Eastern Cape Turnkey Contracts Tender
Eastern Cape Turnkey Contracts Tender
SCMU5-23/24-0115
NAME OF COMPANY:
____________________________________________________________________________
1 SCMU5-23/24-0115
T1.1 Tender Notice and Invitation to Tender
The Eastern Cape Department of Public Works and Infrastructure hereby invites service providers with a
CIDB Grading 7 or Higher in the following classes of construction works General Building (GB) or Civil
Engineering (CE), to submit their proposals.
Bid documents are downloadable free of charge from the Department of Public Works and Infrastructure
website (www.ecdpw.gov.za/tenders) or from the National Treasury’s tender portal
(http://www.etender.gov.za/content/advertised-tenders). Bid documents will be available on 16 February
2024. No bid documents will be available at departmental offices.
Queries relating to the issue of these documents may be addressed in writing to SCM email:
[email protected] Technical enquiries: may be addressed in writing to Mr. K. Kanana Cell:
071 672 4487, 040 602 4511 email: [email protected].
It is the responsibility of the tenderer/s to ensure that bid documents /proposals are submitted on or before
closing time and the correct location as the department will not take responsibility of wrong delivery.
Tenderers using courier services for delivery of their bid documents must ensure the delivery is at the correct
place / location and time as the department will not be held responsible for wrong delivery. Not delivered to
Departmental officials. The Department will not accept responsibility if bids received by officials are not timely
deposited in the Bid Box.
Tenders may only be submitted on the tender documentation that is issued. Tenderers must be registered
on the National Treasury Central Supplier Data Base and proof of registration must be submitted with the
proposal (https://secure.csd.gov.za). Requirements for sealing, addressing, delivery, opening and
assessment of tenders are stated in the Tender Data.
B. TENDER SUBMISSIONS:
Bids must be submitted in sealed envelopes clearly marked “SCMU5-23/24-0115”: “INVITATION
FOR EXPRESSION OF INTEREST FOR THE APPOINTMENT OF TURNKEY CONTRACTS TO
UNDERTAKE THE IMPLEMENTATION OF VARIOUS INFRASTRUCTURE AND CONSTRUCTION
PROJECTS THROUGHOUT THE EASTERN CAPE PROVINCE”. Bid documents must be
deposited in the bid box, DEPARTMENT OF PUBLIC WORKS AND INFRASTRUCTURE, FRONT
CORNER OF QHASANA BUILDING ON THE WAY TO CIDB OFFICES LABELLED “TENDERS”,
BISHO.
C. BID EVALUATION:
2 SCMU5-23/24-0115
Phase One: Functionality will be applied as a prequalification criterion. A minimum of 70 out of the possible
100 is required to be evaluated any further.
Phase Three: Bidders passing all stages above will thereafter be evaluated on Preferential Procurement
Policy Framework Act (PPPFA),
TECHNICAL ENQUIRIES
Mr. K. Kanana
Tel No: 071 685 7057
Email Address: [email protected]
3 SCMU5-23/24-0115
SBD 1
PART A INVITATION TO BID
YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE DEPARTMENT OF PUBLIC WORKS AND INFRASTRUCTURE
BID NUMBER: SCMU5-23/24-0115 CLOSING DATE: 28 MARCH 2024 CLOSING TIME: 11:00
INVITATION FOR EXPRESSION OF INTEREST FOR THE APPOINTMENT OF TURNKEY CONTRACTS TO
UNDERTAKE THE IMPLEMENTATION OF VARIOUS INFRASTRUCTURE AND CONSTRUCTION
DESCRIPTION: PROJECTS THROUGHOUT THE EASTERN CAPE PROVINCE
BID RESPONSE DOCUMENTS MAY BE DEPOSITED IN THE BID BOX SITUATED AT
DEPARTMENT OF PUBLIC WORKS AND INFRASTRUCTURE, FRONT CORNER OF QHASANA BUILDING ON THE WAY TO CIDB
OFFICES LABELLED “TENDERS”, BHISHO.
BIDDING PROCEDURE ENQUIRIES MAY BE DIRECTED TO TECHNICAL ENQUIRIES MAY BE DIRECTED TO:
CONTACT PERSON CONTACT PERSON Mr. Khanyisani Kanana
TELEPHONE NUMBER TELEPHONE NUMBER 071 685 7057
FACSIMILE NUMBER FACSIMILE NUMBER
E-MAIL ADDRESS [email protected] E-MAIL ADDRESS [email protected]
SUPPLIER INFORMATION
NAME OF BIDDER
POSTAL ADDRESS
STREET ADDRESS
TELEPHONE NUMBER CODE NUMBER
CELLPHONE NUMBER
FACSIMILE NUMBER CODE NUMBER
E-MAIL ADDRESS
VAT REGISTRATION NUMBER
SUPPLIER COMPLIANCE TAX COMPLIANCE CENTRAL
STATUS SYSTEM PIN: OR SUPPLIER
DATABASE No: MAAA
B-BBEE STATUS LEVEL TICK APPLICABLE BOX] B-BBEE STATUS LEVEL [TICK APPLICABLE BOX]
VERIFICATION CERTIFICATE SWORN AFFIDAVIT
Yes No Yes No
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/ SWORN AFFIDAVIT (FOR EMES & QSEs) MUST BE SUBMITTED IN ORDER
TO QUALIFY FOR PREFERENCE POINTS FOR B-BBEE]
Yes No
(a) ARE YOU THE ACCREDITED Yes a) ARE YOU A FOREIGN BASED
REPRESENTATIVE IN SOUTH [IF YES, COMPLETE
SUPPLIER FOR THE GOODS
AFRICA FOR THE GOODS No QUESTIONNAIRE
/SERVICES /WORKS OFFERED?
