PROCUREMENT SITE --> Pre-Qualification Technical CSG RREMARKS ADDED AS COMMENTS ON CELL
SN System Category Supplier Name
Submittal Documents Submittal Documents sent
Contacted On Quotation Received on Received on to Site on Documents Sent to RC on Submittal Status Documents Sent to RC on Submittal Status REMARKS
4 Mechanical Waterproofing ISSAM KABBANI 14/03/2018 28/03/2018 Delivered to Site 18/03/2018 18/03/2018 RESUB 18/03/2018 RESUB Resub: 05/04/2018
Absar 23/05/2018
5 Civil Termite Control Al Majal 07/03/2018 11/03/2018 Delivered to Site 14/03/2018 18/03/2018 A 18/03/2018 A
Couriered to site:
7 Finishing/Architecture Paint System Hempel 19/03/2018 28/03/2018 26/03/2018 27/03/2018 04/04/2018
30/05/2018 - Disc
10 Electrical Electric Distribution Boards Al Marshad - ABB 23/04/2018 30/04/2018 20/05/2018 26/06/2018
Expected: 03/04/2018
Al Quraishi - Eaton 20/03/2018 Expected: 03/04/2018 Prequal:12/04/2018 Prequal: 14/04/2018 Gen: No specifications for Disconn switches
12 Electrical Cables & Termination Kit Electric House - Bahrah Cable 05/04/2018 09/04/2018 SENT DIRECT TO SITE
Al Khereji - EGA - PVC 26/03/2018 PVC - 04/04/2018 PVC - 26/03/2018 Sample: PVC - 29/03/2018
11/04/2018 Sample:12/04/2018
15 Electrical Grounding and Lightning Electric House - RayChem 27/03/2018 09/04/2018 Prequal Technical Sample - 06/05/2018 23/04 Missing Certs and Disc - Wasem will provide
Protection 23/04/2018
Electric House 27/03/2018 02/05/2018 Tech. S Copy: 24/06/18 SENT TO SITE: CHECK
Interior and Exterior
17 Electrical Lighting
Adwaa Factory 04/04/2018 19/04/2018 Technical: 19/042018. Disc 06/05/20218
and Prequal: 05/05/2018
Zamil Air Conditioners 30/06/2018 PQD: 18/07/18 PQD: 23/07/18 Missing Specs
Carrier 30/06/2018
24 Mechanical Ductwork and Accessories Sharqawi 15/05/20198 20/05/2018 Soft: 21/05/2018 - Missing some dox in scopy. Emailed. Requested Hcopy
Provided to site
Delivered to Site:
Mitsubishi 06/05/2018 28/05/2018 26/05/2018 SENT TO SITE
ACC 22/05/2018
SETRA 22/05/2018
Fawaz 08/05/2018
Fawaz 08/05/2018
33 Mechanical uPVC Piping Saudi Hepco 15/05/2018 20/05/2018 DIRECT TO SITE Compliance sheet is general - update
Waked 05/06/2018
37 Mechanical Drains and Cleanouts Jubran 19/05/2018 Prequal: 05/06/2018 Prequal: 05/06/2018
Tech: 01/07/2018 Tech: 04/07/2018
SaudiCast 19/05/2018
MCC 31/05/2018
MCC 22/05/201/8
Hafez 26/05/2018
Aktreqco 11/07/2018
44 Finishing/Architecture Metal Doors and Frames Aldrees - Alitco 06/06/2018 11/06/2018 Soft: 25/07/18
Tashyed 19/07/2018
Hafez 26/05/2018
45 Finishing/Architecture Wood Doors and Frames Bin Laden Woodwork Factory 17/07/2018
Rabya 04/07/2018
Al Amoudi 29/05/2018
Olayan TTC 29/05/2018 06/06/2018 21/06/2018 23/06/2018 Cannot quote gypsum ceiling
49 Finishing/Architecture Kitchen Base and Wall Jeraisy 6/2/2018 Prequal Scopy: 02/07/18 Prequal Sent: 04/07/18
Cabinets
Prequal: 27-06-2018
51 Finishing/Architecture Carpet Al Sorayai 6/2/2018 10/06/2018 10/06/2018 Sample: 14/07/18
Al Namla 30/06/2018
53 Finishing/Architecture Concrete Benches Shibh Al-Jazira - SAJCO 01/07/2018 05/07/2018 Prequal S.copy- PQD: 23/07/18
05/07/2018
Artic 01/07/2018
54 Finishing/Architecture Landscaping
A
B
C
D
RESUB