0% found this document useful (0 votes)
22 views7 pages

TS Govtschemes-Latest

Good

Uploaded by

gouthamnirvaan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views7 pages

TS Govtschemes-Latest

Good

Uploaded by

gouthamnirvaan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

S.

Schemes Eligibility Details Department


No
1. Rythu Bandhu For all land • Started on 10th May 2018 • In the
(Farmer’s investment holding farmers • Indiranagar (Shalapally presence of
support scheme – Karimnagar (dist)) district
FISS) • 1.43 Crs beneficiaries’ areas, collector,
58.33 lakh Revenue
• 5000 per area (Kharif – 500 department
rs, rabi – 5000 rs) from and
(2019 – 2020) agriculture
• 1st – Nalgonda district department.
• Last – Medchal malkajgiri
• 2021 – 2022 budget –
14,800 cr.
2. Rythu Bima (Farmers Farmers aged • Started on 15th August 2018 • Ministry of
insurance) between 18 – • On farmer’s death with any agriculture
59 years reason Rs. 5 lakhs insurance
will be given to support his
family.
• Money will be credited
within 10 days after
farmer’s death
• Insurance company: LIC
India
• Rs. 2,271 paid by T.S govt to
LIC
3. Dalitha Bandhu Scheduled caste • Started on August 4th 2021 • Telangana
(SC) vasalamarri (Village) yadadri schedule
Bhuvanagiri (dist) castes
• CM. KCR started as pilot cooperative
project on August 16th 2021 development
at karimnagar (D) corporation
Huzurabad (M) Shalapally – limited.
Indiranagar (V)
• 1st beneficiary
kanukulagidda (V) kottur
Radha
• Family is taken as united
and Rs. 10 lakhs to eligible
families to start their
business
4. Asara Pension Old age – 57 • Started on November 8th • Department of
scheme (Total 10 years weavers 2014 Rural
categories) and faddy • At kottur (Mahaboobnagar development
teppers – 50 dist) and panchayat
years raj
Windows – 18 • Form 2019 June, pension
years and Beedi rate increase from 100 to
workers 2016 rupees and 1500 to
Single women – 3016 rupees
30 years (Rural) • For physically handicapped
35 years (Urban) – 3016 rupees
Aids patients, • All others – 2016 rupees
physically • Widow – blue card
disabled and • PH – green card
artists – no age • All others – Pink card
5. Kalyana Lakshmi / • Girls not • Backward
Shadi Mubarak less than 18 Date Amount classes
years and Oct 2nd, 2014, Rs. 51,000/- welfare
married (to April 1st 2017 Rs. 75,116/- department
parents of April 1st 2018 Rs.
girl) annual 1,00,116/-
income of • For handicapped girl extra
family < 2 25% will be given
lakhs (SC,
ST)
• BC/EBC
urban areas
< 2 lakhs
(from 2016)
• Rural < 1.5
lakhs
• Minority < 2
lakhs
6. Double Bedroom BPL families • Started on October 22nd • Telangana
Houses with no house 2016 state housing
• At suryapet, Nalgonda corporation
district and Erravelli, limited
Narsannapet, Medak (D)
• Housed with 560 ft2 plinth
area, (2 bedrooms, hall,
kitchen and 2 both – cum
toilets) in urban area
• In rural areas – 125 sq.yards
(112559 ft)
• Construction costs Rs. 5.04
lakh in rural areas and 6.05
lakh in urban areas.
7. Mission Bhageeratha Providing safe • Pilon started on 2015 June • RWSRS along
piped drinking 8th at Choutupal, Nalgonda with the
water to all (Dist) by CM. KCR observation of
houses in • PM Narendra Modi started mini ratha
Telangana and an August 7th 2016 at
10% for Medak (D) Gajwel (M) company
industrial uses Komatibanda gutta WAPCOS.
• Past name – jalaharam pilon
details – 26 grids, 66 ft
height with telangana
cultural heritage
bathukamma
• Rural – 100 LPLD municipal
cooperation and Metro
cities – 150 LPCD
• In 35 districts implemented
but not in HYD
• Water required – 86.11 TMC
• Pipe network – 1.697 kms
• Total cost – Rs. 43,791 Cr
• Model – Siddipet
comprehensive drinking
water scheme (1998)
8. Mission Kakatiya • To restore • Pilon started on March 12th • I & CAD
(Mana oori – Mana all minor 2015 by CM KCR at Department
cheruvu) irrigation Nizambad (D) presently
Chinaneetivanarula tasks and Kamareddy (D)
punavuddarona takes in Sadshivanagar (V)
Telangana • Mission kakatiya works
by de-sitting started on April 26th 2015 at
tank beds Nalgonda (D) Nakeraka
and constancy. Chandupatta (V)
increasing by CM KCR
storage • Total tanks 46,531 each
capacity & phase to restore 9.306 tanks
tanks (20/- of total) in 5 years, in a
phased mannel
• 445 ft mission kakatiya pilon
started at Warangal (D)
Narsamapet (M)
madannapeta
peddacheruvu by T. Harish
rao
9. Sheep distribution Golla & • Started on 20th June 2017 at • Telangana
Kurumas of age siddipet (D), Gajwel State sheep
18 years and constituency Kondapaka (V) and goat
above • Government subsidy 75% development
and beneficiary (25%) total cooperative
cost Rs. 1,25,000 (Now Rs. federation
1.78 lakh)
• 21 sheep in 1 units (20
sheep and 1 Ram)
• Seep breeds: Nellore brown
(Dora), Nellure Jodipi,
Deccani and Madras Red
10. KCR Kit Pregnant • Started on 3rd June 2017 at
women (Up to 2 modern government
deliveries) maternity hospital,
petlabarj, Hyderabad.
• Rs. 12,000 for boy child
• Rs. 13,000 for girl child (in 4
phases)
• 16 essential items in KCR kit,
(worth Rs. 2000) – soaps for
mother and child, Baby oil,
baby bed, mosquito net,
dresses, sarees, kit bag,
towels (2), napkins, baby
pounder, diapers, shampoo
and toys for kid
• To reduce IMR and MMR in
India
• Only for delivery in
government hospital
11. Amma Vadi Ambulance • Started on 28th December • Telangana
facility for 2016 state medical
pregnant • 102 toll free number for and health
women Ambulance department.

