eRFX Training - For MAGNA Suppliers - 20151210
eRFX Training - For MAGNA Suppliers - 20151210
Agenda
• Proactive self registration • Page 3
Supplier application
• Pre-registering suppliers by MAGNA Purchasing Dept.
The language of the self registration can be selected via the flags
Supplier self registration
Completing the Questionnaire
• The supplier fills out the company specific supplier questionnaire guided by a wizard
• The online questionnaire contains all data needed by the buyer to decide about the registration
• Mandatory fields are yellow. The other fields may be completed later, when the supplier has full access to the supplier portal
Mandatory fields
are yellow
The content of the questionnaire is equivalent to the supplier master data in the portal
Supplier self registration
Mandatory fields and input errors
• If mandatory fields (yellow) are omitted or if fields are filled incorrectly (e.g. wrong data type), errors are displayed above the input mask and
marked in red
• The registration can not be completed without having filled in all mandatory information
Errors are
marked in red
Supplier self registration
Saving the inputs temporarily
• The supplier cannot finish the registration until every mandatory field is filled
• From the second page on, the input can be saved temporarily and completed later
Via SAVE TEMPORARILY the supplier receives an e-mail with a link to the self-registration. This link can be used to continue
entering the data later.
Supplier self registration
Documents
Click
NEW DOCUMENT
Browse for
documents
Save with OK
Save with OK
Suppliers receive reminders to update their certificates if the expiry date is overdue
Supplier self registration
Selecting a Commodity
• The material classification enables the MAGNA purchasing department to find quickly a suitable supplier for goods and services
• Suppliers enter these data themselves in the registration process
• As soon as all mandatory information is completed, the supplier can finish his registration
• Afterwards the supplier receives an e-mail: Confirmation of your application
• An authorized MAGNA - internal user is automatically informed about the new registration
• He/she may accept the registration, only then an e-mail with login-data will be sent to the supplier
• Via “Finish registration” the supplier receives an e-mail: Confirmation of your application
• Internal users with the authorization to “Activate/Reject suppliers” will receive an information about the new registration
Pre-registering suppliers (by MAGNA
purchasing)
Pre-registering suppliers
Inviting suppliers to complete the registration
• MAGNA purchasing can pre-register a supplier and thus ask him to complete the online questionnaire
• The supplier then receives an invitation to register
• Your MAGNA purchasing only need to specify the company name, name and e-mail of your contact person (business card - details)
Pre-registering suppliers
Purchasing perspective => Send an invitation to supplier
You - as supplier - will receive the following information:
Complete the
mandatory fields
• The supplier receives a link to the supplier portal and a corresponding invitation to register himself
• With this link the supplier can start to complete his data in the registration area
• From here on the procedure is the same as in the known supplier registration
Process of Supplier Registration
OPTION 1: Pro-active supplier application for an account
Supplier completes questionnaire
(=Self-Registration)
or by request of a buyer (=Pre-Registration)
• In the menu YOUR DATA all data that the supplier can view or edit are displayed
• The supplier can view or edit the following data: Company Information, Supplier Ratings, User Data, Settings (Signature), Password,
Proxy/Substitute, Inbox and NDAs
• Overview of all self assessments which were published by the purchasing department
• A self assessment is a published answering-sheet out of a RFI
• The self assessments can be searched, displayed and exported
Different export
formats are available
Start the
export
By clicking on the name the
document can be opened
Supplier‘s perspective
Company > Material group / Classification
In this section the supplier can add (apply for) material groups /Removal of material groups need to be done by MAGNA buyer
Supplier‘s perspective
Organization specific data
• Usually the supplier can select organizations during the registration process
• A later modification of entries is possible for MAGNA- internal users only
Supplier‘s perspective
Company > Contact persons
• The supplier gets an overview of all existing contact persons and can maintain their data
• He can add new contact persons or delete existing contacts
The supplier can only edit the contact persons, but not their user accounts
Supplier‘s perspective
Create contact persons
Create a contact
person
• To give the new contact person access to the system, the supplier can request a user account
• That can be done directly in the respective contact person‘s entry
Confirm with
YES
The request for a user account creates an email to the MAGNA Clearing Center who will provide login credentials after verification.
