0% found this document useful (0 votes)
42 views13 pages

Totalwin Cafe Design Overview

Uploaded by

Gede Garneta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views13 pages

Totalwin Cafe Design Overview

Uploaded by

Gede Garneta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::

TITIK LAMPU TOP RACK KITCHEN

PARTISI- LEMARI BUKU


LENGKAP DENGAN CHARGER KITCHEN & BAR CAFE TABLE
CONNECTOR

ROUND TABLE DIA.60CM +


SQUARE TABLE 60X60CM + 4 KURSI 2 KURSI

SELASAR ESKISTING
KAMAR MANDI

SELASAR ESKISTING

SQUARE TABLE 60X60CM


+2KURSI
AREA PARKIR KAMPUS
TOTALWIN

4,25 m
0,88 m
TANGGA ENTRANCE

0,36 m
PARTISI KAMAR MANDI 0,47 m
AREA PARKIR MOTOR | PLAT BETON

Bar Table

:: TOTALWIN CAFE ::
Bar stool

JALAN UTAMA LOKASI MENUJU GRAHA WAHID

1
BSBCITY
10/11,BSB :: January
City :: 7, 2022
January 7, ::
2022 ::
TAMPAK DEPAN CAFE
location reference

TerraceCC10/11,
BANGUNAN KAMPUS
EKSISTING

TERRACE
RAM EXPANDA tengan
Tanaman Rambat

:: Kedaton
:: KEDATON
Tembok Fasad Finishing
Stucco White Plaster

Garneta
GARNETA
By I Gede
Awning Fabric Canopy +
Rangka Besi | Icon Cafe

BY I GEDE
DESIGNDesign CAFE::::
Totalwin Cafe
::::TOTALWIN
POS SATPAM

Kaca Clear Glass 8 mm


Taraman Unduk Partisi Tangga Entrance Finishing Frameless + Accessories
Calathea Luthea Polished Cement
JALAN MASUK KAMPUS
Washtuffel | COVID SOP

2
1
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
PARTISI- LEMARI BUKU
LENGKAP DENGAN Tembok Fasad Finishing Awning Fabric Canopy +
LAMPU GANTUNG
CHARGER CONNECTOR Stucco White Plaster Rangka Besi | Icon Cafe

3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

:: TOTALWIN CAFE ::
PARTISI KAMAR MANDI
3D ILUSTRASI TAMPAK :: A
LED TV | ANDROID TV scale: 1"=1' 001
55”

3
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001
BANGUNAN KAMPUS
EKSISTING

RAM EXPANDA tengan


Tanaman Rambat Tembok Fasad Finishing
Stucco White Plaster

Awning Fabric Canopy +


Rangka Besi | Icon Cafe

:: TOTALWIN CAFE ::
Taraman Unduk Partisi
Calathea Luthea
Kaca Clear Glass 8 mm
Tangga Entrance Finishing Frameless + Accessories
Polished Cement

4
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

:: TOTALWIN CAFE ::
PARTISI- LEMARI BUKU
LENGKAP DENGAN 3D ILUSTRASI TAMPAK :: A
CHARGER CONNECTOR
PARTISI KAMAR MANDI scale: 1"=1' 001

Taraman Unduk Partisi FURNITURE REFFERENCE :


Calathea Luthea Cafe Table & Chair

5
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

:: TOTALWIN CAFE ::
PARTISI- LEMARI BUKU
LED TV | ANDROID TV LENGKAP DENGAN
55” CHARGER CONNECTOR FURNITURE REFFERENCE :
Cafe Table & Chair

PARTISI KAMAR MANDI

3 D I L U S T R A S I T A M P A K :: A
scale: 1"=1' 001

6
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

:: TOTALWIN CAFE ::
PARTISI- LEMARI BUKU
LENGKAP DENGAN
FURNITURE REFFERENCE : CHARGER CONNECTOR
Cafe Table & Chair

7
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

:: TOTALWIN CAFE ::
FURNITURE REFFERENCE :
Cafe Table & Chair
BAR TABLE
PINEWOOD STYLE

HANGING TABLE
PINEWOOD STYLE

8
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

Tembok INDOOR Finishing Stucco


White Plaster

:: TOTALWIN CAFE ::
KITCHEN TABLE & RACK
W/ WASHBASSIN

9
3D ILUSTRASI TAMPAK ::
A
scale: 1"=1' 001

PINTU EXISTING
BAR TABLE
PINEWOOD STYLE

:: TOTALWIN CAFE :: DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
10
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

