0% found this document useful (0 votes)
415 views4 pages

8180 - Long Lead - Supplier Contact and Submittal Plan and Log

The document appears to be a table listing suppliers for different systems for a site. It includes details like the supplier name, when they were contacted, when quotations were received, when submittal documents were received, and the status of submittals. There are multiple suppliers listed for each system category.

Uploaded by

Ammar Abdalla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
415 views4 pages

8180 - Long Lead - Supplier Contact and Submittal Plan and Log

The document appears to be a table listing suppliers for different systems for a site. It includes details like the supplier name, when they were contacted, when quotations were received, when submittal documents were received, and the status of submittals. There are multiple suppliers listed for each system category.

Uploaded by

Ammar Abdalla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Suppliers for 8180

PROCUREMENT SITE --> Pre-Qualification Technical CSG RREMARKS ADDED AS COMMENTS ON CELL
SN System Category Supplier Name
Submittal Documents Submittal Documents sent
Contacted On Quotation Received on Received on to Site on Documents Sent to RC on Submittal Status Documents Sent to RC on Submittal Status REMARKS

Al Hoty Stanger 01/02/2018 AF AF Yes 01/03/2018 01/03/2018 A

1 Services ITL New Quotation R'cvd


Al Osaimi Engineering 17/03/2018 25/03/2018 AF Yes 28/02/2018 28/02/2018 A

Gulf Engineering House 01/02/2018 AF AF Yes 28/02/2018 28/02/2018 A

Saudi ReadyMix 01/02/2018 AF AF Yes 08/03/2018 08/03/2018 A

GAC 01/02/2018 AF AF Yes 08/03/2018 08/03/2018 A


2 Civil Concrete
Ali Al Massad - Abni 01/02/2018 AF AF Yes 18/03/2018 18/03/2018 A

Al Saleh 29/04/2018 Belal Belal

Bawan Metal Industries 01/02/2018 AF AF Yes 123/03/2018 123/03/2018 A

3 Civil Steel Fozan Metal 01/04/2018 AF Delivered to Site 03/04/2018 09/04/2018

Rashed Steel 12/04/2018 14/04/2018 14/04/2018 15/04/2018

FOSAM 06/03/2018 12/03/2018/ S.Copy Sent to Site H.copy 14/03/2018


sent to site: 05/04/18

DERMABIT 07/03/2018 07/03/2018 20/03/2018 22/03/2018 25/03/2018 A 25/03/2018 A

4 Mechanical Waterproofing ISSAM KABBANI 14/03/2018 28/03/2018 Delivered to Site 18/03/2018 18/03/2018 RESUB 18/03/2018 RESUB Resub: 05/04/2018

NTE 23/05/2018 05/06/2018 25/06/2018 26/06/2018

Absar 23/05/2018

5 Civil Termite Control Al Majal 07/03/2018 11/03/2018 Delivered to Site 14/03/2018 18/03/2018 A 18/03/2018 A

Batterjee International 08/03/2018 10/03/2018 19/03/2018 22/03/2018 Submitted

SANCO - Namlah 07/03/2018 27/03/2018 Delivered to Site 20/03/2018 21/03/2018 21/03/2018


6 Civil Masonry Blocks
Dakhel 08/03/2018 18/03/2018 24/03/2018 - S Copy only - SENT TO SITE
H.copy to site 03/04/2018

Al Saleh 29/04/2018 Belal Belal Belal

Al Jazeera Paints 14/03/2018 03/04/2018 19/03/2018 22/03/2018 27/03/2018

Couriered to site:
7 Finishing/Architecture Paint System Hempel 19/03/2018 28/03/2018 26/03/2018 27/03/2018 04/04/2018

JOTUN 19/03/2018 03/04/2018 Prequal: 21/03/2018 Prequal: 22/03/2018 27/03/2018

ATCO-CMD Turkey Group 15/03/2018 29/03/2018


8 Finishing/Architecture Plastering
Saveto 17/03/2018 29/03/2018 Couriered to Site - 27/03/2018 27/03/2018 09/04/2018
25/03/2018

Al Quraishi - Eaton 19/03/2018 Expected: 03/04/2018 Expected: 03/04/2018 Prequal: 14/04/2018


Prequal:12/04/2018

Saudi Transformers 18/03/2018 31/04/2018 Prequal: 21/03/2018 Prequal: 22/03/2018 25/03/2018


9 Electrical Package Substation
ABB 24/04/2018 08/05/2018 Delivered to site: DELIVERED TO SITE
31/05/2018

Al Fanar 29/04/2018 Expected: 14/05/2018 Courier to site: 23/05/2018

Al Quraishi - Eaton 19/03/2018 Expected: 02/04/2018 Expected: 03/04/2018 Prequal: 14/04/2018


