0% found this document useful (0 votes)
332 views25 pages

Project Proposal - Erection Tower New

Erection tower

Uploaded by

wisnuaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
332 views25 pages

Project Proposal - Erection Tower New

Erection tower

Uploaded by

wisnuaji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

PROJECT PROPOSAL

CV. TEMERLOH CONSTRUCTION

ENGINEERING PROCUREMENT CONTRUCTION


Electrical, Mechanical, Instruments
Mayor Services:
Design Engineering, Construction & Maintenance
150/275/500 kV Transmission line
150 kV Switchyard Substation
 LINE SURVEY & PROFILE DRAWINGS TRANSMISSION LINE
 SOIL INVESTIGATION AND SOIL ANALYSIS
 DESIGN ENGINEERING TOWERS & SWITHYARD
 DESIGN & CONSTRUCTION FOUNDATION
 ERECTION TOWER I STEEL STRUCTURE
 ERECTION SWITCHYARD & SUBSTATION
 STRINGING CONDUCTORS, OPGW, ADSS
 RECONDUCTORING TRANSMISSION LINE

Office : Jl. Cihanjuang Rahayu No. 215 Desa Centeng Kec Parongpong Kab Bandung Barat
Tel : +62 22 2068 0925 , Fax : +62 22 2068 0925, Mobile phone : +62 812 2246 3231
Email : [email protected]

1
Introduction

By Considering

• After years of experience in handling mechanical, electrical,


instrumentation projects both construction and maintenance for
plants and industry.

• Recruit and provide workers who have high skills in the technical field

• A strong desire to develop workers' abilities and contribute to


the country's development.
We decided to set up a company, which specializes in the fields of
mechanical, electrical, instrumentation construction as a contractor,
named:

CV. TEMERLOH CONSTRUCTION

With our many experiences and strong beliefs, hard work and
professional management, we believe that we can meet the needs
of our clients.

CV. TEMERLOH CONSTRUCTION is controlled by a management team


with experience in handling projects in the fields mentioned above. Based
on our experience and expertise, we are confident that we can work with
you to provide the best performance with the principle of mutual benefit.
We, therefore, convey.

Jakarta, 25 Mei 2019

2
Background
CV. TEMERLOH CONSTRUCTION is interested in working on a 500kV erection tower project provided by
the PT ……………… background on the basis of the following strengths:

1. Human Resources: have management personnel, experts and field workers who have experience
in the field of 500kV erection towers
2. Financial : get financial support from several funding sources to manage funds, both individual
funding sources, consortiums and banks, to work on construction projects and business
development projects that are controlled by Team.
3. Equipment : have equipment that supports the smoothness and accuracy of team work in the field
of erection tower.

Vision and Mission


Vision
• Supporting National & International companies in services and solutions
in the field of electrical, mechanical, instrumentation construction work in
Indonesia.

• Become a competitive company.

• Maintain long term business relationship on the basic of mutual benefits and partnerships

• Providing the best quality of work according to specified technical standard.

• To be better than other contractors in similar fields of work.

Mission
• Empowering human resources who are experts in their field.
• Commit to continuous improvement in providing high quality resources and products.
• Support development needs in Indonesia.
• Providing welfare for employees and contributing to the environment.
• Providing customers high quality products and services.
• Grow into a healthy, high-quality company and uphold ethics in business.

Company Policy
Quality Policy

• To provide good quality between products and services , which are in accordance with requirements
and regulation to meet costumer satisfaction.
• Have commitment to quality by allocation resources to need for success.

3
Corporates Culture EAYA PERUSAHAAN
• Effective and Efficient
• Diligent and productive
• Added value for each job
• Initiative and creative
• Harmonious and strong team work

Occupational Health and Safety Policy

CV. TEMERLOH CONSTRUCTION is committed to :

1. Ensure Occupational Health and Safety labor and other people (contractors, suppliers,
visitors and guests) at work.
2. Fulfill all applicable government regulations and other requirements relating to the
implementation of Occupational Safety and Health ( Keselamatan dan Kesehatan kerja
/ K3 ) in the workplace.
3. Carry out continuous improvements to the Occupational Safety and Health (
Keselamatan dan Kesehatan Kerja / K3 ) System and Performance In order to
improve the good K3 culture in the workplace.

