S.
Schemes Eligibility Details Department
No
1. Rythu Bandhu For all land • Started on 10th May 2018 • In the
(Farmer’s investment holding farmers • Indiranagar (Shalapally presence of
support scheme – Karimnagar (dist)) district
FISS) • 1.43 Crs beneficiaries’ areas, collector,
58.33 lakh Revenue
• 5000 per area (Kharif – 500 department
rs, rabi – 5000 rs) from and
(2019 – 2020) agriculture
• 1st – Nalgonda district department.
• Last – Medchal malkajgiri
• 2021 – 2022 budget –
14,800 cr.
2. Rythu Bima (Farmers Farmers aged • Started on 15th August 2018 • Ministry of
insurance) between 18 – • On farmer’s death with any agriculture
59 years reason Rs. 5 lakhs insurance
will be given to support his
family.
• Money will be credited
within 10 days after
farmer’s death
• Insurance company: LIC
India
• Rs. 2,271 paid by T.S govt to
LIC
3. Dalitha Bandhu Scheduled caste • Started on August 4th 2021 • Telangana
(SC) vasalamarri (Village) yadadri schedule
Bhuvanagiri (dist) castes
• CM. KCR started as pilot cooperative
project on August 16th 2021 development
at karimnagar (D) corporation
Huzurabad (M) Shalapally – limited.
Indiranagar (V)
• 1st beneficiary
kanukulagidda (V) kottur
Radha
• Family is taken as united
and Rs. 10 lakhs to eligible
families to start their
business
4. Asara Pension Old age – 57 • Started on November 8th • Department of
scheme (Total 10 years weavers 2014 Rural
categories) and faddy • At kottur (Mahaboobnagar development
teppers – 50 dist) and panchayat
years raj
Windows – 18 • Form 2019 June, pension
years and Beedi rate increase from 100 to
workers 2016 rupees and 1500 to
Single women – 3016 rupees
30 years (Rural) • For physically handicapped
35 years (Urban) – 3016 rupees
Aids patients, • All others – 2016 rupees
physically • Widow – blue card
disabled and • PH – green card
artists – no age • All others – Pink card
5. Kalyana Lakshmi / • Girls not • Backward
Shadi Mubarak less than 18 Date Amount classes
years and Oct 2nd, 2014, Rs. 51,000/- welfare
married (to April 1st 2017 Rs. 75,116/- department
parents of April 1st 2018 Rs.
girl) annual 1,00,116/-
income of • For handicapped girl extra
family < 2 25% will be given
lakhs (SC,
ST)
• BC/EBC
urban areas
< 2 lakhs
(from 2016)
• Rural < 1.5
lakhs
• Minority < 2
lakhs
6. Double Bedroom BPL families • Started on October 22nd • Telangana
Houses with no house 2016 state housing
• At suryapet, Nalgonda corporation
district and Erravelli, limited
Narsannapet, Medak (D)
• Housed with 560 ft2 plinth
area, (2 bedrooms, hall,
kitchen and 2 both – cum
toilets) in urban area
• In rural areas – 125 sq.yards
(112559 ft)
• Construction costs Rs. 5.04
lakh in rural areas and 6.05
lakh in urban areas.
7. Mission Bhageeratha Providing safe • Pilon started on 2015 June • RWSRS along
piped drinking 8th at Choutupal, Nalgonda with the
water to all (Dist) by CM. KCR observation of
houses in • PM Narendra Modi started mini ratha
Telangana and an August 7th 2016 at
10% for Medak (D) Gajwel (M) company
industrial uses Komatibanda gutta WAPCOS.
• Past name – jalaharam pilon
details – 26 grids, 66 ft
height with telangana
cultural heritage
bathukamma
• Rural – 100 LPLD municipal
cooperation and Metro
cities – 150 LPCD
• In 35 districts implemented
but not in HYD
• Water required – 86.11 TMC
• Pipe network – 1.697 kms
• Total cost – Rs. 43,791 Cr
• Model – Siddipet
comprehensive drinking
water scheme (1998)
8. Mission Kakatiya • To restore • Pilon started on March 12th • I & CAD
(Mana oori – Mana all minor 2015 by CM KCR at Department
cheruvu) irrigation Nizambad (D) presently
Chinaneetivanarula tasks and Kamareddy (D)
punavuddarona takes in Sadshivanagar (V)
Telangana • Mission kakatiya works
by de-sitting started on April 26th 2015 at
tank beds Nalgonda (D) Nakeraka
and constancy. Chandupatta (V)
increasing by CM KCR
storage • Total tanks 46,531 each
capacity & phase to restore 9.306 tanks
tanks (20/- of total) in 5 years, in a
phased mannel
• 445 ft mission kakatiya pilon
started at Warangal (D)
Narsamapet (M)
madannapeta
peddacheruvu by T. Harish
rao
9. Sheep distribution Golla & • Started on 20th June 2017 at • Telangana
Kurumas of age siddipet (D), Gajwel State sheep
18 years and constituency Kondapaka (V) and goat
above • Government subsidy 75% development
and beneficiary (25%) total cooperative
cost Rs. 1,25,000 (Now Rs. federation
1.78 lakh)
• 21 sheep in 1 units (20
sheep and 1 Ram)
• Seep breeds: Nellore brown
(Dora), Nellure Jodipi,
Deccani and Madras Red
10. KCR Kit Pregnant • Started on 3rd June 2017 at
women (Up to 2 modern government
deliveries) maternity hospital,
petlabarj, Hyderabad.