Prequal:12/04/2018

Al Khereji - ABB 19/03/2018 Requested Prequal: 24/03/2018

Electric House 27/03/2018 02/05/2018

ECS 22/04/2018 09/05/2018

30/05/2018 - Disc
10 Electrical Electric Distribution Boards Al Marshad - ABB 23/04/2018 30/04/2018 20/05/2018 26/06/2018

Al Fanar 29/04/2018 Expected:14/05/2018 Couriered to site:


23/05/2018

Modern Ocean - ABB 29/04/2018 02/05/2018 16/05/2018

MTS - Schneider 03/07/2018 16/07/2018 Expected: 08/07/2018

UTESCO 18/07/2018 24/07/2018 PQD : 22/07/18 PQD : 24/07/18

Expected: 03/04/2018
Al Quraishi - Eaton 20/03/2018 Expected: 03/04/2018 Prequal:12/04/2018 Prequal: 14/04/2018 Gen: No specifications for Disconn switches

Al Khereji - ABB 20/03/2018 Requested Prequal: 24/03/2018

11 Electrical Disconnect Switch Electric House 27/03/2018 09/04/2018

Al Marshad - ABB 24/04/2018 30/04/2018 Soft: 03/05/2018 HCOPY: 30/05/2018 - Disc


20/05/2018 26/06/2018

Modern Ocean - ABB 24/04/2018 13/05/2018

Saudi Cable 26/03/2018 05/04/2018

12 Electrical Cables & Termination Kit Electric House - Bahrah Cable 05/04/2018 09/04/2018 SENT DIRECT TO SITE

Bahrah Cables 26/03/2018 Expected: 05/04/2018

Electric Care-Milbank 02/04/2018 19/04/2018 Prequal and Technical - 06/05/2018


23/04/2018

13 Electrical Metering System Ghassan-Milbank 09/05/2018

Al Khereji - EGA - PVC 26/03/2018 PVC - 04/04/2018 PVC - 26/03/2018 Sample: PVC - 29/03/2018
11/04/2018 Sample:12/04/2018

PVC & Sample - PVC & Sample -


14 Electrical Electric Conduit Electric House - (ITCC - Metal) (Bahrah - PVC) 26/03/2018 PVC - 09/04/2018 08/04/2018 Metal 12/04/2018 Metal
& Sample - 30/04/2018 & Sample: 06/05/2018

SIP - PVC 03/04/2018 08/04/2018 Direct to site Direct to site

Al khereji - Furse 18/03/2018 04/04/2018 26/03/2018 29/03/2018

15 Electrical Grounding and Lightning Electric House - RayChem 27/03/2018 09/04/2018 Prequal Technical Sample - 06/05/2018 23/04 Missing Certs and Disc - Wasem will provide
Protection 23/04/2018

Al khereji - Honeywell 18/03/2018 04/04/2018 26/03/2018 29/03/2018 04/05/2018


Sample:11/04/2018 Sample:12/04/2018

Electric House - Le Grand 27/03/2018 09/04/2018 21/05/2018 22/05/2018

16 Electrical Electrical Switches and


Receptacles
Couriered to Site:
Al Fanar 05/02/2018 WILL EMAIL 23/05/2018 23/05/2018

Abunayyan - Schneider 29/05/2018 10/106/18

Prequal: 05/04/2018 Prequal: 14/04/2018


National Lighting 27/03/2018 Expected: 17/04/2018 Technical: 25/04/2018 Technical:06/05/2018

Electric House 27/03/2018 02/05/2018 Tech. S Copy: 24/06/18 SENT TO SITE: CHECK
Interior and Exterior
17 Electrical Lighting
Adwaa Factory 04/04/2018 19/04/2018 Technical: 19/042018. Disc 06/05/20218
and Prequal: 05/05/2018

Spectra 22/07/2018 30/07/2018 PQD: 23/07/18

Al Alameya 28/03/2018 Prequal: 12/04/2018 Prequal: 14/04/2018 Prequal: 14/04/2018


Technical: 01/07/18 Technical: 04/07/18

IP Telephone and Data


18 Telecommunications System Salec 02/05/2018 CANNOT OFFER

BEACON 22/05/2018 11/07/2018

Prequal: 12/04/2018 New Prequal: 14/04/2018 New


Al Alameya 28/03/2018 12/04/2018 Prequal & Tech: Prequal & Tech: Prequal: 14/04/2018 Didn't provide Compliance, emailed regarding issues (22/04/2018)
19/04/2018 23/04/2018