To realize our commitment, company will

1. Establish and maintain a sustainable Occupational Safety and Health Management System and
relevant resources.
2. To build workplaces and jobs in accordance with regulations and other requirements related to
Occupational Safety and Health.
3. Providing adequate OHS facilities and infrastructure.
4. Providing education or training related to Occupational Safety and Health to workers to improve the
performance of the Company's Occupational Safety and Health.

Cooperation Offer

• Lump Sum competitive

• Lump Sum negotiated

• Schedule of rates

• Cost reimbursement with fixed fee guaranteed maximum and incentive provisions

• Target estimate cost reimbursement with fixed or percentage fee

• Other variables of these basic forms of contract

4
Organization Chart

5
Equipment and Transport Facilities

Supporting Cars : Daihatsu Xenia 2 unit


Daihatsu Pickup Jumbo 2 unit
Light Truck 2 unit

Site Works : Concrete Mixer 4 unit


Vibrators 4 unit
Concrete sample for test 10 unit
Theodolite for survey line 3 set

Office staff : Personal Computer 3 unit


Laptop 5 unit
Printer 2 Unit
Furniture 3 set

Stringing Machine : Tesmec, Youngkwang korea 2 set


Wanlin, Cina 1 set

6
List Equipment of Erection and Stringing

STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI

Gasoline WANLIN,
1
Power winch
3 TON 2 sets BAIK
CHINA

3 sheaves running WANLIN,


2
block ( 60 cm)
5 TON 200 sets BAIK
CHINA

1 sheave running block ( WANLIN,


3
60 cm )
2 TON 120 sets BAIK
CHINA

10 TON
Anti twisting steel wire
rope 15 mm ( WANLIN,
4
with steel drum @ 1000
12.000 m BAIK
CHINA
m)

Steel drum for pilot WANLIN,


5
wire
1000 m 12 sets BAIK
CHINA

U-shape bend WANLIN,


6
resistance
5 TON 40 NOS BAIK
CHINA

7
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI

WANLIN,
7 High strength shackle 5 TON 200 NOS BAIK
CHINA

Mesh sock grip for WANLIN,


8
conductor
6 TON 8 NOS BAIK
CHINA

Cable mesh sock grip WANLIN,


9
for earthwire & OPGW
3 TON 4 NOS BAIK
CHINA

Running board for two WANLIN,


10
bundle conductors
2 sets BAIK
CHINA

WANLIN,
11 Turnbuckle 2 sets BAIK
CHINA

Gear modle WANLIN,


12
wire
2 NOS BAIK
CHINA
clipper

Hydraulic conductor WANLIN,


13
cutter
8 NOS BAIK
CHINA

8
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI

Two conductor bundle WANLIN, CHINA


14
line cart
6 sets BAIK

WANLIN, CHINA
15 Zoom sag scope 2 sets BAIK

WANLIN, CHINA
16 Grounding short circuit 4 NOS BAIK

Running board for WANLIN, CHINA


17
OPGW
2 NOS BAIK

Joint protector for WANLIN, CHINA


18
conductor
10 sets BAIK

Reel pay out stand with


WANLIN, CHINA
19 drum brake ( for 4 sets BAIK
conductor @ 5 ton)

COMELONG
20
earthwire
2 TON 12 sets BAIK PANDU

9
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI

Engine Puller with 2


21 capstan 7 TON 2 sets BAIK KOREA
( mechanical system)

