0% found this document useful (0 votes)
25 views

Retro Merge2

Uploaded by

sumith14425
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Retro Merge2

Uploaded by

sumith14425
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Scheme (Financial) authentication Form

Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8249111


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8249111
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Meromgutu Munda Tola
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Bandgaon/ Meromgutu/ Meromgutu
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 12
7. FHTC provided in these schemes : 13
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.413 lakhs
F. Community Contribution (@5.00 %) : 0.021 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.551 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.571 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8247621


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8247621
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Anandpur Runghikocha Hunda Hunda Toli
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Anandpur/ Rudhikhoch/ Unduda
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 8
7. FHTC provided in these schemes : 9
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.536 lakhs
F. Community Contribution (@5.00 %) : 0.027 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.548 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.574 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8247686


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8247686
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Anandpur Robokera Khatangbeda
Jayprakash Tola
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Anandpur/ Robkera/ Khatangbera
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 12
7. FHTC provided in these schemes : 18
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.495 lakhs
F. Community Contribution (@5.00 %) : 0.025 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.549 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.573 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8246822


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8246822
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Goilkera Kumhar Toli Nayak Tola Nag Toli
Bedang Tola
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Goelkera/ Goilkera/ Goilkera Bazar
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 12
7. FHTC provided in these schemes : 21
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.495 lakhs
F. Community Contribution (@5.00 %) : 0.025 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.549 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.573 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8344056


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8344056
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Nakti Khas 2
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Bandgaon/ Nakti/ Nakti
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 12
7. FHTC provided in these schemes : 14
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.495 lakhs
F. Community Contribution (@5.00 %) : 0.025 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.549 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.573 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8343993


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8343993
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Surbuda Douparam Adivwasi Tola
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Chakradharpur/ Surgura/ Duarparom
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 12
7. FHTC provided in these schemes : 15
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.578 lakhs
F. Community Contribution (@5.00 %) : 0.029 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.547 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.575 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8246220


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8246220
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Gulkeda Burusai
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Chakradharpur/ Gulkera/ Gulkera
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 8
7. FHTC provided in these schemes : 12
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.536 lakhs
F. Community Contribution (@5.00 %) : 0.027 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.548 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.574 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8253821


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8253821
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Champwa Darog Munda Tola
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Bandgaon/ Champwa/ Darong
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 10
7. FHTC provided in these schemes : 14
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.413 lakhs
F. Community Contribution (@5.00 %) : 0.021 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.551 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.571 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8245191


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8245191
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Surbuda Toyara
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Chakradharpur/ Surgura/ Toera
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 12
7. FHTC provided in these schemes : 14
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.495 lakhs
F. Community Contribution (@5.00 %) : 0.025 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.549 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.573 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________
Scheme (Financial) authentication Form
Government of Jharkhand
Print date : 02.07.2024

Certificate for Scheme ID : 8246231


in accordance with letter no. No.W-11011/49/2021-Water-DDWS, dated 10.01.2024 of NJJM
(To be signed and authenticated at the appropriate level indicated in para 4 of letter dated 10.01.2024)
A. Static Data (auto fetched from the system):
1. Scheme ID : 8246231
2. Scheme name : Retrofitting Existing St/sc Solar Based Mrwss Gulkeda Khas
3. District/ Block/ Panchayat/ Village: West Singhbhum/ Chakradharpur/ Gulkera/ Gulkera
4. SLSSC Date: 02/03/2021
5. Admin Sanction Number : 179/02.03.2021
6. HHs planned in these schemes : 12
7. FHTC provided in these schemes : 15
8. Service Level (lpcd) : 55
9. Work order dated (if issued) : 29/05/2021
10. Total cost of scheme entered in IMIS (based on work order date) : 1.122 lakhs
In case the cost mentioned above (at Sr. No.10), includes inadmissible expenses like O&M, centage, cost of
land, higher service level & urban components, etc., please provides details as below :
B. Inadmissible expenses (reported by the State):
(Para 7.10 of Operational Guidelines for the implementation of JAL JEEVAN MISSION)
11. Costs towards O&M, if any : 0.000 lakhs
12. Costs on account of centage/supervision charge : 0.000 lakhs
13. Costs on account of Land : 0.000 lakhs
14. Construction/renovation/repair of building, office building extension of building, residential building,
vehicle etc. : 0.000 lakhs
15. Cost apportioned for creating infrastructure for provisioning higher service levels i.e. > 55 lpcd : 0.000
lakhs
16. Cost apportioned to infrastructure provisioned for supplying water to urban household if the scheme is
planned also to cover urban households : 0.000 lakhs
17. Amount of Price escalation/ variation : 0.000 lakhs
18. Any other inadmissible cost, if any : 0.000 lakhs
C. Total Inadmissible cost (calculated by the system) [Sum of B(11) to B(18)] : 0.000 lakhs
D. Cost attributed to JJM (After deducting (C) from A(10)) : 1.122 lakhs
E. Cost of in-village infrastructure (admissible under JJM) (reported by State) : 0.660 lakhs
F. Community Contribution (@5.00 %) : 0.033 lakhs
G. Central share under JJM (to be auto calculated by system (from Total Cost at D - Community Contribution
at F) using funding pattern) : 0.545 lakhs
H. State share under JJM [Total Cost(D) - Central Share(G)] : 0.577 lakhs
2. It is hereby certified that information mentioned from (B) to (H) is correct.

Place___________________
Date___________________

Signature with stamp


Name : _____________________
Designation : Collector/ CEO ZP/ EnC/ CE/ SE
Department of_____________________

You might also like