Amount (IDR)
NO Description
Material
A PRELIMINARY -
B TPS BUILDING
Structure Works -
Architecture & Finishes Works -
MEP Works -
C ADDITIONAL PARKING
New Parking area -
Drainage -
MEP WORKS -
TOTAL -
Amount (IDR) Total Amount
Remarks
Labor (IDR)
- -
-
-
-
-
-
-
-
-
- -
___________________________
Name:
Title :
BILL OF QUANTITY
EKA HOSPITAL BSD
SCOPE OF WORKS : WASTE / DISPOSAL HOUSE (TPS) & ADDITIONAL PARKING
PACKAGE : TPS BUILDING
DATE : 20 September 2022
A PRELIMINARY
1 Site Management (include Coordination) 1.00 ls - - -
2 Accomodation & Tools 1.00 ls - - -
3 Electricity & Water 1.00 ls - - -
4 General Cleaning 1.00 ls - - -
5 Reports, Shop Drawing & As Build drawing 1.00 ls - - -
6 Additional Temprary fencing (2,4 m) 1.00 ls - - -
SUB-TOTAL PRELIMINARY - - -
B TPS BUILDING
Civil Works
1 Stone foundation
Excavation ref to drawing 31.71 m3 - - -
Back fill ref to drawing 22.20 m3 - - -
Soil Compaction CBR 6 % ref to drawing 18.12 m2 - - - Soil Compaction
Sand bed h = 50mm ref to drawing 18.12 m2 - - -
Stone foundation ref to drawing 6.80 m3 - - -
2 Sloof
Concrete Fc 25 ref to drawing 1.81 m3 - - -
Rebar (D10) ref to drawing 253.96 kg - - -
Formwork ref to drawing 18.12 m2 - - -
3 Slab
Excavation ref to drawing 27.26 m3 - - -
Soil Compaction CBR 6 % ref to drawing 90.86 m2 - - -
Sirtu Spreading t = 150 mm CBR 30% ref to drawing 13.63 m3 - - -
Lean concrete t = 50 mm ref to drawing 4.54 m3 - - -
Concrete Fc 30 For Slab ref to drawing 16.01 m3 - - -
Wiremesh M10-150 ref to drawing 61.29 m2 - - -
Wiremesh M8-150 ref to drawing 22.64 m2 - - -
Wiremesh M5-150 ref to drawing 6.93 m2 - - -
Formwork ref to drawing 5.86 m2 - - -
4 Column K1
Concrete Fc 30 For Column ref to drawing 0.97 m3 - - -
Rebar (D10) ref to drawing 193.31 kg - - -
Formwork ref to drawing 19.72 m2 - - -
5 Roof Beam
Concrete Fc 30 For Beam ref to drawing 2.76 m3 - - -
Rate (IDR) Amount (IDR) Total Amount
NO Description Specification QTY unit Remarks
Material Labor Material Labor (IDR)
Rebar (D10) ref to drawing 646.12 kg - - -
Formwork ref to drawing 25.34 m2 - - -
Rate (IDR) Amount (IDR) Total Amount
NO Description Specification QTY unit Remarks
Material Labor Material Labor (IDR)
6 Roof
Light weigth steel frame (atap Baja Ringan) ref to drawing 97.61 m2 - - -
UPVC Roof ref to drawing 97.61 m2 - - -
Nok ref to drawing 11.22 m1 - - -
ListPlank h=5cm ref to drawing 31.14 m1 - - -
FLOOR FINISHES
1 Floor Ceramic 30 x 30 ex Roman / equal 64.17 m2 - - -
2 Floor Hardener 3kg/m2 (natural) ex Sika / equal include trowelled
finish & curing works 20.84 m2 - - -
CEILING
1 Skimcoat dry mortar ex MU/Equal m2 - - - not Applicable
2 Interior Paint (Waterbase) ex dulux Catylac ex ICI / Equal m2' - - - not Applicable
1 Kode Unit : IU-TPS.1 & IU-TPS.2/ OU-TPS.1 & IU-TPS.2 (Non Daikin/ Panasonic
2.00 set - - -
Inverter)
Kapasitas : 12.000 BTU/H
2 Pipa Refrigerant AC (1/4" + 1/2") Denji/ Muller 10.90 m' - - -
3 Pipa PVC AC Dia.20 mm (Pipa Drain AC) + Isolasi Rucika, Vinilon 7.00 m' - - -
4 3x2.5 mm2 NYM Power Distribution Cable in PVC Conduit 20 Supreme, Kabelmetal, Voksel,
mm² from P-TPS to AC indoor and outdoor units IU-TPS.1 & Jembo 29.10 m' - - -
IU-TPS.2/ OU-TPS.1 & IU-TPS.2
NO Description Specification
C ADDITIONAL PARKING
C.1 New Parking area
Land Clearing (including paving, asplalt, vegetation (tress,
1
shrups), etc)
2 Demolish Fence
- Panel fence
- BRC Fence
3 ReInstall Exsiting Panel fence
- Panel fence existing material
- BRC Fence existing material
4 Grading (including cut & Fill)
5 Stone Foundation
include backfill excess soil to
- Excavation
parking area
- Sand bed ref dwg
- Stone Foundation ref dwg
- Sloof size 120 x200mm ref dwg
6 Soil compaction CRB >6%
7 Subbase : crushed stone class C h=250mm CBR >35%
8 Base Course : crushed stone class A h=150 mm CBR >90%
9 Sandbed 50mm
Herringbone pattern, ex CI,
10 Paving 8cm
cisangkan equal
Standar DKI including water inlet
11 Cansteen + Paint (New cansteen)
curb/cansteen
12 Carstopper + Paint (existing carstopper) Standar DKI
13 Parking Line (paving red colour w=10cm) ex CI, cisangkan equal
14 Shrups/ grass + including 20cm red soil and fertilizer "Gajah mini"
15 CBR Test 30 nos per layer pavement
C.2 Drainage
Supply and Install drainage system including excavation,
sandbed, back fill and restore the pavement or existing
area to original condition
1 Drainage RCP dia 60 ex Dusaspun, Precon / equal
2 Drainage RCP dia 80 ex Dusaspun, Precon / equal
3 Control Box type BK2 ref dwg
water inlet cansteen include
4 Pipe Water inlet
cansteen work.
Cable NYFGBY 3X4 mm for PJU Lighting including Supreme, Kabelmetal, Voksel,
3 excavation, backfill, sand fill, cable proctection tiles and and Jembo
all other necessary works
6,535.54 m2 - -
95.00 m1 - -
180.00 m1 - -
89.00 m1 - -
180.00 m1 - -
6,535.54 m2 - -
189.00 m3 - -
126.00 m2 - -
121.50 m3 - -
180.00 m1 - -
5,193.12 m2 - -
1,298.28 m3 - -
778.97 m3 - -
259.65 m3 - -
5,193.12 m2 - -
503.28 m1 - -
230.00 no - -
1,090.00 m1 - -
775.53 m2 - -
90.00 no - -
Total Drainage - -
12.00 set - -
24.00 set - -
36.00 point - -
96.40 m1 - -
6.00 Unit - -
6.00 point - -
- -
1.00 point
ls existing existing
ls existing existing
132.00 m'
- -
2.00 no - -
2.00 no - -
- -
1.00 no
1.00 lot - -
1.00 lot included included
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-