Kim Jung-Hoon - Presentation - Plenary 1 - GIC 2016

Uploaded by

florencesseiler
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views19 pages

Kim Jung-Hoon - Presentation - Plenary 1 - GIC 2016

Uploaded by

florencesseiler
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

The 4th Green Industry Conference : Green Industry for Sustainable Cities

Challenges and Accomplishments


towards a sustainable ‘Eco-Industrial Park’
in Ulsan

Jung Hoon Kim


Ulsan Regional EIP Project Div.
Korea Industrial Complex Corp.
Contents

1. Eco-Industrial Park Initiative


2. Outcomes of the EIP Project in Ulsan
3. Expanding Achievements
Industrialization and Environmental Issues

Population Amount of industrial production


1.2 million USD 208.2 billion
85,000 USD 2.2 million

1962 2012 1962 2012

Air Water Bad Odors


pollution pollution 51 cases of bad odor
SO2 0.057ppm (1981) BOD5 11.7ppm (1991) complaints (2000)

3
Overcoming Environmental Problems

2004 Declaration of ‘Ecopolis Ulsan’

Establishment of a master plan to


2005
revive Taehwa River

Starting of ‘Eco-Industrial Park Project’ for


2005
sustainability and greening of industry

2010 Establishment of a green growth action plan

4
Korea EIP Master Plan (‘05~’19)
1st Phase 2005. 11 ~ 2010.05 Pilot EIP with 5 industrial complexes

2nd Phase 2010. 06 ~ 2014.12 Diffusion on 46 industrial complexes with a Standard EIP model

3rd Phase 2015. 01 ~ 2019.12 EIN. EIP Model including all industrial complexes

1st phase Pilot period 2nd phase Diffusion period 3rd phase Completion period

Pilot on 5 industrial complexes Diffusion on 46 industrial complexes Construction of national IS network

5
Activities of EIP Project Div.

Step 1 Step 2 Step 3


Exploring new networks IS Feasibility Study Commercialization

Data collection to explore new synergy Support feasibility study for network Engagement in stakeholder participation
networks establishment and overcoming barriers

Coordinating benefit sharing among


Review of reported datum by companies Supporting feasibility investigation team
participants

Encouraging participation of companies Co-authoring of research project proposal Support project financing sources (ESCO,
through seminars & business meetings with stakeholders WASCO, Green Growth Fund, etc.)

Reviewing the potential of linking the


Collection of on-site information from Monitoring the progress of the feasibility
project with GHG emission reduction
companies through diverse forums study
projects

Project identification through top-down or Final report as a business model that Highlight the success story
bottom-up approach by coordinators includes the stakeholders requirements

6
Governance Structure

Supporting System Cooperation System

Data Collection
IS Project Pre-review

IS Project Funding Providing


Administrative Support Company information

Technology &
Information Exchange
Providing Idea
Determining Policy Direction
R&D Involvement

Business
Finding IS Project Promotion

7
Type of Industrial Symbiosis (IS)

Energy Optimization (including waste to energy)

District Waste Heat


Heat Supply Supply

Exhaust Heat Low Pressure Heat Low Pressure Steam


Heat Pinch
Power Plant (Energy Optimization)
(Organic Rankin Cycle)
Industrial Complex
Electricity Supply

Urban Area
Combustible Municipal High Pressure Steam Middle Pressure Steam
Waste
Incineration
Municipal heat Supply Combustible Industrial
Incinerator Plant Renewable Waste & By-product Gas
Energy Supply

ASR (Automobile Shredder Residue), SRF (Solid Refuse Fuel)

SRF Boiler

8
Type of Industrial Symbiosis (IS)

Resource Optimization (including waste to resource)

Substitute Resource
By-product, Sludge & Waste Supply

Resource Recovery Plant


Company A (Extraction, Distillation, Purification) Company B

Industrial Water Industrial waster Wastewater Reuse


Supply
Water Company
Substitute Resource
Supply

Wastewater Recovery Plant


Company A (Flocculation, MF, RO) Company B

Wastewater

Wastewater Treatment Facility

9
Supporting IS Projects in Ulsan

Period 2005 to present


PhaseⅠ 2005 to 2009 , PhaseⅡ 2010 to 2014 , PhaseⅢ 2015 to present

Data 3,252 Basic Data


General inform. of company about environmental, energy and resource

R&D 74 IS Projects (Feasibility Test)


Energy part 22, Wastewater 7, Waste 45

Participant 283 Companies and Research Institutions

Fund 20.0 million USD


Gov. 13.0 million USD , Local Gov. 3.1 million USD , Company 3.9 million USD

10
Supporting IS Projects in Ulsan

Supply Technology Demand

Company Distillation & Purification Alternative Raw Material (24) Company

By-product (48) Separation & Production High Value-added New Product (13)

SRF & Gasification Renewal Energy (13)

Industrial SRF Boiler


Incineration Heat (3)
Excess Heat (12) Heat Pinch Process Heat (16)

Electricity
Generation (1)
Hot Water (2)
Power Plant
Municipal Combustible
Incineration Heat (2) Hot Water (1)
Waste (2) High Value-added
Wastewater High Value-added Organic & Bio New Product (2)
Inorganic Waste (2) New Product (2) Waste (2) Heat Exchanger

Public Facility Urban & Agricultural District Heat (3)


