AND IN 1 METRE LENGTHS, OR APPROVED CONCRETE RAISED THRESHOLD �
COUNCIL.
RAMP HEIGHT SIMILAR.
TRANSITIONS FROM KERB
HEIGHT TO PROPOSED NOTE: GRATE SHALL BE BOLTED DOWN.
PROVIDE MICROMESH HUMP.
HEELPROOF GRATING EXISTING CONCRETE FOOTPATH TO REMAIN
FROM WELDLOK PTY
LTD, 600mm WIDE AND
A PROVIDE 9m OF 'YELLOW'
E4 LINEMARKING AS SHOWN
IN 1 METRE LENGTHS,
OR APPROVED SIMILAR. RECONSTRUCT CONCRETE
KERB WITH GROOVE TO
PROVIDE HAZARD SUPPORT GRATING.
SIGN IN V-LOCK.
CONSTRUCT CONCRETE REFER TO HEEL GUARD
RAMP MIXED WITH BLACK DUMMY JOINT GRATING DETAIL
OXIDE WITH SL72 MESH (EITHER WET PROVIDE EXPANSION JOINT (EJ)
CENTRALLY PLACED. FORMED OR CONNELLY JOINT OR EQUIVALENT
SAWCUT) WITH 16mm DIA DEFORMED HOT
DIPPED GALVANISED DOWELS
SECTION A-A 600mm LONG O 500mm CENTRES
NOT TO SCALE
r
RAISED SECTION CHARCOAL 75mm THICK MULCH MOUNTABLE KERB
COLOUR. PROVIDE SAWCUT TYPICAL. REFER TO
PEDESTRIAN LINE MARKINGS EXISTING TYPICAL MOUNTABLE
TO RMS STANDARD AS
SHOWN.
/_\_-s:; PAVEMENT. EXISTING
KERB DETAIL.
PAVEMENT
CONSTRUCT NEW
LANDSCAPED KERB CONSTRUCT 200mm THICK
BLISTER ISLANDS CONCRETE RAMP MIXED
WITH MOUNTABLE WITH BLACK OXIDE FINISH, PROVIDE 16mm• DEFORMED HOT PROVIDE LANDSCAPE
PROVIDE PIANO KEY KERB. KERB AS TO 1:15 GRADE WITH SL82
MESH CENTRALLY PLACED.
DIPPED GALVANISED DOWELS
600mm LONG O 500 CENTRES
TYPICAL LANDSCAPED WITH DICHONDRA
REPENS PLANT IN
"PREMARK" LINE MARKING
AS PER AS1742.13-2009,
PER 'KERB ONLY'
ON PLAN R1. KERB BLISTER DETAIL BETWEEN
LOMANDRA-LUCKY
PARAGRAPH 4.6.6. LENGTH TO SUIT
PARTICULAR SITE,
SECTION 8-8 SCALE 1:20
USE "PAINT' ON NEW NOT TO SCALE
CONCRETE USE
THERMOPLASTIC ON OLD OR TO SUIT EXISTING AND INVERT SHALL MATCH THE GUTTER LEVEL.
CONCRETE AND ON TRAFFIC NOTES 1 : D) STATE SURVEY MARKS (SSM·S) -SHALL NOT BE DISTURBED UNLESS APPROVED BY THE
ASPHALTIC CONCRETE. 1. CONCRETE STRENGTH COUNCIL ENGINEER.
A) KERB, KERB &: GUTTER, FOOTPATH, CYCLEWAY, VEHICLE CROSSING, PRAM RAMP, EDGE E) AT ALL LIGHT/POWER POLES, THE CONCRETE SHALL BE ENDED 150MM CLEAR OF THE
STRIP: 25MPA O 28 DAYS POLE AND THE GAP FILLED WITH 30MM OF 10MM COLDMIX/ASPHALTIC CONCRETE.
B)
C)
DISH CROSSING, ROAD PLATFORM/HUMP, ROAD SLAB: 40MPA O 28 DAYS
FOR TRAFFICKED AREAS WHERE FACILITY MUST BE OPEN TO TRAFFIC WITHIN 12 HOURS
9. EXISTING SIGNAGE
A) SUCH SIGNAGE SHALL BE REINSTATED UNLESS THE COUNCIL ENGINEER ADVISES
(EG VEHICLE CROSSING, ROAD SLAB, DISH CROSSING, ROAD PLATFORM/HUMP: 40 MPA OTHERWISE.
