GANESH WAGH
Cluster Manager (MEP Works)
E-Mail:
[email protected] ~ Mobile: +917019402313
Seeking Mid senior level assignments in EPC Supervision Consultancy / project management Company
with an organisation of high repute, preferably in MEP Field Rise Buildings, Residential, commercial,
Industrial and Infrastructure.
PROFILE SUMMARY
Nearly 14 Years of good experience in MEP Design & Project execution, A Strategic MEP leader with
experience in handling the gamut of tasks right from planning, monitoring ,phases of project lifecycle,
overall inter-discipline co-ordination, administration and resource planning etc as stated below:
Project Management Planning & Project control procedures.
Design Management Planning & its control procedures.
MEP Design Review, Shop Drawings & Material submittals review & its approvals.
Method statement review & approval for site mobilization, quality control, MEP Services & HSE Plan.
Contract Management, Negotiations, Change control & Risk Management procedures.
Assistance in creating Work Breakdown structure for MEP Services activities & Developing MEP Schedules.
Site Inspection for materials & workmanship & preparing weekly/monthly MEP Progress reports.
Review MEP Services Invoices & Site Measurements and recommend to management for approvals.
‘ Leading team for Electromechanical Engineers, Vendors, Quantity Surveyors, Quality control & HSE Engineers.
‘ Manage MEP Projects interactions and transactions, MEP Co-ordinations that take place between the parties, before and
after the signature of the contract of the record. Implement good contract management practices.
“ Expertise in review of designs / plans , layouts, working drawings, construction details to ensure execution of projects
within time & Budgeted parameters.
‘ Expertise in laisioning with local Authorities for the preliminary required project NOCs Ex. Electrical, Fire, Sewerage &
Drainage.
‘ Monitoring & controlling projects with respect to cost, time runs and quality to ensure satisfactory execution of project,
liaising with contractors and subordinates to get the things done within scheduled duration.
‘ Prepare Project Mobilization checklist & review logistics plans.
‘ Prepare Quality metrics and set procedures for raising issues and handling problems.
‘ Co-ordination for the Design and construction and manage claims and disputes in an impartial manner.
‘ Prepare MEP Checklist for Concept Design stage, schematic stage, Design Development stage, GFC Drawings.
‘ Vendor selection for MEP by reviewing vendors pre-qualifications, specifications & BOQ\.
‘ Project Supervision & co-ordination for MEP Works & Its Procedures, Inspection & Testing for MEP Works.
‘ Project control & Monitoring using MS Excel & Power BI
‘ Assistance in contract claims & variations, Value engineering, quality Management, Risk Management, prepare project
control procedures, Responsibility Matrics.
‘ Well aware of authorities e.g CEIG,FIRE,BESCOM,BWSSB,BSNL,AAI,BBMP etc.
‘ Good Knowledge of standards & codes IEEE, IEC, NEC, NEMA,NFPA etc.
Core Competencies :
Project Management & Site supervision including Design review for Electrical, FPS,HVAC Plumbing Activities :
. Extensive experience in developing and administer all MEP Contracts from the tender process through to contract
closeout including variations and issue resolution for design, construction and other project related activities,
. HV/LV Systems, Transformer, DG Set , MDB, SMDB, DB, Lighting & Power, aircraft warning lights, street light,Fascade
Lighting , Telecommunication network, server rack, IT Points, Inverter (Emergency Lighting) UPS & Battery system, CCTV
System, Access control system, Public address system Fire, alaram system, Automatic Sliding Door,Road
Blockers,Building Management system.
. FPS System – Automatic Sprinkler system, Hydrant system, VESDS System(very early smoke detection system),
. HVAC System – Spilt AC, Duct able ODU/IDU, Ducting work, Cassette AC, Chiller unit, Cooling tower, Fresh air unit.
HVLS fan system
. Plumbing System – Hydropneumatics system, Potable water system, sewage Plumbing system,Drainage plumbing
system, STP, Water treatment plant.
. preparation HV/LV/ELV, Schematic Designs, Load scheduling, Lighting & Voltage drop calculation etc.
. Preparation of Weekly & Monthly Report & Presentation.
. Review & Identification for Interior fitouts for MEP Services layout & co-ordination for Mall, Retail Outlets, Metro cash &
carry, B2B Warehouse, B2C Warehouse, E- Commerce Automation warehouse Its Building – Training center, R & D
Building, Office Building, Software Office, Data Center, G=7 Building, Villas, Guest House , Canteen
. Employment Details
Presently associated with M/s. Reliance Group in the firm of Reliance Projects & Property Management Service
LTD as a Cluster Manager (MEP) Design & Project Management (Period May 2018 – Still).
