Learn Revit Practice 7 Day Course 1659176581
Learn Revit Practice 7 Day Course 1659176581
Prepared for the teachers’ workshop at Triton College on April 16, 2010.
Revit is a revolutionary software program to create a model of a building for architectural and
interior design, rendering, energy calculations, producing detailed construction documents
from which a building will be bid and built, quantity take‐offs, cost estimating, construction and
facilities management over the life of the building.
1. Open Revit
Note that the “home plate” trapezoidal shaped objects are Revit’s (unusual) version of an
elevation key (where the arrow is pointing). Revit always starts out drawing a building with two
“levels” (floors), although you can change the number of floors by adding more levels.
4. Click on the right wall. Note that a temporary dimension will appear.
6. Do the same for the vertical dimension by clicking on the bottom wall and type in 30:
9. Click on the 3d icon that looks like a house in the upper line of the tool bar:
The symbol in the upper right corner of the screen is called the “view cube” where the arrow is
pointing toward. This is a sweetie of a tool because it will allow you to navigate to different
views of the 3d object. Remember in Revit, you are drawing in 3d all the time. The view cube
appears whenever you are in a 3d view.
Now click on a corner of the cube. This is what it will change to:
Hover your cursor over the picture of the house above the view cube and click on it with the
mouse. This is what it will now look like:
The view cube will only appear in a 3d view, not in a plan, elevation or section – these are 2d
views of your model.
You can zoom in and out in any view by moving the mouse wheel forward or backward. Try it!
Much drawing work in Revit can and should be done in a 3d view. When you are in a 3d view,
you can turn the view around and look at it from different sides by holding the Shift key on the
keyboard down and holding the mouse wheel down at the same time and moving the mouse
around. Try it!
10. Let’s go back to the plan view. To do this, double‐click on the words “Level 1” in the
Project Browser on the left hand of the screen. That means you are going to the Level 1
(First Floor) view.
This will not put a door “tag” symbol in the door opening. Door tags are used to reference a
door schedule, which we will create later on. To keep things simple, we will just put the doors in
for now and add the tags later.
Select one of the dimensions and change it to 20. This is how it will look:
You can also move the door by clicking on it and holding the left button of the mouse down and
moving the mouse left or right.
Let’s say you want to move the door to another wall. To do this you have to select the Pick Host
tool on the Ribbon and select the wall you want to move it to:
Note that when you click on a door, it will show some arrows:
These arrows allow you to change the swing or hand of the door by clicking on them.
When you click anywhere else in the blank space of the drawing, the arrows will disappear.
Be sure to uncheck “Tag on Placement” again, just like you did for the doors. Hover the cursor
near the point you want to place the window and pick the left button of the mouse. Hover the
cursor toward the outside edge of the wall, not the inside edge. If a window gets installed on
the inside rather than the outside of the wall, you can easily correct it by clicking on it and
clicking on the arrows so the arrows are showing on the outside of the wall.
Let’s look at our masterpiece in 3d by clicking on the icon on the top of the ribbon that looks
like a house in 3d :
14. Turn some shadows on to see is more realistically. To do this select the shadows button
on the bottom row of icons:
Super nice!
15. Let’s turn some shading on to get even more realistic view:
To do this select the “Model Graphics Style” icon on the bottom row of icons:
16. Let’s render the image. To do this select the icon that looks like a teapot with a lightbulb
next to it.
This icon image of a teapot has historic meaning within Autodesk products, as the first
rendering program created by Autodesk, 3D Studio Max, used a picture of a teapot to illustrate
its animation and rendering ability. Revit has this program built in.
There are several rendering and lighting options from which you can choose. When you pick
the “Render” button near the top of this dialogue box, Revit will produce a photographic
image that will look like this. Note that there is no ground shadows here because there is no
ground plane created yet.
To come back to the Revit model, click on the “Show the Model” button on the bottom of
the dialogue box.