• Rs. 12,000 for boy child
• Rs. 13,000 for girl child (in 4
phases)
• 16 essential items in KCR kit,
(worth Rs. 2000) – soaps for
mother and child, Baby oil,
baby bed, mosquito net,
dresses, sarees, kit bag,
towels (2), napkins, baby
pounder, diapers, shampoo
and toys for kid
• To reduce IMR and MMR in
India
• Only for delivery in
government hospital
11. Amma Vadi Ambulance • Started on 28th December • Telangana
facility for 2016 state medical
pregnant • 102 toll free number for and health
women Ambulance department.
12. Mana ooru Development and • Started on march 8th 2022 Education
Mana badi & creation of at wanaparthy (D) zilla Department
Mana Basthi effective parishad boys high school
Mana Badi infrastructure in • 1st phase to initiate in
schools across the 9123 schools for 12 types
state of basic facilities in school
13. Nethanna ku Weaves (18 years • Started on 1027 june 24th Department of
cheyutha & above) at bhoodan pochampally () handlooms and
Bhuvanagiri (D) textiles
• Telangna handloom
weaves thrift fund saving
and security scheme
• 50% subsidy on yam and
imprints will be given to
the handloom weavers
• Beneficiary share 80%,
govt share – 16% will be
credited to respective
account
14. Chenetha Mitra Handloom weaves • Started on May 20th 2017
(aged between 18 • State government will
to 59 years) provide on insurance to
weaves similar to the
rythu bhima
15. Telangana palle Inclusive growth • Started on August 22nd Ministry of
pragathi to selected villages 2015 at medak (D) Panchayat Raj
(Telangana kudipally (V) and Rural
rural inclusive • To improve the quality of development
growth project – life in the rural areas
TRIGP) • Sanitation, greenery and
hygiene at the rural parts
16. T-Hub Encourage • Started by Rathan Tata Telangana
(Technology startups (Business and governor E.S.L Information
Hub) incubator) Narshimhan on November Technology and
5th 2015 Industries
• T-Hub 1.0 at Gachibowli Department
(IIIT) in 70,000 sq.ft. This
building was called as
catalyst
• T-Hub 2.0 building by CM
KCR on 28th June 2022 at
Madhapur
17. T – Bridge Encourage • started on October 15th Telangana IT
startups 2016 by K. T. Rama Rao sector
• It is on extension of T –
Hub
• Startup ecosystem builder
18. T – fiber Optical fiber • To provide high speed Information
network to every internet connectivity Technology and
house hold and • T – fiber cable is laid along electronics,
public private with mission bhageeratha department and
enterprise (Digital pipe line to every house in communication
telangana) telangana
• Core back bone for state to
districts
• mandal layer from district
to mandal
• Gram panchayat layer
from mandal to
grampanchayat Axis layer
to all houses in gram
panchayat
19. TS – IPASS To encourage • Ts – Ipass bill approved in Industries and
(Telangana state industrial sector state assembly on 27th commerce
Industrial November 2014, Gazet department
project & Self released on 4th December
certification 2014 then TS – IPASS act
system) 2014 came into force
• Bill permission for setting
up industries will be given
with 30 days (below 200
cr capital expenditure) and
within 15 days (above 200
cr capital expenditure)
20. TS- PRIDE SC, ST • Initiated on 29th November Industries and
(Telangana state entrepreneurs 2014 commerce
program for • Reservation for SC – department
rapid incubation 25.3% and ST – 9.31%
of dalith • Special focus on MSME’s
enterprise) (Small and Micro
enterprises)
21. We – Hub Women • Started by IT Minister
entrepreneurs KT Rama Rao at
Ambedkar university,
Jubilee Hills,
Hyderabad
• Encouraging women
enterprises from
sectors and startup
and scale up by
providing support in
funding mentioning
strategy and for
growth
• Deepth ravula – (EO of
WE-HUB)
22. Telangana Kanti • This scheme is to check up Health and
velugu eye screening for a citizen family welfare
of telangana state at free of department
cost
• It was started on 15th
August 2018 at medak (D)
thufron (M) Malkapur (V)
• Spectacles and medicines
are given at free of cost
after checkup
23. Telangana Ku • It is a flagship program Telangana
Haritha haram of the T.S government Forest
to increase the present department
24% tree cores in the
state to 33% of total
geographical area of
the state
• Aim to plant 230 crore
seeding (10cr within
HMDA and remaining
120 cr in rest of the
state)
• 1st phase started on 3rd
july 2015 at chilkur,
R.R district by CM KCR
• 2nd phase – 8th July
2016 at chitiyala (M)
Gundrampalli (V)
• Till now 7 phases
completed