Software de Seleccion
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
Pasos fundamentales para la instalación de sistemas VRF
•Software de Selección
Datos básicos para Selección del Sistema
selección: Selección del Branch
•Unidades Interiores •Y-branch
•Carga Térmica Total •Unidades Exteriores
•Volumen de aire (CFM) •Diámetros Tubería
•Relación de Combinación
•Distancias de Equipos
Conexión Eléctrica Selección de Control
•Cableado •Tipos de Control
•Características •Cableado
2
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
3
To create a better life for the global
Selección de unidades de trabajo clients with comfortable, efficient and
healthy air-conditioning.
4
To create a better life for the global
Selección de unidades de trabajo clients with comfortable, efficient and
healthy air-conditioning.
5
To create a better life for the global
Step1:Set up a New Project clients with comfortable, efficient and
healthy air-conditioning.
6
To create a better life for the global
Step2:Projection information setting clients with comfortable, efficient and
healthy air-conditioning.
7
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
Rough load calculation
Room Name Cooling Estimated Heating Estimated Air Volume
load (W/m2) load (W/m2) (m3/h. m2)
Office 100~160 60~80 22~30
Restaurant 200~350 60~70 45~60
Meeting room 180~280 60~70 35
Guest room 120~160 60~70 25~30
Supper market 150~200 60~80 36
Auditorium 150~200 120~150 30~45
Exhibition hall 130~200 90~120 30
8
To create a better life for the global
Step2:Load calculation(By the software “Block load”)
clients with comfortable, efficient and
healthy air-conditioning.
Before this step,you should:
1)The drawing of the project in on your hand,Please number the rooms;
2)Layout the units on the drawing,calculate the piping length and height drop;
3)Number the Branch pipe.
4m
1
1
4 4 4 5
2 1
3 1
4
1 5 4
The function of Selection sotware:
3.5m Units model selection、pipe diameter
calculation、selection report output.
6 4-1 4-2 4-3 4-4 4-5
6.5
3.5m
3-1
7
1
8 2 8 1F
6m
2-1 11 2-2 2-3 1 1-4
9 3 10 4 5
3
1-1
1 1 1 5
4
1 1
1-1 1-2 1-3 1-4 9 1-2 1-3
To create a better life for the global
Step 3:Set the Floors,Rooms,and the load. clients with comfortable, efficient and
healthy air-conditioning.
10
To create a better life for the global
Step 4:IDU Selection clients with comfortable, efficient and
healthy air-conditioning.
Different
type IDU
Select the
capacity
•Red Model is recommended.
11
To create a better life for the global
Step 5:IDU Group clients with comfortable, efficient and
healthy air-conditioning.
Purpose:Group different refrigerant system.
Method:According rooms or Floor.
12
To create a better life for the global
Step6:CDU selection for every refrigerant systemclients with comfortable, efficient and
healthy air-conditioning.
Matching ratio
Double click
13
To create a better life for the global
Step 7:Piping designing clients with comfortable, efficient and
healthy air-conditioning.
Pull the branch joint
and IDUs to the pane.
Note:
The branch pipe and IDU No. should be
the same as the one in the project drawing.
14
To create a better life for the global
Step 7:Piping designing clients with comfortable, efficient and
healthy air-conditioning.
1
4 4 5
2 1
3 1
4
1 5 4
3.5m
6 4-1 4-2 4-3 4-4 4-5
6.5
3.5m
3-1
7
1
2
8 8
6m
9 3 10
2-1
4
11 2-2
5
2-3 The branch pipe and IDU No.
1 1 1 should be the same as the one in
the project drawing.
1-1 1-2 1-3 1-4
15
To create a better life for the global
Step 8:Input the piping length and height drop. clients with comfortable, efficient and
healthy air-conditioning.
Double click
Double click
Input pipe length
输入落差 (与外机的相对高度)
16
Step 9:Calculate the pipe diameters,branch pipe models
To create aand
betterIDU
life for the global
capacity. clients with comfortable, efficient and
healthy air-conditioning.
IDU capacity after
correction.
Click Calculate
17
To create a better life for the global
Step 10:Check actual capacity of IDU clients with comfortable, efficient and
healthy air-conditioning.