/SERVICES /WORKS OFFERED? [IF YES ENCLOSE PROOF] BELOW ]
QUESTIONNAIRE TO BIDDING FOREIGN SUPPLIERS
4 SCMU5-23/24-0115
PART B
TERMS AND CONDITIONS FOR BIDDING
1. BID SUBMISSION:
1.1. BIDS MUST BE DELIVERED BY THE STIPULATED TIME TO THE CORRECT ADDRESS. LATE BIDS WILL NOT BE
ACCEPTED FOR CONSIDERATION.
1.2. ALL BIDS MUST BE SUBMITTED ON THE OFFICIAL FORMS PROVIDED–(NOT TO BE RE-TYPED) OR IN THE
MANNER PRESCRIBED IN THE BID DOCUMENT.
1.3. THIS BID IS SUBJECT TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT, 2000 AND THE
PREFERENTIAL PROCUREMENT REGULATIONS, 2022, THE GENERAL CONDITIONS OF CONTRACT (GCC) AND,
IF APPLICABLE, ANY OTHER SPECIAL CONDITIONS OF CONTRACT.
1.4. THE SUCCESSFUL BIDDER WILL BE REQUIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (SBD7).
……………………………………………
(Proof of authority must be submitted e.g. company resolution)
DATE: ……………………………..…………………...
5
SCMU5-23/24-0115
BACKGROUND
The Eastern Cape Department of Public Works & Infrastructure (ECDPW) is committed to delivering,
infrastructure, and construction opportunities through integrated, sustainable infrastructure and
construction projects. To achieve this vision, ECDPW aims to appoint TURNKEY CONTRACTS, to
facilitate the efficient and effective implementation of projects within the province.
ECDPW invites service providers with experience in infrastructure and construction projects to express
their interest in the execution of such works. The scope of work shall include the full range of services
associated with the Public Works Infrastructure Program. The appointment of this TURNKEY
CONTRACTS aims to ensure a streamlined and efficient procurement process for engaging qualified
service providers, promote transparency and fairness in the procurement process, foster a competitive
environment for service providers, and enhance the quality and timeliness of project delivery within the
province.
Since 1994, national priority projects have been used across sectors to reduce poverty in townships.
The priority has been to increase the supply of public infrastructure at an accelerated pace and to
develop sufficient infrastructure to close the gap between the existing infrastructure and the
infrastructure that is needed. ECDPW recognizes the critical role of the private sector in achieving this
goal. Lessons learned about project management and implementation highlight the importance of well-
planned and executed priority projects to deliver infrastructure at an accelerated pace.
Balanced partnerships, effective contracting and governance, a clear empowerment and transformation
pathway, and shared risk and proceeds among all parties are critical to project success.
1.1. The Eastern Cape Province is faced with significant infrastructure shortages, leading to inadequate
living conditions, and a lack of access to essential services and social infrastructure for a substantial
portion of the population. This situation has exacerbated social inequalities and adversely impacted
on the overall socio-economic growth of the province.
1.2. ECDPW is issuing this RFP to appoint TURNKEY CONTRACTS to facilitate the efficient and
effective implementation of projects within the province. The selected TURNKEY CONTRACTS will
help bridge the gap in the infrastructure and construction backlog and address the infrastructure
needs of the province.
1.3. The TURNKEY CONTRACTS will assist ECDPW in addressing the infrastructure and project needs.
6
SCMU5-23/24-0115
Their services will be crucial in the planning, engineering, procurement, construction, and
management of these projects, leading to the successful delivery of infrastructure and the alleviation
of the infrastructure backlogs.
1.4. The primary purpose of appointing TURNKEY CONTRACTS is to address the spatial imbalances
and infrastructure shortages within the various municipalities of the Eastern Cape Province. By doing
so, the selected TURNKEY CONTRACTS will contribute to improving the living conditions and quality
of life for residents across the province. By addressing the current infrastructure and construction
needs, the province can work towards creating more equitable, accessible, and sustainable towns
that promote social cohesion, economic growth, and overall well-being for all its residents.
2. TURNKEY CONTRACTS
2.1. The TURNKEY CONTRACTS will be responsible for project implementation and management of
conveyancers, consultants, contractors, and other service providers. Their responsibilities will
include project planning, design management, procurement, coordination, project monitoring,
quality management, claims management and reporting to ensure the timely and successful
completion of projects.
All Respondent's responding to the submission should be addressing the following (where applicable,
the appropriate documents must be attached):
3.1.1. Cover Letter: A professional cover letter that introduces the TURNKEY CONTRACTS firm
and highlights its interest in the RFP.
3.1.2. Project and Consulting Team: A detailed description of the project team and professional
consulting team, including the roles, qualifications, and experience of each member. The
team should include, but is not limited to the following professionals: Principal Program
Coordinator, Principal Engineer, Construction Project Manager, Engineering
Technologist, Senior Admin Officer, Chief Town Planner, GIS Specialist, Software
Engineer, Environmental Specialist, Accountant, Conveyancer, Civil Engineering,
Electrical Engineering, Geotechnical Engineers, Traffic Engineers, Land Surveyors, Town
Planners, Quantity Surveyors, Architects, OHS Specialists, and Urban Designers, etc.
3.1.3. The following information should be submitted for each in-house professional or
7
SCMU5-23/24-0115
consulting firm:
3.1.5. Locality of the TURNKEY CONTRACTS: Proof of the TURNKEY CONTRACTS local
Eastern Cape office.
3.1.9. Project Management System: A detailed description of the project management system
to be used, highlighting its capabilities and how it will facilitate information access for the
Employer.
3.1.10. Impacts Plan: A comprehensive plan addressing the TURNKEY CONTRACTS primary
economic, social, and environmental impacts, demonstrating their commitment to
sustainable development and the well-being of the community.
3.1.11. Empowerment and Local Beneficiation Plan: A robust plan outlining the TURNKEY
CONTRACTS commitment to promoting the economic empowerment of black
individuals, including black women, youth, and persons with disabilities. The plan should
also emphasize local beneficiation, ensuring that the project brings tangible benefits to
the local community and contributes to socio- economic development.
