DPR Majuli
DPR Majuli
Prepared by
Project Manager
WCDC, WDC-PMKSY 2.0 Majuli
Divisional Officer
Majuli Soil Conservation Division
Majuli
0
DETAILED PROJECT REPORT OF WDC-PMKSY 2.0
(MAJULI – I / 2021-22 (LOWER TUNI)
Block : Majuli
District : Majuli
1
Content
Executive Summary 5-7
CHAPTER -1
INTRODUCTION AND BACKGROUND
INTRODUCTION 8-10
Profile of the Watershed Project 11-12
Table No. 1.1: Project at a Glance 12
Table No. 1.2: Need and Scope of Watershed Development 13-14
Table No. 1.3: Watershed Information 15
Table No. 1.4: Status of other development project in the area 16
Table No. 1.5: Status of Previous Watershed Programme 16
CHAPTER -2
General Description of the Project Area
Table No.2.1: Location/ Details of the type of areas covered under the project 17-18
Table No.2.2: Land Details 19
Table No.2.3: Details of the types of areas covered under the project 20
Table No.2.4: Details of Agro-climatic condition 21
Table No.2.5: Details of flood and drought in the project area 22
Table No.2.6: Details of the soil erosion in the project area 22
Table No.2.7: Details of Soil Ph 23
Table No.2.7.1: Climatic Condition 24
Table No.2.8: Physiographic Features 24
Table No.2.9: Watershed characteristic 24
CHAPTER 3
BASE LINE INFORMATION OF WATERSHED
Table No.3.1: Demographic features 25
Table No.3.2: Livestock details 26
Table No.3.3: Socio-economic status 27
Table No.3.4: Migration details 27
Table No.3.5: Details of Community Based Organization existing in the
28
watershed area
Table No.3.6: Infrastructure Facilities 29
Table No.3.7: Land Use Pattern (in Hectares) 30
Table No.3.8: Details of Common Property Resources 31
Table No.3.9: Agriculture implements 31
2
Table No.3.10: Crop Classification 31
Table No.3.11: Crop and Cropping pattern 32
Table No.3.12: Land Capability Classification 32
Table No.3.13: Irrigation Facility 33
Table No.3.14: Status of water table 33
Table No.3.15: Assessment of drinking water facility 34
Table No.3.16: Surface water resource 34
Table No.3.17: Ground water Structures to be repaired 34
Table No. 3.18: Existing Water Saving Practices 35
Table No. 3.19: Details of existing livelihoods 35
Table No. 3.20: Existing functional assets (Works already completed under
35
different schemes including works undertaken by farmers independently)
Table No.3.21: Problem Typology Of The Watershed 36-37
CHAPTER – 4
Institutional Building and Project Management:
Table No. 4.1: Details of SHGs & UGs newly formed under IWMP 38
Table No. 4.2: Details of Watershed Committees (WC) 39-42
Table No. 4.3: WDT Particulars: 43
Table No. 4.4: PIA particulars 44
Table No. 4.5: Bank Account Details 44
Table No. 4.6: Institutional Mechanisms: (Enclose the following documents) 45-46
Table No. 4.7: Documents of Agreements: 47-49
Table No. 4.8: Convergence plan with IWMP 50
CHAPTER – 5
Management/Action Plan
Table No.5.1: Description on methodology of plan adopted 51-52
Table No.5.2: Details of Natural Resource Management Activities
53-54
Table No. 5.2.1: Soil and Moisture Conservation structures
Table No. 5.2.2: Water Harvesting Structures 55
Table No. 5.2.3: Vegetative Covers 56
Table No. 5.3: Structure or Activity Wise Details of Engineering Structure and
Vegetative Measures 57-58
Table No.5.3.1: Engineering structures for Soil Conservation Measures (SMC)
Table No. 5.3.2: Details of engineering structure for water Harvesting WHS 59
Table No. 5.3.3: Details of activities connected with vegetative cover in 60
watershed works
3
CHAPTER 6
Capacity Building Plan
Table No. 6.1: Details of Capacity Building 61
CHAPTER 7
Table No. 7.1: Phasing of the action plan 62-68
Table No. 7.2: Estimated Benefit Cost Ratio 69
CHAPTER 8
Consolidation and completion of various works
Table No. 8.1: Consolidation of Action Plan 70
CHAPTER – 9
EXPECTED OUTCOMES
Table No. 9.1: Describe in detail the “Expected Outcomes” 71
Table No. 9.2: Summarize in the table given below (Quantifiable indicators) 71-72
Table No.9.3: Backward and Forward Linkages 73
CHAPTER –10
Table No.10: Area taken up for Treatment 74
PHOTOGRAPHS
Photo of Socio-Economic Survey 75
Photo of Watershed Committee Formation 76
Photo of PRA -Exercise 77
PRA – Maps 78
The Project Site Survey 79
LIST OF MAPS TO BE ENCLOSED ALONG WITH DPR
Location map 80
Watershed map 81
Village map 82
Drainage map 83
Land Use/Land Cover map 84
Slope map 85
Contour map 86
DEM 87
Flow Accumulation 88
Soil map 89
Satellite map 90
Annual Action Plan Map (Intervention Map) 91
4
Executive Summary of DPR Majuli-I (Lower Tuni) WDC-PMKSY 2.0 /
2021-22 Majuli District, Assam.
-5-
Institutional arrangement:
Deptt. of Soil-Conservation would take charge of all the relevant issues in the
watershed area. PIA would promote Self-Help Groups; develops natural resources and
locally suitable economic activities; mobilizes finances; and introduces systems to
improve livelihoods of the rural poor and sustain their progress. Currently, it has several
professionals and technical & support staffs. It would collaborate extensively with
government agencies, banks, market institutions, panchayats, other voluntary
organisations, and research bodies. Deptt of soil conservation has long standing
experience in natural resource management projects, watershed and livelihood related
programmes in Assam. The project would be implemented by the community-based
organization (CBO) either existed or promoted during the project.
Period Commonly known CBO would be Women Self Help Group (SHG), User Group
(UG), Watershed Committee (WC), Producers Collectives, etc. It is targeted to form
new SHG and to improve their capacity building. At watershed level, a watershed
committee would be formed and thus become operational. Overall, more than 80% of
the watershed families are going to take part and contribute in the watershed processes
and programmes in various institutional form.
Considering the context, baseline data analysis, PRA exercises, activities under Entry
Point Activity (EPA), natural resource management (NRM) plan, livelihood development
plan, productivity enhancement plan and capacity building plan has been prepared.
Major proposed activities under EPA are which would cost 2% of the whole budget
i.e.Rs.20.24 lakhs. Horticulture, agro-forestry, water harvesting tanks, renovation of
ponds, earthen check dams, nala bund, etc. are the activities under NRM plan which
covers 80% of project families cost 47% of the budget amounting Rs. 475.64 lakhs. The
key focuses of these activities are predominantly to conserve soil and
recharge the moisture regime of the area through centralize and decentralize
structures. Diary, poultry, duckery, piggery, fishery, weaving, goat rearing and banana
plantation are under Production System plans for the 70% of landless and marginalized
families which is 15% of the budget amounting of Rs. 151.80 lakhs. Similarly diary,
poultry, duckery, piggery, weaving, goat rearing, carpentry and cycle repairing are
under Livelihood Activities which is 15% of the budget amounting 151.80 lakhs. The
farmer’s would generate contribution both for livelihood activities and micro-enterprises.
6
A comprehensive training and capacity building plan covering about 400 families (with
overlaps) would capacitate during the project period. The entire proposed plan would be
implemented by Watershed Committee in close coordination with SHGs and UGs under
the facilitation of PIA.
The details of physical target and financial outlay is under chapter-5,6,7 and 8.reatment
area and datails: The details of treatment area is in Table 1.1 and 2.2 Fact sheet about
bench mark indicator and action plan at a glance: The bench mark indicator is in
chapter-9 and action plan in chapter-5, 6, 7 and 8.
7
INTRODUCTION AND BACKGROUND
(I) INTRODUCTION
Name of the State : Assam
Map of the project area showing village boundaries, contours and drainage.
(Page 80 to 87)
Background Note of the District of Majuli:
The Majuli District in which the Majuli-I (Lower Tuni) WDC-PMKSY 2021-22 falls in the
South East corner of the state and is a river island of Brahmaputra. The Majuli district is a
plain district of Assam. The soil of Majuli district mostly of two types inceptisol (Old alluvial)
and Entisol (recent alluvial).
Agricultural scenario:-
Agriculture is the main occupation in the district and contributes a major parts of district
economy which however is a subsistence type. Sali (winter) paddy is the main crop in the
district under rainfed condition Jute, banana, potato, vegetables, pineapple, turmeric,
ginger etc. are also important crops. The district is surplus in production of oilseeds, fruits
and spices while it is measurably deficit in pulses, milk, meat, egg and fish production.
There are tremendous scope for horticultural crops, plantation crops, animal husbandry
and sericulture in the district.
Soil:-
The two orders of soils are found in the district namely (i) Entisols (recent alluvium), (ii)
Inceptions (old alluvium). The soil of zone is mostly acidic nature and Ph increases near
the river track. The organic carbon and available Nitrogen of the soil mostly varies from
medium to high, low in available P2O5 and medium in K2 O status). Mild micronutrient
deficiency specially of Boron has been observed in some areas throughout the district.
However, in general, soil of the district is acidic in reaction. Soil of major areas are mildly
acidic (5.5-6.5 PH), while soil in high land old alluvial is severely acidic. There is a problem
of riverbank erosion in the riverine tracts, especially during flood season.
8
Climate and Soil :–
The Majuli district lays between longitudes 93 o57’30” to 94o33’30” and latitudes 26o50’25”
to 27o11’15”. The district has a sub- tropical humid type of climate, with the relative
humidity varying from 91% to 93% during the morning hours and from 51% to 72% during
the afternoons. The climate of the place can be divided into three main seasons- summer,
monsoon and winter. The average annual rainfall is 1823 mm out of which 75% is received
during monsoon months (June to September). The monsoon months are wet and winter is
dry. Both pre and post monsoon months have unpredicted and erratic rainfall. The mean
maximum and minimum temperature varies from 33 to 38 C and 9 to 10 C, respectively.
The average radiation is the highest during March – April, while overcast sky reduces the
solar radiation to the least during July.
The soil of Majuli district moistly of two types inceptisol (Old alluvial) and Entisol
(recent alluvial).The texture of surface soil ranges from Fine loamy, coarse silty and fine
soil. 58% of total are categorized under fine loamy soil under Incept sol. The most typical
characteristic of the soil of the district is its acidity. The major part of the soils of Majuli
district is acidic in nature. The organic matter content of soil is medium to high. The
available N is medium and available P and K is low to medium.
The climate is sub-tropical in nature with warm and humid summer followed by dry and
cool winter. The climatic season is classified as follows
Winter (b) pre-monsoon, (c) monsoon and (d) retreating monsoon.
WINTER:
The winter covers the months of December, January and February. In this season, fair
weather prevails occasionally associated with fogs and haze. December and January are
the driest months and January is the coldest. The minimum temperature ranges between 8
C and 10 C and the maximum between 27 C and 29 C. The average rainfall in the season
is 20 cm.