Past associated with M/s. Bharat Forge and Kalyani Group in the firm of M/s. Kalyani Global Engineering Pvt Ltd as
MEP Co-ordinator EPC Project Work and Management. (Period Sep 2014 – March 2018)
Past associated with M/S ARVEE Electrical and Engineers Pvt Ltd Pune. As a Sr. Electrical Engineer, Project Work & Site
Management. (Period June 2013 –Sep 2014)
Past associated with M/S Hi-Tech Engineering Corporation India Pvt Ltd Baramati. As an Electrical Engineer (Period
May 2010- June 2013)
Highlights
. Strong Decision making skills & ability to prioritise and plan & execute effectively.
. Facilitated co-ordination and clash resolutions for interface between Architectural, structural & MEP Services
. Actively involved in MEP Supervision & Project Management Services.
. Received Spontaneous award for Project monitoring & control of Karnataka Cluster Area.
. Well Maintained in Billing section/Documents , there is no deviation from third part Audit.
Internal Stake Holder/Client Relationship Management
. Interacting with the client and freezing the technical specifications, Design Drawings & BOQ.
. Executing the MEP Inspection with client and consultants and resolving their concerns.
. Good Knowledge of types of risk, force majeure, managing risks, risk transfer, Benchmarking, Managing the
relationship, Key factors for Management structures, communication, Information flows, communication levels,
consistency in communications, culture, attitudes & Behaviours, Trust, capability to “ do the job” well, goodwill, integrity,
commitment to the relationship, handling problems, Escalation procedures, Dispute resolution, contract maintenance etc.
. Good Knowledge of establishing and managing communication framework and ensuring that it is used effectively for
flows between internal stake holder, client & contractor at all level (peer-to- peer).
. Providing progress and forecasts, with regular feedback to the internal stake holder / client and action taken as required
acceptance testing, progress is improving steadily.
. Providing comparison available on a like -for-like basis wherever required.
. Measuring service quality by creating and using quality metrics – e.g. Completeness of availability, capacity, reliability,
flexibility, timeliness, responsiveness, security, standards, usability, accuracy, auditability, satisfaction.
. Acting as the interface between client / internal stake holder and contractor in handling requests for incorporating new
requirements into the service contract.
.Review Key performance indicators (KPIs) for recognition and reward.
.Review contract to verify that the respective roles and responsibilities in the change control procedures in the contract
for raising, evaluating, costing and approving change requests considering flexibility to deal with emergencies issues
covering requesting changes, assessment of Impact, prioritisation and authorization, contract agreement, control of
Implementation, Documentation of change assessments and orders are satisfactory.
. Review Contract for appropriate structures with representatives of client and contractor management for reviewing and
recommending for authorizing the change requests.
. Review the specification of requirement, the contractual implications, the charges for the additional service and the
delivery timescales.
. Review & Administer procedures to reflect the specific circumstances of the contract and the organization e.g. Contract
maintenance and change control, charges and cost monitoring, ordering procedures, payment procedures, budget
procedures, resource management and planning, management reporting, asset management.
. Review the agreed procedure for placing the additional demands by client/internal stake holder.
. Review requirement for service performance reports and management information before and during contract
negotiations and confirmed during transition period of the contract.
. promote understanding of each other’s business practices and common techniques.
. Keep track of types of changes during the contract period e.g. changes to performance metrics, changes to service
functionality, changes to service infrastructure, changes to workload.
. Review Specification of contract performance metrics and monitor contract performance and report at project outcome
level.
. Negotiate remedies with the contractor and escalate contract problems as necessary.
. prepare report for incidents, problems and issues promptly and accurately and monitor client/internal stake holder
aspects of service quality and escalate problems as necessary.
Previous Work Experience
1-05-2010 to 31-05-2013 Electrical Engineer Hitech Engineering Corporation India Pvt Ltd Baramati.
Project Handled : Sugar (3500 TCD) & Power(20MW) Plant Projects – Shivashakti Sugar Chikkodi Karanataka
Sugar (2500 TCD) & Power (15 MW) Plant Projects – Shoubhgya laxmi sugar Gokak Karanataka
Sugar (2500 TCD) & Power (10MW) Plant Projects – Sitaram Sugar pandharpur Maharastra
Sugar (3500 TCD) & Power(20mw) Plant Projects – Kannada Sugar Aurganbad Maharastra
1-06-2013 to 30-08-2014 Sr. Electrical Engineer ARVEE Electrical & Engineers Pvt Ltd Pune.
Project Handled : TNEB Vellore Sugar & Power Projects Vellore Tamilnadu
TNEB Cheyyar Sugar & Power Projects cheyyar Tamilnadu
TNEB Subramanya Shiva Sugar & Power Projects Dharmapuri Tamilnadu
01-09-2014 to 30-03-2018 MEP Co-ordinator Kalyani Global Engineering Pvt Ltd Pune
Project Handled :- Bharat Forge Ltd Canteen Building Pune
Bharat Forge Ltd Admin Building Pune
Research & Devolvement Centre Building (Pre cast Building) Pune
Training Centre, Villas, Office Building Pune
Reliance Cash & Carry @ 50K Hubli Karnataka
Reliance National Distribution centre @ 4L Gurgaon NCR Delhi
Market Complex Building GSIDC North Goa
HAL Industrial Building HAL Bangalore
08-05-2024 to Till MEP Manager Reliance Projects & Property Management Service Ltd.