WITH ACCELERATOR SUCH AS 2" CACL (REFER TO SP40HC). B) SIGNS REPLACED OR NEW, WITHIN THE NEW CONCRETE SHALL BE INSTALLED WITH A
2. CONCRETE FINISH V-LOK.
A) KERB, GUTTER, LAYBACK, DISH CROSSING, PIT (OUTER EXPOSED) -STEEL TROWEL C) HERITAGE STREET NAME SIGNS EMBEDDED IN FOOTPATH PAVING AND KERBS - CAUTION
B) VEHICLE CROSSINGS, FOOTPATH, CYCLEWAY, ROAD SLABS, PRAM RAMP, ROAD SHALL BE EXERCISED TO NOT DAMAGE THESE SIGNS AND THE CONTRACTOR SHALL LIAISE
HUMPS/RAMPS -BROOM/BRUSH. WITH THE COUNCIL ENGINEER TO DETERMINE WHAT ACTION TO IMPLEMENT WHERE
DISTURBANCE OF THE SIGN IS ESSENTIAL.
R0.3m 3. REINFORCEMENT 10.RESIDENT NOTIFICATION
A) TO AS 4671
B) MINIMUM COVER: SOMM A) ALL RESIDENTS AFFECTED BY THE WORKS SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS
BEFORE THE RELEVANT WORK COMMENCES AND ANY REASONABLE REQUESTS
4. JOINTING, MINIMUM DIMENSIONS, AND REINFORCEMENT CONCRETE ACCOMMODATED.
.,_ ____..J>1..wa.._7'----;,:.;+''""',,';,i�=-�=,.,_s-;.;.;..:...:.
;..:...:.;..:...:..,",,-='ri"c�--;;-=::-"'-=------:
ROAD SLABS 11.SAFETY/SIGNAGE/ACCESS
RAMP HEIGHT TRANSITIONS A) ANY RECONSTRUCTED SECTION OF CONCRETE SHALL HAVE A MINIMUM DIMENSION OF A) DURING CONSTRUCTION, ADEQUATE WARNING SIGNS AND BARRICADING SHALL BE PROVIDED
FROM KERB HEIGHT TO 900MM IN ANY DIRECTION. TO ENSURE THAT THE WORK SITE MEETS THE REQUIREMENTS OF AS 1742.2 &: 1743.3,
PROPOSED HUMP. B) ALL JOINTS SHALL BE AT RIGHT ANGLES UNLESS DIRECTED OTHERWISE BY THE COUNCIL AND TO PROVIDE ADEQUATE PROTECTION TO PEDESTRIANS &: MOTORISTS.
PROVIDE MICROMESH ENGINEER. B) ADEQUATE AND SAFE ACCESS FOR PEDESTRIANS SHALL BE PROVIDED AT ALL TIMES.
HEELPROOF GRATING FROM C) EXPANSION JOINTS - REFER TO NOTES ON R3 STANDARD DRAWING. C) AT DRIVEWAYS -PREVENTION OF ACCESS SHALL BE KEPT TO AN ABSOLUTE MINIMUM AND
WELDLOK PTY LTD, 600mm D) ALL DOWELS SHALL BE PERFECTLY ALIGNED IN PLAN VIEW AND IN ELEVATION, IE THE ARRANGEMENTS SHALL BE MADE WITH THE RESIDENT/BUSINESS, BY THE CONTRACTOR, FOR
WIDE AND IN 1 METRE E,J, EXPANSION JOINT DOWELS SHALL NOT BE SPLAYED RELEVANT TO EACH OTHER.
LENGTHS, OR APPROVED
SIMILAR. GUTTER BRIDGE
RAISED CROSSING E) ALL EXPANSION JOINT MATERIAL SHALL BE THE SAME THICKNESS OF THE CONCRETE AND
A SUITABLE DAY/TIME FOR THIS WORK. USE OF HIGHER STRENGTH CONCRETE, WITH
SHORTER CURING TIME MAY BE NECESSARY.
BE IN ONE LENGTH &: WIDTH.
SUBJECT TO STORMWATER SCALE 1:100
F) AT ALL EXPANSION JOINTS, ANY 'SPILL' CONCRETE FROM THE PREVIOUS POUR (IE 12.DIMENSIONS
CAPACITY INVESTIGATIONS A) ALL DIMENSIONS ARE IN MILLIMETERS UNLESS SHOWN OTHERWISE.
&: DESIGN. SEPARATE TO THE FINISHED CONCRETE) SHALL BE REMOVED.
G) CONTRACTION/DUMMY JOINTS (UNREINFORCED CONCRETE) - NOMINALLY AT 3M INTERVALS 13.GENERAL
OR EQUALLY BETWEEN EXPANSION JOINTS BUT NOT LESS THAN THE CONCRETE WIDTH A) ALL WORKS SHALL BE CARRIED OUT TO COUNCIL'S SPECIFICATION, TO BEST PRACTICE
BETWEEN JOINTS/EDGES. STANDARDS, AND TO THE SATISFACTION OF COUNCIL'S SUPERVISING ENGINEER.