PRE-MONSOON:
The months of March, April and May constitute the pre-monsoon season. From March the
land surface gets steadily heated and the temperature starts rising. Strong convection
develops due to the local depressions formed especially in the afternoon. The nor ‘westers
locally called Bordoichilla appears during the period. Rainfall ranges between 59 and 160
cm and maximum temperature ranges between 28 C and 32 C. This season is, in fact, a
transitional phase between the dry cool winter and the warm moist monsoon.
MONSOON:
With the onset of monsoon in early June, heavy rainfall occurs. Widespread low clouds
and high humidity together maintain almost uniform temperature over the area. The
9
maximum temperature ranges between 33 C and 37 C. The average annual rainfall during
the period is 300 cm. The occurrence of thunderstorms is the most conspicuous
characteristics of the monsoon weather. This is the season of dominant agricultural
operation in the area.
RETREATING MONSOON:
The monsoon withdraws from the area in the last week of September or first week of
October. The geographic low is replaced by high pressure and a flat pressure gradient
occurs. Rainfall decreases abruptly and the sky becomes progressively clear. Sunny days
prevail till the end of November. The CWB climate thus has a profound influence on the
economy and life of the people of the area. It is most suitable for the cultivation of a variety
of grain and horticultural crops.
Rainfall data analysis for the area:
GROUND WATER POTENTIALITY: -
The depth of ground water table plays an important role in determining the risk due to
contamination to groundwater. Like the surface water bodies, the pressure on the ground
water is increasing in the watershed area. Ground water occurs under phreatic condition in
the shallow aquifer zone and under semi-confined condition in the deeper aquifer. Flow of
ground water is from north to south. Pre-monsoon water level varies from 0.01 to 9.40
mbgl and during post-monsoon period, water level varies from 0.56 to 8.26 mgbl. Other
than higher arsenic (As) and iron (Fe) concentration in ground water, most of the chemical
constituents are within the permissible limit.
10
(II) PROFILE OF THE WATERSHED PROJECT
Table No.1.1 Project at a glance:
11
Table No.1.1 Project at a glance:
Census Block
MWS Name of Village GP Name
Code Name
Sumoi Mari 1860000 Majuli Kamalabari
Kamalabari MWS Potia Gaon 1859600 Majuli Kamalabari
Names & Census Code of Villages covered
3A5A1g1 Gagol Doba 1860200 Majuli Kamalabari
Motia Bari 1860500 Majuli Kamalabari
Tataya Gaon 1861700 Majuli Rawnapara
Bhuramora No.2 1862600 Majuli Rangachahi
Rawanpara MWS Burha Senchowa 1860400 Majuli Rawnapara
3A5A1g3 Kamar Gaon 1861900 Majuli Rawnapara
Bonkhowa Chuk 1862500 Majuli Rawnapara
6 Mekheli Gaon 1862400 Majuli Rawnapara
Dhowachala 1863800 Majuli Bongaon
Jogi Gaon 1862200 Majuli Bongaon
Bongaon MWS Chamaguri Satra 1861800 Majuli Bongaon
3A5A1g5 Chakuli Pathar 1864500 Majuli Bongaon
Mudoi Tanti 1863900 Majuli Bongaon
Bon gaon 1862300 Majuli Bongaon
Karhal Gaon 1861900 Majuli Rawnapara
Dakhinpat Satra 1860100 Majuli Dakhinpat
Dakhin Pat MWS
Borboka Pathar 1864700 Majuli Dakhinpat
3A5A1g2
Radha Chapori N.C. 1859900 Majuli Dakhinpat
Goroimari Doloni 1862000 Majuli Dakhinpat
1. Upliftment of Socio-Economic condition of the rural poor.
Four major reasons for 2. Increase of Agricultural area as well as Production.
7
selection of watershed 3. Generation of employment opportunities to the rural people.
4. Conservation and Proper utilization of Natural Resources.
Name, Address, Phone
Divisional Officer, Majuli Soil Conservation Division, Majuli,
8 No. and Registration
Assam (9085757345/9854450561)
No.of the PIA(s)
Date of approval of
9 Watershed Development -
Plan by the DPC
10 Area of the Project (ha.) 5484.00
Area proposed to be
11 4600.00
treated (ha.)
12 Financial year of sanction 2021-22
13 Project duration 5 years
Project Cost (Rs. in
14 1012.00
Lakhs)
Date of sanction by the
15 04-01-2022
State Authority
Date of release of 1st
installment of Central
16 23/2/2022
Assistance (to be filled up
by DoLR)
17 Any other (please specify)
Source: From Field Survey
12
Table No.1.2: Need and Scope for Watershed Development:
A write up elaborating the weightage table for selection of the watershed. (Weightage for
selection of Watershed as per DoLR’s instructions already issued)
Majuli-I/2021-22
Others 7.5 5 5 5 0 0 10 7.5 10 10 10 10 - 80
(Lower-Tuni)
Sl. Max
Criteria Ranges and Scores
No Score
Below
Poverty index(%of
i 10 Above 80% (10) 80 to 50 % (7.5) 50 to 20 % (5) 20%
poor to population)
(2.5)
% of SC/ST More than 40% Less than
ii 10 20 to 40 % (5)
population (10) 20% (3)
Actual wages Actual wages
are significantly are equal to or
iii Actual wages 5 lower than higher than
minimum wages minimum wages
(5) (0)
% of small and More than 80% Less than 50
iv 10 50 to 80% (5)
marginal farmers (10) (3)
Ground water Over exploited
v 15 Critical (10) Sub critical (5) Safe (0)
status (15)
0 to -33.2 (0)
Moisture index/ -66.7 & below -33.3 to -66.6 (5) Non
vi 10
DPAP/DDP Block (10) DDP Block DPAP Block DPAP/DDP
Block
Above
Area under Less than 10%
vii 15 10 to 20% (10) 20 to 30% (5) 30%
assured irrigation (15)
(Reject)
Fully
Problematic Partially
viii Drinking water 10 No source (10) covered
village (7.5) covered (5)
(0)
Low – less
High – above Medium – 10 to
ix Degraded land 15 than 10 % of
20% (15) 20 % (10)
TGA (5)
Lands with
Lands with low Land with high
production & moderate production &
where production & where
Productivity
productivity can where productivity
x potential of the 10
be significantly productivity can can be
land
enhanced with be enhanced marginally
reasonable with reasonable enhanced with
efforts (10) efforts (5) reasonable
efforts (0)
13
Sl. Max
Criteria Ranges and Scores
No Score
Contiguity Neither
Contiguous to with in the contiguous to
previously micro previously
Contiguity to treated watersheds treated
another watershed & in the project watershed
xi watershed that 10 contiguity but non nor contiguity
has already been within the contiguous to within the
developed/treated micro previously micro
watersheds in treated watersheds
the project (10) watershed in the project
(5) (0)
Cluster approach
in the plains 4 to 6 micro
Above 6 micro- 2 to 4 micro
(more than one watersheds
xii 15 watersheds in watersheds
contiguous micro- in cluster
cluster (15) in cluster (5)
watersheds in the (10)
project)
Cluster approach
in the hills (More 3 to 5 micro
Above 5 micro- 2 to 3 micro
than one watersheds
xiii 15 watersheds in watersheds
contiguous micro- in cluster
cluster (15) in cluster (5)
watersheds in the (10)
project)
Total 150 150 90 41 2.5
14
Table No.1.3 Watershed Information:-
Name Geographic
Sl. Village to be Treatable Approval
of Watershed Code al Area
NO treated Area (Hact.) Year
Project (Hact)
1 Sumoi Mari 126.00 106.10
2021-22
11 500.00 461.90
Gaon
12 Jogi Gaon 147.00 126.10
Bongaon MWS 13 Chamaguri Satra 137.00 25.00
3A5A1g5
14 Chakuli Pathar 243.00 211.50
15 Mudoi Tanti 127.00 95.60
16 Bon gaon 181.00 157.00
17 Karhal Gaon 147.00 124.00
18 Dakhinpat Satra 120.00 97.50
DakhinPat
MWS 19 Borboka Pathar 254.00 218.00
3A5A1g2 Radha Chapori
20 843.00 759.40
N.C.
21 Goroimari Doloni 310.00 241.20
Total 5484.00 4600.00
Source: GIS
15
Table No.1.4: Status of other development project in the area:
Funding source
Name of village
Nodal Agency
Project Name
Year started
No. of Micro
Expenditure
Area under
completion
completion
% financial
% physical
watershed
Total Cost
treatment
PMKSY
Sl. No.
PIA
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Nil
16
CHAPTER-2
GENERAL DESCRIPTION OF THE PROJECT AREA
17
18
Table No.2.2 Land Details (Area in Ha.):-
1 2 3 4 5 6 7 8 9
Treatable Area
pastures (Ha.)
Geographical
Land under
Permanent
Forest
Cultivable
cultivable
Sl.
(Ha.)
(Ha.)
(Ha.)
Names of villages Area
Non-
(Ha.)
(Ha.)
No.
(Ha.)
1 Dhowachala Gaon 500.00 0.00 435.40 459.20 1.20 2.70 60.70 461.90
2 Bhuramora No.2 175.00 0.00 160.60 146.60 0.50 6.10 7.80 152.70
3 Jogi Gaon 147.00 0.00 135.60 125.00 7.00 1.10 3.30 126.10
4 Bon Gaon 181.00 0.00 152.60 150.80 0.80 6.20 21.40 157.00
5 Bonkhowa Chuk 221.00 0.00 177.30 183.10 1.90 7.80 34.00 190.90
6 Motia Bari 290.00 0.00 283.80 245.00 1.00 1.80 3.40 246.80
7 Mudoi Tanti 127.00 10.00 76.60 90.00 0.90 5.60 33.90 95.60
8 Potia Gaon 338.00 0.00 255.30 224.00 0.00 6.80 75.90 230.80
9 Chamaguri Satra 137.00 0.00 34.90 18.00 2.00 7.00 93.10 25.00
10 Mekheli Gaon 319.00 0.00 305.00 288.20 1.00 4.50 8.50 292.70
11 Chakuli Pathar 243.00 0.00 213.00 208.60 0.50 2.90 26.60 211.50
12 Tataya Gaon 346.00 0.00 320.10 296.90 0.70 3.10 22.10 300.00
13 Sumoi Mari 126.00 0.00 103.60 96.60 1.00 9.50 11.90 106.10
14 Borboka Pathar 254.00 0.00 237.20 212.60 4.10 5.40 7.30 218.00
15 Kamar Gaon 267.00 0.00 225.60 227.30 0.00 8.10 33.30 235.40
Radha Chapori
16 843.00 0.00 804.00 754.20 0.00 5.20 33.80 759.40
N.C.
