Control Of Work (COW) Review Form
Date:
UJV UJV1
Review Leader Name:
Review Leader Position:
Discipline / Task Reviewed:
Subcontractor Reviewed:
1-2. TASK REQUIREMENTS & ASSESSMENT
Items Reviewer Assessment / Findings Satisfactory
(By review leader) (By review leader) (Y/N / NA)
1 Procedures Have Subcontractors’ supervision/workers been given
Requirements the chance to read the relevant task related procedures.
Have all personnel passed the UJV Induction Training,
Training including the mandatory training for the job.
Requirements
Has THE Permit to Work Authority’s (PH, PA, PC, AA, IA,
2 Bearer & Applicant) attended the UJV or TOP Permit to
TBT Works training ?.
Did the working crew receive toolbox talks to reinforce
safety practices and address any emerging issues?
Are all heavy equipment inspected and certified in
accordance with UJV Color coding inspection?
Do the mandatory PPE’s (Boots, eye protection Helmet
and hand protection) comply with Thai and International
Tools &
standard and in good condition?
Equipment
inspected and Have all electrical power tools and equipment’s been
3 certified. inspected by electrical inspector and tagged.
Have all lifting gears must be inspected and certified in
accordance with UJV Color coding inspection?
PPE
Check that all Cranes, Boom trucks have been inspected
by 3rd party every 3 months.
Check that all manifold’s for energy tests have been
inspected by 3rd party every 3 months.
All hydro-test equipment must be marked up with serial
Page 1 of 3
Control Of Work (COW) Review Form
number and pressure rating.
Check that all Full Body Harnesses and lanyards are in
good condition and free from defects.
Is the area supervisor / Foreman competent to oversee
the work activity? With a minimum of 5 years’
experience.
4 Competency
Requirements Is the Permit Holder (PH) aware of the risk associated
with the work activity.
Does the work require review by UJV scaffold/rigging
Subject Matter Expert?
Is there any SIMOPS issue at the work location i.e. RT,
Road closure, Pressure Testing, Energization, scaffolding
work or any other activity that could pose a risk?
Are people working directly above or below task?
Was the safety flyer communicated as minimum 24 hours
before commencing the job?
Area Barricades & Signs in place to prevent unauthorized
personnel from entering into work area?
5 20 second
scan prior to Is the contractual obligation of supervision vs workers
commence ratio followed?
work o Forman: 1FM to 12 Workers
o Supervisor: 1 Supervisor to 3 FM = 36 Workers
o HSE: 1 HSE to 50 Workers
Does the Lifting activities comply with the rule of 4
persons of lifting team (crane operator, signal man, rigger
and lifting supervisor) along with lifting checklist?
Task supervisor is present?
HSE Supervisor is present?
Has the JSEA and method statement been approved
6 Other before commencing works?
Requirements Does the job require any emergency rescue planning?
Page 2 of 3
Control Of Work (COW) Review Form
3. WORK DEMONSTRATION IF REQUIRED
Work Details Photo of work Satisfactory
(By review leader) (By review leader) (Y/N)
Details of the
activity
4. PERFORMANCE REVIEW / RECOMMENDATIONS
Findings Recommendations / Corrective Actions Satisfactory
(By review leader) (By review leader) (Y/N)
Comments:
Approved by: UJV Review Leader Subcontractor Representative
Name / Date / Sign Name / Date / Sign
Page 3 of 3