Project Handled :- Retail Outlets, Mall Format Projects, B2B Warehouse, B2C Warehouse, E-Commerce Automation
Warehouse, National Distribution Centre, Petro Projects, Office Building, Metro Cash & Carry Project,
Achievements & Hobby
. Achieved methodical approach to all tasks, MEP Activities & its constraints, risk and quality procedures.
. Achieved strong decision making skills and ability to prioritise and plan effectively.
. Achieved MEP Conflict resolutions Skills and focused on identifying the root causes of MEP Problems.
. Selects, on boards, and orients the staff assigned to projects to clearly identify the role of project management in the
project, including specific roles and responsibility for project each member, evaluated the performance of staff in co-
ordination with their direct supervisors.
. Assistance in developing the Power BI IN Initial Stage.
. Determined what meetings, reports, and other activities will be used to control the project.
. Developed project progress chart & construction control checklists to measure, monitor & manage the projects.
. Developed project operation MEP guidelines & MEP Metrics to be used to measure quality.
. Developed project progress MEP Flow charts for communication plan, Change management plan, Quality (QA/QC)Plan,
Safety plan, and transition & closure plan.
. Verified the accuracy of material quantity take off, material approval Status, procurement and delivery status,
procurement and delivery status by arranging procurement meetings.
Academic Details
BEE (Electrical & Electronics ) from Delhi Institute of Business Management & Technology, New Delhi 2018
DEE (Electrical & Electronics ) from Govt. Polytechnic, Belgaum, Board of Technical Education Bangalore 2010
Trainings :
. Project Management
. Power BI
. Time Management
IT Skills
. Well versed with MS Office (Word, Excel, Power point) Auto cad & Internet Applications.
. Cloud Computing (Learning stage)
Personal Dossier
Date of Birth : 4th April 1989
Address : A-819,820, 02 Malaji Galli, Yamakanmardi Tq. Hukkeri Dist. Belgum St. Karnatka.
Phone Number : +917019402313
Languages Known : English, Hindi, Marathi and Kannada
Preferred Location : Bangalore/Pune
Technical Skills
. Kept everyone focused on completing the project to the agreed terms and conditions, specifications, Drawings, times
Schedule and quality standards, MEP Budget and approved MEP Project management plan.
. Design Reviews, Construction supervision & co-ordinations & Modification of Electromechanical works.
. Review & verify & approve Contractor’s/ Vendor’s pre – Qualifications, Logistics plans, HSE Plans, methods statements,
shop drawings, material submittals, MEP Co-ordination Plans, contractor’s QA/QC Plans, Construction Programme for MEP
Services.
. Control & Monitoring of managing MEP Scope, schedule & Anticipating potential threats – Risk Management, check lists,
Templates/Forms etc.
. Develop responsibility matrix, communication Plans, Document/Drawings/Material submittal control Flow charts.
Role & Responsibilities Handled as site Supervision Consultant Engineer
. Supervising on site construction activities to ensure completion of project within the stipulated time & cost.
. Executing the detailed engineering and bid for mechanical works, electrical distribution system including contract
condition, technical specification with data sheet, material bill of quantity etc.
. Monitored and oversee project progress, including personal responsibilities provided guidance to MEP team members to
ensure timely & effective MEP project execution considering life safety code and LEED requirements.
. Checked the completeness of drawings before starting construction, eliminating the subsequent request for information
(RFI) and Delays.
. Review & verified & approved contractor’s / vendors pre-qualifications, method statements, shop drawings, material
submittals, contractor’s QA & Safety plans, drawings & materials schedules etc for MEP.
. Checking the maintenance provisions during review of any MEP Shop drawings.
. Checked for co-ordination and clash resolutions for interfacing between architectural, structural & MEP Services during
designing & pre construction phase.
. prepared meeting agenda, organized MEP Meetings for Project Kick off/site Mobilisation & work progress.
. Hold team building for MEP Activities, distributed information, achieved work results that meet requirements.
. Analyzed & performed MEP Change in requests(Approved or rejected in co-ordination with client).
. Implemented approved MEP Changes, including corrective and preventive actions for any defects & constraints.
. Maintained accurate field notes and performed accurate field computations related MEP Works.
. Inspected materials at vendors premises before dispatch as per approved drawing and in accordance with relevant
international quality standard & specification.
. prepared comparison of materials submittals, considering specifications & Contractual requirements.
. Discussed & negotiated with the supplier / manufactures for profitable discounts, and finalized the deal technically as
well as commercially for getting more competitive prices.
. prepare job status report, work progress report, material status report for smooth execution of work.
.prepared time extension claims, reimbursement, of prolongation cost, acceleration cost and for the losses incurred due to
various reasons, also made Investigations to find out ground to raise claims.
. Ensured that all invoices for completed portions of the work are submitted