17 Gagol Doba 179.00 0.00 162.10 147.50 1.00 6.70 9.20 154.20
18 Karhal Gaon 147.00 0.00 101.00 119.00 3.00 5.00 38.00 124.00
19 Goroimari Doloni 310.00 0.00 228.70 234.20 0.00 7.00 74.30 241.20
20 Burha Senchowa 214.00 0.00 185.00 167.90 3.00 5.30 20.70 173.20
21 Dakhinpat Satra 120.00 0.00 90.00 87.50 0.00 10.00 20.00 97.50
19
Table No.2.3 Details of the types of areas covered under the project:
1 2 3
8 Gagol Doba 45 0 0 5 50
12 Goroimari Doloni 53 14 0 1 68
13 Dakhinpat Satra 100 50 0 0 150
17 Chakuli Pathar 43 7 0 0 50
20
Table No. 2.4: Details of Agro-climatic condition
1 2 3 4 5 6 7
Major soil types Major crops
project area
the Project
b) Area in ha
Area in ha
Major crops
Name of
a)Type
Sl. Names of the
No. villages a) Name
11
Alluvial
21
Table No. 2.5: Details of flood and drought in the project area:
1 2 3 4 5
Periodicity
Sl. Any other
Particulars Villages Not affected
No. Annual (please
specify)
No. of village s : 21
Name(s) of villages –
Dhowachala Gaon,
Bhuramora No.2, Jogi
Gaon, Bon Gaon,
Bonkhowachuk,
Motiabari, Mudoi
Tanti, Potia Gaon,
Chamaguri Satra,
1 Flood
Mekheli Gaon,Chakuli Periodic Flash Flood Nil
Pathar,Tataya Gaon,
Sumoimari, Borboka
Pathar,Kamar Gaon,
Radha Chapori N.C.,
Gagol Doba, Karhal
Gaon, Goroimari Doloni,
Burha Senchowa,
Dakhinpat Satra
No. of villages – NIL
2 Drought Name(s) of villages –
- - -
Does not arise
Source: From field
1 2 3 4 5
Run off Average soil
Type of Area affected
Cause (mm/ loss (Tonnes/
erosion (ha)
year) ha/ year)
Water erosion
a Sheet 4316
b Rill 264 556 15
c Gully -
Sub-Total 4580 15
Wind erosion N/A NA -
Total 4580 556 15
Source: From field
22
Table No. 2.7: Details of Soil PH:
1 2 3 4 5
SL. Sample
Names of the villages Soil PH Soil Type
No. No.
1 Dhowachala Gaon 1 5.50 to 6.00 Alluvial(Sandy Loam)
2 Bhuramora No.2 2 5.50 to 6.00 Alluvial(Sandy Loam)
3 Jogi Gaon 3 5.50 to 6.00 Alluvial(Sandy Loam)
4 Bon Gaon 4 5.50 to 6.00 Alluvial(Sandy Loam)
5 Bonkhowa Chuk 5 5.50 to 6.00 Alluvial(Sandy Loam)
6 Motia Bari 6 5.50 to 6.00 Alluvial(Sandy Loam)
7 Mudoi Tanti 7 5.50 to 6.00 Alluvial(Sandy Loam)
8 Potia Gaon 8 5.50 to 6.00 Alluvial(Sandy Loam)
9 Chamaguri Satra 9 5.50 to 6.00 Alluvial(Sandy Loam)
10 Mekheli Gaon 10 5.50 to 6.00 Alluvial(Sandy Loam)
11 Chakuli Pathar 11 5.50 to 6.00 Alluvial(Sandy Loam)
12 Tataya Gaon 12 5.50 to 6.00 Alluvial(Sandy Loam)
13 Sumoi Mari 13 5.50 to 6.00 Alluvial(Sandy Loam)
14 Borboka Pathar 14 5.50 to 6.00 Alluvial(Sandy Loam)
15 Kamar Gaon 15 5.50 to 6.00 Alluvial(Sandy Loam)
16 Radha Chapori N.C. 16 5.50 to 6.00 Alluvial(Sandy Loam)
17 Gagol Doba 17 5.50 to 6.00 Alluvial(Sandy Loam)
18 Karhal Gaon 18 5.50 to 6.00 Alluvial(Sandy Loam)
19 Goroimari Doloni 19 5.50 to 6.00 Alluvial(Sandy Loam)
20 Burha Senchowa 20 5.50 to 6.00 Alluvial(Sandy Loam)
21 Dakhinpat Satra 21 5.50 to 6.00 Alluvial(Sandy Loam)
Source: District Agriculture Office, Majuli
Average Temp(0C)
Average Annual Open pan Relativ Average
Wind
Sl. Monthly rainfall(in evaporatio e Annual run
Year Velocit
No Rain fall(in mm) Max Min n (mm per Humidit off
y
mm) preceding day) y(RH) (mm/year)
5 years
5 to 11
1 2017 170.83 2050.00 36,00 7.00 50.00 72% 617.00
km/hr
5 to 11
2 2018 148.50 1782.00 37,00 14.00 53.00 73% 547.00
km/hr
5 to 11
3 2019 142.42 1709.00 38,00 12.00 49.00 71% 526.00
km/hr
5 to 11
4 2020 149.50 1794.00 32,00 15.00 54.00 75% 543.00
km/hr
5 to 11
5 2021 148.33 1780.00 30.00 12.00 48.00 74% 547.00
km/hr
5 to 11
Average 151.92 1823.00 34.60 12.00 50.80 73% 556.00
km/hr
Source: Water Resource, Majuli
23
Table No.-2.8 Physiographic Features:
Average
Order of Major Toposequence annual soil
Elevation(MSL) Slope Range(%)
Watershed Stream (Soil series) loss(Ton /
hectare/year)
Sandy loam
84.50m 2 to 5 - Tuni river 15.00
Loamy
24
CHAPTER – 3
BASE LINE INFORMATION OF WATERSHED
Literacy
Work Force
25
Table No. 3.2: Livestock details:
1 2 3
Sl.
Feature No./ quantity)
No
1 Milch Animals
Cows 5490
Buffaloes 128
2 Draft Animals
Ox 2506
He Buffalo 7
3 Others
Poultry 2039
Piggery 19
Fishery 360
5 Fodder Availability
26
Table No.3.3: Socio- economic status:
1 2 3 4 5 6
Land Holding (Ha) Annual Gross Income (Rs.) [per head/year]
Rain fed Irrigated
No. of BPL
Total HHs
Sl.
HHs
Type
Others
Others
No SC ST Others Total
SC
SC
ST
ST
1 Marginal 2536 2317 113.60 70.30 2067.40 -- -- -- 22720000.00 14060000.00 413480000.00 450260000.00
2 Small Farmers 739 367 311.40 178.50 1162.80 -- -- -- 62280000.00 35700000.00 232560000.00 330540000.00
1 2 3 4 5 6 7
No. of persons No. of days Distance of destination
Sl. Occupation during Income from such
migrating per year of Major reason(s) for migrating of migration from the
No. migration occupation (Rs.)
M F Total migration village (km)
To get regular wages etc. during lean
period of the year and after completing
1 3820 Nil 3820 150-180 days of cultivation practice and get subsidiary 20-40 km Daily wage 6000-8000
income for upliftment of the family
member.
Source: From field
27
Table No. 3.5: Details of Community Based Organizations existing in the watershed village:
1 2 3 4 5 6 7 8 9
No. of ST in each No. of SC in each No. of Others in No. of BPL in each
Total no. of CBOs No. of members Bank linkage
category category each category category
Sl.
Type of Bank
No With With No.
Group With Loan
. only only Total M F Total M F Total M F Total M F Total M F Total of
both Amount
Men Women SHGs
(Rs.)
(i)Landless - - - - - - - - - - - - - - - - -
(ii) MF - 6156 6156 745 745 1537 1537 2687 2687 4242 4242 165 330.00
SHG - 935 - 15
1 (iii) SF - - - - - - - - - - - - - - - - -
(iv) LF - - - - - - - - - - - - - - - - -
Total - 935 - 15 - 6156 6156 745 745 1537 1537 2687 2687 4242 4242 165 330.00
(i) Landless nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
(ii) MF nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
UGs Nil Nil Nil Nil
2 (iii) SF nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
(iv) LF nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
Total - 935 - 15 nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
3 VSS nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
4 FG/FC nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
5 WUA nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
6 F-SHG-C nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
7 F-SHG-B nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
8 PG nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
9 PC nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
Other
related
10 nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil nil
Groups
(Specify
VSS: Van Suraksha Samiti, FG: Farmer’s Group/ Farmer’s Club, WUA: Water User Association, F-SHG: Federation of SHGs (C: at Cluster, B: at Block), PG: Producer’s Group, PC:
Producer’s Cooperatives.
28
Table No. 3.6: Infrastructure Facilities:
1 2 3 4 5
Sl. Status
Infrastructure type No./Quantity Distance (km)
No (description)
Educational Institutions
Within project
Anganwadi 137 In walking distance
area
1 Primary School 36 In walking distance
Secondary school 8 In walking distance
Govt. College 2 In walking distance
Vocational Institutions 1 In walking distance
Service Institutions
Bank 3 In walking distance
Post office 3 In walking distance
2 Primary Health Care
3 In walking distance
Center
Veterinary Center 4 In walking distance
Markets/ Village Haat 3 In walking distance
No. of bore wells/pump sets
3 Nil In walking distance
(Functional)
No. of Milk collection
centers
Nil In walking distance
( Union/ Society/ Pvt.
4
Agency/Others)
Total Quantity of surplus
Nil
milk
Road Connectivity (to main
5 road by an all-weather Yes - -
road) (Yes/No)
6 Bus facility (Yes/No) Yes - -
No. of HHs provided
7 4408 - -
electricity
No. of HHs with access to
8 450 - -
drinking water
Access to Agro Industries
9 No - -
(Yes/No)
Any other facilities (specify-
10 - -
------------)
Source: From field
29
Table No.3.7 Land use pattern (in Hectares):
1 2 3 4 5 6 7 8 9 10 11 12 13
Geographical area
Community land
agriculture use
private land
Permanent
Net area
Pastures
Gross
Permanent
Temporary
Cultivated
Sl. Forest Net Sown sown
Use
Cultivate
Irrigated
Rainfed
Village cropped
fallow
fallow
No. area Area more than
area
once
1 Dhowachala Gaon 500.00 0.00 2.00 64.6 1.20 3.00 3.00 68.70 459.20 7.90 467.10 44.00 511.10
2 Bhuramora No.2 175.00 0.00 2.00 14.4 0.50 1.00 7.10 6.80 146.60 14.00 160.60 16.00 176.60
3 Jogi Gaon 147.00 0.00 1.50 11.4 7.00 1.00 1.40 3.00 125.60 10.00 135.60 14.00 149.60
4 Bon Gaon 181.00 0.00 2.20 28.4 0.80 1.50 7.20 23.40 157.80 6.80 164.60 17.00 181.60
5 Bonkhowa Chuk 221.00 0.00 2.40 43.7 2.00 1.50 7.80 49.00 183.70 8.50 192.20 20.00 212.20
6 Motia Bari 290.00 0.00 2.20 6.2 1.00 2.00 2.00 3.20 245.00 38.80 283.80 29.00 312.80
7 Mudoi Tanti 127.00 10.00 1.00 50.4 1.00 1.00 5.10 37.00 90.40 6.50 96.90 10.00 106.90
8 Potia Gaon 338.00 0.00 2.30 82.7 0.00 2.00 7.10 92.90 224.00 62.00 286.00 3.00 289.00
9 Chamaguri Satra 137.00 0.00 0.80 102.1 2.00 1.00 7.00 107.00 18.00 3.00 21.00 2.00 23.00
10 Mekheli Gaon 319.00 0.00 1.80 14 1.00 2.00 2.00 11.00 288.60 16.40 305.00 32.00 337.00
11 Chakuli Pathar 243.00 0.00 2.00 30 0.50 1.50 3.40 29.10 208.60 6.40 215.00 22.00 237.00
12 Tataya Gaon 346.00 0.00 2.00 25.9 0.70 2.00 4.10 24.10 296.90 30.20 327.10 33.00 360.10
13 Sumoi Mari 126.00 0.00 0.70 22.4 2.00 1.00 7.40 13.00 96.60 7.00 103.60 10.00 113.60
14 Borboka Pathar 254.00 0.00 2.20 16.8 5.10 1.00 3.40 8.30 212.60 24.60 237.20 24.00 261.20
15 Kamar Gaon 267.00 0.00 2.00 41.4 0.00 1.00 8.00 36.90 227.30 4.80 232.10 23.00 255.10
16 Radha Chapori N.C. 843.00 0.00 2.20 39 0.00 5.00 4.20 34.80 754.20 49.80 804.00 8.00 812.00
17 Gagol Doba 179.00 0.00 1.10 16.9 1.00 1.00 7.50 10.40 147.50 17.60 165.10 17.00 182.10
18 Karhal Gaon 147.00 0.00 1.15 46 3.00 1.00 4.00 55.00 119.00 6.00 125.00 13.00 138.00
19 Goroimari Doloni 310.00 0.00 2.00 81.3 0.00 1.50 6.10 113.30 234.20 6.40 240.60 24.00 264.60
20 Burha Senchowa 214.00 0.00 2.20 29 3.00 1.00 6.00 20.00 167.90 17.10 185.00 19.00 204.00
21 Dakhinpat Satra 120.00 0.00 0.70 30 0.00 1.00 7.00 30.00 87.50 5.50 93.00 9.00 102.00
Total 5484.00 10.00 34.25 796.60 31.80 33.00 110.80 776.90 4481.20 349.30 4840.50 389.00 5229.50
Source: From field & Census 2011
30
Table No. 3.8: Details of Common Property Resources:
1 2 3 4
Total Area (ha)
Area available for treatment (ha)
Area owned/ In possession of
Sl. CPR
Govt.