5. EXCAVATION B) DURING AND AFTER EXCAVATION, ANY UNSOUND AREAS BELOW THE CONCRETE WORK
SHALL BE DRAWN TO THE COUNCIL ENGINEER'S ATTENTION, TO ESTABLISH IF ANY
A) AT ALL JOINS TO EXISTING CONCRETE/ASPHALT -THE JOIN SHALL BE SAW CUT BEFORE
EXCAVATION. ADDITIONAL EXCAVATION/ BASE COURSE IS NECESSARY.
CONSTRUCT NEW KERB AND
GUTTER WITH GROOVE TO B) ALL EXCAVATED MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT A C) THE WORK SITE SHALL BE KEPT IN A CLEAN, TIDY, AND SAFE CONDITION AT ALL TIMES
SUPPORT GRATE LICENSED WASTE DISPOSAL FACILITY. AND TO THE SATISFACTION OF COUNCIL'S ENGINEER.
6. ROAD BASE 14.DOCUMENT PRIORITY
A) COMPACTION: 95" STANDARD. A) THIS PLAN SUPERSEDES ANY STATEMENTS ON OTHER DOCUMENTS, EG SPECIFICATIONS,
B) RECYCLED DGB SPECIFICATION: FOR SUPPLY OF RECYCLED MATERIAL FOR PAVEMENTS, OTHER PLANS, ETC, UNLESS ADVISED BY THE COUNCIL ENGINEER.
..
EARTHWORKS, AND DRAINAGE REFER TO SPECIFICATION FOR SUPPLY OF RECYCLED 15.INSPECTIONS
-4 · . MATERIAL FOR PAVEMENTS, EARTHWORKS AND DRAINAGE' BY IPWEA (NSW) (LATEST INSPECTIONS BY THE COUNCIL SUPERVISING ENGINEER SHALL BE REQUIRED AT THE FOLLOWING
','"I EDITION). STAGES AND AS OTHERWISE DIRECTED BY THE COUNCIL ENGINEER:-
. .. ., 7. RESTORATION OF ADJOINING ROAD PAVEMENT
A) SHALL BE CARRIED OUT WITH FULL DEPTH AC20 AND AC10, WITH THE SURFACE FINISH
A) EXCAVATION COMPLETED.
B) FORMWORK AND REINFORCEMENT SET.
ROAD PAVEMENT BEING WITH AC10 (MINIMUM THICKNESS 30MM). C) CONCRETE POURED AND CURED.
EXISTING FOOTPATH B) AC SHALL CONFORM TO RMS SPECIFICATION R116 - 'ASPHALT (DENSE AND OPEN D) COMPLETED.
GRADED)'.
8. UTILITIES, SERVICES & SURVEY MARKS
HEEL GUARD GRATING DETAIL A) ALL UNDERGROUND UTILITY SERVICES SHALL BE CHECKED FOR LEVEL AND LOCATION PRIOR
TO COMMENCEMENT OF WORKS, BY THE CONTRACTOR.
SCALE 1:20 B) ALL SERVICE COVERS AFFECTED BY THE WORKS SHALL BE ADJUSTED AS REQUIRED AND
TO SUIT THE LEVELS OF THE NEW WORK. NO SERVICE FITTINGS SHALL BE COVERED.
(ORIGINAL = A3 SHEET) C) PROPERTY STORMWATER PIPES: WHERE AFFECTED, SHALL BE REPLACED WITH 90MM UPVC
-
R.T.A. TELECOM/OPTUS -T-T-T-T-
A.G.L / SHELL PIPELINES GAS ---G---G----G-G- A. H. D.
-s-s-s-s- SCALES T1
DESIGNED SYDNEY WATER SEWER PLAN NO.
PG/DJT 1ElSTRA / OFT\JS WATER -w---w-w-w- STANDARD TRAFFIC DRAWING
APPROVED FOR CONSIRUCTlON MAY 2019
INNER WES SYDNEY ELECTRICITY RAILWAY �-R-R-R-
PEDESTRIAN CROSSING ON FLAT TOP SPEED HUMP T1
DRAWN NOTICE OF ENTRY El.EC. CABLES -E-E-E-E- AS SHOWN
PG/DJT
MAY 2019 COUNCIL KERB &: GUTTER
NOTICES DATE
OIL PIPELINES
STORM WATER
-P-P-P-P-
-sw-sw-sw- AMEND O,.TE DESCRIPTION APPRCW. VERSION V1