DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
Civil Infra Work Sector-F Ext
MONTHLY PROGRESS REPORT NO.09
PERIOD: 01 January 2024 to 31 January 2024
SUBMITTED BY:
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
CONTENTS
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
Sector Plan (Sketch)
Contract Detail
Executive Summary/Overview
Weather Report
Payment Status (IPC Detail)
Monthly Civil Works Summary
Lab Test Report
S-Curve
Manpower Detail
Equipment Detail
Progress Plan
Progress Pictures
Key Plan
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
Contract Detail
Name of Project Civil Infra Works of Sec-F Ext
Location Bahawalpur
Client DHAB
Design /Consultant Al-Imam JV FAHHM
Consultants
Commencement Date 05 Jan 2023
Completion Date 04 Jan 2024
After EOT Completion Date 04 May 2024
Duration 16 Months
Project Cost Sector-F Ext 637.144 Mn
Executive Summary/Overview
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
Date of Commencement: 05 Jan 2023
Date of Completion: 04 May 2024
This Monthly Report covers progress up to 31 January 2024.
1. Road work
Earth Work, Sub Grade Preparation, Sub Base, Aggregate Base Course Work in Progress.
2. Sewerage work
Excavation of Trenches Work in Progress
Sand Bedding and RCC Pipe Installation work in progress.
Construction of manholes work in progress.
Backfill Work in Progress.
House Chamber & Crossing Work in Progress.
3. Drain Work
Excavation, Lean, Steel Fixing and Concrete for Bed, Walls Top Slab & Backfill
Works Completed. Grating Works in Progress
4. Rising Main
Excavation and Pipe Installation Works in Progress.
RCC Sleeve works Completed.
5. Water Supply Networks
Excavation and RCC Pipe Installation for Sleeves and Road Crossing works in Progress.
Excavation & Installation of Main Pipeline and HDPE Pipe Installation in Progress.
6. OHWT
Excavation Sand Bed, Lean, Steel Fixing, Concrete & Bitumen Coating for Raft Completed.
Backfilling, Shaft Steel & Concrete Pouring Works Completed.
Bowl Concrete Pouring is Completed. Stair Concrete Pouring Work in Progress.
7. Electrical Sleeves Works
Excavation, Pipe Installation, Sand Cushion & Backfilling Work in Progress.
Weather Report
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
Payment Status (IPC & EPC)
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
Se IPC No Submission Date Vetted Work Remarks
r Done (Mn)
1 IPC-01 24 May 2023 43.585 Paid
2 IPC-02 19 June 2023 64.941 Paid
3 IPC-03 24 Aug 2023 67.61 Paid
4 IPC-04 16 Oct 2023 50.66 Paid
5 EPC-01 (IPC- 11 Dec 2023 11.79 Paid
05)
6 IPC-06 26 Dec 2023 37.30 In Progress
Grand Total 275.90
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
Progress Monthly Accumulative
Achieved Plan Lag (-) Achieved Plan Lag (-)
Sr Month Year
Progress % Progress /Lead+) Progress % Progress Lead+)
1 Dec 2022 - - - - - -
2 Jan 2023 - - - - - -
3 Feb 2023 - - - - - -
4 Mar 2023 - 1.000 -1.000 - 1.000 -1.000
5 Apr 2023 - 4.000 -4.000 - 4.000 -4.000
6 May 2023 9.336 8.000 1.336 9.336 8.000 1.336
7 Jun 2023 17.399 15.000 2.399 17.399 15.000 2.399
8 Jul 2023 19.965 24.600 -4.635 19.965 24.600 -4.635
9 Aug 2023 35.823 37.490 -1.667 35.823 37.490 -1.667
10 Sep 2023 39.873 42.630 -2.757 39.873 42.630 -2.757
11 Oct 2023 50.404 52.630 -2.226 50.404 52.630 -2.226
12 Nov 2023 56.405 58.630 -2.225 56.405 58.630 -2.225
13 Dec 2023 47.230 64.630 -17.400 47.230 64.630 -17.400
14 Jan 2024 50.412 73.630 -23.218 50.412 73.630 -23.218
Monthly Civil Works Progress Summary
Lab Test Report
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
CIVIL INFRASTRUCTURE DEVELOPMENT WORKS Sector F- Extension DHA BAHAWALPUR
Progress Sheet Month of January,2024
FDT
Sieve Sand Unit C/ Los Cylinder
Description Fai PI MDD CBR Sp.gr Calibratio Penitr Extra GMM GMB Stabiltiy
Total Pass Analysis Equivalent wt Lumps Ang 28 days
l Soundness
Earth.work 41 32 9 1 1 1 1
Cone Calibration
Granular Sub Base 18 14 4 1 1 1 1 1 1 1
Agg/Base Corse
C/Agg For Concrete
F/Agg For Concrete
Compressive Strength 33
Comp/ Stre Of Bricks
Comp/Stre Kerb
3
Stone
Asphalt Binder Cource
Core Compaction
Bitumen
cement
C/Agg For DST
This Month 59 46 13 2 2 2 2 1 0 1 0 0 0 0 0 0 0 0 1 36
Previous
242 196 50 36 22 22 18 12 1 9 2 2 0 0 0 0 0 0 5 225
Accumulative
Total Accomulative 301 242 63 38 24 24 20 13 1 10 2 2 0 0 0 0 0 0 6 261
Cotractor Rep: Consltant Rep:
S CURVE OF Sec-F Ext.
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur
Doc.#: BA/MPR/09 Submission Date 19 Feb 2024
110.00
90.00
70.00
50.00
30.00
10.00
Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May-
22 23 23 23 23 23 23 23 23 23 23 23 23 24 24 24 24 24
P 0 0 0 1 4 8 15 24.6 37.4 42.6 52.6 58.6 64.6 73.6 81.6 90.6 96.6 100
l 9 3 3 3 3 3 3 3 3
a
n
n
e
d
A 0 0 0 0 0 9.33 17.3 19.9 35.8 39.8 50.4 56.4 47.2 50.4 NaN NaN NaN NaN
c 6 99 65 23 73 04 05 3 12