Tensioner (single)
22
Hydraulic system
5 TON 4 sets BAIK KOREA

23 Hydraulic compressor 100 TON 6 sets BAIK KOREA

Compressor Dies for


23
ACSR 438 mm2
100 TON 6 sets BAIK KOREA

25 Swivel 6 TON 16 sets BAIK KOREA

26 Lever Block 1,5 TON 24 sets BAIK KOREA

27 Drum Stand Oil Jack 10 TON 8 sets BAIK KOREA

10
STATUS
NO. DESCRIPTION MODEL CAPASITY Q'TY BUATAN
KONDISI

WIRE CONNECTOR
28
FOR 16mm
4 TON 50 pcs BAIK KOREA

29 CHAIN BLOCK 5 TON 8 sets BAIK JEPANG

30 BV WINCH 2 TON 4 sets BAIK LOKAL

STEEL ROPE FULL LOKAL /


31
BAJA 12 mm
10 TON 5000 m BAIK
CHINA

NYLON ROPE 16 LOKAL EX


32
mm
5 TON 6000 m BAIK
KOREA

HANDY TALKY
33
MOTOROLA UHF
5 km 20 sets BAIK JEPANG

RIG RADIO HT
34
MOTOROLA UHF
10 km 4 sets BAIK JEPANG

11
Experience List last 10 Years for Switchyard 150kV

12
13
Work Documentation

SWITCHYARD 150 KV TALANG KELAPA , PALEMBANG

14
ERECTION TOWER 150 / 500 kV

15
16
PLTU KANCI CIREBON
SWITCHYARD 150 KV

17
STRINGING 4CCT 2XTACSR 410/67 mm2 Cirebon Power Plant

18
STRINGING CONDUCTOT AT S/W KDL CONNECTION WITH EQUIPMENTS

LIFTING ALUMINIUM BUSBAR INSTALL JUMPER TO EQUIPMENTS

WELDING ALUMINIUM BUSBAR ALUMINIUM BUSBAR

19
RESUME

Name : Rudy Thamrin

Classification : Electrical & Mechanical SUPERINTENDENT

Permanent Address : Jl Sari Rasa XV No 62 Sarijadi 40151


Bandung - Jawa Barat Indonesia
Mobile Phone : 081222 46 3231
Email [email protected]

Place/ Date of Birth : Pekanbaru – Minas, August 20,


Nationality : Indonesian
Marital Status : Married
Religion : Moslem
Education : Faculty of Electrical
Language : Indonesia – English - Japan

GENERAL EDUCATION AND VACATION TRAINING

2013 TRAINING & SEMINAR MHP Mini Hydro Power


Principles of MHP, Identification and selection criteria, Feasibility design
Element of MHP site, Turbines and Hydro laboratory, Operation and maintenance

2013 Biomass Waste To Energy Project Development


Case studies of grid connected biomass – Biogas to electricity power plants
Appropriate technology assessment
Technical design and engineering including construction lead time
Biological management, operation maintenance , process control and trouble shooting
Business plan development, safety assessment and mitigation plan

2001 Process Mapping According to ISO 9001-2000


Awareness Safety Management System OHSAS 18001
Up Grading ISO 9001-2000 for service Industries
Integration Management System (Quality Environment and Safety )
Comprehensive 150/TS 16949
Documentation system ( process approach

1982 – 1983 Passed from PERTAMINA – BECHTEL International Incorporation Job No 14119, Training Program ( 6
Months ).
Job Training in Electrical Dept. Intensified Training in Alternating Current Principles and Diagrams,
Power Factor ,Alternators, Transformers, Testing Instrument and Trouble Shooting
November 11, 1982 to January 25, 1983 Bandung – Jabar.

1981 Passed from Electrical System Course, Bandung


ICCI PT – CDME Construction Development in the Middle East Training Program ( 6 Months ).
Job Training in Electrical Dept. Intensified training in Power and Power Transformer Station, Work Shop
for Repair and Maintenance of Electric Motors, Pumps, Generators, and Welding Transformers.

20
WORK EXPERIENCES

2016 - 2018 HYUNDAI CONSTRUCTION


Project Name Raja Mandala Power Plant
Position Electrical Engineer
Project Name Indonesia Rajamandala Hydroelectric Power Plant PJT
Project Description : Supply, Installation, Test and commissioning for Equipment(Excluded Civil work
- Switchyard : 150kV AIS 4bays
Power House : 150/11kV 50MVA Transformer, 11kV MV SWGR, LVAC, MCC
Main Contractor / Client : HYUNDAI Engineering Co. / REP(Rajamandala Electric Power)
Site address : Kampung Cisameng, RT.01 RW.07 Kel. Rajamandala Kulon Kec. Cipatat Kab. Bandung Barat
40754.
Contract Period : ’15.04.22~’19.05.11

Responsibilities: Responsible for Superintendent and Construction Management in all Electrical Project In Power
House . 150/11kV 50MVA Transformer, 11kV MV SWGR, LVAC, MCC - Switchyard : 150kV AIS 4bays
Review and Correct Shop Drawing prior to start of Project.
Advised and required Construction Sub Contractors to attend a weekly Meeting in order to Brought out the site of
Project and Construction, problem guide and monitor construction
Contractors to their work from time to time and assure the Quality of Construction Work
Man ship whether in the proper Specification and ASTM - JIS Standard.
Review and Recommend Approved Construction Schedule, Measure Contractors Progress and location are not
suitable to the Specification and Drawing.
Insure and Advise Construction Contractors to prepare Marked up Drawing and sketches for the preparation of As
Build Drawing, as the work completed.