No Particulars Govt. Any other (Pl. Any other (Pl.
Pvt. persons PRI Pvt. persons (specify PRI
(specify dept.) Specify) Specify)
deptt.)
1 Wasteland/ degraded land
2 Pastures Nil 31.80 Nil Nil Nil Nil Nil Nil
3 Orchards
4 Village Forest
5 Forest Nil 10.00 Nil Nil Nil Nil Nil Nil
6 Village Ponds/ Tanks 2.00 - 6.00 -
7 Community Buildings - - - 8.00
8 Weekly Markets - - 1.00 -
9 Permanent markets - - - 10.00
10 Temples/ Places of worship - - - 1.50
11 Others (Pl. specify) - - - -
Total 2.00 41.80 7.00 19.50 Nil Nil Nil Nil
Source: From field
Table No. 3.9: Agriculture implements: Table No. 3.10: Crop Classification:
1 2 3 1 2 3
Sl. No Implements Nos. Sl. No Crop classification Area (Hact.)
1 Tractor 4 1 Single crop 4488.40
2 Sprayers-manual/ power 215 2 Double crop 100.2
3 Cultivators/Harrows nil 3 Multiple crop 63.0
4 Seed drill nil
31
Table No. 3.11: Crops & Cropping Pattern:
1 2 3 4 5 6
Rain fed Irrigated Total
Crop sown
Productivity
Productivity
Productivity
Production(
Production
Production
Season
cultivation
cultivation
cultivation
Area (ha)
Area (ha)
Area (ha)
(Kgs/ha)
(Kgs/ha)
(Kgs/ha)
(Rs. /ha)
(Rs. /ha)
(Rs. /ha)
(6+10)/2
(Ton/yr)
(Ton/yr)
Sl.
Cost of
Ton/yr)
Cost of
Cost of
(7+11)
(4+8)
(5+9)
No
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sugar cane 4 28.80 7200.00 7000.00 3 22.50 7500.00 9000.00 7 51.30 7350.00 8000.00
1
Kharif Black gram 15 16.88 1125.00 8000.00 10 11.75 1175.00 8000.00 25 28.63 1150.00 8000.00
Rabi Mustard 6 36.00 6000.00 15000.00 - - - - 6 36.00 6000.00 15000.00
2
Vegetable 3 1.50 500.00 20000.00 2 1.20 600.00 20000.00 5 2.70 550.00 20000.00
Summer
3 Summer Rice 4100 10250 2500.00 24000.00 - - - - 4100 10250 2500.00 24000.00
Total - 4128 1033.18 - - 15 35.45 - - 4143 10368.63 - -
Source: From field
32
Table No.3.13: Irrigation facilities:
1 2 3 4
1 Ponds Nil
1 2 3 4 5 6 7 8
Depth of
Source
water table
Source located at
Sl. Plot No of the Name of the Date of from
(open (ridge/ Remarks
No source Owner* recording ground
well)** middle /
level (in
valley)
mts)
1 Burasensowa Bhaity Taye, 1-1-2022 9 Valley
2 Potia Gaon Pabon Dutta, 1-1-2022 7 Valley
Motiabari
3 Ranjan ayeng, 1-1-2022 10 Valley
Missing
Dakhinpat Munindra
Shallow Tube well
4 1-1-2022 9 Valley
Satra Hazarika,
5 Bhuya,Tataya Jyoti 1-1-2022 9 Valley
Saikia,
6 Khireswar 1-1-2022 10 Valley
Kamar Gaon
7 Gagol Duba Lalit Kutum, 1-1-2022 9 Valley
8 Chumaimari Dibakar Doley, 1-1-2022 9 Valley
9 Bhuramara Khagen Das, 1-1-2022 9 Valley
33
Table No. 3.15: Assessment of drinking water facility:
1 2 3 4 5
Sl.
Item Units Quantity Source
No
Tube Well ,
1 Drinking water requirement Ltrs/day 226020
Govt. Supply
Present availability of drinking
2 Ltrs/day 220000
water
No. of drinking water sources
3 Nos 104
available
a) Functional Nos 87
b) Need Repairing Nos 17
c) Defunct Nos
Short fall if any Ltrs/day 6020
No. of families getting drinking
4 water from outside the Micro Nos Nil
watershed area
Requirement of new drinking water
5 Nos. 20
sources (if any)
Source: From field
1 2 3 4 5
Storage
Sl.
Type of water resource Nos. Area irrigated (Ha) capacity
No
(Cum)
1 Tank Nil Nil Nil
2 Pond Nil Nil Nil
3 Lake Nil Nil Nil
4 Check dam Nil Nil Nil
5 Percolation tank Nil Nil Nil
6 Channel/Canal 1 3.50 -
7 Any others (specify--------------) Nil Nil Nil
Source: From field
34
Table No. 3.18: Existing Water Saving Practices:
NIL
$: Sprinklers, Drip, PVC Pipe, etc., #: Vermi compost, organic manuring, check basin, alternate furrow, Ridges and
furrow & specific practices
Source: From field
1 2 3 4
Table No. 3.20: Existing functional assets (Works already completed under
different scheme including works undertaken by Farmers independently):
1 2 3 4 5 6
Sl. Name of the Quantity Amount
Plot No. Programme
No work (No./RMTs) spent (Rs.)
Nil
35
Table No.3.21 PROBLEM TYPOLOGY OF THE WATERSHED:
1 2 3 4
Sl. Proposed interventions to
Problem of the area Problem Analysis
No. overcome problems
Soil Erosion, and heavy soil loss in
Soil Conservation Construction of graded bund
upland area.
(slope, erosion, soil and field bund to protect the
1 Sheet erosion is combatively high
loss, rainfall, soil erosion and siltation
in many places.
productivity, etc) problems.
Unpredictable nature of Soil
Re-generation of drainage
Degradation of Natural Resource channel by excavation and
such as congestion of natural reclamation activities.
drainage. Reclamation of natural
Lack of water storage facility water bodies (beels) by
results in shortage of water during excavating and constructing
Water conservation winter. periphery bund etc.
(Water budget, Run-off resulting from seasonal toIncrease water storage
2
Ground water norms, rain conquers high velocity due to capacity.
productivity steep slope in the watershed and Creation of Farm Pond and
thereby causes different types of related distribution channel
soil erosion hazards. for water harvesting/storage
Due to inadequate irrigation and irrigation.
infrastructure mainly mono Construction of Nullabund to
cropping is done control the water logging
problem.
36
1 2 3 4
Sl. Proposed interventions to
Problem of the area Problem Analysis
No. overcome problems
Promotion of Dairy, Piggery,
Less income generating goaery, Duckery and Poultry
Existing Livelihood
unsustained activities. farming activities.
6 activities for Asset less
Their present occupation is Daily Promotion of weaving
persons.
Labour, Rikswa Pullers etc. activities for asset less
woman.
Formation of SHG, User
Community Based
groups for promotion of
7 Organizations & Social Most of the SHGs are not functional.
various income generating
capital base
activities
Conducting Awareness
programmes among the
1. In many villages it is observed
Capacity Building villagers.
that the Participation in Gram
(participation, training, Providing training in
8 Sabha is very low due to lack of
awareness of watershed respect to each activities
awareness towards watershed
community proposed for watershed
development activities.
development as well as
livelihood generation.
1. Providing Market Promotion
Lack of Marketing and treading Centres along with Low Cost go-
9 Others (specify)
Facilities down for storage of various
products.
Source: From field
37
CHAPTER - 4
Institutional Building and Project Management
Table No. 4.1 Details of SHGs & UGs newly formed under IWMP:
1 2 3 4 5 6 7 8 9
Bank linkage
Total No. of CBOs
Type of
Group
Sl.
No
No. of members
Bank linkage
No. of SHGs
With Both
With Only
With only
Women
Total
Men
M F Total M F M F M F
Total
Total
Total
(i)
Landless
1 SHG (ii) MF
(iii) SF
Total (iv) LF
Can be filled up only after execution of the project
(i)Landless
2 UGs (ii) MF
(iii) SF
Total (iv) LF
*Account no. of Watershed Committee, PIA.
38
Table No. 4.2: Details of Watershed Committees (WC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
39
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
40
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
42
Table No 4.3: WDT Particulars:
1 2 3 4 5 6 7
Description of
Sl. Names of WDT Qualification /
M/F# Age professional Role/ Function*
No members Experience
training
H.S & Diploma in Departmental A, B, C, D, E, F,
1 Bharat Khanikar M 50
Survey training on survey G, H, I
Departmental
E, F, J (Training
2 Sri Anupam Dutta M 28 M. Sc (Agri) training on
on Agriculture)
Agriculture
Departmental
BVSC & A+A E, F, J (Training
3 Thaneswar Mudoi M 52 training on
(Veterinary) on Veterinary)
Veterinary
Departmental
B. Tech. ( E, F, J (Training
4 Dibajyoti Pegu M 31 training on
Irrigation) on Irrigation)
Irrigation
D.Tech ( Departmental E, F, J (Training
5 M.A Chowdary M 50 Handloom training on on Handloom
Textile) Handloom Textile Textile)
*In column 7 only the letter assigned, as below, needs to be typed, except for `J’, where the type
may be specifically mentioned.