4. SCOPE OF WORKS
4.1.1. Project managing contractors, engineers, architects, quantity surveyors and any other
consultants or service providers: The TURNKEY CONTRACTS will be responsible for project
management of contractors, engineers, architects, quantity surveyors and any other consultants
or service providers who will work on various infrastructure projects.
4.1.2. Monitoring adherence to delivery schedules and cash flows by contractors, engineers,
architects, quantity surveyors and any other consultants or service providers: The TURNKEY
CONTRACTS will monitor the progress of contractors, architects, quantity surveyors and any
other consultants or service providers to ensure that they adhere to delivery schedules and cash
flow requirements.
4.1.3. Monitoring contractors, engineers, architects, quantity surveyors and any other consultants
or service providers on compliance with contractual obligations: The TURNKEY CONTRACTS
will ensure that contractors, engineers, architects, quantity surveyors and any other consultants
9
SCMU5-23/24-0115
or service providers comply with their contractual obligations to ensure the successful completion
of infrastructure projects.
4.1.4. Reviewing and approving contractors, engineers, and service provider invoices: The
TURNKEY CONTRACTS will review and approve contractors, engineers and service providers
invoices to ensure that the work has been completed according to the contract terms, project
schedule, and quality requirements.
4.1.5. Deploying an innovative user-friendly project and program management system: The
TURNKEY CONTRACTS will deploy a project and program management system that is not only
innovative, but also easy to use and provides relevant reporting for regional and senior
management throughout ECDPW.
4.1.6. Introducing a system where ECDPW will have access to live dashboards and performance
information on projects: The TURNKEY CONTRACTS will introduce a live dashboard system that
will provide ECDPW with access to project performance metrics and key indicators in real-time.
4.1.7. Deploying a live GIS System on all projects under construction: The TURNKEY
CONTRACTS will deploy a Geographic Information System (GIS) to provide an integrated and
interactive mapping platform that supports decision-making processes for all infrastructure
projects.
4.1.9. Appointing suitable contractors for the execution of the construction works: If requested by
the Client, the TURNKEY CONTRACTS shall appoint suitable contractors for the execution of the
construction works, it shall adhere to the requirements set out in the Public Finance Management
Act (PFMA).
4.1.20. Facilitating and assisting with the submission of Infrastructure delivery proposals: The
TURNKEY CONTRACTS will assist with the submission of infrastructure delivery proposals by
various municipalities and other government departments in line with their Infrastructure Delivery
Plans.
10
SCMU5-23/24-0115
4.1.21. Identifying project viability and state of readiness: The TURNKEY CONTRACTS will work
with various municipalities and other government departments to identify project viability and
readiness for infrastructure projects.
4.1.22. Engaging with relevant sector partners: The TURNKEY CONTRACTS will engage with
relevant sector partners, including but not limited to municipalities and other provincial and
national sector departments for their contribution and input in current and future infrastructure
projects.
4.1.23. Suitability Analysis of Proposals: The TURNKEY CONTRACTS will analyse and advise
the department on the suitability of infrastructure proposals. This will include assessing the
readiness of proposed projects with regards to land, bulk services, and other feasibility
imperatives. The TURNKEY CONTRACTS will also provide recommendations to ensure the
efficient delivery of infrastructure projects.
4.1.24. Norms and Standards Research: The TURNKEY CONTRACTS will research, collate and
recommend inputs to the projects in line with the Norms and Standards. This will ensure that
infrastructure projects are developed in accordance with all standards and regulations.
4.2.1. Monitoring adherence to delivery schedules and cash flows by contractors, engineers, architects,
quantity surveyors and any other consultants or service providers to ensure timely delivery of
projects and efficient use of funds.
4.2.2. Ensuring that contractors, engineers, architects, quantity surveyors and any other consultants or
service providers adhere to contractual obligations to avoid legal disputes and ensure project
quality.
4.2.3. Providing quality assurance by certifying milestones and payment of claims to ensure project
deliverables meet quality standards.
4.2.5. Ensuring consistent compliance with the Quality Assurance Management Framework to maintain
project quality.
11
SCMU5-23/24-0115
4.2.6. Ensuring consistent compliance with the Standard Procedure for claims processing and
procedures to ensure fair and timely payment of claims.
4.2.7. Processing claims received from contractors, engineers, architects, quantity surveyors and any
other consultants or service providers within 30 days to ensure timely payment and avoid delays.
4.2.8. Serving as a full TURNKEY CONTRACTS responsible for receiving project funding from ECDPW
and distributing it to all relevant contractors, engineers, consultants, and other service providers
to ensure efficient use of funds.
4.2.9. Advising on the feasibility and sustainability studies of potential or identified future projects to
ensure projects are viable and sustainable from feasibility to implementation.
4.2.10. Assisting in conducting projects contract reviews to identify any issues or concerns and address
them to ensure project quality.
4.2.11. Developing and implementing a risk management plan to identify, assess, and mitigate potential
risks and issues that may impact project delivery, including those related to health and safety,
environmental impact, stakeholder engagement, and financial management, to avoid project
delays and ensure project quality.
4.2.12. Establishing and maintaining effective communication channels with all stakeholders to ensure
project goals and objectives are clearly understood, and all parties are kept informed of project
progress to maintain project quality.
4.2.13. Providing support and guidance to municipalities and other government departments in the
development and implementation of any of their infrastructure programs, including technical
assistance, capacity building, and training to ensure successful project implementation.
4.2.14. Developing and maintaining an effective project management system that includes standardized
processes and procedures, project templates, and reporting mechanisms to ensure that all
projects are delivered on time, within budget, and to the required quality standards to ensure
efficient project management.
4.2.15. Conducting regular project audits and reviews to identify areas for improvement and to ensure
that project management processes are being followed, and project goals are being achieved to
avoid delays and ensure project quality.
