EH BSD - TPS & Add Parking Date 23.09.2022 r2

Uploaded by

Syavel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 19

BILL OF QUANTITY

EKA HOSPITAL BSD


SCOPE OF WORKS : WASTE / DISPOSAL HOUSE (TPS) & ADDITIONAL PARKING
DATE : 20 September 2022

Amount (IDR)
NO Description
Material

A PRELIMINARY -

B TPS BUILDING
Structure Works -
Architecture & Finishes Works -
MEP Works -

C ADDITIONAL PARKING
New Parking area -
Drainage -
MEP WORKS -

TOTAL -
Amount (IDR) Total Amount
Remarks
Labor (IDR)

- -

-
-
-
-

-
-
-
-

- -

.............., ....... September 2022


PT. ______________________

___________________________
Name:
Title :
BILL OF QUANTITY
EKA HOSPITAL BSD
SCOPE OF WORKS : WASTE / DISPOSAL HOUSE (TPS) & ADDITIONAL PARKING
PACKAGE : TPS BUILDING
DATE : 20 September 2022

Rate (IDR) Amount (IDR) Total Amount


NO Description Specification QTY unit Remarks
Material Labor Material Labor (IDR)

A PRELIMINARY
1 Site Management (include Coordination) 1.00 ls - - -
2 Accomodation & Tools 1.00 ls - - -
3 Electricity & Water 1.00 ls - - -
4 General Cleaning 1.00 ls - - -
5 Reports, Shop Drawing & As Build drawing 1.00 ls - - -
6 Additional Temprary fencing (2,4 m) 1.00 ls - - -

SUB-TOTAL PRELIMINARY - - -

B TPS BUILDING

B.1 Structure Works


Demolish Existing
1 Demolish existing building. 72.00 m2 - - -

Civil Works
1 Stone foundation
Excavation ref to drawing 31.71 m3 - - -
Back fill ref to drawing 22.20 m3 - - -
Soil Compaction CBR 6 % ref to drawing 18.12 m2 - - - Soil Compaction
Sand bed h = 50mm ref to drawing 18.12 m2 - - -
Stone foundation ref to drawing 6.80 m3 - - -

2 Sloof
Concrete Fc 25 ref to drawing 1.81 m3 - - -
Rebar (D10) ref to drawing 253.96 kg - - -
Formwork ref to drawing 18.12 m2 - - -

3 Slab
Excavation ref to drawing 27.26 m3 - - -
Soil Compaction CBR 6 % ref to drawing 90.86 m2 - - -
Sirtu Spreading t = 150 mm CBR 30% ref to drawing 13.63 m3 - - -
Lean concrete t = 50 mm ref to drawing 4.54 m3 - - -
Concrete Fc 30 For Slab ref to drawing 16.01 m3 - - -
Wiremesh M10-150 ref to drawing 61.29 m2 - - -
Wiremesh M8-150 ref to drawing 22.64 m2 - - -
Wiremesh M5-150 ref to drawing 6.93 m2 - - -
Formwork ref to drawing 5.86 m2 - - -

4 Column K1
Concrete Fc 30 For Column ref to drawing 0.97 m3 - - -
Rebar (D10) ref to drawing 193.31 kg - - -
Formwork ref to drawing 19.72 m2 - - -

5 Roof Beam
Concrete Fc 30 For Beam ref to drawing 2.76 m3 - - -
Rate (IDR) Amount (IDR) Total Amount
NO Description Specification QTY unit Remarks
Material Labor Material Labor (IDR)
Rebar (D10) ref to drawing 646.12 kg - - -
Formwork ref to drawing 25.34 m2 - - -
Rate (IDR) Amount (IDR) Total Amount
NO Description Specification QTY unit Remarks
Material Labor Material Labor (IDR)