Close the rendering dialogue box, turn off the shadows, and go back to “Hidden Line” visual
appearance. Now your drawing will look like this again:
Start dimensioning by clicking on the left wall and then on each window centerline by
clicking on them one at a time and then click on the right wall, and then on a blank area on
the right side of the drawing. It should now look like this:
Note that there is a EQ symbol with a red slash through it above the dimension string.
All windows will now move over to be equally spaced and the windows will be
“constrained” to this equality spacing regardless of whether the building is lengthened or
shortened.
If you now click on the EQ symbol again the windows will still be evenly spaced and actual
dimensions will appear:
This sub‐ribbon contains options that you can choose for interior walls.
Select the “Change Element Type” button. A drop down list of various wall types will appear.
Select the Interior 5” Partition (2 hr) wall type and uncheck the “Chain” box. Note that the
Height for the new walls will change to “Level 2.” That is because you selected an interior wall
type. Exterior walls are drawn from the bottom of the first level to the top of the highest level.
Interior walls are drawn on just one level. In both cases, they will be drawn from Level 1,
because that is the current level (remember you changed to the Level 1 view). If you changed to
the Level 2 view, new walls will be drawn at level 2 for their bottom and go up to Level 3 for
their top. After a wall is drawn, you can change the level that it is on and its height by selecting
it and then clicking on “Element Properties.” A dialogue box will appear that will allow you to
make many adjustments in wall height, vertical starting level and ending level.
Satisfaction!
20. Add the dimensions to the interior walls on the first floor
Now the purple lines go away and the floor has been drawn. You will not see the floor in
plan, but go to the 3d view and see it.
23. Let’s cut a section through the building. To do this, first select the View Tab:
Then pick the Section tool. A cross‐shaped cursor will appear. Pick a point on the left side of the
plan outside the exterior wall, then a point to the right side of that point, like this:
You can clearly see the floor you just created, as well as the level symbols and the interior walls.
The outer rectangle around the section itself is called a “viewport” in Revit. It can be adjusted
by clicking on it and moving one of the arrows that appears. Let’s try it:
Return to Level 1 Plan. Notice that the section mark now looks like this:
24. Let’s create a stair to the second floor. Go to the Home Tab. Select the “Stairs” tool.
Pick two points to show the direction and length of the stair: pick the first point at a
location to the right of the first interior wall. Then move the cursor far to the right and
pick the second point. Your stair “sketch” will look like this:
It says “18 RISERS CREATED, 0 REMAINING.” This is a straightforward way of making the stairs,
but you can be fancier about it by picking a series of points while “sketching” to allow you to
turn the direction of the stairs or create landings. A little practice is warranted to control the
sketch creation.
Now to complete the stairs, select the “Finish Stairs” tool on the left side of the Ribbon.
25. Go to the Level 2 Plan. First put a floor in at this level. On Home tab, select the “Floor”
tool. Hover the cursor above the inside face of one of the exterior walls and hit the Tab
key on the keyboard, then left click the mouse. The purple lines will be drawn around
the interior of the exterior walls, like this:
You will get a dialogue box asking you if you want the walls that are below this floor to attach to
the bottom of the new floor. Select “Yes.” What that will do is stop the tops of the wall below
the floor thickness, no matter how thick the floor will be. If you answer No to this dialogue, the
floors will remain attached to the Level 2 plane and thus penetrate through the floor.