4.2.16. Developing and implementing a sustainability plan for each project that addresses environmental
12
SCMU5-23/24-0115
impact, energy efficiency, waste management, and water conservation to ensure sustainable
project implementation.
4.2.17. Developing and implementing a community engagement plan that encourages the participation
of local stakeholders in project planning and implementation and fosters community ownership
and support for the project to ensure successful project implementation.
4.2.18. Provide technical assistance and guidance to contractors and service providers on best practices
in infrastructure development, including design, construction, and post-construction
maintenance.
4.2.19. Provide regular training and capacity building opportunities to project staff, contractors, and
service providers on project management, technical skills.
4.2.20. Develop and implement a quality management plan that includes standards and procedures for
ensuring that all project deliverables meet the required quality standards.
4.3.1. The TURNKEY CONTRACTS will have the responsibility of appointing professional consultants
to assist with the engineering and architectural designs of each project. The TURNKEY
CONTRACTS will work closely with these consultants to ensure that all engineering requirements
are met and that projects are completed in accordance with the engineering standards and
regulations. The specific scope of work for engineering will also include:
4.3.2. Reviewing engineering and architectural drawings, specifications, and designs for each project
to ensure compliance with relevant codes, standards, and regulations. The TURNKEY
CONTRACTS will also ensure that the designs are constructible, safe, and feasible, taking into
account site conditions, local regulations, and the project's budget and timeline.
4.3.3. Reviewing bill of quantities (BOQs) and cost estimates for each project to ensure accuracy and
completeness. The TURNKEY CONTRACTS will also provide guidance on cost-effective
solutions to optimize the project's budget without compromising quality and performance.
4.3.4. Providing technical guidance and advice to contractors, engineers, and other stakeholders on
engineering issues throughout the project lifecycle. This includes interpreting and clarifying
project requirements, resolving technical issues and conflicts, and ensuring that all parties are
aware of their roles and responsibilities.
13
SCMU5-23/24-0115
4.3.5. Ensuring that all engineering work is completed in accordance with the relevant engineering
standards and regulations, including but not limited to structural, mechanical, electrical, and civil
engineering. The TURNKEY CONTRACTS will also ensure that all designs are reviewed and
approved by relevant authorities and stakeholders as required.
4.3.6. Conducting regular site inspections to ensure that construction work is progressing in accordance
with the project schedule and specifications. The TURNKEY CONTRACTS will also verify that all
work is completed in compliance with the approved design and construction standards, and that
any changes or modifications are documented and approved by the relevant stakeholders.
4.3.7. Reviewing engineering and architectural changes and design modifications as required and
ensuring that any changes are properly documented and communicated to all relevant parties.
The TURNKEY CONTRACTS will also assess the impact of any changes on the project's budget,
timeline, and quality, and provide recommendations on how to mitigate any adverse effects.
4.3.8. Conduct quality control checks to ensure that all construction work is completed to the required
quality standards. This includes performing regular quality inspections and tests, verifying that all
materials and equipment meet the required specifications, and ensuring that all workmanship is
of the required standard.
4.3.9. Preparing and submitting engineering reports to ECDPW on the progress of each project. The
TURNKEY CONTRACTS will also prepare regular progress reports for the project team and other
stakeholders as required, highlighting any issues or concerns, and providing recommendations
for corrective action.
4.3.10. Ensuring that all projects are completed within the approved budget and timelines. The
TURNKEY CONTRACTS will develop and maintain detailed project schedules, track progress
against milestones, and identify any potential delays or cost overruns. The TURNKEY
CONTRACTS will also provide recommendations on how to mitigate any adverse effects and
ensure that the project is delivered within the approved scope, budget, and timeline.
4.4.1. The TURNKEY CONTRACTS procurement activities will be carried out in accordance with the
procurement policies of the Department and procedures of the PFMA. The specific scope of work
for procurement will also include:
4.4.2. The Preparation of Tender Documents: The TURNKEY CONTRACTS will be responsible for
14
SCMU5-23/24-0115
preparing tender documents for the procurement of services, including engineering services,
construction works, and consulting work. The TURNKEY CONTRACTS will ensure that the
tender documents are comprehensive, clear, and provide sufficient information to enable
potential bidders to prepare responsive bids.
4.4.3. The TURNKEY CONTRACTS will ensure that all procurement activities are conducted in a fair,
transparent, and competitive manner and in compliance with applicable laws and regulations.
4.4.4. The TURNKEY CONTRACTS will be responsible for evaluating bids and proposals submitted by
potential service providers, appointing them as the TURNKEY CONTRACTS.
4.4.5. The TURNKEY CONTRACTS will be responsible for managing the contracts awarded, including
monitoring the performance of suppliers, ensuring compliance with contract terms and conditions,
and resolving any issues that may arise.
4.4.6. The TURNKEY CONTRACTS will maintain accurate and up-to-date records of all procurement
activities and contracts awarded and will provide regular reports to ECDPW on the status of
procurement activities and contract performance.
4.4.7. The TURNKEY CONTRACTS will ensure that all procurement activities are carried out in an
environmentally sustainable manner, and that suppliers are selected based on their commitment
to environmental sustainability and social responsibility.
4.4.8. The TURNKEY CONTRACTS will manage the budget for each project within the program. The
TURNKEY CONTRACTS will be responsible for the accurate recording of all project-related
expenses and the management of the cash flow for each project. The TURNKEY CONTRACTS
will be required to ensure that all expenses are within the approved budget and will provide
regular reports to ECDPW on the financial performance of each project.
4.4.9. The TURNKEY CONTRACTS will develop and maintain a detailed project budget for each
project, which will include all costs associated with the project, including, but not limited to,
engineering fees, contractor fees, materials, equipment, and any other project-related expenses.
4.4.10. The TURNKEY CONTRACTS will receive invoices from contractors, engineers, architects,
quantity surveyors and any other consultants or service providers for work completed on each
project. The TURNKEY CONTRACTS will verify that the work has been completed in accordance
with the contract terms, project schedule, and quality requirements before approving the invoices.