43
Table No. 4.4: PIA particulars:
1 2 3
Sl.
Particulars Details of PIA
No
1 Type of organization H. Government Department
2 Name of organization Department of Soil Conservation, Assam
Divisional Soil Conservation Officer, Majuli Soil Conservation
3 Designation & Address
Division, Majuli, Assam
4 Telephone 9085757345/9854450561
5 Fax
6 E-mail [email protected]
# In column no. 8.1.6 (1), only the letter assigned to each type, as given below, needs to be typed.
A Line Dept. B Autonomous organization
C Govt. Institute D Research Bodies
E Zila Parishad F Intermediate Panchayat
G Voluntary Organisations H Any other (please specify).
Source: From office record
44
Table No. 4.6 Institutional Mechanisms: (Enclose the following documents)
Watershed Committee
45
Table No. 4.6.1 Fund Flow mechanisms – flow chart,
STATE LEVEL
NODAL AGENCY,
ASSAM (100%)
PROJECT IMPLEMENTATION
WCDC AGENCY (PIA)
46
Table No: 4.6.3. List of Watershed Records to be maintained
• Cash Book
• Computerized Accounting System
• Vouchers
4.7.2.3 Resolution of Gram Sabha ,Aam Sabha, WC approving action plan# (to be
enclosed latter)
#the resolution should be done village wise and needs to be approved in Gram/
Aam Sabh
47
4.8 Project Implementation
Project Implementation Strategy including coordination and monitoring of implementation
process, DWDU and other coordination mechanism. (Describe in detail).
Project Implementation involves a number of activities of which the major are - securing community
participation, co-ordination of activities and project management & Controlling, Monitoring.
Co-ordination is the practice whereby more people or organizations work together to deal collectively
with a shared objective. The rationale for co-ordination shall be-
1. To take immediate curative action for problems encountered in implementation of the project.
Project Management & Controlling means managing activities to ensure progress towards the project
objectives.
1. Evaluating the progress of project by comparing the current situation with established goals
and objectives.
2. Submitting reports to account for project activities and finance
3. Monitoring performance to document the way people carry out their responsibilities.
4. Providing feedback to people on a regular, informal basis including optimistic feedback and
constructive criticism.
5. Adjusting plans to respond the changes in the internal and external organizational environment.
Monitoring is an important stage of project implementation and it implies the process of routinely
gathering information on all aspects of the project.
The first level monitoring shall be done by the project staff. The DWDU and PIA shall be
responsible for monitoring the staff and task under them and Project Manager shall be accountable for
monitoring all aspects of the project. The second level monitoring shall be done by third party. The
monitoring team shall be collected the report through field visit, progress and measures
performance including financial reporting.
Step for Monitoring Process:
Defining the objectives of the monitoring system;
Designing a programme to monitor achievements systematically;
Selection of indicators/parameters to be monitored, the location, methods/processes and
frequency of observations and the information processing and reporting procedure are
essential; and
Organizing, motivating and training people to obtain convey and use the information.
48
Monitoring Tools
Semi-structured interviews;
Community workshops to evaluate the extent of adoption and resulting achievements from
conservation practices.
Observation and measurement of easily quantifiable field indicators.
Farmers’ own records can be prepared which provides vital information to the central
theme.
Ground photographs taken from the same place before and after remedial measures, depicting
details about landscape CPR’s changes in the status of natural resources.
Community evaluation of certain simple technical, ecological, economical, social and essential
services indicators.
Remote sensing satellite imageries and aerial photographs taken at the start of the plan are
repeated periodically.
Geographical Information Systems (GIS)
Video monitoring.
Comparison with demonstration and research plots/ farms.
Comparison with demonstration and research micro-watersheds.
Hydro-meteorological measuring.
Using the information gathered by other institutional and private enterprises.
Combination of above mentioned tools.
Project Immediate corrective action for problem WCDC, Project Manager, WDT
encountered Member
Co-ordination
Create Relationship among staff and Project Manager
Institution
Team Building & Capacity Building WCDC/PIA/Project Manager
49
Table No. 4.8 Convergence plan with IWMP:
1 2 3 4 5 6 7
Sl. Name of
NO activity/task/
structure
proposed under Reference Estimated
Names of Level of
convergence Period no. of Fund
Departments decision taken
of activity/ Proposed
with Schemes (a) Structures for
Support task/ Under
converging (b) livelihoods convergence
(Years) structure in Convergence
with IWMP (c) Capacity Block/district
DPR (in Rs.)
Building
(d) Any other (pl.
specify)
1
Nil
50
CHAPTER – 5
Management/Action Plan
i. Awareness campaign through Gram Sabha in all villages of watershed area is essential.
Awareness generation programme will be conducted for all project stakeholders at
watershed level with the fundamental purpose of educating them and creating more
interest in regard to various aspects of the IWMP project.
ii. Awareness campaign through distribution of leaflet and brochures describing about the
IWMP project.
b) Initial Orientation program: For successful completion of the project, orientation of both project
personnel and watershed communities according to the changing perspective is vital and it will
enhance skills and competency of project staff to work with the villagers. Various training,
awareness programme, meeting and seminar shall be conducted to build necessary ability and
competency among the project officials, PRIs, especially GPs and other Communities Based
Organizations (CBOs) about planning, implementation and management of various project activities.
c) Formation process UGs & Watershed Committee: The User Group and Watershed Committee are
formed through Gram Sabha and awareness programme.
Village meeting & Conduct of Participatory Rural Appraisal (PRA) techniques for problem
identification, need assessment and selection of project activities. All the treatment plan and
interventions are identified after elaborate PRA exercise.
Socio Economic Survey of all Households in Watershed village.
Collection of baseline data such as Demographic features, Livestock details, BPL status,
Operational Holdings, Migration particulars, Details of Community Based Organization, Land
features, Details of CPR, Crops & Cropping patters, Soil classification & Erosion status, Climate
& Hydrological features, Ground water status, Irrigation facilities, Status of water table, Quality and
availability of drinking water, Water budget, Details of livelihoods.
51
Problem Typology Analysis.
Integration of various spatial and non-spatial (attribute) data using the Geographical
Information system (GIS). GIS software is an especially effective tool for watershed
management. GIS software provides the ability to create a computerized database consisting of
spatial (map or image) data.
2. Planning Process: All the data collected have been compiled and filled up the
required table accordingly.
3. Mapping: Mapping has been done with the help of local villagers after doing the
PRA exercise.
4. Hydro-geological Survey : The ground water table and the perculation capacity
of the area has been studied during preparation of DPR
5. Public-Private partnership: The relationship of the public with the villagers of
the edjoining villages has been studied.
6. Consolidation & preparation of DPR documents: Combining all the records, the
DPR has been prepared with the best effort.
7. Approval by Aam Sabha/ Gram Sabha : The DPR has been approved by the Gram
Sabha.
52
5.2 Details of Natural Resource Management Activities
Table No. 5.2.1 Soil and Moisture Conservation structures:
1 2 3 4 5 6 7 8 9 10 11 12
Name of Activities
(1st/2nd/3rd/4th/5th)
(including name
Contribution (in
implementation
Name of village
Dimension (in
Area (in Hact)
beneficiaries
Total Grant
(Structure)
Unit cost
structure
Name of
Plot No.
Year of
GPS No
Rs.)
Latitude Longitude
Motiabari Motiabari pathar - 600.00RM 1455.00 8,73,000.00 43,650.00 8,73,000.00 1st 26.956597 94.222239
Chumaimari Arjungurupathar - 800.00RM 2055.00 16,44,000.00 82,200.00 16,44,000.00 1st 26.933772 94.226791
Kamalabari Mohanpur to 26.949422 94.218093
Motiabari - 687.00RM 1428.57 10,00,000.00 50,000.00 10,00,000.00 2nd
MWS Malowkuwa Pathar
Gagol Duba to 26.94545 94.241444
Gagol Duba - 515.00RM 1667.00 8,60,000.00 43,000.00 8,60,000.00 2nd
Habisora
Motiabari Debotor Pathar - 605.00RM 2055.00 12,44,000.00 62,200.00 12,44,000.00 3rd 26.96461 94.217353
Bonkhuwachuk Kumarchapori Pathar - 885.00RM 1455.00 12,88,000.00 64,400.00 12,88,000.00 1st 26.973313 94.267198
Totaya Kaundara Pathar - 706.00RM 1500.00 10,60,000.00 53,000.00 10,60,000.00 1st 26.94394 94.260444
Kamar Gaon Simoluguri Pathar - 800.00RM 2055.00 16,44,000.00 82,200.00 16,44,000.00 1st 26.94545 94.241444
Rawanapara
2nd 26.964622 94.224882
Agri Bund
53
1 2 3 4 5 6 7 8 9 10 11 12
(1st/2nd/3rd/4th/5th
implementation
Name of village
M/sqm/cum) of
Name of MWS
Dimension (in
Area (in Hact)
beneficiaries
GPS No
Unit cost
structure
Name of
(in Rs.)
Year of
patch)
(Structure)
Latitude Longitude
Goroimari Afolamukh Pathar - 207.00RM 1455.00 3,01,000.00 15,050.00 3,01,000.00 1st 26.91121 94.279725
Agri Bund
Moghuli Pathar
Dakhinpat Dakhinpat - 1000RM 1612.00 16,12,000.00 80,600.00 16,12,000.00 3rd 26.937283 942515553
(Koroni Ati)
MWS Chenimari Jan to
Radha Chapori Dakhinpath Kumar - 605.00RM 2055.00 12,44,000.00 62,200.00 12,44,000.00 3rd 26.919726 94.240216
Gaon
Chumoimari Arjunguri Pathar - 500.00RM 1300.00 6,50,000.00 32,500.00 6,50,000.00 3rd 26.933772 94.226791
Kamalabari
MWS Malowkhuwa th 26.950914 94.218689
Reclamation of Drainage
54
Table No. 5.2.2 Water Harvesting Structures:
1 2 3 4 5 6 7 8 9 10 11 12
(1st/2nd/3rd/4th
Contribution
implementat
M/sqm/cum)
name of the
of structure
local patch)
Total Grant
Dimension
amount (in
(Structure)
Total Cost
(including
beneficiaries
Activities
Unit cost
GPS No.
Name of
Name of
Name of
Plot No.
Area (in
Year of
(in Rs.)
(in Rs.)