WORK EXPERIENCES
2013 - 2017 PT WIGATA YASA SAMITRA
Project Name Waste to Energy Indonesia
Position Project Manager
Responsibilities:
Directing, monitoring and coordinating, sectional processes, evaluation and plans, to guarantee standard running conditions and process
productivity in accordance to daily/ monthly production plans and schedule.
Review of project contract document, workscope, specifications, drawings and procedure.
Preparation of proposed plans & schedules, and also manpower & equipment loadings.
Preparation of project plans & schedules, and also manpower & equipment loadings.
Proven ability to plan & organize and lead technical projects/teams.
Using Primavera does planning & close monitoring.
Prepare and Set-up All Planning and Control Report Project, Review Production Construction and Productivity. Prepare level-1,2 & 3 detailed
schedules.
Assist the Project Management Team ensure compliance with company safety objectives throughout the life of project.
Monitoring Efficiency Man-hours of Client Review base on Task work for Claim Progress MFI.
Advise the project management team on any delays and critical activities, and propose the solution to avoid delays.
Attend briefings, clarifications, negotiations and progress meeting with client
Assist in preparation of project close-out report to completion.
Preparing Reports to Client’s representative and Project Director
Leading the engineer Control and advised of Team Construction Engineer during the construction progress.
Brief of Project, are Contractor for Project Construction Service to and the value of contract is USD $ 1 Million. The scope of work build,
Installation & construction (Mechanical & Structure, Piping, Civil, Support Operation Maintenance, Electrical and Instrument) all area base on
Client Required

Experience
2012 - 2013 : BAYER HEALT CARE
Project Name : Jakarta Expansion Project Phase II in Jakarta Indonesia
Position : Mechanical and Electrical Coordinator

Responsibilities:
Involve of Engineering, Procurement and Construction , Assist to prepare of Technical Dossier Document.
Review & Monitor of schedule and relevant engineering costs, as per PROJECT Procedure and through constant monitoring of
MR status, deliverables status and quantities situation.
Identification of Design Changes and proper management of the deviations (if any) from contract or basis of design.

21
Assessment and revision (if necessary) of the assumptions and decisions of the proposal phase with special regards to material
quantities, engineering approach and man-hours.
Directing, monitoring and coordinating, sectional processes, evaluation and plans, to guarantee standard running conditions and
process productivity in accordance to daily/ monthly production plans and schedule.
Proven ability to plan & organize and lead technical projects/teams.
Interface communication with Subcontractor’s and Vendor’s
Assist the Project Management Team ensure compliance with company safety objectives throughout the life of project.
Advise the project management team on any delays and critical activities, and propose the solution to avoid delays.
Attend briefings, clarifications and progress meeting with client
Preparing Reports to Client’s representative and Project Manager
To carry out the Engineering, Design, The Procurement of equipment and materials, Construction, Testing, Pre-commissioning,
defect rectification and necessary services for commissioning and performance testing required to install and complete the
Facilities necessary for the Pipe line Project along with associated facilities at BAYER HEALTH CARE within 12 Months to
complete project work. The contract worth is (USD 65 Million).

Experience
2002 - 2003 : PT PERTAMINA Consortium PT INTI MARINDO
Project Name : Pipe line Padalarang to gedebage
Position : Piping Superintendent

Responsibilities:
Involve of Engineering, Procurement and Construction for Lump sum Turn Key (LSTK).
Assist to prepare of Technical Dossier Document.
Prepare & Control of schedule and relevant engineering costs, as per PROJECT Procedure and through constant monitoring of
MR status, deliverables status and quantities situation.
Identification of Design Changes and proper management of the deviations (if any) from contract or basis of design.
Prepare and Set-up All Planning and Control Report Project, Review Production Construction and Productivity. Prepare level-1,2
& 3 detailed schedules Check of Material Requisitions, Work Requisitions and Technical Bid evaluation against the project
contractual constraints
Assessment and revision (if necessary) of the assumptions and decisions of the proposal phase with special regards to material
quantities, engineering approach and man-hours.
Directing, monitoring and coordinating, sectional processes, evaluation and plans, to guarantee standard running conditions and
process productivity in accordance to daily/ monthly production plans and schedule.
Assist the Project Management Team ensure compliance with company safety objectives throughout the life of project.
Advise the project management team on any delays and critical activities, and propose the solution to avoid delays.
Attend briefings, clarifications and progress meeting with client
Preparing Reports to Client’s representative and Project Manager
The contract, worth $2.7 billion, is one of a series awarded recently by PT KID as part of the expansion of its PERTAMINA
refinery. Under the contract, Consortium KID will supply engineering, procurement and construction services on a lump-sum
turnkey basis for package No. 3 of the expansion.