4.4.11. The TURNKEY CONTRACTS will procure all contractors and service provider under the
15
SCMU5-23/24-0115
TURNKEY CONTRACTS and all contractors and service providers will report directly to the
TURNKEY CONTRACTS.
4.4.12. The TURNKEY CONTRACTS will pay the relevant service provider invoices to the engineers,
contractors and all other relevant service providers.
4.4.13. The TURNKEY CONTRACTS will maintain accurate and up-to-date financial records for each
project and will provide regular financial reports to ECDPW on the status of each project's budget.
4.4.14. The TURNKEY CONTRACTS will provide financial advice and recommendations to ECDPW on
project-related expenses and will work closely with ECDPW to ensure that all projects are
completed within budget.
4.4.15. It will not be expected from the TURNKEY CONTRACTS to distribute any payments to
contractors, engineers, or consultants if the TURNKEY CONTRACTS has not yet received the
funds from ECDPW or other Departments.
4.5.1 If required by the Client to assist, the TURNKEY CONTRACTS will collaborate with ECDPW and
explore alternative funding mechanisms for all infrastructure programs. This may include
engaging with banks and other financial institutions in South Africa, as well as international
funding institutions, to identify alternative sources of funding that can be used to accelerate the
execution of infrastructure projects and ease the burden on the existing national and provincial
budgets.
4.5.2 The TURNKEY CONTRACTS will be responsible for preparing funding proposals and business
plans for review and approval by ECDPW and other relevant stakeholders. This may include
conducting feasibility studies, financial modelling, and risk assessments to ensure that proposed
funding mechanisms are viable and sustainable. This will also include the drafting of business
plans for the consideration of ECDPW.
4.5.3 If deemed necessary by the Client, the TURNKEY CONTRACTS will assist in negotiating
alternative funding mechanisms with banks and other financial institutions on behalf of ECDPW
and other Departments for the consideration and approval by ECDPW. This may include
negotiating loan terms, interest rates, and repayment schedules.
4.5.4 The TURNKEY CONTRACTS will be responsible for managing the disbursement of funds to
16
SCMU5-23/24-0115
contractors, engineers, architects, quantity surveyors and any other consultants or service
providers in accordance with the terms of any alternative funding agreements.
4.5.5 The TURNKEY CONTRACTS will maintain accurate and up-to-date financial records for each
funding mechanism and will provide regular financial reports to ECDPW on the status of each
funding mechanism.
4.5.6 The TURNKEY CONTRACTS will also be responsible for ensuring that all funding mechanisms
are in compliance with applicable laws and regulations.
5. COST OF PROPOSAL
Unless otherwise stated in the RFP, the Employer will not compensate the Respondent for any
costs incurred in the preparation and submission of a proposal, including the costs of any testing
necessary to demonstrate that aspects of the proposal complies with requirements.
In line with the State's goals to promote economic empowerment of previously and currently
disadvantaged populations, the Respondent is similarly required to promote economic empowerment,
primarily within the locality of the development, and through the legitimate inclusion of disadvantaged
groups in all aspects of planning, delivery and ownership.
(b) A minimum of 30% of the value of the project shall be procured from black persons
or otherlegal entities owned in majority by black persons (to the extent that the 30%
of value is achieved), and that such procurement shall be distributed reasonably
across built environment professionals, consultants, construction material
suppliers, subcontractors, laborer’s, etc., so appointed or procured from, and shall
be maintained throughout the project's lifecycle.
17
SCMU5-23/24-0115
6.2. Local Beneficiation
Wherever practically possible all goods, services and labour be procured from entities based on
the following criteria: in the demarcated wards in which the development is taking place, failing
which the local municipality, then district or metropolitan municipality, then province or nationally.
Functionality will be scored in accordance with the criteria set out below and a minimum of 70 out
of the possible 100 is required to be evaluated any further.
Each Proposal will undergo an intensive assessment and evaluation process by the Department,
which will consist of 3 distinct stages, namely:
7.1.1 Administrative Compliance Check that assesses whether all the submitted proposals
have observed all the rules and protocols set out in this RFP.
7.1.2 Has the respondent submitted all documents as outlined in the requirements of the RFP.
7.1.3 Eligibility Compliance Check which assesses whether the respondent have passed the
minimum requirements as out in this RFP.
7.1.4 It is compulsory that the Respondent meet the following minimum requirements. If a
respondent does not meet these following minimum requirements, they will automatically
be disqualified:
Should the Respondent not meet the minimum requirements reviewed as part of the Administrative
Checks as set out in Table 01, then such Respondent shall be disqualified from the RFP process and
no further evaluation shall take place. Respondents that meet the minimum requirements for Stage 1
shall proceed to be evaluated in accordance with Stage 2 criteria - Technical Compliance Assessment.
The Technical Compliance Assessment stage of the evaluation process includes or requires that:
18
SCMU5-23/24-0115
7.2.1. The Respondent be assessed for technical compliance.
7.2.2. Technical compliance will be assessed based on functionality assessment criteria that have
been developed by the Department and defined in Table 2 below. Respondent scoring
below 70 of the points noted in Table 2 will be disqualified and will not be eligible for further
evaluation or consideration.
Should the Respondent not meet the minimum requirements reviewed as part of the Technical
Compliance Assessment, then such Respondent shall be disqualified from the RFP process and no
further evaluation shall take place. Respondents that meet the minimum requirements for Stage 2 shall
proceed to be evaluated in accordance with Stage 3 criteria - Price and Specific Goals Evaluation.