If the IDU capacity is too small,return to “AC SELECTION”;
Note:Please don’t use “PREVIOUS”button.By this way,you can’t
change the IDU model.
Click“AC
selection”
Choose the
IDU again.
18
To create a better life for the global
Step 11:Calculate the Capacity again and recheck.
clients with comfortable, efficient and
healthy air-conditioning.
Click”PIPING
DRAWING
Click “Calculate”
Recheck the ID capacity
19
To create a better life for the global
Introducir información del proyecto y selección por clients
Árbolwith comfortable, efficient and
healthy air-conditioning.
20
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
21
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
22
To create a better life for the global
Full Inverter Series VRF Introduction clients with comfortable, efficient and
healthy air-conditioning.
Flexible Piping Installation
No matter how big the building is
1 Flexible installation
in high-rise buildings
Max. Drop height
between indoor
2 Flexible installation
in wide areas and Outdoor units. Drop
height
From the first
branch joint
between
to the farthest
indoor
Indoor units
units
Total pipe length can reach up to m
Maximum actual piping 175m
110 * note:
• 110m will be permitted only if ODU is below.
• Max. level difference between indoor and
outdoor units is 70m if ODU is above.
23
To create a better life for the global
Full Inverter Series VRF Introduction clients with comfortable, efficient and
healthy air-conditioning.
Flexible Piping Installation
No matter how big the building is
1 Flexible installation
in high-rise buildings
From the first
branch joint
to the farthest
Max. Drop height Indoor units
2 Flexible installation
in wide areas between indoor
and Outdoor units.
Drop
height
between
indoor
units
Total pipe length can reach up to m
Maximum actual piping 175m
110 * note:
• 110m will be permitted only if ODU is below.
• Max. level difference between indoor and
outdoor units is 70m if ODU is above.
24
To create a better life for the global
EJEMPLO EDIFICIO OFICINAS
clients with comfortable, efficient and
healthy air-conditioning.
Instalación flexible de tubería
Condensadora arriba
Oficinas: Piso 10
2 pisos a acondicionar
Piso 4
Piso 5
Equipo en cubierta
Altura entre pisos 3 Mts
Piso 6
Piso 5
25
To create a better life for the global
PISO 6 clients with comfortable, efficient and
healthy air-conditioning.
26
To create a better life for the global
PISO 6 clients with comfortable, efficient and
healthy air-conditioning.
CST 1V CST 1V CST 1V
9KBTU 9KBTU 9KBTU
0.9 0.6
4.0 3.6
CST 4V
36 KBTU CST 4V
36 KBTU
4.4
1.3
3.8 2.4 1.6
27
To create a better life for the global
PISO 5 clients with comfortable, efficient and
healthy air-conditioning.
28
To create a better life for the global
PISO 5 clients with comfortable, efficient and
healthy air-conditioning.
CST 4V
12 KBTU
CST 1V CST 1V CST 1V
07 KBTU 07 KBTU 07 KBTU
0.6 1.6
0.8
3.2 2.5
2.8
CST 4V 1.3 CST 4V
36 KBTU 09 KBTU
0.7
2.5
2.1
1.4 4.5
CST 4V
36 KBTU
2.4
29
To create a better life for the global
Árbol del Sistema clients with comfortable, efficient and
healthy air-conditioning.
30
To create a better life for the global
Selección de Controles Control Central
clients with comfortable, efficient and
healthy air-conditioning.
Controles individuales Control Central
Avanzado
31
To create a better life for the global
Conexión de Comunicación clients with comfortable, efficient and
healthy air-conditioning.
Click any point in on this
page,wiring connection
automatically.
32
To create a better life for the global
Generacion de Reporte clients with comfortable, efficient and
healthy air-conditioning.
2 formatos de Reporte
33
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
34
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
35
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
Reporte de Selección
Resultados de Calculo y Selección
Lista de Materiales
Lista de Materiales por Sistema
Especificaciones
Tubería y distribuidores de Refrigerante
36
To create a better life for the global
clients with comfortable, efficient and
healthy air-conditioning.
Reporte de Selección
Distribución del Sistema
Conexión entre Condensadoras
Conexión de Comunicación
37