Experience
1994– 1998 PT. DENKI INTERNUSA ENGEERING
Location : Bandung – West Java.
Position : Electrical and Mechanical Project Manager

Estimated and Calculated Budget and Planning for the Project.


Prepared Schedule of Material, Schedule of Man Power, Shop Drawing and Standard Drawing and Standard Drawing Submit
Project Report and Advise Project Manager Immediately for possible delays and take remedial Action, prepare, recommendation
and solutions to all problems holding up the Progress of Construction and Safety.
Testing Start Up and Commissioning
Work at PT. DENKI INTERNUSA ENGINEERING, Bandung :
 Motel Patra Jasa Cirebon, Rrehabilitation of Electrical & Air Conditioning System, Hot Water system.
 Sultan Adyamegah Plaza, Bandung, Plumbing & Fire Fighting Work.
 Gedung BTN, Cimahi West – Java, Mechanical & Electrical Work.
 Al-Islam Hospital, Bandung West – Java, Mechanical & Electrical Work.
 Gedung BDN, Sukabumi West – Java, Electrical , Fire Alarm, Security System Works.
 Salak Geothermal, Sukabumi West – Java, Electrical and Heat Ventilation Air Conditioning Works.
 Unit Pengolahan V Pertamina DAK, East Kalimantan, Re-Tubing & Install Site Bundle E-2-04
A/B/C/D Plant # 2.
 Pertamina EP, Sangatta East Kalimantan, Pipe Replacement Line 20” for Oil Pipe.

22
 Unit Pengolahan V Pertamina DAK, Balikpapan East Kalimantan Pipe Replacement line for Fire
Hydrant in Kijang.
 Salak Geothermal, Sukabumi West – Java, Supply and Installation of HVAC.
 Power Plant Tual, Maluku Tenggara, Electrical Works.

Experience
1990 – 1991 PT. TATA METRIKA NUSANTARA
Location : Cirebon – West Java Puri Santika Hotel
87 Room, Standard Room and Suite Room.
Position : Mechanical & Electrical Ass Site Manager.

Duties and Responsibilities


To coordinate and evaluate of Electrical and Mechanical Supervisor to Execute the Implementation of Programs in the Project.

The lines of Electrical and Mechanical Coordinate Installation


a. Medium Voltage 20KV Panel Metering, Incoming, Outgoing Transformer.
b. Power Standby Generator 375 KVA – 125 KVA
c. Lighting Installation
d. Plumbing Installation, Hot and Cold Water Pipe.
e. Fire Fighting / Fire Protection System.
f. Sewage Treatment Plant.

Experience
1990 – 1991 MURTHY KURNIA UTAMA PT.
In associated with ACC SERVICE PRIMA PT.
Location : Palembang – South Sumatera
International Plaza Project
Position : Electrical and Mechanical Coordinator

Duties and Responsibilities


Responsible for the Construction of Air Conditioning System, Erection and Install of Water Cooled Package 13 unit, total Water
Cooled 15.855.900 BTU/Hr.
Constructions of Cooling Tower, Condenser Water Supply Pipe, Condenser Water Supply Return Pipe, Machine Support Bases,
Header, Condenser Supply Pump.
Installation of Supply Air Duct, Return Air Duct, Chamber Box, Supply Diffuser.
Testing, Start Up and Commissioning.

Experience
1988 – 1989 PT. TOTAL BANGUN PERSADA
Location : Jakarta – Gedung Kantor Pusat PT.PELNI 15 Storey.
Position : Electrical and Mechanical Coordinator

Duties and Responsibilities


To Coordinate and Evaluated a Team of Electrical and Mechanical Site Manager to Execute the Implementation of the Programs
at the Project.

The lines of Electrical and Mechanical to Coordinate :


a. Power Standby Generator 500 KVA
b. Medium Voltage 20 KV Panel, Metering, Incoming, Out Going Transformer.
c. Lighting Installations.
d. Fire Alarm System.
e. Fire Fighting System.
f. Sewage Treatment Plan.
g. Deep water pipe and Dirty water pipe.
h. Deep wheel and Pump Installation.