Name of
village
Hact)
MWS
Rs.)
ion
/5th
(in
Latitude Longitude
Radhachapori Rani Narah Path - 30.00cum 16667.00 5,00,000.00 25,000.00 5,00,000.00 1st 26.920874 94.245241
nd
Radhachapori Natun Chubur - 30.00cum 16667.00 5,00,000.00 25,000.00 5,00,000.00 2 26.918682 94.251185
Mohbat Path
Dakhinpath MWS
Radhachapori Dakhinpat Kumar - 30.24cum 16667.00 5,04,000.00 25,200.00 5,04,000.00 5th 26.922286 94.242032
Gaon
40.00cum 26.933295 94.299935
Borbuka Pathar Borbuka Pathar 16667.00 9,04,000.00 45,200.00 9,04,000.00 1st
Reclama E/W = 150 m
tion of Samaguri Bonia 26.940582 94.261771
Samaguri Satra 44.40cum 16667.00 7,40,000.00 37,000.00 7,40,000.00 2nd
Marshy Gaon
Bongao MWS land by Construction of
Box Chakoli Pathar Box Culvert at 44.40cum 16667.00 7,40,000.00 37,000.00 7,40,000.00 1st 26.963127 94.300651
Culvert Chakali Pathar
Tataya Khaundbari Gaon 44.40cum 16667.00 7,40,000.00 37,000.00 7,40,000.00 1st 26.941811 94.255166
Kamar Gaon to 26.91996 94.239752
Rawanapara MWS Kamar Gaon 44.40cum 16667.00 7,40,000.00 37,000.00 7,40,000.00 1st
Chumoimari
Mekheli Gaon Chapori Pathar 44.40cum 16667.00 7,40,000.00 37,000.00 7,40,000.00 2nd 26.956894 94.261182
Gagolduba 26.935519 94.248957
Kamalabari MWS Gagolduba 44.40cum 16667.00 7,40,000.00 37,000.00 7,40,000.00 2nd
Pathar
Kamalabari MWS Potia Goan Kuh Beel - 1818.00sqm 220.00 4,00,000.00 20,000.00 4,00,000.00 2nd 26.94409 94.228308
Renovation of Pond
Chariniya - Ati
Mekheli gaon - 2727.00sqm 220.00 6,00,000.00 30,000.00 6,00,000.00 1st 26.959068 94.255385
Beel
2 No.Bhuramora Khalimari - 2777.00sqm 220.00 6,11,000.00 30,550.00 6,11,000.00 2nd 26.94409 94.228308
Rawanapara MWS Bonkhuwachuk Potiyabari Beel - 2727.00sqm 220.00 6,00,000.00 30,000.00 6,00,000.00 2nd 26.967665 94.267133
Totaya Pathar-
Totaya - 4091.00sqm 220.00 9,00,000.00 45,000.00 9,00,000.00 4th 26.94608 94.248761
Bhimpur Satra
nd
Mekheli gaon Tatinga Beel 2273.00sqm 220.00 5,00,000.00 25,000.00 5,00,000.00 2 26.959137 94.255246
Bongao MWS Chakali Pathar Chakali Pathar - 2273.00sqm 220.00 5,00,000.00 25,000.00 5,00,000.00 3rd 26.962218 94.294979
Gagol Duba Gelapukhuri - 2650.00sqm 302.00 8,00,000.00 40,000.00 8,00,000.00 1st 26.938646 94.235648
Constructi
Potia gaon Potia Mandir Beel - 1325.00sqm 302.00 4,00,000.00 20,000.00 4,00,000.00 1st 26.94376 94.221882
Pond
Farm
on of
55
1 2 3 4 5 6 7 8 9 10 11 12
Contributio
Total Grant
Dimension
amount (in
(Structure)
implement
(1st/2nd/3rd/
Total Cost
(including
beneficiaries
M/sqm/cu
Activities
structure
n (in Rs.)
the local
Name of
Name of
Name of
name of
Plot No.
Area (in
(in Rs.)
Year of
Name of
village
Unit cost
patch)
4th/5th
Hact)
MWS
m) of
ation
GPS No.
Rs.)
(in
Latitude Longitude
Mudoi Tanti Balichat Jan - 2650.00sqm 302.00 8,00,000.00 40,000.00 8,00,000.00 1st 26.96344 94.280691
Chakali Pathar Chakali pond - 1988.00sqm 302.00 6,00,000.00 30,000.00 6,00,000.00 1st 26.962218 94.294979
Construction of
Farm Pond
Jugi Gaon Jugi pathar - 1325.00sqm 302.00 4,00,000.00 20,000.00 4,00,000.00 1st 26.95999 94.297014
Bongao MWS Chamuguri Ghura Chara-Ati
- 1988.00sqm 302.00 6,00,000.00 30,000.00 6,00,000.00 2nd 26.946775 94.282205
Bonia Pathar
Changalimora 26.959819 94.2841122
Bongaon - 1988.00sqm 302.00 6,00,000.00 30,000.00 6,00,000.00 2nd
jaan
2 . No Karhal 26.931604 94.290703
Dakhinpath MWS Karhal Gaon - 2650.00 sqm 302.00 8,00,000.00 40,000.00 8,00,000.00 4th
Gaon
TOTAL OF WHS 170,59,000.00 8,52,950.00 170,59,000.00
*Source: From PRA Exercise & field survey
Table No. 5.2.3 Vegetative Covers:
1 2 3 4 5 6 7 8 9 10 11 12
Name of village
(1st/2nd/3rd/4th/5t
M/sqm/cum) of
implementatio
Dimension (in
Area (in Hact)
Contribution
name of the
local patch)
Total Grant
(Structure)
(including
Activities
structure
Unit cost
Name of
Name of
Plot No.
(in Rs.)
Year of
GPS No.
Rs.)
)
n
h
Latitude Longitude
Kamalab
ari MWS
Fodder
Jugi pathar Jugi pathar 1.00 Hact. 3,00,000.00 3,00,000.00 15,000.00 3,00,000.00 3rd 26.940294 94.292854
Bongaon
Plantation
MWS
Chakali Chakali
Horticulture 1.00 Hact. 3,00,000.00 3,00,000.00 15,000.00 3,00,000.00 2nd 26.96391 94.300185
Pathar Pathar
Protective Chakali Chakali
7.00 Hact. 1,71,430.00 12,00,000.00 60,000.00 12,00,000.00 3rd 26.96397 94.300183
Afforestation Pathar Pathar
TOTAL OF VEGETATIVE COVER 25,77,000.00 1,28,850.00 25,77,000.00
Source: From PRA Exercise & field survey
56
5.3.: Structure or Activity Wise Details of Engineering Structure and Vegetative Measures
Table No.5.3.1: Engineering structures for Soil Conservation Measures (SMC)
1 2 3 4 5 6 7 8 9 10
Proposed Plan
Sl. Area Estimated cost (Rs. in lakh) Farmers’
Name of Name of Total unit Grant
No Name of village (in Unit cost Contributio
Structure farmers (No./cum/RM) Portion (Rs.
. Hact) M W O T n (Rs. In
In lakh)
lakh)
A Private Land
Nil
Common Land
1 Motiabari 82 600.00RM 0.01455 0.17000 8.46000 0.10 8.73 0.43650 8.73000
2 Chumaimari 150 800.00RM 0.02055 3.60000 12.64000 0.20 16.44 0.82200 16.44000
3 Motiabari 90 687.00RM 0.01429 0.25000 9.70000 0.05 10.00 0.50000 10.00000
4 Gagol Duba 145 515.00RM 0.01667 1.55000 7.00000 0.05 8.60 0.43000 8.60000
5 Motiabari 122 605.00RM 0.02055 3.60000 8.64000 0.20 12.44 0.62200 12.44000
6 Bonkhuwachuk 120 885.00RM 0.01455 0.35000 12.43000 0.10 12.88 0.64400 12.88000
7 Totaya 170 706.00RM 0.01500 2.64000 7.86000 0.10 10.60 0.53000 10.60000
8 Kamar Gaon 148 800.00RM 0.02055 3.60000 12.64000 0.20 16.44 0.82200 16.44000
9 Bhurasensuwa 108 538.00RM 0.01455 0.20000 7.60000 0.04 7.84 0.39200 7.84000
Agri Bund Mekheli Gaon 87 3.50000 2.45000 0.05 6.00 0.30000 6.00000
10 206.00RM 0.02909
11 Bhurasensuwa 95 725.00RM 0.01455 0.10000 10.40000 0.05 10.55 0.52750 10.55000
12 No.2 Bhuramara 38 300.00RM 0.01455 0.03000 4.33000 0.01 4.37 0.21850 4.37000
13 Kamar gaon 95 600.00RM 0.01727 1.40000 8.86000 0.10 10.36 0.51800 10.36000
14 Bongaon 122 715.00RM 0.01664 1.40000 10.46000 0.05 11.91 0.59550 11.91000
15 Mudoi Tanti 65 409.00RM 0.01455 1.20000 4.72000 0.03 5.95 0.29750 5.95000
16 Jugi Gaon 125 593.00RM 0.02266 3.55000 9.84000 0.05 13.44 0.67200 13.44000
17 Mudai Tati 54 324.00RM 0.01850 0.04000 5.95000 0.01 6.00 0.30000 6.00000
18 Chamuguri 96 252.00RM 0.01727 1.40000 2.86000 0.10 4.36 0.21800 4.36000
19 Bongaon 65 400.00RM 0.01850 1.20000 6.15000 0.05 7.40 0.37000 7.40000
57
1 2 3 4 5 6 7 8 9 10
Proposed Plan
Sl. Name of Area
Name of Total unit Estimated cost (Rs. in lakh) Farmers’
No Structur Name of village (in Unit cost Grant Portion
farmers (No./cum/RM) Contribution
. e Hact) M W O T (Rs. In lakh)
(Rs. In lakh)
A Private Land
Nil
Common Land
20 Goroimari 28 207.00RM 0.01455 0.06000 2.94000 0.01 3.01 0.15050 3.01000
21 Agri Bund Dakhinpat 155 1000RM 0.01612 1.20000 14.87000 0.05 16.12 0.80600 16.12000
22 Radha Chapori 115 605.00RM 0.02055 3.60000 8.64000 0.20 12.44 0.62200 12.44000
23 Chumoimari 56 500.00RM 0.01300 1.32000 5.15000 0.03 6.50 0.32500 6.50000
24 Motiabari 20 250.00RM 0.01000 0.07000 2.40000 0.03 2.50 0.12500 2.50000
Chamuguri
25 84 800.00RM 0.01209 1.32000 8.30000 0.05 9.67 0.48350 9.67000
Reclamation Bonia
of Drainage
26 Dhowachala 85 750.00RM 0.01200 1.50000 7.45000 0.05 9.00 0.45000 9.00000
Channel
27 Borboka 92 600.00RM 0.01800 3.50000 7.20000 0.10 10.80 0.54000 10.80000
28 Radhachapori 37 400.00RM 0.01000 0.10000 3.88000 0.02 4.00 0.20000 4.00000
29 Dakhinpat Satra 46 500.00RM 0.01000 0.10000 4.88000 0.02 5.00 0.25000 5.00000
Brick
30 Karhal gaon 146 300.00RM 0.05310 11.40000 4.50000 0.03 15.93 0.79650 15.93000
Canal
TOTAL OF SMC WORKS 81.15000 249.38000 2.19 332.72 16.63600 332.72000
(M – Materials, W- wages, O- others, T – Total)
58
5.3.2: Details of engineering structures for Water Harvesting WHS:
1 2 3 4 5 6 7
Proposed Plan
Sl. Total unit (No./cum/
Name of Structure Name of village Unit cost Estimated cost (Rs. in lakh) Farmers’ Contribution
No. RM)
M W O T (Rs. In lakh)
A Private Land
Nil
B Common Land
1 Radhachapori 30.00cum 0.16667 3.500 1.45 0.05 5.00 0.25000
2 Radhachapori 30.00cum 0.16667 3.500 1.45 0.05 5.00 0.25000
3 Radhachapori 30.24cum 0.16667 3.540 1.45 0.05 5.04 0.25200
4 Borbuka Pathar 40.00cum 0.16667 6.330 2.63 0.08 9.04 0.45200
Reclamation of Marshy E/W = 150 m
5 Samaguri Satra 44.40cum 0.16667 5.180 2.16 0.06 7.40 0.37000
6 land by Box Culvert Chakoli Pathar 44.40cum 0.16667 5.180 2.16 0.06 7.40 0.37000
7 Tataya 44.40cum 0.16667 5.180 2.16 0.06 7.40 0.37000
8 Kamar Gaon 44.40cum 0.16667 5.180 2.16 0.06 7.40 0.37000
9 Mekheli Gaon 44.40cum 0.16667 5.180 2.16 0.06 7.40 0.37000
10 Gagolduba 44.40cum 0.16667 5.180 2.16 0.06 7.40 0.37000
11 Potia Goan 1818.00sqm 0.00220 0 3.97 0.03 4.00 0.20000
12 Mekheli gaon 2727.00sqm 0.00220 0 5.97 0.03 6.00 0.30000
13 2 No. Bhuramora 2777.00sqm 0.00220 0 6.08 0.03 6.11 0.30550
14 Renovation of Pond Bonkhuwachuk 2727.00sqm 0.00220 0 5.97 0.03 6.00 0.30000
15 Tataya 4091.00sqm 0.00220 0 8.96 0.04 9.00 0.45000
16 Mekheli gaon 2273.00sqm 0.00220 0 4.97 0.03 5.00 0.25000
17 Chakali Pathar 2273.00sqm 0.00220 0 4.97 0.03 5.00 0.25000
18 Gagol Duba 2650.00sqm 0.00302 0 7.97 0.03 8.00 0.40000
19 Potia gaon 1325.00sqm 0.00302 0 3.97 0.03 4.00 0.20000
20 Chumoimari 2650.00sqm 0.00302 0 7.97 0.03 8.00 0.40000
21 Motiabari 994.00sqm 0.00302 0 2.97 0.03 3.00 0.15000
22 Construction of Farm Mudoi Tanti 2650.00sqm 0.00302 0 7.97 0.03 8.00 0.40000
23 Pond Chakali Pathar 1988.00sqm 0.00302 0 5.97 0.03 6.00 0.30000
24 Jugi Gaon 1325.00sqm 0.00302 0 3.97 0.03 4.00 0.20000
25 Chamuguri Bonia 1988.00sqm 0.00302 0 5.97 0.03 6.00 0.30000
26 Bongaon 1988.00sqm 0.00302 0 5.97 0.03 6.00 0.30000
27 Karhal Gaon 2650.00sqm 0.00302 0 7.97 0.03 8.00 0.40000
TOTAL OF WHS 10.540 105.95 0.66 117.15 5.85750
59
Table No. 5.3.3: Details of activities connected with vegetative cover in watershed works *
1 2 3 4 5 6 7 8 9
Proposed Plan
Name of village
No of Plants
Grant Portion
Structure
Contribution
Unit cost
Name of
(Rs. In lakh)
(Rs. In lakh)
Cost (Rs. In
Estimated
Sl.
