MCC Company Profile
MCC Company Profile
1. COMPANY INTRODUCTION
3. COMPANY QUALIFICATIONS
6. PROJECT PERFORMANCE
BRIEF INTRODUCTION
• A large-sized state-owned enterprise under the supervision
of SASAC.
• Listed on Shanghai and HKG stock exchanges in 2009.
• A large conglomerate operating four core businesses
including construction and engineering, equipment
manufacturing, resource development, and property
development.
• A renowned EPC contractor at home and abroad.
• The largest metallurgical engineering contractor in China.
• Nearly 70 subsidiaries with domestic competitiveness and
global presence.
• 160,000 Employees including 53,000 technical and
management personnel.
• MCC International Incorporation Ltd. (MCCI) is the
integrated platform company of MCC authorized to manage
and operate its overseas business
• MCC Last year Revenue around USD 180 Billion
2. WORLD RANKING DESCRIPTION
Listed on:
3. COMPANY QUALIFICATIONS - CHINA CERTIFICATE
Superfine Grade General Contracting Qualification Subsidiaries
Superfine Grade Qualifications in the metallurgical industry 8
The Plant Planning of Kunming Iron & Steel Holding Co. Ltd.
The Environment Assessment for Zhanjiang Industrial Park
3. COMPANY QUALIFICATIONS
Enterprise Qualification Items
Class A consultation 59
Class A investigation 8
Class A design 96
Class A supervision 21
• 97 engineering consultation qualifications including steel, construction, nonferrous metallurgy, municipal utilities…
• 13 engineering investigation qualifications relating to geotechnical engineering, hydrogeology and engineering surveying…
• 168 engineering design qualifications in design industry, building, municipal utilities, metallurgy, power…
• 433 engineering construction qualifications related to housing construction, smelting, municipal administration…
• 10 design-construction integration qualifications including fire engineering, architectural decoration engineering…
• 35 supervision qualifications relating to smelting engineering, housing construction engineering…
• 8 engineering bidding agency qualifications
• 39 real estate development qualifications in Classes I,II,III and others
• 37 overseas contracted engineering qualifications
3. COMPANY QUALIFICATIONS
4. GLOBAL OFFICE LOCATION
UAE Kuwait Russia Kazakhstan India Mongolia Bangladesh Myanmar Hong Kong Korea Japan
Turkey Canada
Algeria
Egypt
Cuba
Pakistan
Mexico
Mauritania
Tanzania Venezuela
Columbia
Zimbabwe
Brazil
Botswana
Peru
Mozambique
Uruguay
South Africa
Papua New
Mauritius Sri Lanka Malaysia Singapore Vietnam Indonesia Saipan Australia New Zealand Guinea Chile Argentina
5. CORE COMPETENCE
Category No.
China Skill Award Winner 1
A B C D E F Diagnose
Feasibility
Planning Engineering Implementation Operation
Study Upgrade
Direct service to the client
B4 EIA
6. PROJECT PERFORMANCE
STADIUM
Zhengzhou Xinzheng International Air port Siem Reap Cambodia International Air port
6. PROJECT PERFORMANCE
INFRASTRUCTURE
Chengdu New Ring 2 Elevated Road Colombo Airport Express Way, Sri Lanka
6. PROJECT PERFORMANCE
OVERSEAS RESOURCE DEVELOPMENT
Pakistan, Copper and Gold Mineral Development Project SINO-IRON Project in West Australia
6. PROJECT PERFORMANCE
Overseas Equipment Manufacturing—Heavy mechanical equipment
Tundish Tanker Assembly Machine BGC-70B-type Slag Pot Carrier Vehicle Exported to the Pgilippines
1450 6-roll Reversible Cold Rolling Set Sintering Equipment Units Exported to Japan
6. PROJECT PERFORMANCE
OVERSEAS– FERROUS METAL
China, Baosteel Extension Project, 3rd Phase Australia, Sino Iron Project
USMINAS Coke Oven Project, Brazil. 0.75Mt/a The world's largest blast furnace 5860m3(sha-steeL)
6. PROJECT PERFORMANCE
OVERSEAS– NON FERROUS METAL
Nickel Smelting Plant, Tagaung Taung, Burma Shanghai Hong Qiao High – Speed Railway Station
Lead Project in India (E), 10t/a electrolytic lead, 10t/a vitriol and silver plate Laterite General Contracting Project in Papua New Guinea (EP)
6. PROJECT PERFORMANCE
OVERSEAS – WASTE WATER TREATMENT
Shenzhen, Guanlan Sewage Treatment Wuhan, Er Lang Miao Sewage Treatment Sewage Treatment Project (Phase I), Shanghai City
