0% found this document useful (0 votes)
40 views7 pages

6BB+BS Reb650-1b

Uploaded by

Mohamed Awad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views7 pages

6BB+BS Reb650-1b

Uploaded by

Mohamed Awad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

COMMISSIONING TEST RECORD

Contract no.:

Customer: End Client: Page:


SEC-EOA Page 1 of 7
Site: Panel / Designation / Location no.: Description:
KUDMI Mobile Substation 6BB+BS HIGH Z DIFFERENTIAL
PROTECTION RELAY(REB650)

1. GENERAL DATA AND INFORMATION

Designation No : 87B/95B-1B CT Ratio : 2000/1


Manufacturer : Hitachi Energy VT Ratio : NA
Model No. : ABB-REB650 Aux. Supply : 125V DC
Sl.No. : T2240030 Frequency : 60.00 Hz

2. MECHANICAL CHECK AND VISUAL INSPECTION

ITEM DESCRIPTION CHECKED


1. Inspect for physical damage / defects. OK
2. Verify connections as per approved drawings. OK
3. Check tightness of all connections. OK

3. ELECTRICAL TESTS

3.1. Function Test

ITEM DESCRIPTION CHECKED


1. Test switch/plug checked for correct function. OK
2. Case earthing checked. OK
3 Indications checked. OK
4 Alarm contacts checked. OK
5 Trip contacts checked. OK

3.2. Metering Check:

3.2.1. Current Measurement Check:

Phase Injected Sec Current (A) Expected Primary Current(A) Observed Primary Current (A)

R 0.5 1000 1000.281 0

Y 0.75 1500 1500.299 -119.958

B 1.0 2000 2001.996 120.042


Limit Current = ± 5% of Ir Voltage = ± 5% of Ur

DATE: 30/06/2024
TESTING ENGINEER SEC- Engineer

Signature: ________________ Signature: ________________


Name : ENG/ MOHAMMED AWAD Name : ENG/ MOHAMMED ALFETAINY
COMMISSIONING TEST RECORD
Contract no.:

Customer: End Client: Page:


SEC-EOA Page 2 of 7
Site: Panel / Designation / Location no.: Description:
KUDMI Mobile Substation 6BB+BS HIGH Z DIFFERENTIAL
PROTECTION RELAY(REB650)

3.2.2. Measured Value (HPZDIFF):

Phase Injected Voltage (V) Expected Current (A) Observed Voltage (V) Observed Current (A)

75 0.041 75.1 0.042

R 100 0.055 100 0.056

150 0.083 149.9 0.083


Limit Current = ± 0.5% of Ir Voltage = ± 0.5% of Ur

Phase Injected Voltage (V) Expected Current (A) Observed Voltage (V) Observed Current (A)

75 0.041 75.0 0.042

Y 100 0.055 100 0.055

150 0.083 149.9 0.083


Limit Current = ± 5% of Ir Voltage = ± 5% of Ur

Phase Injected Voltage (V) Expected Current (A) Observed Voltage (V) Observed Current (A)

75 0.041 75.0 0.042

B 100 0.055 99.9 0.055

150 0.083 149.9 0.083


Limit Current = ± 5% of Ir Voltage = ± 5% of Ur

DATE: 30/06/2024
TESTING ENGINEER SEC- Engineer

Signature: ________________ Signature: ________________


Name : ENG/ MOHAMMED AWAD Name : ENG/ MOHAMMED ALFETAINY
COMMISSIONING TEST RECORD
Contract no.:

Customer: End Client: Page:


SEC-EOA Page 3 of 7
Site: Panel / Designation / Location no.: Description:
KUDMI Mobile Substation 6BB+BS HIGH Z DIFFERENTIAL
PROTECTION RELAY(REB650)