Farmers’
lakh)
No.
A Private Land
Nil
B Common Land
60
Chapter 6
Capacity Building Plan
1 2 3 4 5 6 7 8 9 10
Sl.
Total GrantAmount
(1st/2nd/3rd/4t
etc. at both Being
Number of events
Participants in an
Total Traineedays
and Doing level)
programme (=
Implementation
required for the
Total Number of
No
Name of the
Exposure (
Training &
6x7 ; in Rs.)
Number of
Total Cost
(= 3 x 4 x 5)
Cost per
h/ 5th)
Year of
days per
(inRs)
event
event
MASS MEETING
1 Mass Meeting 5 500 1 2500 100 250000 250000 1st, 2nd , 3rd
Sub Total 5 - - 2500 - 250000 250000
AWARENESS MEETING
Awareness
1 8 200 1 1600 200 320000 320000 1st, 2nd , 3rd
Meeting
Sub Total 8 - - 1600 - 320000 320000
PUBLICITY MATERIALS
1 Publicity Materials - - - - - 256000 256000 1st, 2nd ,
Sub Total - - - - - 256000 256000
INSTITUTIONAL BUILDING
WC Formation &
1 4 300 1 1200 100 120000 120000 1st
Registration, etc.
1st, 2nd , 3rd, 4th,
2 UG Formation 20 50 1 1000 200 200000 200000
5th
3 SHG Formation 20 50 1 1000 300 300000 300000 1 , 2 , 3rd, 4th,
st nd
61
CHAPTER 7
Phasing of Programme and Budgeting
*Please refer to the “Fund Utilization pattern component wise in % under IWMP” letter attached in the Annexure
Table No. 7.1: Phasing of the action plan.
1 2Component 3 4 5 6 7 8 9 10 11
1st year 2nd year 3rd year 4th year 5th year Total
Sl. Unit Cost
Activities Unit
No (Rs.) Phy Phy Fin Phy Fin Phy Fin Phy Fin Phy
Fin (Rs.) Fin (Rs.)
(No) (No) (Rs.) (No) (Rs.) (No) (Rs.) (No) (Rs.) (No)
1 Entry Point Activities (2%)
i
Renovation tanks No. - - - - - - - - - - - - -
62
1 2 3 4 5 6 7 8 9 10 11
Component
1st year 2nd year 3rd year 4th year 5th year Total
Sl. No
Unit Cost
Activities Unit
(Rs.) Phy Phy Fin Phy Fin Phy Fin Phy Fin Phy
Fin (Rs.) Fin (Rs.)
(No) (No) (Rs.) (No) (Rs.) (No) (Rs.) (No) (Rs.) (No)
2 Institution & Capacity Building (3%)
Mass Meeting
i
Mass Meeting No. 50000 3 150000 1 50000 1 50000 - - - - 5 250000
Awareness Meeting
ii
Awareness Meeting No. 40000 6 240000 1 40000 1 40000 - - - - 8 320000
Awareness Generation (events) to be conducted (Publicity Materials)
Pamphlets
No. 5.60 10000 56000 - - - - - - - - 10000 56000
iii distribution
Wall posters No. 10.00 4400 44000 5600 56000 - - - - - - 10000 100000
Rallies No. 10000.00 10 100000 - - - - - - - - 10 100000
Institutional Building
WC Formation &
Registration, etc. No. 30000 4 120000 - - - - - - - - 4 120000
iv
Formation of UGs No. 10000 10 100000 5 50000 2 20000 2 20000 1 10000 20 200000
SHG Formation
No. 15000 10 150000 10 150000 - - - - - - 20 300000
Training
DWDC No. 10000 1 10000 - - 1 10000 - - - - 2 20000
PIA/WDT No. 20000 2 40000 - - 1 20000 - - - - 3 60000
v
Watershed Committee No. 11000 8 88000 - - 2 22000 - - - - 10 110000
User Group No. 20000 5 100000 - - 1 20000 4 80000 2 40000 12 240000
SHG No. 40000 8 320000 - - - - - - 4 160000 12 480000
63
1 2 3 4 5 6 7 8 9 10 11
Component
Unit 1st year 2nd year 3rd year 4th year 5th year Total
Sl. No
64
1 2 3 4 5 6 7 8 9 10
1st year 2nd year 3rd year 4th year 5th year Total
Component
Activities
Unit Cost
Unit Cost
Unit Cost
Unit Cost
Unit Cost
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Sl.
Unit
No
65
1 2 3 4 5 6 7 8 9 10 11
Component 1st year 2nd year 3rd year 4th year 5th year Total
Activities
Unit Cost
Sl. No
(Rs.)
Unit
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
5 Natural resource Management
i Soil and Moisture Conservation Structure
a Agri Bund RM 1731.00 7 80,01,000.00 5 45,88,000.00 6 61,87000.00 2 10,36,000.00 2 17,76000.00 22 215,88000.00
Earthen
b Drainage RM 1250.00 1 9,67,000.00 4 28,80,000.00 1 6,50,000.00 - - 1 2,50,000.00 7 47,47,000.00
Channel
c Brick Channel RM 5310.00 - - 1 15,93,000.00 - - - - - - 1 15,93,000.00
ii Water Harvesting Structure
Reclamation of
a Marshy Land Cum 17,265.00 5 36,24,000.00 4 27,20,000.00 - - - - 1 504,000.00 10 68,48,000.00
(Box Culvert)
Renovation of
b Cum 0.00190 1 6,00,000.00 4 21,11,000.00 1 5,00,000.00 1 9,00,000.00 - - 7 41,11,000.00
Pond
Construction of
c Cum 0.00190 5 30,00,000.00 3 20,00,000.00 - - 2 11,00,000.00 - - 10 61,00,000.00
Pond
iii Vegetative Cover
a Single Planting No. 3000.00 - - - - 1 7,77,000.00 - - - - 1 7,77,000.00
b Fodder Hact. 3,00,000.00 - - - - 1 3,00,00.00 - - - - 1 3,00,000.00
C Horticulture Hact. 3,00,000.00 - - 1 3,00,000.00 - - - - - - 1 3,00,000.00
d P. Afforestation Hact. 1,71,430.00 1 12,00000.00 - - - - 1 12,00,000.00
Total 19 16192000.00 22 16192000.00 11 9614000.00 5 3036000.00 4 2530000.00 61 47564000.00
6 Administration
WC office
a No. 36000 4 144000 4 144000 4 144000 4 144000 4 144000 7,20,000
expenditure
b WS secretary Salary No. 48000 4 192000 4 192000 4 192000 4 192000 4 192000 9,60,000
Stationary &
c - - - 1208000 - 1208000 - 1208000 - 1208000 - 1208000 60,40,000
miscellaneous
Salary of
d
Accountant
No. 264000 1 264000 1 264000 1 264000 1 264000 1 264000 13,20,000
e Salary of DEO No. 216000 1 216000 1 216000 1 216000 1 216000 1 216000 10,80,000
Total 2024000 2024000 2024000 2024000 2024000 101,20,000
66
1 2 3 4 5 6 7 8 9 10 11
1st year 2nd year 3rd year 4th year 5th year Total
Component
Activities
Unit Cost
Sl. No
(Rs.)
Unit
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
7 Detail Project Report (DPR)
Monitoring &
a No. 506000 - - 1 506000 1 506000 1 506000 1 506000 4 2024000
Evaluation
Total - - 1 506000 1 506000 1 506000 1 506000 4 2024000
8 Detail Project Report (DPR)
DPR preparation
including Socio-
a economic survey,
No. 1012000 1 1012000 - - - - - - - - 1 1012000
PRA etc.
Total 1 1012000 - - - - - - - - 1 1012000
9 Natural resource Management Governance
Maintenance of
i
created assett
a Meeting with PRI No. 5000 8 40000 8 40000 8 40000 8 40000 - - 32 160000
Preparation of
b overall Project No. 5000 4 20000 4 20000 4 20000 4 20000 - - 16 80000
Development Plan
Meeting with
c No. 5000 2 10000 2 10000 2 10000 2 10000 - - 8 40000
Annual Audit
II Water Budgeting - -
Ground Water
a Monitoring (twice No. 10000 21 210000 21 210000 21 210000 21 210000 - - 84 840000
a year)
Training for the
b Monitoring No. 20000 3 60000 3 60000 3 60000 3 60000 - - 12 240000
Exercise
67
1 2 3 4 5 6 7 8 9 10 11
1st year 2nd year 3rd year 4th year 5th year Total
Component
Activities
Unit Cost
Sl. No
(Rs.)