6 Roof
Light weigth steel frame (atap Baja Ringan) ref to drawing 97.61 m2 - - -
UPVC Roof ref to drawing 97.61 m2 - - -
Nok ref to drawing 11.22 m1 - - -
ListPlank h=5cm ref to drawing 31.14 m1 - - -

ref to MEP drawing no P-EH-BSD-


7 Gutter 150mmx50mm 9.16 m1 - - -
09-03-LYD-C-001-1

SUB-TOTAL Structure Works - - -

B.2 Architecture & Finishes Works

WALL WORK & WALL FINISHES


1 Light Concrete Block 100 mm Powerblock, celcon/equal, thin
bed 120.71 m2' - - -
2 Plaster & Smooth render finish dry mortar ex MU/Equal 189.77 unit - - -
3 Interior Paint (oil Paint) ex Jotun/nippon /equal 113.53 m2' - - -
4 Interior Paint (Waterbase) ex dulux Catylac ex ICI / Equal - m2' - - - not Applicable
5 Exterior Paint ex dulux Wheathershield ex ICI / Equal 76.24 m2' - - -
6 Wall Ceramic 30x30 ex Roman / equal 45.66 m2 - - -

FLOOR FINISHES
1 Floor Ceramic 30 x 30 ex Roman / equal 64.17 m2 - - -
2 Floor Hardener 3kg/m2 (natural) ex Sika / equal include trowelled
finish & curing works 20.84 m2 - - -

CEILING
1 Skimcoat dry mortar ex MU/Equal m2 - - - not Applicable
2 Interior Paint (Waterbase) ex dulux Catylac ex ICI / Equal m2' - - - not Applicable

DOORS & WINDOWS


1 Folding Door 5,8x 3 including accessories 1.00 unit - - -
2 Steel Door 900x 2100 including accessories 4.00 bh - - -

SUB-TOTAL PEKERJAAN ARSITEKTUR - - -

B.3 MEP Works

B.3.1 ELECTRICAL WORK


Supply and install as well as testing of low voltage panels,
lamp armatures, switches, and sockets along with all
accessories complete with other installation tools according to
drawings and technical specifications.
1 Relokasi KWH Meter 1 Phase, Ex.Ruang Tunggu Supir 1.00 ls - - -
2 Supreme, Kabelmetal, Voksel,
From KWH Meter 1 Phase to P-TPS, NYY 3 x 6 mm2 Jembo 1.00 m' - - -
3 P-TPS Include Digital timer switch Schneider/ ABB 1.00 Unit - - -
4 SHIP / BUNKER LIGHT, LED 1 x 16 W Philips/ Osram 4.00 no - - -
5 SHIP / BUNKER LIGHT, LED 1 x 8 W Philips/ Osram 3.00 no - - -
6 FITTING E27 + LED BULB 1O watt Philips/ Osram 7.00 no - - -
7 Schneider/ BOSS, Broco,
1 Way 1 Gang 10A Switch Panasonic 4.00 no - - -
8 Schneider/ BOSS, Broco,
2 Way 1 Gang 10A Switch Panasonic 1.00 no - - -
Rate (IDR) Amount (IDR) Total Amount
NO Description Specification QTY unit Remarks
Material Labor Material Labor (IDR)
9 Schneider/ BOSS, Broco,
Socket outlet 1 phase 16 A Panasonic 2.00 no - - -

Supply and install of low-voltage panel fedeer cables,


installation cables for lighting points, switches, and sockets
along with all accessories complete with other installation
tools according to drawings and technical specifications.

