Project Proposal - Erection Tower New
Project Proposal - Erection Tower New
Office : Jl. Cihanjuang Rahayu No. 215 Desa Centeng Kec Parongpong Kab Bandung Barat
Tel : +62 22 2068 0925 , Fax : +62 22 2068 0925, Mobile phone : +62 812 2246 3231
Email : [email protected]
1
Introduction
By Considering
• Recruit and provide workers who have high skills in the technical field
With our many experiences and strong beliefs, hard work and
professional management, we believe that we can meet the needs
of our clients.
2
Background
CV. TEMERLOH CONSTRUCTION is interested in working on a 500kV erection tower project provided by
the PT ……………… background on the basis of the following strengths:
1. Human Resources: have management personnel, experts and field workers who have experience
in the field of 500kV erection towers
2. Financial : get financial support from several funding sources to manage funds, both individual
funding sources, consortiums and banks, to work on construction projects and business
development projects that are controlled by Team.
3. Equipment : have equipment that supports the smoothness and accuracy of team work in the field
of erection tower.
• Maintain long term business relationship on the basic of mutual benefits and partnerships
Mission
• Empowering human resources who are experts in their field.
• Commit to continuous improvement in providing high quality resources and products.
• Support development needs in Indonesia.
• Providing welfare for employees and contributing to the environment.
• Providing customers high quality products and services.
• Grow into a healthy, high-quality company and uphold ethics in business.
Company Policy
Quality Policy
• To provide good quality between products and services , which are in accordance with requirements
and regulation to meet costumer satisfaction.
• Have commitment to quality by allocation resources to need for success.
3
Corporates Culture EAYA PERUSAHAAN
• Effective and Efficient
• Diligent and productive
• Added value for each job
• Initiative and creative
• Harmonious and strong team work
1. Ensure Occupational Health and Safety labor and other people (contractors, suppliers,
visitors and guests) at work.
2. Fulfill all applicable government regulations and other requirements relating to the
implementation of Occupational Safety and Health ( Keselamatan dan Kesehatan kerja
/ K3 ) in the workplace.
3. Carry out continuous improvements to the Occupational Safety and Health (
Keselamatan dan Kesehatan Kerja / K3 ) System and Performance In order to
improve the good K3 culture in the workplace.
1. Establish and maintain a sustainable Occupational Safety and Health Management System and
relevant resources.
2. To build workplaces and jobs in accordance with regulations and other requirements related to
Occupational Safety and Health.
3. Providing adequate OHS facilities and infrastructure.
4. Providing education or training related to Occupational Safety and Health to workers to improve the
performance of the Company's Occupational Safety and Health.
Cooperation Offer
• Schedule of rates
• Cost reimbursement with fixed fee guaranteed maximum and incentive provisions
4
Organization Chart
5
Equipment and Transport Facilities
6
List Equipment of Erection and Stringing
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI
Gasoline WANLIN,
1
Power winch
3 TON 2 sets BAIK
CHINA
10 TON
Anti twisting steel wire
rope 15 mm ( WANLIN,
4
with steel drum @ 1000
12.000 m BAIK
CHINA
m)
7
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI
WANLIN,
7 High strength shackle 5 TON 200 NOS BAIK
CHINA
WANLIN,
11 Turnbuckle 2 sets BAIK
CHINA
8
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI
WANLIN, CHINA
15 Zoom sag scope 2 sets BAIK
WANLIN, CHINA
16 Grounding short circuit 4 NOS BAIK
COMELONG
20
earthwire
2 TON 12 sets BAIK PANDU
9
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI
Tensioner (single)
22
Hydraulic system
5 TON 4 sets BAIK KOREA
10
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI
WIRE CONNECTOR
28
FOR 16mm
4 TON 50 pcs BAIK KOREA
HANDY TALKY
33
MOTOROLA UHF
5 km 20 sets BAIK JEPANG
RIG RADIO HT
34
MOTOROLA UHF
10 km 4 sets BAIK JEPANG
11
Experience List last 10 Years for Switchyard 150kV
12
13
Work Documentation
14
ERECTION TOWER 150 / 500 kV
15
16
PLTU KANCI CIREBON
SWITCHYARD 150 KV
17
STRINGING 4CCT 2XTACSR 410/67 mm2 Cirebon Power Plant
18
STRINGING CONDUCTOT AT S/W KDL CONNECTION WITH EQUIPMENTS
19
RESUME
1982 – 1983 Passed from PERTAMINA – BECHTEL International Incorporation Job No 14119, Training Program ( 6
Months ).
Job Training in Electrical Dept. Intensified Training in Alternating Current Principles and Diagrams,
Power Factor ,Alternators, Transformers, Testing Instrument and Trouble Shooting
November 11, 1982 to January 25, 1983 Bandung – Jabar.