:: TOTALWIN CAFE ::
Outdoor Existing Table Washtuffel for COVID 19
with Umbrella Stand SOP

Outdoor Existing Table


with Umbrella Stand

11
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
3D ILUSTRASI TAMPAK :: A
scale: 1"=1' 001

:: TOTALWIN CAFE ::
Outdoor Existing Table
with Umbrella Stand

Washtuffel for COVID 19


SOP

12
DESIGN BY I GEDE GARNETA :: KEDATON TERRACE C 10/11, BSB CITY :: January 7, 2022 ::
RENCANA ANGGARAN BIAYA RENCANA ANGGARAN BIAYA
PEKERJAAN RENOVASI CAFÉ STIE TOTALWIN PEKERJAAN RENOVASI CAFÉ STIE TOTALWIN
LOKASI : SIMONGAN - SEMARANG LOKASI : SIMONGAN - SEMARANG

HARGA SATUAN JUMLAH HARGA TOTAL HARGA HARGA SATUAN JUMLAH HARGA TOTAL HARGA
NO. URAIAN PEKERJAAN SAT. VOL. NO. URAIAN PEKERJAAN SAT. VOL.
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

I. PEKERJAAN BONGKARAN
2 Pekerjaan Area Outdoor
1 Bongkaran pagar depan m2 14,00 100.000,00 1.400.000,00
a. Partisi Samping + Kamar Mandi Unit 1,00 9.900.000,00 9.900.000,00
2 Bongkaran Keramik Eksisting Indoor m2 30,64 50.000,00 1.532.000,00 2.932.000,00 b. Lemari Buku Dan Area Charger Connection Unit 1,00 14.640.000,00 14.640.000,00
e. Washtuffel Unit 1,00 800.000,00 800.000,00
II. PEKERJAAN SIPIL : f. Kran Air Unit 1,00 120.000,00 120.000,00
1 Pekerjaan Beton Penutup Saluran Depan Pagar ~ Cor Plat m3 3,72 4.000.000,00 14.880.000,00 g. Pipa Air Bersih m' 15,00 60.000,00 900.000,00
Lantai Beton K-250 + Pembesian 14.880.000,00 h. Pipa Air Kotor m' 15,00 80.000,00 1.200.000,00
i. Kursi Café Unit 28,00 1.075.000,00 30.100.000,00
2 Pekerjaan Pembuatan Kamar Mandi Luar : j. Meja Kotak 60 x 60 cm Unit 6,00 1.175.000,00 7.050.000,00
a. Dinding Bata Ringan Kamar Mandi m2 12,60 140.000,00 1.764.000,00 k. Meja Bundar Dia. 60 cm Unit 4,00 1.000.000,00 4.000.000,00
b. Plester Aci m2 25,20 80.000,00 2.016.000,00 l. Meja Payung Dia. 60 cm Unit 2,00 2.700.000,00 5.400.000,00
c. Polished Cement Lantai Kamar Mandi m2 2,10 245.000,00 514.500,00 m. Ceilling Hanging Lamp + Kabel Ex. Eterna Titik 15,00 425.000,00 6.375.000,00
d. Closed Duduk ex. TOTO + Pasang bh 1,00 2.300.000,00 2.300.000,00 Sub Total Area Indoor 80.485.000,00
e. Urinoir Ex. Toto bh 1,00 2.500.000,00 2.500.000,00
f. Jet Shower bh 1,00 260.000,00 260.000,00 SUB TOTAL PEKERJAAN ARCHITECTURAL 144.218.000,00
g. Kran Air bh 1,00 80.000,00 80.000,00
h. Pintu Kamar Mandi Custom Made bh 1,00 870.000,00 870.000,00 TOTAL BIAYA PEKERJAAN RENOVASI CAFÉ 291.098.800,00
i. Saptictank & Resapan Unit 1,00 5.000.000,00 5.000.000,00
DIBULATKAN 291.000.000,00
j. Pipa Air Bersih m' 15,00 60.000,00 900.000,00
k. jPipa Air Kotor m' 10,00 80.000,00 800.000,00 17.004.500,00 Terbilang : Dua Ratus Sembilan Puluh Satu Juta Rupiah