4. SECONDARY INJECTION
4.1. Over current Protection:
Over current Protection : (OC4SPTOC: 1) IDMT Ib=1A
Operational Accuracy : ± 1.0% of I at I > Ir Reset Ratio : >0.95
Measured Current (A)
Phase Current Setting (A) Actual Reset ratio
Pickup (A) Dropoff (A)
(Dropoff / Pickup)
R 1.000 0.978 0.978

Y 1 0.999 0.979 0.980

B 0.999 0.979 0.980

4.2. Over current Protection Operating Times (OC4SPTOC: 1)

Operational Accuracy : ± 0.5% ± 25 ms @ definite time mode

Phase Injected Current (A) TMS Final Setting in Secs Measured Time in Secs

R 0.029

Y 1.2 0.0 0.027

B 0.025
4.3 High Z Differential Protection:
Relay tested By Current Injection Method. Series Resistance Assumed
R -Series Resistance Set = 1800 Ohms
Y -Series Resistance Set = 1806 Ohms
B -Series Resistance Set = 1803 Ohms
4.3.1. U> Alarm Pickup / Drop Off Test:( USED AS CT SUPV FUNCTION)

Operational Accuracy : ± 1.0% of I at I > Ir Reset Ratio : >0.95


Voltage Final Set (V)
Phase U= 40 V Expected Current Measeured Current Measeured Voltage
I=U/R

R 0.022 0.022 40.2

Y 40 0.022 0.022 40.3

B 0.022 0.022 40.3

DATE: 30/06/2024
TESTING ENGINEER SEC- Engineer

Signature: ________________ Signature: ________________


Name : ENG/ MOHAMMED AWAD Name : ENG/ MOHAMMED ALFETAINY
COMMISSIONING TEST RECORD
Contract no.:

Customer: End Client: Page:


SEC-EOA Page 4 of 7
Site: Panel / Designation / Location no.: Description:
KUDMI Mobile Substation 6BB+BS HIGH Z DIFFERENTIAL
PROTECTION RELAY(REB650)

4.3.2. U> Trip Pickup / Drop Off Test: ( BUS BAR PROTECTION)

Operational Accuracy : ± 1.0% of I at I > Ir Reset Ratio : >0.95


Voltage Final Set (V)
Phase U= 100 V Expected Current Measeured Current Measeured Voltage
I=U/R
R 0.055 0.055 99.48

Y 100 0.055 0.055 98.97

B 0.055 0.055 99.26

4.3.3. U> Alarm Timing Test:

Phase Injected Current (A) TMS Final Setting in Secs Measured Time in Secs

R 5.029

Y 0.05 5.0 5.032

B 5.030

4.3.4 U> Trip Timing Test:

Phase Injected Current (A) TMS Final Setting in Secs Measured Time in Secs

R 0.037

Y 0.11 0.0 0.033

B 0.038

DATE: 30/06/2024
TESTING ENGINEER SEC- Engineer

Signature: ________________ Signature: ________________


Name : ENG/ MOHAMMED AWAD Name : ENG/ MOHAMMED ALFETAINY
COMMISSIONING TEST RECORD
Contract no.:

Customer: End Client: Page:


SEC-EOA Page 5 of 7
Site: Panel / Designation / Location no.: Description:
KUDMI Mobile Substation 6BB+BS HIGH Z DIFFERENTIAL
PROTECTION RELAY(REB650)

5. INPUTS AND OUTPUTS TESTS:

INPUT OPTO-ISOLATORS CHECKS (With Relay Energized):


Go to CONFIGURATION - MONITORING,
I/O STATUS,
then go to BINARY INPUTS VALUES
to check the values after giving pulse on each BI.