20
WORK EXPERIENCES
Responsibilities: Responsible for Superintendent and Construction Management in all Electrical Project In Power
House . 150/11kV 50MVA Transformer, 11kV MV SWGR, LVAC, MCC - Switchyard : 150kV AIS 4bays
Review and Correct Shop Drawing prior to start of Project.
Advised and required Construction Sub Contractors to attend a weekly Meeting in order to Brought out the site of
Project and Construction, problem guide and monitor construction
Contractors to their work from time to time and assure the Quality of Construction Work
Man ship whether in the proper Specification and ASTM - JIS Standard.
Review and Recommend Approved Construction Schedule, Measure Contractors Progress and location are not
suitable to the Specification and Drawing.
Insure and Advise Construction Contractors to prepare Marked up Drawing and sketches for the preparation of As
Build Drawing, as the work completed.
WORK EXPERIENCES
2013 - 2017 PT WIGATA YASA SAMITRA
Project Name Waste to Energy Indonesia
Position Project Manager
Responsibilities:
Directing, monitoring and coordinating, sectional processes, evaluation and plans, to guarantee standard running conditions and process
productivity in accordance to daily/ monthly production plans and schedule.
Review of project contract document, workscope, specifications, drawings and procedure.
Preparation of proposed plans & schedules, and also manpower & equipment loadings.
Preparation of project plans & schedules, and also manpower & equipment loadings.
Proven ability to plan & organize and lead technical projects/teams.
Using Primavera does planning & close monitoring.
Prepare and Set-up All Planning and Control Report Project, Review Production Construction and Productivity. Prepare level-1,2 & 3 detailed
schedules.
Assist the Project Management Team ensure compliance with company safety objectives throughout the life of project.
Monitoring Efficiency Man-hours of Client Review base on Task work for Claim Progress MFI.
Advise the project management team on any delays and critical activities, and propose the solution to avoid delays.
Attend briefings, clarifications, negotiations and progress meeting with client
Assist in preparation of project close-out report to completion.
Preparing Reports to Client’s representative and Project Director
Leading the engineer Control and advised of Team Construction Engineer during the construction progress.
Brief of Project, are Contractor for Project Construction Service to and the value of contract is USD $ 1 Million. The scope of work build,
Installation & construction (Mechanical & Structure, Piping, Civil, Support Operation Maintenance, Electrical and Instrument) all area base on
Client Required
Experience
2012 - 2013 : BAYER HEALT CARE
Project Name : Jakarta Expansion Project Phase II in Jakarta Indonesia
Position : Mechanical and Electrical Coordinator
Responsibilities:
Involve of Engineering, Procurement and Construction , Assist to prepare of Technical Dossier Document.
Review & Monitor of schedule and relevant engineering costs, as per PROJECT Procedure and through constant monitoring of
MR status, deliverables status and quantities situation.
Identification of Design Changes and proper management of the deviations (if any) from contract or basis of design.
21
Assessment and revision (if necessary) of the assumptions and decisions of the proposal phase with special regards to material
quantities, engineering approach and man-hours.
Directing, monitoring and coordinating, sectional processes, evaluation and plans, to guarantee standard running conditions and
process productivity in accordance to daily/ monthly production plans and schedule.
Proven ability to plan & organize and lead technical projects/teams.
Interface communication with Subcontractor’s and Vendor’s
Assist the Project Management Team ensure compliance with company safety objectives throughout the life of project.
Advise the project management team on any delays and critical activities, and propose the solution to avoid delays.
Attend briefings, clarifications and progress meeting with client
Preparing Reports to Client’s representative and Project Manager
To carry out the Engineering, Design, The Procurement of equipment and materials, Construction, Testing, Pre-commissioning,
defect rectification and necessary services for commissioning and performance testing required to install and complete the
Facilities necessary for the Pipe line Project along with associated facilities at BAYER HEALTH CARE within 12 Months to
complete project work. The contract worth is (USD 65 Million).
Experience
2002 - 2003 : PT PERTAMINA Consortium PT INTI MARINDO
Project Name : Pipe line Padalarang to gedebage
Position : Piping Superintendent
Responsibilities:
Involve of Engineering, Procurement and Construction for Lump sum Turn Key (LSTK).
Assist to prepare of Technical Dossier Document.
Prepare & Control of schedule and relevant engineering costs, as per PROJECT Procedure and through constant monitoring of
MR status, deliverables status and quantities situation.
Identification of Design Changes and proper management of the deviations (if any) from contract or basis of design.