NYA 3 (1x1x2,5 mm2) cable in PVC Conduit 20 mm² for


installation:
1 Supreme, Kabelmetal, Voksel,
SHIP / BUNKER LIGHT, LED 1 x 16 W Jembo 16.90 m' - - -
2 Supreme, Kabelmetal, Voksel,
SHIP / BUNKER LIGHT, LED 1 x 8 W Jembo 10.20 m' - - -
3 Supreme, Kabelmetal, Voksel,
FITTING E27 + LED BULB 1O watt Jembo 38.09 m' - - -
4 Supreme, Kabelmetal, Voksel,
1 Way 1 Gang 10A Switch Jembo 13.20 m' - - -
5 Supreme, Kabelmetal, Voksel,
2 Way 1 Gang 10A Switch Jembo 3.30 m' - - -
6 Supreme, Kabelmetal, Voksel,
Socket outlet 1 phase 16 A Jembo 6.60 m' - - -

Sub Total B.3.1 - ELECTRICAL WORK - - -

B.3.2 VAC Works

Supply and install of the main equipment of the Wall mounted


AC unit and Exhause fan and including the outdoor and indoor
unit control cables, AC brackets and all auxiliary equipment
and accessories installed in position according to the drawings
and technical specifications.

1 Kode Unit : IU-TPS.1 & IU-TPS.2/ OU-TPS.1 & IU-TPS.2 (Non Daikin/ Panasonic
2.00 set - - -
Inverter)
Kapasitas : 12.000 BTU/H
2 Pipa Refrigerant AC (1/4" + 1/2") Denji/ Muller 10.90 m' - - -
3 Pipa PVC AC Dia.20 mm (Pipa Drain AC) + Isolasi Rucika, Vinilon 7.00 m' - - -
4 3x2.5 mm2 NYM Power Distribution Cable in PVC Conduit 20 Supreme, Kabelmetal, Voksel,
mm² from P-TPS to AC indoor and outdoor units IU-TPS.1 & Jembo 29.10 m' - - -
IU-TPS.2/ OU-TPS.1 & IU-TPS.2

5 Kode unit : EF-TPS.1 Kruger, Nicotra, Fantech 1.00 Unit - - -


Type : Centrifugal inline Fan
Kapasitas : 250 cfm, 0,2 inch / wg

6 Kode unit : EF-TPS.2 Kruger, Nicotra, Fantech 1.00 Unit - - -


Type : Axial fan
Kapasitas : 200 cfm, 0,35 inch / wg

NYM 3x2.5 mm2 cable in PVC Conduit 20 mm² from P-TPS to :


7 Supreme, Kabelmetal, Voksel,
EF-TPS.1 Jembo 4.50 m' - - -
8 Supreme, Kabelmetal, Voksel,
EF-TPS.2 Jembo 9.30 m' - - -
Rate (IDR) Amount (IDR) Total Amount
NO Description Specification QTY unit Remarks
Material Labor Material Labor (IDR)
Ducting from BJLS material without insulation with zincromate
finishing is installed according to drawings and technical
specifications.
9 BJLS 50 Lokfom,Fumira 4.00 m2 - - -
10 Exhause Louvre 250 x 250 Lokal 1.00 no - - -
11 Exhause Louvre 300 x 150 Lokal 1.00 no - - -
12 Exhaust Air Grille 250 x 250 mm (E1) Lokal 2.00 no - - -
13 Exhaust Air Grille 150 x 150 mm (E2) Lokal 3.00 no - - -
14 Rucika-Wavin, Pralon, Vinilon,
Pipe Ø 150 mm PVC class D (5 kg/m2) Supramas 1.00 m' - - -

Sub Total B.3.2 - VAC Works - - -

B.3.3 Plumbing Works


Supply and install of plumbing system pipe installations from
PPR PN 10 material, not isolated, installed in position,
complete with fitting, all supports, hangers and installation
aids and other connections, according to the Drawings and
Technical Specifications.
1 Pipe Ø 25 mm Wespex, SD, Wavin Tigris 30.00 m' - - -
2 Pipe Ø 20 mm Wespex, SD, Wavin Tigris 7.10 m' - - -
3 Gate valve Ø 25 mm Kitz, Toyo, Hatersley 1.00 no' - - -
4 Kran Onda 3.00 no' - - -