3 Pekerjaan Tangga Entrance Area Outdoor Café | 5 anak m2 5,72 465.000,00 2.659.800,00 Noted :
tangga | Pasangan Bata Finishing Cement Polished 2.659.800,00 1. Harga di atas belum termasuk pajak- pajak yang berlaku seperti Ppn 10% & Pph.
2. Harga di atas berlaku sampai dengan 1 bulan dari waktu saat di serahkannya nilai RAB
4 Pekerjaan Sanitair Untuk SOP Covid 3. List Item pekerjaan dan harga masih bisa di negosiasikan dan disesuaikan dengan kebutuhan yang diperlukan.
a. Washtuffel Unit 1,00 800.000,00 800.000,00 4. Waktu Penyelesaian Pekerjaan Maksimal 60 Hari Kerja
b. Kran Air Unit 1,00 120.000,00 120.000,00
c. Pipa Air Bersih m' 4,00 60.000,00 240.000,00 Term Of Payment :
d. Pipa Air Kotor m' 1,00 80.000,00 80.000,00 1.240.000,00 1. Down Payment sebesar 50% Setelah Kontrak Pekerjaan Di Tandatangani.
2. Termyn I sebesar 25 % setelah progres pekerjaan SIPIL mencapai 100%
5 Pekerjaan Polished Cement Area Lantai Outdoor & Indoor m2 78,50 245.000,00 19.232.500,00 19.232.500,00
3. Termyn II ( Pelunasan) sebesar 20% Setelah Pekerjaan SIPIL & ARCHITECTURAL seluruhnya telah di serah terimakan dengan baik.
4. Retensi sebesar 5 % setelah masa pemeliharaan selama 1 Bulan
6 Pekerjaan Pasang Canopy | Spec. Tiang Kolom Besi m2 47,85 1.400.000,00 66.990.000,00
Hollow 10x10 | Frame Rangka Atap Besi Hollow 5 x 5 | Atap
Alderon | Finishing Cat Black Sprayed 66.990.000,00 Semarang, 7 Januari 2022
Architect + Pelaksana,
7 Pekerjaan Pemasangan Ram Expanda m2 12,60 250.000,00 3.150.000,00 3.150.000,00

8 Pekerjaan Pemasangan Rolling Grill m2 26,10 720.000,00 18.792.000,00 18.792.000,00


SUB TOTAL PEKERJAAN SIPIL 146.880.800,00

III. PEKERJAAN ARCHITECTURAL ( I Gede Garneta )


1 Pekerjaan Area Indoor :
a. Pemasangan Pintu Kaca & Jendela Kaca Frameless m2 9,90 520.000,00 5.148.000,00
Clear Glass 8 mm + Accessories
b. Drop Ceiling Sunda Plafond Wood Grain m2 8,00 220.000,00 1.760.000,00
c. Bar Table Unit 1,00 14.560.000,00 14.560.000,00
d. Kitchen Table (Belakang Bar Table) Unit 1,00 8.160.000,00 8.160.000,00
e. Washbasin Unit 1,00 800.000,00 800.000,00
f. Kran Air Unit 1,00 120.000,00 120.000,00
g. Pipa Air Bersih m' 15,00 60.000,00 900.000,00
h. Pipa Air Kotor m' 15,00 80.000,00 1.200.000,00
i. Kitchen Rack Unit 1,00 9.960.000,00 9.960.000,00
j. Hanging Table Unit 1,00 3.150.000,00 3.150.000,00
k. Kursi Bar | Bar Stool Unit 7,00 1.075.000,00 7.525.000,00

:: TOTALWIN CAFE ::
l. Ceilling Hanging Lamp + Kabel Ex. Eterna Titik 18,00 425.000,00 7.650.000,00
m. Fabric Canopy Fasad + Rangka Unit 1,00 2.800.000,00 2.800.000,00
Sub Total Area Indoor 63.733.000,00