Estimated and Calculated Budget and Planned the Project of Electrical Mechanical.
Prepared quotations of Material and Equipments requisition from Owner.
To submit Progress Report and Advise Project Manager immediately for possible delays and Take remedial action.
Prepare, recommendation and solutions to all problems holdings up the progress of Construction and Safety.

23
Testing for Medium Voltage 20KV Panel Metering Incoming, Outgoing (MV. Indoor Metals Clad Switchgear 24KV / 400 V / 3 PH/
50 HZ)
Testing for Transformer 20 KV, Oil Testing, Power Factor Testing and Earth Grounding Testing.
Test Bed Result Diesel Generating set D 234 series 500KVA.

Experience
1985 – 1988 TEKNIK UMUM PT
Position Electrical and Mechanical Field Engineer and Estimator

ELECTRICAL FIELD ENGINEER AND ESTIMATOR


For the PLTA saguling Hydro Electric Power Project.
Electrical Construction in surge Tanks – Penstock Tunnels, Primary Distribution, Termination and Splicing of Cables, Installation
conduit and boxes layout, lighting Etc.

SITE ENGINEER
For the construction of Television Republik Indonesia ( TVRI ) Bandung West Java, Estimated and Calculated Budget and
Planned the Project of Mechanical piping and Fitting, Electric Water Pumps, Included to provide the supply of Materials,
Equipment,. Installation of Air Conditioning System in Accordance to the HVAC Duct Construction Standard and SMACNA
Report to the Project Manager on Progress, problems and recommendation for the Project and Engineering.

MECHANICHAL FIELD ENGINEER


The Installation two (2) Steam Boiler, Colorifier, Feed Water System Circulation pump, Insulation MG Rock Wool Pipe Covering,
Flange Insulation, Control Panel.
Pre-commissioning, commissioning and Start Up of Steam Boiler, PT. Vonex Indonesia.

PIPING SUPERVISOR
Construction of 24” Raw Water Pipe line and Intake Facilities Project 8 KM, PT.Pupuk Kujang Cikampek West Java.
Pipe type API 5 LX – X 42 API 1104 15 th Edition 1980.
Piping Installation dia 24” – 8 KM, Installation of PIG LAUNCHER, PIG RECEIVER Accordance with code ANSI B 31.4 or
B.31.8.
River Crossing/ swampy area crossing constructions, Testing, Start Up and Commissioning

Experience
1984 – 1985 NIHON ARCHITECTS, ENGINEER CONSULTANTS INC in
association with TEAM CONSULTANTS / DACREA Consultants PT.
Location Jakarta – LIPPO PLAZA POJECT 21 Storey
Position Electrical Inspector

Duties and Responsibilities


Responsible for Superintendent and Construction Management in all Electrical Project In Main Building.
Review and Correct Shop Drawing prior to start of Project.
Advised and required Construction Contractors to attend a weekly Meeting in order to Brought out the site of Project and
Construction, problem guide and monitor construction
Contractors to their work from time to time and assure the Quality of Construction Work
Man ship whether in the proper Specification and JIS Standard.
Review and Recommend Approved Construction Schedule, Measure Contractors Progress and location are not suitable to the
Specification and Drawing.
Insure and Advise Construction Contractors to prepare Marked up Drawing and sketches for the preparation of As Build
Drawing, as the work completed.

Experience
1983 – 1984 BERCA INDONESIA PT – YAMATAKE HONEY WELL
Location Bontang East Kalimantan
Train C area – Train D area – Main Control Room
Position Electrical and Instrumentation General Foreman ( GF )

Duties and Responsibilities


Electrical and Instrumentation Construction in Train C area Train D area and Main Control Room. Installation of Level Gauge,
Level Controller Differential type flange MTD, Level Transmitter – Temperature Indicator.Direct the Work of (4) Foreman with
total Manpower of 24 personnel under my Supervision.

24
1982 – 1983 BECHTEL INTERNATIONAL Inc. Job No 14119 Badak LNG Expansion Project.
Location : Bontang East Kalimantan
Train C area – Train D area – Main Control Room and Utility area.
Position : Electrician Foreman ( FR )

Duties and Responsibilities


Installation of underground duct and pulled direct burial cables from Train C and D and off plot area for primary distribution
instrument, power and control cables, complete with termination and connections, constructed Overhead Cable Trays and
Fitting, from Boilers , Hot plants extension, turbine building to Main Control Room, Complete Construction of Main Control Room.
The Specification Standard Utilizing BECHTEL Standard, and National Electrical Code.

I declare that the information given above is true.