90/10 preference point system for goods or services with Rand value above R50 million
i. The following formula must be used to calculate the points out of 80 for price in respect of an
invitation for a proposal with a Rand value equal above R50 million, inclusive of all applicable
taxes:
Ps = 90 (1-Pt-P min)
P min
Where
ii. A maximum of 10 points may be awarded to a tenderer for the specific goals specified for the
tender.
iii. The points scored for the specific goal must be added to the points scored for the price and
the total must be rounded to the nearest two decimal places.
iv. Subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act, 2000, the
contract must be awarded to the tenderer scoring the highest points.
A share certificate and or CIPC information of the company might be requested to be able to
verify ownership.
19
SCMU5-23/24-0115
Any other relevant evidence can be requested from the respondent to substantiate the claim
for the 10 points from any of the above specific goals on the table.
CSD printout must accompany all submission documents.
Locality points will be allocated to any company with a valid and verifiable address in the
Eastern Cape e.g., CIPC, SARS, Lease Agreement, Municipal Account statement etc. A lease
agreement must have substantiating legitimate evidence relating to the Eastern Cape address
claimed, such as proof of rental payment and receipt of rentals by both the lessee and lessor.
8. PRICE OFFERED
The TURNKEY CONTRACTOR will be entitled to a Fee percentage added to the total cost of each
infrastructure project. This fee will be added to the total project cost, including contractors, engineers,
consultants, and all other service providers' costs needed to execute services related to the
infrastructure projects. The fee is fixed and non-negotiable.
(Respondents are required to insert the project percentage total as indicated in the pricing schedule.)
The awarded fee percentage, shall remain fixed throughout the duration of the contract. Compensation
to the respondent will be based on the aggregate group percentage. Any proposed amendments to the
percentage fee must be mutually agreed upon by both parties and shall be formalized in writing.
9. DURATION
This Proposal and the execution of the identified projects shall be for a period of 60 months. The
agreement will commence upon the date of signing of the Service Level Agreement (SLA) between the
ECDPW and will be for a period of 60 months. All project-specific Service Level Agreements (SLA)
signed during this period shall remain active until the completion date as specified in the project-specific
Service Level Agreement (SLA).
The Employer reserves the right to reject any or all bids, in whole or in part, and is not obligated to
award the contract to the lowest bidder. The decision to accept or reject any bid will be at the sole
discretion of the Employer, who may consider various factors, including but not limited to, the bidder's
qualifications, experience, financial stability, and the overall value and suitability of the bid in relation to
20
SCMU5-23/24-0115
the project requirements. The Employer also reserves the right to negotiate with the selected bidder to
achieve mutually agreeable terms before finalizing the award of the contract.
The Employer further reserves the right to cancel the bidding process at any stage without incurring
any liability to the bidders.
By submitting a bid, the bidder acknowledges and agrees that the Employer's decision in this regard is
final and binding.
11.1. Variations, amendments and additions to the Conditions of Contract as Special Conditions of
Contract prescribed by the Employer will be determined for every sub-project. Each of the Special
Conditions of Contract shall be cross-referenced to the clause in the General Conditions of Contract to
which it mainly applies.
11.2. The following referenced Engineering and Construction Works Contract may be applicable
depending on the nature of the project identified under this Appointment:
11.3. The standard industry forms of contract shall be used with minimal project-specific variations and
additions which do not change their intended usage.
11.4. The project involves the implementation of public sector infrastructure projects in the Eastern Cape
Province. ECDPW will identify infrastructure projects which are part of their project pipeline. The
TURNKEY CONTRACTS will execute these identified projects in accordance with the conditions of
this contract.
21
SCMU5-23/24-0115
11.5. The TURNKEY CONTRACTS shall upon identification of any project executed through this Proposal
determine the total cost of the project for the full execution of the project as specified in “Scope of
Works.” The TURNKEY CONTRACTS will be entitled to a fixed fee as outlined in Price Offered which
will be added to the total cost of the project.
11.6. The Project Cost shall be determined by the TURNKEY CONTRACTS for each individual project and
presented to the Employer for the approval of such project cost before the TURNKEY CONTRACTS
can proceed with the execution thereof.
11.7. Payment of works completed shall be certified in accordance with the applicable conditions of the
contract for each project and shall be effected by the Employer to the TURNKEY CONTRACTS in
accordance with the provisions of the Contract. The TURNKEY CONTRACTS will subsequently
make payment to the identified Service Providers responsible for the execution of the works.
11.8. The implementation of this Proposal and the execution of the identified projects shall be for a period
of 60 months. The agreement will commence upon the date of signing of the Service Level
Agreement (SLA) between the ECDPW and will be for a period of 60 months. All project-specific
Service Level Agreements (SLA) signed during this period shall remain active until the completion
date as specified in the project-specific Service Level Agreement (SLA).
11.9. The execution of this Proposal may be extended by mutual agreement between the parties, which
agreement shall be binding only if and when reduced to writing and agreed to by the parties.
11.10. In line with the State’s goals to promote economic empowerment of previously and currently
disadvantaged populations, the TURNKEY CONTRACTS is required to promote economic
empowerment, primarily within the locality of the development, and through the legitimate inclusion
of disadvantaged groups in all aspects of planning, delivery and ownership.
(b) A minimum of 30% of the shareholding in the entity proposed to plan, execute and develop the
project is held by black persons (black persons as defined in Broad-Based Black Economic
Empowerment Amendment Act 2013 (Act No 46 of 2013)), and that such minimum level of
ownership by the black persons is maintained throughout the project’s lifecycle.
22
SCMU5-23/24-0115
(c) A minimum of 30% of the value of the project shall be procured from black persons or other legal
entities owned in majority by black persons (to the extent that the 30% of value is achieved), and
that such procurement shall be distributed reasonably across built environment professionals,
consultants, construction material suppliers, subcontractors, labourer’s, etc., so appointed or
procured from, and shall be maintained throughout the project’s lifecycle.
Wherever practically possible the TURNKEY CONTRACTS shall procure goods, services and labour from
entities based in the demarcated wards in which the development is taking place, failing which the local
municipality, then district or metropolitan municipality, then province or nationally.