The floor will now be created. To see how it looks in section, double‐click the section arrow
head:
26. Now we are ready to put on a roof. Kind of like building a building, no?
Select the Level 2 Plan on the browser. On the Home tab, select the Roof tool:
Hover the cursor over the exterior face of one of the walls and hit the Tab key to select
all the walls, then click the left button of the mouse. You will get a purple line drawn
around the walls 2’‐0” away from the walls (this will be the roof overhang):
You will then see a dialogue box asking you if you want the exterior walls to attach to
the sloping roof. Select the Yes button:
It is an odd appearance, I must admit, but totally rational, because the plan view is cut
4’‐0” above the floor level. If you go to the section view, it will look like this:
27. When you look at the Level 2 Plan you may notice that you can still see the walls below,
even though there is a floor now at Level 2 and the walls stop below the floor. This is
because level 1 “Underlay” is turned on by default. The “underlay” is a very useful tool
because it allows you to see the walls below when you are creating walls on a floor
above. You can turn it off. Here’s how:
Go to Level 2 Plan. Right‐click the mouse to bring up a menu; select “View Properties.”
Now this dialogue box will appear:
The first way is a temporary way, which lasts only for the duration of the drawing session, the
second way is permanent until you turn it back on again. Let’s look at both of these methods.
First the temporary method. At the bottom of the screen is the “View Control Bar:”
There is an icon on this bar that looks like a pair of glasses. To turn off any object in the view
you are in, first select the object and then click on the glasses and pick “Hide Element. “
When you pick the roof with your left mouse button, it will turn blue:
Note that there is a light blue line around the screen. That is a visual clue for you to let you
know that something is hidden in that view. If you cannot remember what you hid, simply pick
the light bulb on the right end of the View Control Bar. Note that objects that are temporarily
hidden will print.
To turn hidden objects back on, select the glasses icon again and pick “Reset temporary
Hide/Isolate.”
The second method of turning off objects in a view is to right click on an object and select “Hide
in View” > “Elements.” Once again, you can use the light bulb toggle in the View Control Bar to
show the hidden elements – this time they are shown in a faded purple color, to distinguish a
permanent hide from a temporary one. So it will look like this:
28. Let’s add a wall on the second floor to create a room. On the Home tab, select the Wall
tool. Draw a wall on Level 2 and put a door in it, like this:
Go to a 3d view:
Place a Room gismo in each room, so the Level 1 Plan should look like this:
The “Schedule Properties” dialogue box will appear. From the “Available Fields” list, select the
following fields and click on the “Add ‐‐‐>” button after each one.
Number
Name
Level
Area
Perimeter
Floor Finish
Base Finish
Wall Finish
Ceiling Finish
Unbounded Height
Comments
You can fill in the blank cells with the Floor, Base, Wall and Ceiling Finish materials and any
comments you may want to include, such as “SLOPED CEILING.”
32. Finally, let’s put everything together onto drawings to send out to bid or construction. In
the browser, find the item down toward the bottom called “Sheets (all).” Right click on it
and select “New Sheet.” A sheet titleblock selection box will appear. Click “Load” and
load the D‐sized title block from the Titleblock folder in the Imperial Library. A blank
sheet will appear that looks something like this:
Drag the Level 1 and Level 2 plans onto the sheet you just created. They will come onto the
sheet complete with titles. The viewports will be large, but they will not print. You will need to
move the titles up a bit under each plan and shorten the line under the title name. To move the
view title on the sheet, just click on it with the left mouse button, hold the button down and
move to where you want it. To shorten the line under the title, click on the viewport (not the
view title). A dot will appear on the right end of the line. Hold the left mouse button down on
the dot and drag it to where you want it to be.
Note that the elevation tags will show up too far away from the plans and will get in the way of
the other views you want to put on the sheet. To fix this, go back to Level 1 plan and then level
2 plan and drag the elevation marks closer to the exterior walls on each side. Here is how the
Level 1 Plan looks before moving the tags:
Elevation keys on the Level 2 plan will automatically be moved to the same locations as on the
Level 1 plan.
Move their view titles and shorten the line under the title names just like you did for the plans:
Note that the number of the section and elevation detail on the sheet has been assigned, as
well as the number of the sheet on which they appear. If you move the section to another
sheet, for instance, the sheet number on the tag will be automatically changed. Revit will not
allow you to place a view on more than one sheet.