Faq Sap
Faq Sap
On the next screen paste in all the new materials. You may
have to paste in the materials in groups of 13-15 at a time. It
depends on your screen. I copy them from an Excel sheet 13 at
a time. There is no paste from the buffer. But for under 1000
objects, it doesn't take long to do.
Below for your convenience a few details about this code including any
standard documentation. To use this transaction within your SAP system
simply enter it into the command input box located in the top left-hand
corner of the SAP GUI, and press enter. You can also add additional
command options such /o to trigger in a new window..See the full list
of command options available.
PO table download
EKKO & EKPO
GRN data download
EKBE or MSEG
ashwini.kini commented:
Hi Mangesh,
The issue is with GR based IV check box. Valuation type and batch number both
will be picked from previous record. This indicator is used to differentiate the
individual goods receipts.
As it is not checked, the record is taking same data from previous GRN.
Best Regards,
Ashwini Kini.
Remarks 2:
ashwini.kini commented:
Hi Mangesh,
As per the discussion, I replicated the same in DEV. But there is no issue in
configuration. In DEV the next batch number is getting generated.
When I analyzed it thoroughly, In PO please check the below field (GR Based IV)
whether it is checked or unchecked.
Solution:If the GR based IV is unchecked, please check it after reversing the GRNs.
If stock is available for the material, then it will not allow user to change the field.
Go to SM30, then put table ZLIC and maintain the required details.
Go to SM30, then put table ZARN and maintain the required details.
First, cancel the invoice via T-code VF11, reverse the goods movement by VL09,
and then delete the outbound by T-code VL02N.
Steps:
2. Reverse the Goods Issue using VL09, turn the pick quantity
u2018zerou2019 in the delivery document
4. Finally set the reason for rejection at the Sales Order Header
Level. (So Bala, just check the SO you want to delete ever had
any subsequent documents? )
Right now we get retest date as per SAP std. (i.e. GR date + Inspection interval)for first time.
at the time of next inpection date, 09 inpsection lot generate, UD given & new inspection date
calculate based on UD+inspcetion interval.
we do not require next inspection date at the time of GR processing (i.e. initially).
it must be calculated after UD given to "01" inpspection lot as it calculate for "09" inspection lot.
same way for the SFG material, first time next inspection date calculate based on Mfg.date +
inpsetcion interval.
at the time of next inpection date, 09 inpsection lot generate, UD given & new inspection date
calculate based on UD+inspcetion interval.
we require new next inspection date = 09 lot creation date + inspection date.