23
SCMU5-23/24-0115
TABLE 1: LIST OF RETURNABLE DOCUMENTS
Returnable Documents marked with an X in the Yes column must be completed and
submitted with the bid, failure to comply with the requirements may invalided your bid
12. No
13. Returnable Document 14. Yes
15. No
16. 17. RETURNABLES DOCUMENTS FOR EVALUATION PURPOSE 18. 19.
20. 121. Compulsory Briefing Session Certificate N/A
22. 223. Resolution of Board of Directors 24. X
25.
26. 327. Resolution of Directors Enter into Consortia of Joint Venture(s) (if applicable)
28. X
29.
30. 431. Special Resolution of Consortia or Joint Venture(s) (if applicable) 32. X
33.
34. 535. Schedule of Proposed Subcontractors (if applicable) 36. 37. X
38. 639. Capacity of the Respondent 40. X
41.
42. 743. All SBD Standard Bidding Documents (Completed and signed where applicable)
44. X
45.
46. 847. Legal Joint Venture Agreement (if applicable) 48. X
49.
51. Authority to sign on behalf of the bidder on a company letterhead and/or
50. 9 52. X
53.
stamped
54. 10
55. Central Supplier Database (CSD) Report or Number 56. X
57.
58. 12
59. Company Registration documents 60. 61. X
62. 13
63. Certified Identity Documents of company Directors or Shareholders 64. 65. X
66. 14
67. Tax compliance Certificate 68. 69. X
70. 16
71. Detailed company profile 72. 73. X
75. CV’s, Qualification, and professional registration certificates of project team
74. 17 76. X 77.
personnel involved on the project
78. 18
79. Confirmation of NHBRC Registration and NHBRC Registered Engineer (Active)
80. X
81.
83. Summary of verifiable previous projects and reference letters with contact
82. 19 details on 85. X
86.
84. a company letterhead and/or stamped
88. Financial Statements: Latest annual turnover for the year 2022/2023 should
exceed
87. 20 90. X
91.
89. R 20 million. (Should the Respondent not meet this minimum requirement, then
such Respondent shall be automatically disqualified)
92. 21
93. Form of Offer (Fully completed and signed) 94. X
95.
24
SCMU5-23/24-0115
TABLE 2: TECHNICAL ASSESSMENT CRITERIA
25
SCMU5-23/24-0115
The TURNKEY CONTRACTORs primary (local) economic, social, and
7 environmental impacts 10
plan.
8 Empowerment and Local Beneficiation Plan 10
TOTAL POINTS FOR FUNCTIONALITY 100
26
SCMU5-23/24-0115
PRICING SCHEDULE
PRICING SCHEDULE
(Professional Services)
[A] Project
(Sum of Items 1 to 9) %
Management
1 Project Managing Service Providers %
2 Monitoring Adherence to Schedules %
3 Monitoring Compliance with Contractual Obligations %
4 Reviewing and Approving Invoices %
5 Deploying Project and Program Management System %
6 Introducing Live Dashboards and Performance Information %
7 Deploying GIS System on Projects %
8 Identifying Project Viability and State of Readiness %
9 Engaging with Relevant Sector Partners %
[B] Contracts
(Sum of Items 10 to 24) %
Management
10 Monitoring Adherence to Schedules and Cash Flows %
11 Ensuring Compliance with Contractual Obligations %
12 Providing Quality Assurance by Certifying Milestones %
Implementing Quality Management Plan and Quality
13 %
Assurance
14 Ensuring Compliance with Standard Procedure for Claims %
15 Processing Claims %
16 Advising on Feasibility and Sustainability Studies %
17 Assisting in Conducting Project Contract Reviews %
18 Developing and Implementing Risk Management Plan %
27
SCMU5-23/24-0115
19 Providing Support and Guidance to Municipalities %
20 Conducting Regular Project Audits and Reviews %
21 Developing and Implementing Sustainability Plan %
Developing and Implementing Community Engagement
22 %
Plan
23 Providing Technical Assistance and Guidance %
24 Providing Training and Capacity Building %
[C] Technical
(Sum of Items 25 to 35) %
Management
25 Reviewing Engineering Changes %
26 Reviewing Engineering and Architectural Drawings %
27 Reviewing Bill of Quantities and Cost Estimates %
28 Providing Technical Guidance and Advice %
29 Ensuring Compliance with Engineering Standards %
30 Conducting Regular Site Inspections %
31 Reviewing Design Modifications %
32 Conducting Quality Control Checks %
33 Preparing and Submitting Engineering Reports %
34 Norms and Standards Research %
35 Ensuring Projects within Approved Budget and Timelines %
[D] Procurement (Sum of Items 36 to 45) %
36 Suitability Analysis of Proposals %
37 Preparing Tender Documents %
38 Evaluating Bids and Proposals %
39 Recommendation Reports for Professional Consultants %
40 Recommendation Reports for Contractors %
41 Maintaining Records of Procurement Activities %
42 Financial Record Keeping and Financial Reporting %
43 Financial Advice and Recommendations %
44 Finalizing Contract document for Professional Consultants %
45 Finalizing Contract document for Contractors %
[E] Funding and
(Sum of Items 46 to 52) %
Financial Management
Collaborating with stakeholders for Funding/or Alternative
46 %
Funding
47 Facilitating and Assisting with Infrastructure Proposals %
48 Preparing Funding Proposals and Business Plans %
49 Implement a robust financial reporting system %
50 Managing Disbursement of Funds %
51 Maintaining Financial Records %
52 Ensuring Compliance with Laws and Regulations %
The Respondent is obligated to meticulously price all items, ensuring that each Function Heading is priced within
the range of a minimum of 0.5% to a maximum of 2%. Failure to adhere to this stipulation will result in
disqualification of the respondent.
28
SCMU5-23/24-0115
SBD 4
BIDDER’S DISCLOSURE
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted
Suppliers, that person will automatically be disqualified from the bid process.