6. PROJECT PERFORMANCE
OVERSEAS– POWER & ENERGY
Beijing Yanqi Lake International Conference and Exhibition Cnter Beijing Phoenix International Media Ceter
Chu Hai’s CBD Development include a super high-rise tower over 300m
Heyuan Affordable Housing Project in Tianjin Office Premises Of Beijing Fortune Centre
6. PROJECT PERFORMANCE HIGH RISE BUILDING PROJECT
5. SALIM GROUP IRON ORE CONCENTRATOR PLANT 4. SGM WULING SPAREPARTS WORKSHOP PROJECT
7. DEXIN STEEL INDONESIA 3.5 MILLION T/A PLANT PILING PROJECT 6. CFLD LAVON SWANCITY PROJECT
8. NANSHAN INDUSTRIAL PARK 1MILLION T/A ALUMINA PROJECT 7. JAKARTA LIVING STAR PROJECT
13. PT QMB NEW ENERGY LATERITE NICKEL ORE HPAL SMELTER PROJECT
KRAKATAU STEEL
BLAST FURNACE PROJECT
Owner: PT Krakatau Steel Persero
Project Location: Cilegon, Banten
Project Period: 2012 - 2016
Status: 100% Completed
Project Outline:
Establishment of New Blast Furnace Complex to produce
1,200,000 MT/Y of Hot Metal & Pig Iron. MCC mainly
responsible for “One Stop Service Project “ starting from the
Project Design, Equipment Procurement, Debugging, until
Training.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
Sulawesi Mining Investment is a joint Indonesia -China venture, began
construction on its multi-billion dollar integrated smelter project in
Morowali Industrial Park, Central Sulawesi that produce annual
production of Nickel Iron Pig (NPI) reach 600.000 ton/year and the
Power Station. MCC was given the trust to be involved in the SMI
smelter work from Phase I until Phase III. The first phase included
300.000 Ton NPI production line and 2 x 65 MW coal plants, the second
phase 2 x 150 MW, and the third phase another 2 x 150 MW.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
Utilize the mineral resources at Gebe, Maluku, PT FBLN is
planning to made smelter development that adopting blast
furnace smelting technology with annual production reaching
800,000T ferronickel. This project contains of 1 set of 350
vertical lime kiln, 4 sets of blast furnace, nickel ore sintering
facility, eco-friendly facility, 2×4500KW blast furnace gas
power plant.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Outline of Project:
With the growing investment in mining in the Sulawesi area, PT
Stargate Pacific Resources is also not behind in the construction
and planning of smelter areas that using the RKEF Ferronickel
Processing Plant system. Following the owner's goals, MCC is
entrusted with making the Bankable Project Feasibility Study and
providing the best consultation for the owner in making this
ferronickel smelter.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
PT MSP (a subsidiary of the Harita Group) planning to build the
smelter that consists of 3 x 33 KVA. To supply the electricity
needs, PT MSP will also build a electric steam power plant
(PLTU) independently consisting of 3 generating units with a
capacity of 3 x 40 MW according to the needs of the smelter.
The product to be produced from this smelter is Ferronickel
with a production capacity of 250.000 tons per year. With this
large capacity, this smelter will not only process nickel raw
materials from mining companies affiliated with Harita, but can
also receive supplies from other Nickel IUP-OP holding
companies in South Halmahera and its surroundings through
mutually beneficial business relationships.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
MSP FERRONICKEL PROJECT
Project Awards:
The project was awarded LUBAN Award (overseas project). MCC team overcame the local
shortage of materials and backward logistics and communication conditions in OBI Island
to complete the project on schedule.
MCC awarded “National Prime-Quality Project” for China Construction Engineering
Overseas Project.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
The scope of project includes the installation work of long -distance
belt conveyor transportation system and concentration and tailing
system, installation of mechanical equipment, pipeline and electric
equipment, single and linkage commission, no -load and load test etc.
