NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B
VENDOR COMMENTS RESPONSE SHEET
Document No. ENG052-20ERW-PPFU001-B18-0005 Rev No. ZLOG Transmittal No. Date
PFML Transmittal JI2047-PFML-PPFU001-T-033 02
Page PETROFAC STATUS
SL No. VENDOR RESPONSE REMARKS
No. COMMENTS By ( O\C)
Provide the tag nos. for each CP equipment,
1. components & cables consistent with the CP layout Noted. Final tag numbers incorporatd as per
4 of 4 Eric.catis
drawings, equipment/test facility schedule and cable the test facility and cable schedule C
schedule.
Add notes related to cable termination inside the box
2.
4 of 4 shall be referred to drawing no. xxxx and cable to pipe Eric.catis Noted and incorporated
C
connection drawing no.xxxx
3.
4 of 4 Label and include in below cable schedule Eric.catis Noted and incorporated C
4.
4 of 4 Indicate DP tag no. as per layout Eric.catis Noted and incorporated C
5.
4 of 4 Add Column for scope of supply Eric.catis Noted and incorporated C
Name Noufal KP Name Farheen Mevliwala
Signature Signature
Date 19/11/22 Date 30/11/2022
Legend (Status O\C) : O - Open / C – Closed Page 1 of 1
NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW
Table of content
1. Schematic Drawing For Well Casing Cathodic Protection System 4
Farheen 30/11/2022