2. Bidder’s declaration
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any person
having a controlling interest in the enterprise, employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state employee
numbers of sole proprietor/ directors / trustees / shareholders / members/ partners or any person
having a controlling interest in the enterprise, in table below.
Full Name Identity Number Name of State institution
furnish particulars:
……………………………………………………………………………………
……………………………………………………………………………………
2.2 Does the bidder or any of its directors / trustees / shareholders / members / partners or any person
having a controlling interest in the enterprise have any interest in any other related enterprise
whether or not they are bidding for this contract? YES/NO
1 the power, by one person or a group of persons holding the majority of the equity of an enterprise, alternatively,
the person/s having the deciding vote or power to influence or to direct the course and decisions of the enterprise
29
SCMU5-23/24-0115
3. DECLARATION
……………………………… …………………………………
Signature Date
……………………………… …………………………………
Position Name of Bidder
_______________________
2 Joint venture or Consortium means an association of persons for the purpose of combining their expertise,
property, capital, efforts, skill and knowledge in an activity for the execution of a contract
30
SCMU5-23/24-0115
SBD 6.1
This preference form must form part of all tenders invited. It contains general information and serves as
aclaim form for preference points for specific goals.
NB: BEFORE COMPLETING THIS FORM, TENDERERS MUST STUDY THE GENERAL
CONDITIONS,DEFINITIONS AND DIRECTIVES APPLICABLE IN RESPECT OF THE TENDER
AND PREFERENTIAL PROCUREMENT REGULATIONS, 2022
1. GENERAL CONDITIONS
1.1 The following preference point systems are applicable to invitations to tender:
- the 80/20 system for requirements with a Rand value of up to R50 000 000 (all applicable
taxesincluded); and
- the 90/10 system for requirements with a Rand value above R50 000 000 (all applicable
taxesincluded).
b. The applicable preference point system for this tender is the 80/20 preference point system.
c. Either the 90/10 or 80/20 preference point system will be applicable in this tender. The lowest/
highest acceptable tender will be used to determine the accurate system once tenders are
received.
1.3 Points for this tender (even in the case of a tender for income-generating contracts) shall be awarded
for:
(a) Price; and
(b) Specific Goals.
POINTS
PRICE 90
SPECIFIC GOALS 10
Total points for Price and SPECIFIC GOALS 100
1.5 Failure on the part of a tenderer to submit proof or documentation required in terms of this tender to
claim points for specific goals with the tender, will be interpreted to mean that preference points for
specific goals are not claimed.
31
SCMU5-23/24-0115
1.6 The organ of state reserves the right to require of a tenderer, either before a tender is adjudicated or
at any time subsequently, to substantiate any claim in regard to preferences, in any manner required
by the organ of state.
2. DEFINITIONS
(a) “tender” means a written offer in the form determined by an organ of state in response
to an invitation to provide goods or services through price quotations, competitive tendering
process or any other method envisaged in legislation;
(b) “price” means an amount of money tendered for goods or services, and includes all applicable
taxes less all unconditional discounts;
(c) “rand value” means the total estimated value of a contract in Rand, calculated at the time
of bidinvitation, and includes all applicable taxes;
(d) “tender for income-generating contracts” means a written offer in the form determined by an
organ of state in response to an invitation for the origination of income-generating contracts
through any method envisaged in legislation that will result in a legal agreement between the
organ of state and a third party that produces revenue for the organ of state, and includes, but is
not limited to, leasing and disposal of assets and concession contracts, excluding direct sales and
disposal of assets through public auctions; and
(e) “the Act” means the Preferential Procurement Policy Framework Act, 2000 (Act No. 5 of 2000).
80/20 or 90/10
Where
3.2 FORMULAE FOR DISPOSAL OR LEASING OF STATE ASSETS AND INCOME GENERATING
PROCUREMENT
80/20 or 90/10
32
SCMU5-23/24-0115
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmax = Price of highest acceptable tender
(b) any other invitation for tender, that either the 80/20 or 90/10 preference point system will
apply and that the lowest acceptable tender will be used to determine the applicable
preference point system,
then the organ of state must indicate the points allocated for specific goals for both the 90/10 and
80/20 preference point system.
Table 1: Specific goals for the tender and points claimed are indicated per the table below.
(Note to organs of state: Where either the 90/10 or 80/20 preference point system is applicable,
corresponding points must also be indicated as such.
Note to tenderers: The tenderer must indicate how they claim points for each preference point
system.)
Historically Disadvantaged
Individual:-
(a) 100% black ownership 3
(b) 51% to 99% black 2
ownership
(C) Less than 51% black 0
ownership
33
SCMU5-23/24-0115
Black women ownership:-
(a) 100% black women 2
ownership
(b) 30% to 99% black women 1
ownership
(C ) Less than 30% black 0
women ownership
Black youth ownership:-
(a) 100% black youth 2
ownership
(b) 30% to 99% black youth 1
ownership
( C )Less than 30% black 0
youth ownership
Locality:-
(a) Within the Eastern Cape 3
(b) Outside the Eastern Cape 0
34
SCMU5-23/24-0115
DECLARATION WITH REGARD TO COMPANY/FIRM
4.6 I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that
the points claimed, based on the specific goals as advised in the tender, qualifies the company/
firm for the preference(s) shown and I acknowledge that:
95.1.1. T
he information furnished is true and correct;
95.1.2. T
he preference points claimed are in accordance with the General Conditions as indicated
inparagraph 1 of this form;
95.1.3. I
n the event of a contract being awarded as a result of points claimed as shown in
paragraphs
1.4 and 4.2, the contractor may be required to furnish documentary proof to the satisfaction
ofthe organ of state that the claims are correct;
95.1.4. I
f the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any other
remedy it may have –
……………………………..…………………………….
SIGNATURE(S) OF TENDERER(S)
DATE: ……………………………………………………..
ADDRESS: ………………………………………………………
………………………………………………………