The main quantities of the bid include 7,650t mechanical equipment,
3,850t steel structures, 16,000m pipelines and 330km cables, in
which the pipe belt conveyor is 12km in length, known as the longest
record in Asia.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
PT. Megah Energi Khatulistiwa (MEK) is a company engaged in the 2 X
30 MW Steam Power Plant (PLTU) and Coal Upgrading Plant (Semi-
Coke). With the Vertical Retort Carbonizer technology, MEK is able to
produce 600,000 tons of semi-coke per year with raw materials of 1
million tons of coal, as well as by-products in the form of tar as much
as 50 thousand tons per year and coke gas which can be used as a gas
power plant of 30 MW.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
DEXIN STEEL INDONESIA 3.5 MILLION T/A
EPC PROJECT
Owner: PT Dexin Steel Indonesia
Project Location: Morowali, Sulawesi
Project Period: 2018 – 2021
Status: 100% Complete
Project Outline:
As the implementation of Dexin Steel Indonesia to build stainless steel new
plant smelter, MCC been trusted to build the plan. The signing of the
project contract covers a total of steelmaking continuous casting and wire
rod and other tenders, including 2 x 120 tons of converter, 1.5 million tons
/ year rod, wire works and whole factory public auxiliary.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
Located in the mine area of Kawasi Village, Obi Town, west of
Obi Island, South Halmahera District, North Maluku Province,
Indonesia, the project is jointly invested and constructed by
Ningbo Lygend Mining Co., Ltd. and Indonesia's PT Harita
Group. Covering an area of 155 hectares, the project plans to
build a smelting factory capable of producing 870,000
tons/year of ferronickel, with eight 48-MVA RKEF processes
and four 150-MW power stations.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
Huayue Nickel-Cobalt HPAL Project is located in the Morowali, Central
Sulawesi. The annual production of the smelter is 61,000 tons of
nickel and 6,000-7,000 tons of cobalt. It is the world's largest laterite
nickel ore hydrometallurgy project. MCC was involved in the entire
process of the project as the general contractor adopts the most
advanced third-generation high-pressure acid leaching process,
integrating non-ferrous metal smelting and chemical refining, with
high capital investment, high technical threshold, high automation
control, ultra-low-cost output, and ultra-low carbon emissions.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
Project Outline:
The project is located in IMIP, Sulawesi. The project annual
production capacity is 50,000 tons nickel metal hydrometallurgy,
4,000 tons of cobalt metal hydrometallurgical, 50,000 tons of nickel
hydroxide. Meanwhile for the EV-Battery product annual
production reach 150,000 tons of battery-grade nickel sulfate
crystals, 20,000 tons of battery-grade cobalt sulfate crystals and
30,000 tons of battery-grade manganese sulfate crystals.
6. PROJECT PERFORMANCE
INDONESIA METALLURGICAL PROJECT
INDONESIA DEXIN STEEL 6 MILLIONS
TON STEEL PLANT PROJECT
The project is located in IMIP, Sulawesi and divided to be 2 phase
with annual production reaching 6 millions ton.
1. The 1st phase consists of 2 sets blast furnaces, 2 sets 120t
converters, 2 sets of 8-strand billet continuous casting machines, 1
set of slab continuous casting machines and other equipment. The
first phase of the project completed and put into operation in
December 2021. The production capacity is: annual output 3.5
million tons of crude steel, 1 million tons of bar and 500,000 tons
of wire rod. 2. While the 2nd Phase project content is 1 set blast
furnace, 1 set 120t converter and bar re-routing project. It is
expected to be put into use in December 2022.
NON-METALLURGICAL PROJECT
EXPERIENCE
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
CISUMDAWU TOLL ROAD PHASE-2
PROJECT
Owner : MINISTRY OF PUBLIC WORKS
& HOUSING (PUPR)
Location : West Java
Period : September 2016 – April 2022
Project Outline:
PT SINAR TAMBANG ARTHALESTARI is the
owner and producer of Semen Bima and also
subsidiary company of Pan Asia Group.
Semen Bima factory which was built on an
area of 43 hectares. MCC trusted with the
EPC contract for a 5000t/d cement line in
Banyumas, Purwokerto, Indonesia, involving
design, civil works, installation, equipment
purchase, commissioning, etc.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
Project Outline:
PT SGMW Motor Indonesia started its operation by building its first
plant in Greenland International Industrial Center in Cikarang, Bekasi
Regency, West Java province on August 20, 2015. The plant is
expected to produce up to 150,000 vehicles in a year in its maximum
capacity and is estimated to create 3,000 jobs for Indonesia. MCC is
responsible for the Spare Parts Workshop parts construction that
estimated will be finished and started operating with 12 months.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
BIOTIS VACCINES PROJECT
PT Biotis Prima Agrisindo (BPA), a veterinary vaccine company which is a joint venture
between Pharmally International Holding Company Limited and Harbin Weike Biotechnolgy
Company. The total land area of the BPA factory is 45 thousand square meters, including a
building of 26 thousand square meters consisting of an active vaccine production room
and an inactive vaccine production room (defused vaccines) with a total of 2 production
With an annual production capacity of 800,000 doses of avian influenza vaccine, the
project is the largest biological vaccine plant in Indonesia.
During the implementation of the project, MCC has been highly praised by the owner, won
the Award of Excellent Contractor and the Award of Excellent safety quality
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT
CFLD LAVON SWAN CITY HOUSING
PROJECT
Lavon Swan City is an housing development project that located at
Cikupa, Tangerang, Banten Province. Standing on 60 hectares of land,
Lavon Swan City is a housing area with international standard facilities
developed that following standards of 5 renowned consultants in the
fields of architectural design, urban design or layout and advertising /
brand. MCC responsible in the construction of Lavon Swan City
Marketing Gallery, surround shophouses facilities, and sample house
area. The project finished within 1 year.
6. PROJECT PERFORMANCE
INDONESIA NON METALLURGICAL PROJECT