BUT. HYUNDAI ENGINEERING CO.
, LTD
GD MENARA JAMSOSTEK MENARA UTARA LT.9
JL. GATOT SUBROTO KAV 38 RT.06 RW.01
KUNINGAN BARAT MAMPANG PRAPATAN
JAKARTA SELATAN, DKI JAKARTA 12790
WORK ORDER
ELECTRICAL AND CONTROL & INSTRUMENT WORK
No. : HEC-WO-F-ECI-0001
Date : September 7, 2023
BUT.HYUNDAI ENGINEERING.CO.,LTD (hereinafter called HEC ), Gd. Menara Jamsostek Menara Utara Lt.
9 Jl.Gatot Subroto Kav.38 RT.06.RW.01 Kuningan Barat, Mampang Prapatan Jakarta Selatan DKI Jakarta 12790,
herewith palace on order to Subcontractor as follows :
Name of Subcontractor : PT. INFORMATION DATASYSTEM
( hereinafter called Subcontractor IDS)
Komplek Rukan Mabilu City Resort Blok I No.11 Jl. Raya Outer Ring,
Cengkareng Timur, Jakarta Barat.
Attn : Mr. Tigor Nauli Adrian
Position : President Director
Phone : 021-54391562
Email :
[email protected]Scope of Works :
Supply of Manpower
Tools and Equipment Preparation and Arrangement
Mobilization and Demobilization
Palace of Work : IKCP Project CFPP 2x100MW, Asam – Asam, Kalselteng
Contract Price :
PRICE TOTAL PRICE
NO DESCRIPTION QTY UOM REMARKS
IDR IDR
1 SWGR 1 Lot 2,106,160,000 2,106,160,000
2 POWER TRANSFORMER 1 Lot 1,138,284,161 1,138,284,161
3 Cable for Unit #1 1 Lot 2,143,774,864 2,143,774,864
4 Cable for Unit #2 1 Lot 1,820,229,488 1,820,229,488
TOTAL IDR 7,208,448,513
PPN 11% IDR 792,929,336
GRAND TOTAL IDR 8,001,377,849
Schedule of Works : September 11, 2023 – March 8, 2024
Term of Payment : 1. 50% Down Payment with the Order
PT. INFORMATION DATASYSTEM BUT. HYUNDAI ENGINEERING.CO.LTD
BUT. HYUNDAI ENGINEERING CO., LTD
GD MENARA JAMSOSTEK MENARA UTARA LT.9
JL. GATOT SUBROTO KAV 38 RT.06 RW.01
KUNINGAN BARAT MAMPANG PRAPATAN
JAKARTA SELATAN, DKI JAKARTA 12790
2. 40% Payment Againts Monthly Progress Report
3. 10% After The Construction Work Finished
4. Payment Shall Be Made Within 10 Days After Receiving Invoice
Term of Condition : 1. The Prices are firm and fixed. Should the delivery be delayed for reasons
beyond out control, the price shall be subject to adjustment by adding any
extra cost, which result from the deferred delivery
2. Performance Bond : 5% (6 Month Period)
3. Warranty Bond : 5% (12 Month Period After The Effective Date of
TOC)
4. Advance Payment Bond : 50% (6 Month Period)
5. All of the Bonds Issued by PLN Insurance Company
Document of contract : 1. Refer to Price Proposal of Subcontract Number Quotation No.
202/IDS-QUO/IX/2023 (September 4, 2023)
2. Final Quotation.
BUT.HYUNDAI ENGINEERING.CO., LTD PT. INFORMATION DATASYSTEM
Mr. Kim Hee Chul Mr. Tigor Nauli Adrian
Project Manager President Director
PT. INFORMATION DATASYSTEM BUT. HYUNDAI ENGINEERING.CO.LTD