TEST METHOD
OPTO RESULT Display
(Energize only one at a time with REMARKS
INPUT NO. FALSE to TURE
125V DC Station Battery voltage)

X324

BI 1 ENERGIZE TB NO. X324 : 2 – 1  Yes  N/A ZONE B PROTN. IN

BI 2 ENERGIZE TB NO. X324 : 5 – 4  Yes  N/A ZONE B PROTN. OUT

BI 3 ENERGIZE TB NO. X324 : 6 – 4  Yes  N/A BB-1B-CT SHORTING


 Yes 50/50N//51/51N
BI 4 ENERGIZE TB NO. X324 : 9 – 8  N/A
RELAY FAULTY
BI 5 ENERGIZE TB NO. X324 : 10 – 8  Yes  N/A UNDER TEST
 Yes ZONE-1B PROT DC
BI 6 ENERGIZE TB NO. X324 : 13 – 12  N/A
FAIL
BI 7 ENERGIZE TB NO. X324 : 14 – 12  Yes  N/A 86B1-1 OPTD

BI 8 ENERGIZE TB NO. X324 : 17 – 16  Yes  N/A 86B1-2 OPTD

BI 9 ENERGIZE TB NO. X324 : 18 – 16  Yes  N/A IND CIRCUIT DC FAIL

X329

BI 10 ENERGIZE TB NO. X329 : 2 – 1  Yes  N/A SPARE

BI 11 ENERGIZE TB NO. X329 : 5 – 4  Yes  N/A SPARE

BI 12 ENERGIZE TB NO. X329 : 6 – 4  Yes  N/A SPARE

BI 13 ENERGIZE TB NO. X329 : 9 – 8  Yes  N/A SPARE

BI 14 ENERGIZE TB NO. X329 : 10 – 8  Yes  N/A SPARE

BI 15 ENERGIZE TB NO. X329 : 13 – 12  Yes  N/A SPARE

BI 16 ENERGIZE TB NO. X329 : 14 – 12  Yes  N/A SPARE

BI 17 ENERGIZE TB NO. X329 : 17 – 16  Yes  N/A SPARE

BI 18 ENERGIZE TB NO. X329 : 18 – 16  Yes  N/A SPARE

DATE: 30/06/2024
TESTING ENGINEER SEC- Engineer

Signature: ________________ Signature: ________________


Name : ENG/ MOHAMMED AWAD Name : ENG/ MOHAMMED ALFETAINY
COMMISSIONING TEST RECORD
Contract no.:

Customer: End Client: Page:


SEC-EOA Page 6 of 7
Site: Panel / Designation / Location no.: Description:
KUDMI Mobile Substation 6BB+BS HIGH Z DIFFERENTIAL
PROTECTION RELAY(REB650)

OUTPUT RELAYS CHECKS (With Relay Energized):

Test Procedure:
Go to IED CONFIGURATION,
TESTS, IED TEST, TEST MODE : ON,
then go to BINARY OUTPUTS-CHANGE THE POSITION OF EACH BO FROM FULSE TO TURE FROM HMI,
then check contact resistance.

TEST METHOD RESULT


OUTPUT
(Energize only one relay at a time by Contact Checked REMARKS
RELAY No.
Test ON in ‘IED TEST’) ≤ 0.2Ω

X317

BIO1 CONTACT OPERATED X317 : 1 – 2 (N/O)  Yes  N/A SPARE


BIO2 CONTACT OPERATED X317 : 3 – 4 (N/O)  Yes  N/A SPARE
BIO3 CONTACT OPERATED X317 : 5 – 6 (N/O)  Yes  N/A SPARE
BIO4 CONTACT OPERATED X317 : 7 – 8 (N/O)  Yes  N/A BB ZONE-1B TRIP
BIO5 CONTACT OPERATED X317 : 9 – 10 (N/O)  Yes  N/A BB ZONE-1B TRIP
BIO6 CONTACT OPERATED X317 : 11 – 12 (N/O)  Yes  N/A CT SUPVN. OPTD
BIO7 CONTACT OPERATED X317 : 13 – 14 (N/O)  Yes  N/A SPARE
BIO8 CONTACT OPERATED X317 : 15 – 16 (N/O)  Yes  N/A SPARE
BIO9 CONTACT OPERATED X317 : 17 – 18 (N/O)  Yes  N/A SPARE