19 Telecommunications Fiber Optic System Salec 02/05/2018 CANNOT OFFER


Infrastructure

BEACON 22/05/2018 11/07/2018

Prequal: 12/04/2018 Prequal: 14/04/2018 Prequal: 14/04/2018 Fire


Al Alameya 28/03/2018 Fire Alarm: 12/04/2018 IPTV/CCTV: 01/07/18 Fire Alarm: 15/04/2018 Alarm: 16/04/2018
IPCCTV: 04/07/18

20 Telecommunications Electronic Safety and


Secuirty: IP CCTV
Electronic Safety and
20 Telecommunications Secuirty: IP CCTV Salec - IP CCTV 02/05/2018 CANNOT OFFER

BEACON - IP CCTV 22/05/2018 11/07/2018

NAFFCO - Fire 06/05/2018 31/05/2018 S.Copy - 29/07/18

Bridgeway - Fire 06/05/2018 15/05/2018 20/05/2018 23/05/2018


21 Telecommunications Fire Alarm
Setra - Fire 21/05/2018 11/06/2018

ACC - Fire 22/05/2018 06/06/2018

Zamil Air Conditioners 30/06/2018 PQD: 18/07/18 PQD: 23/07/18 Missing Specs

22 Mechanical AC Units York 30/06/2018

Carrier 30/06/2018

Zamil Projects 15/05/2018

23 Mechanical HVAC Testing and


Commissioning

Cube 15/05/2018 23/05/2018 12/07/2018 12/07/2018

24 Mechanical Ductwork and Accessories Sharqawi 15/05/20198 20/05/2018 Soft: 21/05/2018 - Missing some dox in scopy. Emailed. Requested Hcopy
Provided to site

Aramec 15/05/2018 21/06/2018

KBE 15/05/2018 Expected: 09/06/2018 at


site

National Factory 15/05/20198 05/06/2018


25 Mechanical Air Inlets and Outlets
Global Energy 15/05/2018 20/05/2018 23/05/2018 30/05/2018

GGC - Gulf Grilles Co 22/05/2018 25/07/2018

Delivered to Site:
Mitsubishi 06/05/2018 28/05/2018 26/05/2018 SENT TO SITE

26 Mechanical Electric Traction Elevator Otis 06/05/2018

NAFFCO 08/05/2018 30/05/2018 - 29/07/18

Bridgeway 08/05/2018 15/05/2018 20/05/2018 23/05/2018

27 Mechanical Fire Suppression HEBA Fire 22/05/2018

ACC 22/05/2018

SETRA 22/05/2018

Al Jammaz 08/05/2018 17/05/2018 Couriered to site


20/05/2018

28 Mechanical Irrigation System MEAC - Hunter 08/05/2018 S.Copy- 22/07/18

Fawaz 08/05/2018

Al Saadeh 08/05/2018 06/06/2018 16/07/2018 19/07/2018


29 Mechanical Fans
Zamil Projects 15/05/2018

Global Energy 22/05/2018 28/05/2018 06/06/2018 06/06/2018

Fawaz 08/05/2018

National Factory 08/05/2018 CAN NOT QUOTE

30 Mechanical Sound Attenuators Sharqawi 22/05/2018

Global Energy 23/05/2018 29/05/2018 06/06/2018 06/06/2018

Gulf Grilles Co. - GGC 25/07/2018 28/07/2018

AVK 09/05/2018 PQD Soft: 25/07/18

31 Mechanical Valves UBM 09/05/2018 21/05/2018 DIRECT TO SITE DIRECT TO SITE

Al Ghamdi 14/05/2018 20/05/2018 23/05/2018 30-05-2018


Extra copy: 04/07/18

32 Mechanical Plumbing Fixtures Al Shaya 14/05/2018

Ebaa House 22/05/2018

Neproplast 15/05/2018 05/07/2018 DIRECT TO SITE

33 Mechanical uPVC Piping Saudi Hepco 15/05/2018 20/05/2018 DIRECT TO SITE Compliance sheet is general - update

Ruwaili 16/05/2018 21/05/2018 DIRECT TO SITE

Ruwailli 20/05/2018 Received 21/05/2018

34 Mechanical Warning Tape Global Source 23/05/2018 07/06/2018 21/06/2018

Waked 05/06/2018

Saudi Hepco 15/05/2018 30/05/2018 DIRECT TO SITE

35 Mechanical FRP Manhole Acwa 15/05/2018

Petra 17/05/2018 Missing Specs

36 Mechanical Electric Water Heater MCC 17/05/2018

UBM 19/05/2018 20/05/2018 Direct to site Direct to site Missing Specs

37 Mechanical Drains and Cleanouts Jubran 19/05/2018 Prequal: 05/06/2018 Prequal: 05/06/2018
Tech: 01/07/2018 Tech: 04/07/2018