Area
Municipal Waste

11
Supporting IS Projects in Ulsan

Commercialization
From To Recycling Technology R&D
(%)
Using as alternative raw material after distillation & purification 24 9 (37.5)
Resource
By-product Company Manufacturing high value-added new product after separation & synthesis 11 6 (54.5)
Energy Manufacturing an Industrial Energy Source using waste 8 2 (25.0)
Heat pinch 11 7 (63.6)
Energy Company Energy
Electricity generation using waste heat 1 0 (0.0)
Company Incineration
heat Company Energy Incineration heat utilization for industrial energy supply 3 3 (100.0)
Resource Using as alternative raw material after distillation & purification 2 2 (100.0)
By-product Public facility
Energy Manufacturing an Industrial Energy Source using waste 1 0 (0.0)
Energy Urban area Energy Waste heat utilization for district heat supply 3 0 (0.0)
By-product Agricultural Resource Using as alternative raw material after distillation & purification 2 1 (50.0)
Resource Manufacturing high value-added new product after separation & synthesis 2 0 (0.0)
By-product Company
Public facility Energy Manufacturing an Industrial Energy Source using waste 2 1 (50.0)
Incineration Company Energy Incineration heat utilization for industrial energy supply 2 2 (100.0)
heat
Urban area By-product Company Energy Manufacturing an Industrial Energy Source using waste 2 0 (0.0)
Total 74 33 (44.6)

12
Achievements of IS Projects in Ulsan
Project Performance (of 33 projects that have commercialization)

Item Phase Ⅰ Phase Ⅱ Phase Ⅲ Net


Investments (million USD) 143.4
Costs Reduction 70
Economic Benefit
New Sales 48.3
(million USD/yr)
Net Profit 118.3
Waste Recycling 40,044
Environmental Benefit
Wastewater Recycling 79,357
(ton, ㎥, tCO2/yr)
CO2 Reduction 612,213

13
Success Story of EIP Project
Energy Optimization in Y Utility (SKE.) PO (SKC)

H2 (DY) 20 ton/hr

Reformer (45kgf)

[ Step 1]
Municipal Waste
Incinerator 1 (SA)
20 ton/hr PTA (HS2) 15 ton/hr
Incineration Heat Reaction Heat
(16kgf)
Municipal Waste
30 ton/hr Industrial Waste
Incinerator 2 (SA) 15 ton/hr 10 ton/hr Incinerator (K)
Incineration Heat Incineration Heat 35 ton/hr
(45kgf) [ Step 4]

[ Step 2]
PP/PU (HS1) Optical Film (HS3) 60 ton/hr #2 FCC (SKE.)

30 ton/hr

25 ton/hr PTA (LTChem) 20 ton/hr 1,4-BDO (KP)


Reaction Heat Reaction Heat
Savings energy [ Step 5] (5kgf) (45kgf)

consumption of 13%
In Yong-yun Region DOP (HHChem) 25 ton/hr 10 ton/hr
Reaction Heat
Performance (45kgf) Industrial waste
[ Step 3] Incinerator (TT)
Investments 83.0 million USD Acetate Tow (EF) Incineration Heat
70 ton/hr (18kgf)
Profit 42.9 million USD/yr
Utility (SKChem.)
CO2 Reduction 272,137 tCO2/yr Biomass Boiler
(45kgf)
14
Success Story of EIP Project

By-Product High Value-add Product


Coating Material Zn Dust Coating
(Coarse Zn Particle) (Zn Flake & Dust)
Production Company Recycling Company Production Company
Anticorrosive Coating
Zn Dust Production Process Attrition Milling Process
Production Process

Waste Oil High Value-add Product


Petrochemical Waste Oil Heat Transfer Oil
(By-product Mixture) (Heat Transfer Oil)
Company Recycling Company Demand Company
Organic Compound Distillation & Purification
Process for Liquid & Gas type
Production Process Process

Heat Transfer Oil


Demand Company
Process for High
Temperature

15
Classification of IS Project
Project Performance in Korea

Exploring IS Project Creating 595 Projects Plans

Supporting Feasibility Study Completing 303 Studies

Commercialization Starting 197 Businesses

12 Emissions Groups
Classification of Business
37 Recycling Technologies

Standardization of BM 5 BM Standard (Pilot)

16
Classification of IS Project
Classification of Business
Emission group Recycling technology (BM)

1. Recycling of non-ferrous scrap as an industrial resource


1. Waste metal
2. Recovery of precious metals from scrap
3. Recycling of iron scrap

2. Waste acid, alkali and oil 4. Recycling of waste acid as an industrial resource
5. Recovery of precious organics from industrial wastewater

: :

6. Slag, ash and waste foundry sand 21. Manufacturing of reducing agent for steel using cokes
22. Manufacturing of construction materials using slag etc.
23. Manufacturing of inorganic compounds using fly ash etc.
: :
: :

11. Excess and exhausted heat 36. Energy optimization using excess process heat
and incinerator heat

12. Industrial and municipal wastewater 37. Industrial water optimization using effluent of
wastewater treatment facility

17
Achievements expansion strategy
Expansion Strategy Support for Green Industry
in Developing Countries

Expansion towards EIN Systems Distribution by


in Korea ‘RESCO’ after
Switching to
Appropriate
3 Phase EIP Project Incubation and Technology
Support of
‘RESCO’
1, 2 Phase EIP Project
Development of
many BMs based
on best practices
Exploring and
Know-How of
many IS Projects

RESCO : REsource Service Company (Private)

18
Thank you !