X321

BIO10 CONTACT OPERATED X321 : 1 – 2 (N/O)  Yes  N/A SPARE


BIO11 CONTACT OPERATED X321 : 3 – 4 (N/O)  Yes  N/A SPARE
BIO12 CONTACT OPERATED X321 : 5 – 6 (N/O)  Yes  N/A SPARE
BIO13 CONTACT OPERATED X321 : 7 – 8 (N/O)  Yes  N/A SPARE
BIO14 CONTACT OPERATED X321 : 9 – 10 (N/O)  Yes  N/A SPARE
BIO15 CONTACT OPERATED X321 : 11 – 12 (N/O)  Yes  N/A SPARE
BIO16 CONTACT OPERATED X321 : 13 – 15 (N/C)  Yes  N/A SPARE
BIO17 CONTACT OPERATED X321 : 14 – 15 (N/O)  Yes  N/A SPARE
BIO18 CONTACT OPERATED X321 : 16 – 18 (N/C)  Yes  N/A SPARE
BIO19 CONTACT OPERATED X321 : 17 – 18 (N/O)  Yes  N/A SPARE

DATE: 30/06/2024
TESTING ENGINEER SEC- Engineer

Signature: ________________ Signature: ________________


Name : ENG/ MOHAMMED AWAD Name : ENG/ MOHAMMED ALFETAINY
COMMISSIONING TEST RECORD
Contract no.:

Customer: End Client: Page:


SEC-EOA Page 7 of 7
Site: Panel / Designation / Location no.: Description:
KUDMI Mobile Substation 6BB+BS HIGH Z DIFFERENTIAL
PROTECTION RELAY(REB650)

X326

BIO20 CONTACT OPERATED X321 : 1 – 2 (N/O)  Yes  N/A SPARE


BIO21 CONTACT OPERATED X321 : 3 – 4 (N/O)  Yes  N/A SPARE
BIO22 CONTACT OPERATED X321 : 5 – 6 (N/O)  Yes  N/A SPARE
BIO23 CONTACT OPERATED X321 : 7 – 8 (N/O)  Yes  N/A SPARE
BIO24 CONTACT OPERATED X321 : 9 – 10 (N/O)  Yes  N/A SPARE
BIO25 CONTACT OPERATED X321 : 11 – 12 (N/O)  Yes  N/A SPARE
BIO26 CONTACT OPERATED X321 : 13 – 15 (N/C)  Yes  N/A SPARE
BIO27 CONTACT OPERATED X321 : 14 – 15 (N/O)  Yes  N/A SPARE
BIO28 CONTACT OPERATED X321 : 16 – 18 (N/C)  Yes  N/A SPARE
BIO29 CONTACT OPERATED X321 : 17 – 18 (N/O)  Yes  N/A SPARE
INDICATION LED TEST
LED Checks:
Go to hardware test to view the physical position of the LED.
OPTO Input Number Result Display On or Off Function
LED 1  Yes  N/A R-PH OC START
LED 2  Yes  N/A R-PH OC START
LED 3  Yes  N/A R-PH OC START
LED 4  Yes  N/A R-PH OC TRIP
LED 5  Yes  N/A R-PH OC TRIP
LED 6  Yes  N/A R-PH OC TRIP
LED 7  Yes  N/A SPARE
LED 8  Yes  N/A SPARE
LED 9  Yes  N/A SPARE
LED 10  Yes  N/A 87B-R-PH TRIP
LED 11  Yes  N/A 87B-B-PH TRIP
LED 12  Yes  N/A 87B-Y-PH TRIP
LED 13  Yes  N/A ZONE 1A IN
LED 14  Yes  N/A ZONE 1A OUT
LED 15  Yes  N/A Z1A CT SHORT
7. Equipment Used
Equipment Name Serial No
Freja 300 7501720

DATE: 30/06/2024
TESTING ENGINEER SEC- Engineer

Signature: ________________ Signature: ________________


Name : ENG/ MOHAMMED AWAD Name : ENG/ MOHAMMED ALFETAINY