0% found this document useful (1 vote)
399 views1 page

HV Cable Sizing for Engineers

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
399 views1 page

HV Cable Sizing for Engineers

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

ANNEXURE -3

M/s. Hyder consulting India (P) LTD, Bangalore

Project: M/s .NEW HOPE QUEENSLAND BULK HANDLING Title HV CABLE SIZING CALCULATION DOC No. UB000756/ELECT/HV/0001 REV : R3 DATE :25-03-2014

Cable derating Cable rating Cable rating after (R CosΦ+XsinΦ)/no of


SL.No Feeder Designation Rating FLC PF Num of runs cable size Ckt. Length R X Voltage Drop Voltage Drop (%V)
factor before derating derating runs

KVA Amp Run K N Sq mm Amp Amp Mts Ohm/Km Ohm/Km Run Run Run

1 Inloading Transformer (TF1) 750 39.365945832 0.85 0.7056 1 25 145 102.312 280 0.9270 0.1340 0.858538880144113 16.39 0.15

2 Inloading Transformer (TF3) 1500 78.731891665 0.85 0.7056 1 25 145 102.312 290 0.9270 0.1340 0.858538880144113 33.95 0.31

3 Out loading Transformer (TF4) 1500 78.731891665 0.85 0.7056 1 25 145 102.312 290 0.9270 0.1340 0.858538880144113 33.95 0.31

4 OutloadingTransformer (TF9) 1000 52.487927777 0.85 0.7056 1 25 145 102.312 20 0.9270 0.1340 0.858538880144113 1.56 0.01

Main SW1 - Ring Main SW3


5 Outgoing feeder
1500 78.731891665 0.85 0.7056 1 50 204 143.9424 800 0.4940 0.1210 0.483640705204759 52.76 0.48

Main SW1 - Ring Main SW2


6 Outgoing feeder (Substation -S5)
2955 155.10182658 0.85 0.7056 1 70 249 175.6944 380 0.3420 0.1150 0.351280009078903 35.86 0.33

Note:
1.Cable lengths are tentative only and detremined from the existing plot plan layout

2.Continuous carrying capacity of Power cables under site conditions shall consider various derating factors like ambient air temperature, grouping, method of laying etc.

3.Power cables will withstand the calculated fault current of the circuit for the duration not less than the maximum time taken by the primary protective system to isolate the fault. Fault clearing times for 11000 V transformer feeders will be 160 msec and for outgoing feeders 500m sec.
4.Voltage drop in feeder cables will be limited to about 3% during full load running condition.

5.Cable data for the volt drop calculations are considred from OLEX catalogue (Page number 18).

6.We have considered a total load (connected load is 1500kVA) of 2000kVA for the SW 1 Main 11KV Substation MCB 4 outgoing feeder (Incomer of SW3).

7.As per ETAP load flow study we have considered connected load is 2955 KVA for the SW1 Main 11 KV Substation MCB 5 outgoing feeder (Incomer of SW2).