Prepare and Set-up All Planning and Control Report Project, Review Production Construction and Productivity. Prepare level-1,2
& 3 detailed schedules Check of Material Requisitions, Work Requisitions and Technical Bid evaluation against the project
contractual constraints
Assessment and revision (if necessary) of the assumptions and decisions of the proposal phase with special regards to material
quantities, engineering approach and man-hours.
Directing, monitoring and coordinating, sectional processes, evaluation and plans, to guarantee standard running conditions and
process productivity in accordance to daily/ monthly production plans and schedule.
Assist the Project Management Team ensure compliance with company safety objectives throughout the life of project.
Advise the project management team on any delays and critical activities, and propose the solution to avoid delays.
Attend briefings, clarifications and progress meeting with client
Preparing Reports to Client’s representative and Project Manager
The contract, worth $2.7 billion, is one of a series awarded recently by PT KID as part of the expansion of its PERTAMINA
refinery. Under the contract, Consortium KID will supply engineering, procurement and construction services on a lump-sum
turnkey basis for package No. 3 of the expansion.
Experience
1994– 1998 PT. DENKI INTERNUSA ENGEERING
Location : Bandung – West Java.
Position : Electrical and Mechanical Project Manager
22
Unit Pengolahan V Pertamina DAK, Balikpapan East Kalimantan Pipe Replacement line for Fire
Hydrant in Kijang.
Salak Geothermal, Sukabumi West – Java, Supply and Installation of HVAC.
Power Plant Tual, Maluku Tenggara, Electrical Works.
Experience
1990 – 1991 PT. TATA METRIKA NUSANTARA
Location : Cirebon – West Java Puri Santika Hotel
87 Room, Standard Room and Suite Room.
Position : Mechanical & Electrical Ass Site Manager.
Experience
1990 – 1991 MURTHY KURNIA UTAMA PT.
In associated with ACC SERVICE PRIMA PT.
Location : Palembang – South Sumatera
International Plaza Project
Position : Electrical and Mechanical Coordinator
Experience
1988 – 1989 PT. TOTAL BANGUN PERSADA
Location : Jakarta – Gedung Kantor Pusat PT.PELNI 15 Storey.
Position : Electrical and Mechanical Coordinator
Estimated and Calculated Budget and Planned the Project of Electrical Mechanical.
Prepared quotations of Material and Equipments requisition from Owner.
To submit Progress Report and Advise Project Manager immediately for possible delays and Take remedial action.
Prepare, recommendation and solutions to all problems holdings up the progress of Construction and Safety.
23
Testing for Medium Voltage 20KV Panel Metering Incoming, Outgoing (MV. Indoor Metals Clad Switchgear 24KV / 400 V / 3 PH/
50 HZ)
Testing for Transformer 20 KV, Oil Testing, Power Factor Testing and Earth Grounding Testing.
Test Bed Result Diesel Generating set D 234 series 500KVA.
Experience
1985 – 1988 TEKNIK UMUM PT
Position Electrical and Mechanical Field Engineer and Estimator
SITE ENGINEER
For the construction of Television Republik Indonesia ( TVRI ) Bandung West Java, Estimated and Calculated Budget and
Planned the Project of Mechanical piping and Fitting, Electric Water Pumps, Included to provide the supply of Materials,
Equipment,. Installation of Air Conditioning System in Accordance to the HVAC Duct Construction Standard and SMACNA
Report to the Project Manager on Progress, problems and recommendation for the Project and Engineering.
PIPING SUPERVISOR
Construction of 24” Raw Water Pipe line and Intake Facilities Project 8 KM, PT.Pupuk Kujang Cikampek West Java.
Pipe type API 5 LX – X 42 API 1104 15 th Edition 1980.
Piping Installation dia 24” – 8 KM, Installation of PIG LAUNCHER, PIG RECEIVER Accordance with code ANSI B 31.4 or
B.31.8.
River Crossing/ swampy area crossing constructions, Testing, Start Up and Commissioning
Experience
1984 – 1985 NIHON ARCHITECTS, ENGINEER CONSULTANTS INC in
association with TEAM CONSULTANTS / DACREA Consultants PT.
Location Jakarta – LIPPO PLAZA POJECT 21 Storey
Position Electrical Inspector
Experience
1983 – 1984 BERCA INDONESIA PT – YAMATAKE HONEY WELL
Location Bontang East Kalimantan
Train C area – Train D area – Main Control Room
Position Electrical and Instrumentation General Foreman ( GF )
24
1982 – 1983 BECHTEL INTERNATIONAL Inc. Job No 14119 Badak LNG Expansion Project.
Location : Bontang East Kalimantan
Train C area – Train D area – Main Control Room and Utility area.
Position : Electrician Foreman ( FR )
Yours faithfully,
Rudy Thamrin
25