Supply and install of waste water system pipes made of PVC


class AW (10 kg/m2) not insulated, installed in position,
complete with fitting, all supports, hangers and installation
aids and other connections, according to Drawings and
Technical Specifications.
5 Rucika-Wavin, Pralon, Vinilon,
Pipe Ø 80 mm Supramas 10.00 m' - - -
6 Rucika-Wavin, Pralon, Vinilon,
Pipe Ø 65 mm Supramas 4.00 m' - - -
7 Rucika-Wavin, Pralon, Vinilon,
Pipe Ø 50 mm Supramas 10.00 m' - - -
8 Floor Drain Ø 50 mm Kharisma, Antasan, Onda 4.00 no' - - -

Sub Total B.3.3 - Plumbing Works - - -

Dismantling and Inventory TPS Exsisting MEP 1.00 lot - - -

Testing & Commissioning 1.00 lot - - -

Allow for instruction Manual Book and training the


1.00 lot Include Include Include
Employer's engineering staff

SUB-TOTAL PEKERJAAN MEP - - -

TOTAL BANGUNAN TPS - - -


BILL OF QUANTITY
EKA HOSPITAL BSD
SCOPE OF WORKS : WASTE / DISPOSAL HOUSE (TPS) & ADDITIONAL PARKING
PACKAGE : ADDITIONAL PARKING
DATE : 20 September 2022

NO Description Specification

C ADDITIONAL PARKING
C.1 New Parking area
Land Clearing (including paving, asplalt, vegetation (tress,
1
shrups), etc)
2 Demolish Fence
- Panel fence
- BRC Fence
3 ReInstall Exsiting Panel fence
- Panel fence existing material
- BRC Fence existing material
4 Grading (including cut & Fill)
5 Stone Foundation
include backfill excess soil to
- Excavation
parking area
- Sand bed ref dwg
- Stone Foundation ref dwg
- Sloof size 120 x200mm ref dwg
6 Soil compaction CRB >6%
7 Subbase : crushed stone class C h=250mm CBR >35%
8 Base Course : crushed stone class A h=150 mm CBR >90%
9 Sandbed 50mm
Herringbone pattern, ex CI,
10 Paving 8cm
cisangkan equal
Standar DKI including water inlet
11 Cansteen + Paint (New cansteen)
curb/cansteen
12 Carstopper + Paint (existing carstopper) Standar DKI
13 Parking Line (paving red colour w=10cm) ex CI, cisangkan equal
14 Shrups/ grass + including 20cm red soil and fertilizer "Gajah mini"
15 CBR Test 30 nos per layer pavement

C.2 Drainage
Supply and Install drainage system including excavation,
sandbed, back fill and restore the pavement or existing
area to original condition
1 Drainage RCP dia 60 ex Dusaspun, Precon / equal
2 Drainage RCP dia 80 ex Dusaspun, Precon / equal
3 Control Box type BK2 ref dwg
water inlet cansteen include
4 Pipe Water inlet
cansteen work.

C.3 MEP WORKS

C.3.1 Electrical & Electronic Work

Supply and Install along with testing the installation of


general street lamp armatures, along with all accessories
complete with other installation tools, installation in
accordance with electrical installation regulations, in the
ground and following technical drawings and specifications.
"PJU Single" comprising 1x70watt LED Street light, cable
NYM 3x2,5mm2 incld conduit, Junction box, 6m high steel Pole : Indalux / equal
1
pile pole dia 100mm finished powder coating, foundation, Light : PHILIPS
ancorage and all other necessary works
"PJU Double" comprising 2x70watt LED Street light, cable
2 NYM 3x2,5mm2 incld conduit, Junction box, 6m high steel Pole : Indalux / equal
pile pole dia 100mm finished powder coating, foundation, Light : PHILIPS
ancorage and all other necessary works

Cable NYFGBY 3X4 mm for PJU Lighting including Supreme, Kabelmetal, Voksel,
3 excavation, backfill, sand fill, cable proctection tiles and and Jembo
all other necessary works

