MEP Clearance Form: Clearance Required To Start Under Raft Activity

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
239 views1 page

MEP Clearance Form: Clearance Required To Start Under Raft Activity

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MEP Clearance Form

Project : TG2144-Townhouses and Semi-Detached Villas Clearance Reference No.RHP1P2-BW-TGC-4TV-FN-CLR-ST-00009


Client: Revision No.
Consultant: Date
Main Contractor : M/s. Trojan General Contracting L.L.C (TGC) WIR Reference No.
Sub-Contractor :

Discipline: □ Mechanical □ Electrical □ Plumbing □ HVAC □ Others…………………………


Request by TGC Receiving by MEP Sub-Contractor
Requested by TGC Site Received by Received by
Engineer MEP Site Engineer PE/ CM QA/QC
Name: Jonathan Name:
Requested Date: 01.07.24 Receiving Date:
Clearance for the Activity Clearance Code

Clearance required to start under raft activity MCLR-03

Location Details:
Plot No. Sector/ Cluster/ Zone Building Type/ Villa Type Level/ Floor Villa No./ Room No./ Flat No. Grid Lines/ Area of Work

Phase 1C Cluster 1 Canal Promenade 4TVR FF Villa 368/369 (B004)

Sl. No. Activity Yes No N/A WIR Reference Remarks


1 U/G DRAINAGE PIPING AND LEAK TEST □ □ □
Planned/ Target Clearance required on: Actual Clearance required on:
Mechanical Engineer Comments (MEP Sub-Contractor)

□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Electrical Engineer Comments (MEP Sub-Contractor)

□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Project Engineer/ Construction Manager Comments (MEP Sub-Contractor)

□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
QA/QC Comments (MEP Sub-Contractor)

□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
MEP Coordinator Comments (Optional) (Main Contractor)

□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Consultant Comments (Optional)

□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:
Received by TGC Engineer (Main Contractor)

□ Full Approved
□ Partial Approved
□ Not Approved
Name: Signature: Date:

Form : TGC/QAQC/FRM/PR/031 Rev.01-09/03/23 page 1 of 1