIENCE
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
CISUMDAWU TOLL ROAD PHASE-2
PROJECT
Owner : MINISTRY OF PUBLIC WORKS
& HOUSING (PUPR)
Location : West Java
Period : September 2016 – April 2022

This project is located at nearby Bandung City, West Java Province of


Indonesia. This project is one of the real implementation of China
“One Belt & One Road” development strategic, and also MCC’s first
Government preferential treatment project in Indonesia, lending by
China Export-Import Bank. This tunnel is the first highway tunnel in
Indonesia, which has attracted great attention of the Indonesian
government. During the implementation of the project, many
government leaders visited the construction site for inspection and
work guidance. On March 17, 2016, Indonesian President Jokowi
personally led a delegation to the project for field study.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
CISUMDAWU TOLL ROAD PHASE-2 PROJECT

Indonesia Government Team carried out


inspection on site
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
CONCH CEMENT PROJECT
Owner : PT. CONCH CEMENT INDONESIA
Location : South Kalimantan, North Sulawesi
Period : 2012-2018

South Kalimantan: PT Conch’s Greenfield Cement Plant located at


South Kalimantan, Indonesia, with an installed capacity of 1.5Mta.
Construction of the factory began in 2012. It has the capacity to
produce 3200tpd Clinker Cement production line with 2x18MW coal -
fired power plant, also ore limestone transfer, clinker storage and
transfer, and other 22 sub-items.
North Sulawesi: PT Conch North Sulawesi Cement located at North
Sulawesi, Indonesia with project construction start on 2016 and
finished on 2018, the project scopr of wosk is including the planning
and construction of 2 x 5,000 tons clinker production lines per day,
annual production of 4.4 million tons of cement milling system, 3 x
20 MW private power plant, 2 x 7.5 MW heat waste power
generation system.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT

PANASIA CEMENT PROJECT


Owner : PT. SINAR TAMBANG ARTHA LESTARI
Location : Banyumas, Central Java
Period : August 2013 – May 2016

Project Outline:
PT SINAR TAMBANG ARTHALESTARI is the
owner and producer of Semen Bima and also
subsidiary company of Pan Asia Group.
Semen Bima factory which was built on an
area of 43 hectares. MCC trusted with the
EPC contract for a 5000t/d cement line in
Banyumas, Purwokerto, Indonesia, involving
design, civil works, installation, equipment
purchase, commissioning, etc.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT

SGM WULING SPAREPARTS


WORKSHOP DESIGN 2 PROJECT
Owner : PT. SGMW MOTOR INDONESIA
Location : Cikarang, West Java
Period : March 2016 – May 2017

Project Outline:
PT SGMW Motor Indonesia started its operation by building its first
plant in Greenland International Industrial Center in Cikarang, Bekasi
Regency, West Java province on August 20, 2015. The plant is
expected to produce up to 150,000 vehicles in a year in its maximum
capacity and is estimated to create 3,000 jobs for Indonesia. MCC is
responsible for the Spare Parts Workshop parts construction that
estimated will be finished and started operating with 12 months.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
BIOTIS VACCINES PROJECT
PT Biotis Prima Agrisindo (BPA), a veterinary vaccine company which is a joint venture
between Pharmally International Holding Company Limited and Harbin Weike Biotechnolgy
Company. The total land area of the BPA factory is 45 thousand square meters, including a
building of 26 thousand square meters consisting of an active vaccine production room
and an inactive vaccine production room (defused vaccines) with a total of 2 production
With an annual production capacity of 800,000 doses of avian influenza vaccine, the
project is the largest biological vaccine plant in Indonesia.
During the implementation of the project, MCC has been highly praised by the owner, won
the Award of Excellent Contractor and the Award of Excellent safety quality
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
CFLD LAVON SWAN CITY HOUSING
PROJECT
Lavon Swan City is an housing development project that located at
Cikupa, Tangerang, Banten Province. Standing on 60 hectares of land,
Lavon Swan City is a housing area with international standard facilities
developed that following standards of 5 renowned consultants in the
fields of architectural design, urban design or layout and advertising /
brand. MCC responsible in the construction of Lavon Swan City
Marketing Gallery, surround shophouses facilities, and sample house
area. The project finished within 1 year.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT

JAKARTA LIVING STAR PROJECT


Owner : PT SINDELI PROPERTINDO
Location : East Jakarta
Period : June 2019 – June 2021

Jakarta Living Star is a superblock residential area that


stands on an area of 4.8 hectares. This residential area
consists of 6 apartment towers as high as 28 floors which
include 3,648 apartment units, a commercial district,
complete with various other supporting facilities. MCC was
entrusted as the Main Contractor for the development
process of the Jakarta Living Star project.