House Estimate 10lakh

Uploaded by

manilesnarf5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

QUANTITY UNIT

HEADING DESCRIPTION WISE


A.)EXCAVATION
1.> Earth work excavation in all kinds of soil (except hard rock
required blasting) by mechanical means
(Hydraulicexcavator) / manual means over areas
including disposal of excavated earth, dressing of sides
and ramming of bottoms as directed by site in charge,
lead upto 50 m and lift upto 3m, disposed earth to be
levelled and neatlydressed. 19 mtr.cube
2.> EARTH FILLING Filling with approved good quality earth in plinths, area
levelling etc. in layers each not exceeding 200mm in
depth,breaking clods, watering, compacting each layer
with vibratory compactor and at inaccessible places
withwooden/steel rammer to achieve.
17.5 mtr.Cube
3.>P.C.C 1:3:6 Providing and laying plain cement concrete (P.C.C ) 1:3:6 (1
cement: 3 M. sand : 6 coarse aggregate) using 40mm hard
broken granite stones of required thickness for foundation,
rafts, plinth beams, at plinth level, levelling course and all
locations, etc. The rate including cost and conveyance of all
materials, labour, form work, base
preparation,consolidation, curing, all leads and lift etc
complete as directed by the Engineer-in-charge.
4.05 mtr.cube
4.>RANDOM Random rubble masnory in CM. 1:5 using machine cut RR
RUBBLE MASONRY stone of nearest available size for basement work , fins
0.45 DEPTH etc.including scaffolding curing, racking joints, cost,
conveyance of all materials and all labour charges etc.
16.05 mtr.cube
5.>RANDOM Random rubble masnory in CM. 1:5 using machine cut RR
RUBBLE MASONRY stone of nearest available size for basement work, fins
0.6 DEPTH etc.including scaffolding curing, racking joints, cost,
conveyance of all materials and all labour charges etc.
9 mtr.cube
(M15)Providing & laying RCC M15/ Design Mix( cement:M.
6.>PLINTH BEAM sand :coarse aggregate) for plinth beam. 1.65 mtr.cube

B.) SUPER
STRUCTURE
7.>Laterite 1:5 using machine cut laterite stone of 35x20x20cm or
masonry in CM. nearest available size for superstructure walls, fins etc.
including scaffolding curing, racking joints, cost,
conveyance of all materials and alllabour charges etc.
3811 nos
8.>Providing & M15/ Design Mix ( 1 cement: 2 M. sand : 4 coarse
laying RCC aggregate) for,Column + Lintel + Sunshade + Slabs (GF+FF)
+Stair
material cost 19.01 mtr.cube
labour cost
9.>STEEL WORK Providing and fabricating reinforcement Fe 500 (TMT
high yield strength bars) for RCC work, including
straightening, cutting, bending, cranking, hooking, lapping,
placing in position, tying with 18 gauge binding wire of
approved quality including cost of binding wire and
anchoring to the adjoining members wherever necessary
etc,including wastages etc., complete as per design and
specifications and direction with all lead and lift & as
directed bythe Engineer-in-charge (wastages/laps not to
be measured and paid). Cover block PVC/CC as
approved by theengineer in charge.column + lintel +
sunshade + slabs (GF+FF) +stair + plinth beam

1598 kg
10.>PLASTERING Plastering the internal walls (including parapet, drop and
sunshade) with cement mortar 1:5, (1 cement: 5 course
sand) 16mm thick (after hacking the concrete surface if
necessary) including cost, conveyance and unloading of
allmaterials, all labour, scaffolding, watering, curing, etc.
complete as per the Engineer's Instruction.
3800 sqft
cement + psand, material cost
11.>FLOORING Providing and laying cement flooring of specified type and
thickness without warpage, of approved make and
colourlaid on 20 mm thick cement mortar as per the
approved design including borders/any pattern/buttons,
for liftcladding including grouting the joints with joint
filler Roff","Fosroc" or approved make by the architect
as permanufacturers specification to match in colour with
the tiles including curing, finishing, acid washing etc.
complete.(tile cost + labour cost + cement mortar)

963 sqft
12.>WALL TILES Doing walls for kitchen,toilets• with ceramic tiles of
approved quality, colour, over the plasterd surface
usingcement slurry including cost and conveyance of all
materials and all labour charges etc. complete.(tile cost +
labour cost + cement mortar)
647.5 sqft
13.>STAIR
HANDRAIL
14.>TOILET EWC + Health faucet•+ Wash Basin Accesosories + 2 in 1
ACCESSORIES wall mixer + Over head showertotal cost for 3 toilets

15.>KITCHEN
ACCESSORIES Stainless Steel sink + Sink faucet total cost for 1 kitchen
16.>KITCHEN SLAB
FLOORING Kitchen slab(granite cost + labour cost + cement mortar) 25 sqft
17.>PAINTING Painting exterior and interior with paint and making
texture / pattern as per the requirment by applying two
coatsand as per specifications and colour as per Architects
choice including cost of all materials and labour charges etc
complete. 4562 sqft
18.>JOINERY Doors Providing & fixing 35 mm thick flush door shutter
WORKS (Mansonite skin ) including ISI marked stainless steel butt
hingeswith necessary screws confirming to IS 2202, solid
core of block board construction, with frames of hard wood
and well matched 1 mm thick laminated veneered
shutters of both face shutters for internal doors. All
edges shouldfinish with matching wood lipping with PU
clear coat . Rate including the cost of hardware item like SS
butt hinges,handle, locks , ball bearing etc shall be aproved
make of Hafele or equivalent. The item included lock hole
boring /hinge rebate cutting etc.

total amount considered for doors


Supplying and fitting steel frame fully glazed windows and
door as per approved design including necessary hingesand
19.>Windows fittings etc., complete.
total amount considered for windows
20.>ELECTRICAL total amount considered for electrical work including
AND WIRING labour and materials
21.>PLUMBING total amount considered for plumbing and sanitary works
AND SANITARY
WORKS
22.>SEPTIC TANK total amount considered for septic tank work
23.>STEEL total amount considered for steel carporch work
CARPORCH

GRAND TOTAL
TOTAL IN WORDS
RATE PER COST(in
UNIT Rs)

400 7600

300 5250

6850 27743

1625 26000

1625 14625

10600 17490

41 156251
4050 76990
155400

48 76704

15 57000
24350

45 43335

45 29138

8000
30700

4800

150 3750

16 72992

47300

74400

40000

25725
20000

35000

1080543
TEN LAKH
EIGHTY
THOUSAN
D FIVE
HUNDRED
FORTY
THREE