Supreme, Kabelmetal, Voksel,


NYFGBY 3X4 mm cable from the temporary panel to the
PJU power panel for PJU Lighting including excavation,
Jembo
4
backfill, sand fill, cable proctection tiles and and all other
necessary works

Supply and Install of the main equipment for CCTV


Systems along with all auxiliary tools and accessories
installed in their positions according to technical drawings
and specifications.
5 CCTV\Fixed Bullet Color IP Camera W/ Outdoor Housing HIK Vision min 3 Megapixel
Installed on PJU Pole.
UTP CAT.6 Cable in PVC Conduit Pipe 20 mm2 from unit
6 CCTV to Switch Hub Poe including excavation, backfill, Comscope, Belden or equal
sand fill, cable proctection tiles and and all other necessary
works

C.3.2 Main Equipment


Supply and Install of the main equipment for Electrikal and
CCTV Systems along with all auxiliary tools and
accessories installed in their positions according to
technical drawings and specifications.
1 NVR 1 x 8 Channel (HDD : 2 TB)
2 1x LCD Monitor 32" in Control room
3 Switch hub Poe
4 Converter FO to LAN
5 Panel outdoor for converter (Network) Local
6 Panel outdoor for converter (Power), include busbar, rel Local
omega, etc
7 Socket outlet 1 phase 16 A for switch hub Poe Schneinder, BOSS
8 UPS 1 KVA, Back up 15 menit
9 Cable NYM 3 x 2,5 mm in PVC Conduit Pipe 20 mm2 from
1 KVA UPS to the nearest panel
Supreme, Kabelmetal, Voksel,
10 Cable NYM 3 x 4 mm in PVC Conduit Pipe 20 mm2 for
converter FO to LAN (Power Switch) Jembo
11 Main equipment table/rack
12 Installation Main Equipment
Fiber optic cable 2 cores (drop wire 2 cores) in a 20 mm2
13 PVC Conduit Pipe from the POE switch hub poe to the
control room
14 MCB 3 Phase 10 A, 6 KA for led street lighting Schneinder, ABB / equal
15 MCB 3 Phase 16 A, 6 KA for led street lighting Schneinder, ABB / equal
16 MCB 1 Phase 4 A, 4,5 KA for converter FO to LAN (Power Schneinder, ABB / equal
Switch)

C.3.3 Other (MEP)


1 Testing & Commissioning
2 Allow for instruction Manual Book and training the
Employer's engineering staff
Rate (IDR) Amount (IDR)
QTY unit
Material Labor Material Labor

6,535.54 m2 - -

95.00 m1 - -
180.00 m1 - -

89.00 m1 - -
180.00 m1 - -
6,535.54 m2 - -

189.00 m3 - -
126.00 m2 - -
121.50 m3 - -
180.00 m1 - -
5,193.12 m2 - -
1,298.28 m3 - -
778.97 m3 - -
259.65 m3 - -
5,193.12 m2 - -

503.28 m1 - -
230.00 no - -
1,090.00 m1 - -
775.53 m2 - -
90.00 no - -

Total New Parking area - -


195.00 m1 - -
37.00 m1 - -
20.00 no - -
29.00 no - -

Total Drainage - -

12.00 set - -

24.00 set - -

36.00 point - -

96.40 m1 - -

6.00 Unit - -
6.00 point - -

Total Electrical & Electronic Work - -

Unit existing existing


no existing existing
1.00 no - -
2.00 no - -
1.00 no - -
1.00 no - -
1.00 no - -
Unit existing existing

lot existing existing

- -
1.00 point
ls existing existing
ls existing existing
132.00 m'
- -

2.00 no - -
2.00 no - -
- -
1.00 no

Total Main Equipment - -

1.00 lot - -
1.00 lot included included

Total Other (MEP) - -

Total MEP WORKS - -


TOTAL ADDITIONAL PARKING - -
Total Amount
Remarks
(IDR)

-
-

-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-

-
-

-
-
-
-
-
-
-
-
-

-
-
-

-
-
-

-
-