Explanation
Supplier – contact person – user account
1 n 1 1
1 n
• The supplier can also de-activate existing contact persons (e.g. colleagues, who left the company) by himself
Deactivate user
account of contact
person
Contact persons with de-activated user account will not get any a-mails out of eRFX & do not have system access.
Supplier‘s perspective
Edit user account
If the supplier has not maintained a signature, his E-mails will be sent without any signature
Supplier‘s perspective
Create a new password
After the supplier has changed his password, he will be logged out automatically – he can login again with the new
password
Supplier‘s perspective
Create a proxy / substitute
Save with OK
Precondition: The designated substitute has a user account already and knows the principal‘s username
Supplier‘s perspective
NDAs – Non-Disclosure Agreements
• Overview of all NDAs, which were assigned to the supplier and were (not yet) accepted by him
• The supplier can view the files and either accept or reject them
• When a signature is required the NDA has to be signed (offline) and forwarded to the internal user (via E-mail, fax or upload in the system)
• When an NDA is added to an event, the supplier doesn‘t have to accept it once again, if he has accepted it at „Your data“ already – in the event this
NDA is only shown for his information
• The MAGNA buyer will receive a notification by E-mail as soon as the supplier has accepted an NDA
• These NDAs don‘t refer to a certain event, but they are valid generally
Supplier data management
Data expiry date
• If the validity date expires (data validity = 12 months!), the supplier is required to update his data
• The contact person (supplier) goes through all the views of his record and has to update the company data
• Once the supplier has updated the data, he can regain access to his usual eRFX view / to events
By clicking “Finish” the validity of the data will automatically extend for another year.
Events / supplier´s perspective
Events / supplier´s perspective
2) Login and entering the Event Preconditions: Event online, NDAs have been accepted
• The event is visible on your eRFX Home-page (Dashboard) as soon as it is placed online.
• Whenever an NDA is linked to an event the NDA must be accepted first (respectively signed ) bevor the supplier gets
access to the event or any event documents.
Quotation Process /NDA without signature
• During event creation MAGNA purchasing can link NDAs (Non disclosure agreements) to an event
• Any details of the event (RFQ) are only visible to suppliers after having accepted all NDAs linked to the RFQ
General Information
provided by MAGNA
purchasing
RFQ template
to be filled out by
supplier
Rules:
Fill-out all yellow (= mandatory)
fields!
• The supplier can upload additional document(s) when providing his quotation
• When the option “mandatory upload” has been selected by MAGNA purchasing the supplier
must upload an additional document / additional documents before being allowed to quote
Quotation Process via xls
5a) It is possible to select
now either: 5d) When clicking OK
Save quote temporarily the quotation is being
or committed as a
Commit quote binding offer.
• The supplier can upload additional document(s) when providing his quotation
• When the option “mandatory upload” has been selected by MAGNA purchasing the supplier
must upload an additional document / additional documents before being allowed to quote
Quotation Process ONLINE
• Quotes which have been temporarily saved (Status: Quote in process) can be reopened at a later time for
modification
• When the quotation has been finalized it is required to COMMIT the QUOTE. The quote is now a binding offer and
cannot be changed by the supplier.
Quotation Process – upload of additional documents
In the area „Supplier uploads“ the suppliers are able to upload any documents related to their quotations.
1.) Supplier
does select
Supplier 2.) Supplier does
uploads select „New“
4.) Supplier can link
the document to a
specific quotation*
* If the supplier is uploading additional documents while having a „quote in process“ the documents will be
automatically linked to the quote. Otherwise it is possible to manually link any document to a specific quotation
Quotation Process – upload of additional documents
If a supplier does have several quotations committed (eg in different rounds of the event) or stored temporarily it is
possible to review the quotes and reopen for modification (as long as quotes have not been committed)
Information to
the quote
“currently open”