SaudiCast 19/05/2018

Bandar Eid Al Essa 19/05/2018 Missing Specs

Daniya Trading 19/05/2018 Prequal: 06/06/2018 Prequal: 06/06/2018


38 Mechanical Water Meter
Al Nahar Co

MCC 31/05/2018

UBM 20/05/2018 20/05/2018 21/05/2018 DIRECT TO SITE No cast iron pipe

39 Mechanical Plumbing Piping Fawaz 21/05/2018

MCC 22/05/201/8

40 Mechanical Plumbing Piping Fawaz 21/05/2018


Accessories

DOES NOT HAVE UL LISTED


Jubran 06/05/2018 HANGERS Prequal: 05/06/2018 Prequal: 06/06/2018

Laticrete 20/05/2018 21/05/2018 22/05/2018 22/05/2018

41 Finishing/Architecture Tile Adhesive and Grouting Saveto Approved

Al Rajhi 26/05/2018 Prequal: 21/06/2018 Direct to Site: 08/07/18

Metal: Handrails - Ladder -


42 Finishing/Architecture Decorative
Metal: Handrails - Ladder -
42 Finishing/Architecture Decorative Bright Steel Factory 26/05/2018 06/02/2018 Prequal: 11/06/2018 Prequal: 23-06-2018 Quote based on unit - BOQ and DWG don't match for full offer

Hidada 26/05/2018 CANNOT QUOTE

Hafez 26/05/2018

Al Kayan decore 26/05/2018 CANNOT QUOTE

43 Finishing/Architecture Woodworks - Pergola, Zaid Trading 04/07/2018


Truss, Mushrabia

Aktreqco 11/07/2018

Binladin Woodwork Factory 19/07/2018

Anfal 27/05/2018 02/07/2018 Prequal Soft

Al Rajhi 27/05/2018 26-06-2018 - Prequal Direct to Site

44 Finishing/Architecture Metal Doors and Frames Aldrees - Alitco 06/06/2018 11/06/2018 Soft: 25/07/18

Labenat Al Marsusa 19/07/2018

Tashyed 19/07/2018

Hafez 26/05/2018

Aldrees - Alitco 06/06/2018

45 Finishing/Architecture Wood Doors and Frames Bin Laden Woodwork Factory 17/07/2018

Labenat Al Marusa 19/07/2018

Riyadh Furniture - Saudi Modern Factory 19/07/2018

Al Fanar 29/05/2018 27/06/2018 - Prequal 27/06/2018-Prequal

46 Finishing/Architecture Tile - Porcelain-Terrazzo- Nesma Orbit 04/07/2018 10/07/2018


Clay

Rabya 04/07/2018

Al Amoudi 29/05/2018

47 Finishing/Architecture Tile - Stone-Marble

Olayan TTC 29/05/2018 06/06/2018 21/06/2018 23/06/2018 Cannot quote gypsum ceiling

Ceiling System - Gypsum


48 Finishing/Architecture Board Buildex 29/05/2018 19/06/2018 26/06/2018 Direct to Site

Gboard 26/06/2018 30/06/2018 Submittal: 04/07/18


Sample: 15/07/18

Olayan TTC 6/2/2018

49 Finishing/Architecture Kitchen Base and Wall Jeraisy 6/2/2018 Prequal Scopy: 02/07/18 Prequal Sent: 04/07/18
Cabinets

Riyadh Furniture - Saudi Modern Factory 6/2/2018 Prequal S.copy-


05/07/2018

Olayan TTC 6/2/2018 01/07/2018 17/07/2018 19/07/2018

Kitchen Base and Wall


50 Finishing/Architecture Cabinets - Jeraisy 6/2/2018 24/07/2018 Prequal S.Copy- 02/07/18 Prequal: 04/07/18
Fixed/Moveable
FURNITURE
Prequal S.copy-
Riyadh Furniture - Saudi Modern Factory 6/2/2018 05/07/2018

Olayan TTC 6/2/2018 Does not have to spec

Prequal: 27-06-2018
51 Finishing/Architecture Carpet Al Sorayai 6/2/2018 10/06/2018 10/06/2018 Sample: 14/07/18

Al Sourayia 7/7/2018 09/07/2018 S.copy - 22/07/18

Al Ghamdi 6/4/2018 06/07/2018 03/07/2018

52 Finishing/Architecture Toilet and Bath Accessories Al Shaya 6/5/2018

Ebaa House 5/5/2018

Al Namla 30/06/2018

53 Finishing/Architecture Concrete Benches Shibh Al-Jazira - SAJCO 01/07/2018 05/07/2018 Prequal S.copy- PQD: 23/07/18
05/07/2018

Artic 01/07/2018

54 Finishing/Architecture Landscaping

55 Finishing/Architecture Fence and Gates