Unit
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Phy (No)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Fin (Rs.)
Protection & Regulation/
Regeneration of common
III land (for the protection of - - - - - - - - - - - - - -
the upper reaches of
watershed slopes)
Meeting with Departmental
Officer & staff of Forest,
Agriculture, Veterinary etc.
a No. 5000 10 50000 10 50000 10 50000 10 50000 - - 40 200000
for protection of the upper
reaches of watershed
slopes)
b Formation of UG & Mobility No. 2000 40 80000 40 80000 40 80000 40 80000 - - 160 320000
Formation of Vouluntary
c No. 3000 12 36000 12 36000 12 36000 12 36000 - - 48 144000
Organization & Mobolity
Total 1 506000 1 506000 1 506000 1 506000 - - 4 2024000
10 Consolidation & Withdrawal Phase
Consolidation & Withdrawal
a No. 3036000 - - - - - - - - 1 3036000 1 3036000
Phase
Total - - - - - - - - 1 3036000 1 3036000
253,00,0 253,00, 253,00,0 151,80,0 101,20,0 1012,00
GRAND TOTAL
00.00 000.00 00.00 00.00 00.00 000.00
68
Table No. 7.2 Estimated Benefit Cost Ratio:
Total Benefit
Sl. BCR
Name of the activity Total Cost (Rs.) expected * Remarks
No.
(Rs.)
69
Chapter 8
Consolidation and completion of various works
Table No. 8.1: Consolidation of Action Plan:
Sl. Implementation Phase Consolidation/exit
No Phase
1 year 2nd year 3rd year 4th year 5th year
Component Total
Phy Phy Phy Phy
Phy
(No/ Fin (Rs.) (No/ Fin (Rs.) Fin (Rs.) (No/ Fin (Rs.) (No/ Fin (Rs.)
(No/
Unit) Unit) Unit) Unit)
Entry Point
1 2% 20,24,000.00 - - - - - - - - 20,24,000.00
Activities (2%)
DPR
2 Preparation by 1% 10,12,000.00 - - - - - - - - 10,12,000.00
PIA(1%)
Institution &
3 Capacity 1.5% 15,18,000.00 0.5% 5,06,000.00 0.5% 5,06,000.00 0.25% 2,53,000.00 0.25% 2,53,000.00 30,36,00000
Building (3%)
Productivity
4 Enhancement 1% 10,12,000.00 3% 30,36,000.00 6% 60,72,000.00 4.25% 43,01,000.00 0.75% 7,59,000.00 15,18,0000.00
(15%)
Livelihoods for
5 1% 10,12,000.00 2.5% 25,30,000.00 6% 60,72,000.00 4.5% 45,54,000.00 1% 10,12,000.00 15,18,0000.00
Asset less (15%)
Natural
Resource
6 16% 161,92,000.00 16% 161,92,000.00 9.5% 96,14,000.00 3% 30,36,000.00 2.5% 25,30,000.00 475,64000.00
Management
(47%)
7 Monitoring (2%) - Nil 0.5% 5,06,000.00 0.5% 5,06,000.00 0.5% 5,06,000.00 0.5% 5,06,000.00 20,24,000.00
NRM &
8 Governance 0.5% 5,06,000.00 0.5% 5,06,000.00 0.5% 5,06,000.00 0.5% 5,06,000.00 - Nil 20,24,000.00
(2%)
Consolidation
9 - Nil - Nil - Nil - Nil 3% 30,36,000.00 30,36,000.00
phase (3%)
Management
10 2% 20,24,000.00 2% 20,24,000.00 2% 20,24,000.00 2% 20,24,000.00 2% 20,24,000.00 101,20,000.00
Cost (10 %)
Total 25% 253,00,000.00 25% 253,00,000.00 25% 253,00,000.00 15% 151,80,000.00 10% 101,20,000.00 1012,00,000.00
70
CHAPTER – 9
EXPECTED OUTCOMES
Table No. 9.2: Summarize in the table given below (Quantifiable indicators)
1 2 3 4 5 6
Unit of
Sl. Pre-project Expected Post-
Item measurem Remarks
No. Status project Status
ent
Status of water table (Depth to
1 Meters 9.00 8.4
Ground water level)
Ground water structures
2 No. NA NA
repaired/ rejuvenated
3 Quality of drinking water Description Treated Potable
4 Availability of drinking water Description 70% 90%
5 Increase in irrigation potential Hec. - 1000
Change in cropping/ land use To double &
6 Description From single
pattern multiple
7 Area under agricultural crop Hec. 4651.60 4763.20
i Area under single crop Hec. 4488.4 4553.2
ii Area under double crop Hec. 100.2 130.00
iii Area under multiple crop Hec. 63.0 80.00
Net increase in crop production
8 Hec. 5997.50 6421.00
area
Increase in area under
9 Hec. - 13.00
Vegetation/Forest
Increase in area under
10 Hec. - 10.00
horticulture
11 Increase in area under fuel Hec. - 2.00
12 Increase in area under Fodder Hec. - 7.00
Per
13 Increase in milk production Litres/day 0.5 to 2.0 2.0 to 3.5
household
Environmental Impact
Change in Soil Loss
Tone/Hact/
14 Perenniality of flow and change 15.00 9.00
Year
in Run-off
Recharge of ground water
100 (newly
15 No. of SHGs Promoted No. -
formed)
71
1 2 3 4 5 6
Sl. Unit of Pre-project Expected Post-
Item Remarks
No. measurement Status project Status
100 (newly
15 No. of SHGs Promoted No. -
formed)
Increase in no. of
16 No. - 607
livelihoods
Per
17 Increase in income Rs. 10,000.00 15,000.00
HH/month
18 Status of Migration No. 3820 3056
19 SHG Federations formed No. - 1
20 Credit linkage with banks Rs. - 40.00 lakhs
21 Resource use agreements Does not exist Initiated
WDF collection & 38,96,200.00
22 Rs. Nil
management lakhs
Description Area could progress and become self-sufficient if
irrigation potential is enhanced, assetless are roped under
23 Summary of lessons learnt
livelihood generation/micro-enterprises activities with several
other techno economic/socio-economic efforts
72
Table No.9.3: Backward and Forward Linkages:
Name of the
Type of Marketing Facility Pre-project (no.) Expected post project status
institution
(A) Backward
linkages
(i) Seed certification Govt. of Assam Nil Will be done
Co-operative and Strong Seed supply system will
(ii) Seed supply system Nil
Agriculture Dept. be developed
Co-operative and
(iii) Fertilizer supply Strong Fertilizer supply system
local Nil
System will be developed
fertilizer dealer
(iv) Pesticide supply Strong Pesticide supply system
Local Pesticide Dealer Nil
System will be developed
Internal Credit link will be
Co-operative Bank, developed among SHG, Local
(v) Credit institutions SHG, Local Bank, 168 Bank, Co-operative Bank etc.
Nodal Bank etc. and external credit link from
commercial / nodal banks.
(vi) Water supply Water User Group Nil Will be developed
KVK, ATMA, Strong extension services
(vii) Extension services Agriculture 5 will be developed among all
Dept., NGOs institutions
SHG, Horticulture Strong extension services will
(viii) Nurseries Nursery, Local 7 be developed among all
Nursery institutions
(ix) Tools/machinery Ag Deptt 4 Will Continued
Suppliers
(x) Price Support Ag Deptt, Vetty Dept. 3 Will Continued
System
(xi) Labour Local wage labour 365 Strong network will be
developed
(B) Forward linkages Strong network will be
developed
(i) Harvesting/threshing Local level 2 Strong network will be
Machinery developed
(ii) Storage (including Local level 1 Strong network will be
cold storage) developed
(ii) Road network Local level 3 Strong network develop
(iii) Transport facilities Local level 2 Strong network develop
(vi) Agro and other Local committee, Institution will take initiative so
Industries Cooperative Nil that beneficiaries will get better
opportunities.
(vii) Milk and other Local committee, Institution will take initiative so
collection centres Cooperative Nil that eneficiaries will get better
opportunities.
73
ANNEXURE -II
SDG Format
TOTAL TARGET AREA TO BE TREATED
DURING IMPLEMENTATION OF THE PROJECT UNDER WDC-PMKSY2.0
DISTRICT : MAJULI
PROJECT : MAJULI-1/2021-22 (LOWER TUNI) WDC-PMKSY 2.0
Benefitted (Ha)
Total Treatable
List of activities (As per 5 Year Action Plan)
Component
Area to be
Sl. No.
(Structure)
(including
Activities
Name of
Name of
the local
name of
Plot No.
village
patch)
1 Motiabari Motiabari pathar 92.00
2 Chumaimari Arjungurupathar 168.00
3 Motiabari Mohanpur to Malowkuwa Pathar 103.00
4 Gagol Duba Gagol Duba to Habisora 88.00
5 Motiabari Debotor Pathar 128.00
6 Bonkhuwachuk Kumarchapori Pathar 133.00
7 Totaya Kaundara Pathar 108.00
8 Kamar Gaon Simoluguri Pathar 172.00
9 Bhurasensuwa Sola Pathar 83.00
10 Mekheli Gaon Charinga Pathar 68.00
11 Bhurasensuwa Bihidia Pathar 112.00
Agri Bund
Pathar
16 Jugi Gaon P.W.D to Jugi Pathar 140.00
17 Mudoi Tanti Ruwati Pathar to Bonkuwachuk 66.00
18 Chamuguri Chamuguri Bonia Pathar 49.00
19 Bongaon PWD to Changalimora Pathar 80.00
20 Goroimari Afolamukh Pathar 34.00
21 Dakhinpat Moghuli Pathar (Koroni Ati) 164.00
22 Chenimari Jan to Dakhinpath
Radha Chapori 128.00
Kumar Gaon
23 Chumoimari Arjunguri Pathar 68.00
Reclamation of Drainage
Bihidiya Beel
26 Dhowachala Bhagemari 94.00
27 Borboka Borboka Pathar 112.00
28 Radhachapori Kawoi Mari Jan 44.00
29 Dakhinpat Satra Chenimari-Magurmara 54.00
Chann
Brick
30
el
74
List of activities (As per 5 Year Action Plan)
Total
Component
(Structure)
Treatable
Activities
Name of
Sl. Plot No. (including Area to be
No. Name of village name of the local Benefitted
patch) (Ha)
Plantation
Production
Block
- - 8.00
Based
Total B 8.00
Total C = A + B 4600.00
75
CHAPTER – 10
Sl.
Component Total Area taken up for treatment as per DPR (Hact)
No.
a. Soil & Moisture Conservation Structure 2914.00
Total C = A + B 4600.00
N.B.: C. Total Target Area to be Treated = Project Treatable Area
76
DOOR TO DOOR SOCIO-ECONOMIC SURVEY
77
WATERSHED COMMITTEE FORMATION
78
PRA EXERCISE
79
PRA MAPS
80
THE PROJECT SITE
81
82
83
84
85
86
87
88
89
90
91
92
Sources of maps
93