12. Mana ooru Development and • Started on march 8th 2022 Education
Mana badi & creation of at wanaparthy (D) zilla Department
Mana Basthi effective parishad boys high school
Mana Badi infrastructure in • 1st phase to initiate in
schools across the 9123 schools for 12 types
state of basic facilities in school
13. Nethanna ku Weaves (18 years • Started on 1027 june 24th Department of
cheyutha & above) at bhoodan pochampally () handlooms and
Bhuvanagiri (D) textiles
• Telangna handloom
weaves thrift fund saving
and security scheme
• 50% subsidy on yam and
imprints will be given to
the handloom weavers
• Beneficiary share 80%,
govt share – 16% will be
credited to respective
account
14. Chenetha Mitra Handloom weaves • Started on May 20th 2017
(aged between 18 • State government will
to 59 years) provide on insurance to
weaves similar to the
rythu bhima
15. Telangana palle Inclusive growth • Started on August 22nd Ministry of
pragathi to selected villages 2015 at medak (D) Panchayat Raj
(Telangana kudipally (V) and Rural
rural inclusive • To improve the quality of development
growth project – life in the rural areas
TRIGP) • Sanitation, greenery and
hygiene at the rural parts
16. T-Hub Encourage • Started by Rathan Tata Telangana
(Technology startups (Business and governor E.S.L Information
Hub) incubator) Narshimhan on November Technology and
5th 2015 Industries
• T-Hub 1.0 at Gachibowli Department
(IIIT) in 70,000 sq.ft. This
building was called as
catalyst
• T-Hub 2.0 building by CM
KCR on 28th June 2022 at
Madhapur
17. T – Bridge Encourage • started on October 15th Telangana IT
startups 2016 by K. T. Rama Rao sector
• It is on extension of T –
Hub
• Startup ecosystem builder
18. T – fiber Optical fiber • To provide high speed Information
network to every internet connectivity Technology and
house hold and • T – fiber cable is laid along electronics,
public private with mission bhageeratha department and
enterprise (Digital pipe line to every house in communication
telangana) telangana
• Core back bone for state to
districts
• mandal layer from district
to mandal
• Gram panchayat layer
from mandal to
grampanchayat Axis layer
to all houses in gram
panchayat
19. TS – IPASS To encourage • Ts – Ipass bill approved in Industries and
(Telangana state industrial sector state assembly on 27th commerce
Industrial November 2014, Gazet department
project & Self released on 4th December
certification 2014 then TS – IPASS act
system) 2014 came into force
• Bill permission for setting
up industries will be given
with 30 days (below 200
cr capital expenditure) and
within 15 days (above 200
cr capital expenditure)
20. TS- PRIDE SC, ST • Initiated on 29th November Industries and
(Telangana state entrepreneurs 2014 commerce
program for • Reservation for SC – department
rapid incubation 25.3% and ST – 9.31%
of dalith • Special focus on MSME’s
enterprise) (Small and Micro
enterprises)
21. We – Hub Women • Started by IT Minister
entrepreneurs KT Rama Rao at
Ambedkar university,
Jubilee Hills,
Hyderabad
• Encouraging women
enterprises from
sectors and startup
and scale up by
providing support in
funding mentioning
strategy and for
growth
• Deepth ravula – (EO of
WE-HUB)
22. Telangana Kanti • This scheme is to check up Health and
velugu eye screening for a citizen family welfare
of telangana state at free of department
cost
• It was started on 15th
August 2018 at medak (D)
thufron (M) Malkapur (V)
• Spectacles and medicines
are given at free of cost
after checkup
23. Telangana Ku • It is a flagship program Telangana
Haritha haram of the T.S government Forest
to increase the present department
24% tree cores in the
state to 33% of total
geographical area of
the state
• Aim to plant 230 crore
seeding (10cr within
HMDA and remaining
120 cr in rest of the
state)
• 1st phase started on 3rd
july 2015 at chilkur,
R.R district by CM KCR
• 2nd phase – 8th July
2016 at chitiyala (M)
Gundrampalli (V)
• Till now 7 phases
completed

You might also like