0% found this document useful (0 votes)
688 views9 pages

HNS COC Level 4 Network Exam Package

Uploaded by

Leta SK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
688 views9 pages

HNS COC Level 4 Network Exam Package

Uploaded by

Leta SK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

lOMoARcPSD|43736577

HNS COC Level 4 practice exam full package new

database (Addis Ababa Institute of Technology)

Scan to open on Studocu

Studocu is not sponsored or endorsed by any college or university


Downloaded by Leta Kemo (letakemo4@gmail.com)
lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

Ethiopian TVET College


HNS COC Level 4 Assessment Full practical exam
Project 1:Propose and design new network infrastructure.
Given the following scenario do according to the following.
Textile Company has 2 building in its compound. The average distance between
the buildings is 65meters. Each building has four floors. Assume that in average
there are 8 users in each floor. The company has 10Mbps of internet connection
from the service provider. Textile planned to connect these 2 building through
network. And you assigned as a project manager. Textile is now wanted to
implement new network infrastructure which include following requirement.
❖ To share file and other resources from central location.
❖ To share email, schedule and task.
❖ To administrator users from central location.
❖ To store and share data from central database.
❖ To host and update compatibility website.
❖ To insured the security quality of service.
Task 1: Identify and list all required hardware and equipment used to
implement new network infrastructure based on the following template on
MS-Word.
Hardware
No Item Specification Quantity Estimated Total
Unit Price Price
1 Servers IBM core i7CPU 06 20,000 120,000
3.00GHz, RAM 16B,
HDD 2TB
2 Client PCs Dell core i5 CPU @2.6 64 10,000 640,000
GHz, RAM 8GB ,
HHD 1TB
3 Access switch D-Link 24 port 08 2,000 16,000
4 Distribution Cisco core switch 24 01 20,000 20,000
switch port
5 Cable UTP cat6 full copper 5 Roll 5,000 25,000
6 WAP TP-link 450Mbs 8 2000 16,000
7 Ventilator/fan Datacenter fan 1 20,000 20,000
8 UPS 3000V 1 40,000 4000
1

Downloaded by Leta Kemo (letakemo4@gmail.com)


lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

9 Connecter jack Rj45 1000 5 5000


10 Crimper standard 4 800 3200
11 Tester Standard 2 1000 2000

Task 2: Identify and list all required software used to implement new network
infrastructure based on the following template.

Software requirements to implement this network


No Item Specification Quantity Estimated Total Price
Unit Price
1 NOS Windows server 02 CD 150 300
2008R2
2 Clients OS Windows 10 Pro 5 CD 100 500
3 Database SQL Server 1CD 100 100
software 2008R2
4 Design software Microsoft Visio 1CD 100 100
2007
5 Office package Microsoft office 5 CD 100 500
2010
6 Internet Chrome, Mozilla Download Download
Firefox, - free free
7 Utility software Kaspersky anti- 30CD 500 5,000
virus
8 Driver software Snappy 209 Download Download
- free free
9 Mailing Mail exchange Download Download
software - free free

Downloaded by Leta Kemo (letakemo4@gmail.com)


lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

Task3:Calculate the total cost of the project including hardware and software.
Hardware cost = 871,200
Software cost = 6,400
Labor cost = 40,000
Internet connectivity = 40,000
Estimated total cost of the project = 957,600

Task 4: Draw physical diagram/Topology of the project that included every


component and equipment’s that listed in task 1.
❖ Show appropriate type of cable to be used.
❖ Show appropriate network devices in appropriate place.
❖ Show type internet connectivity needed to build the infrastructure.
❖ Show(put) server in appropriate places.
❖ Show user client arrangement.
Project 2:Plan, Organize and assist to develop organizational client support.
Task1: Identify the phases, Activities to be performed, Duration,
Responsibility body of the project the following template.
No Phases Activities to be performed Duration Responsibility
body
1 Planning Prepare work plan Project manager
Allocate budget 2 weeks
Determine human resource
Identify Software
2 requirements Hardware 3 weeks Network technician
Purchasing procurements
Design Visit building site Network Admin
Network Select install design tool & 2 weeks
3 network topology
Design physical logical Diagram
Network Install Cabling Network Admin
installation and Configure routers, firewalls, 5weeks & Network technician
4 device switches etc.
configuration Configure all servers

5 Maintenance Check band width 2 weeks Network Admin


and testing Check every devices & network & Network technician
arrangement.

Downloaded by Leta Kemo (letakemo4@gmail.com)


lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

Prepare troubleshooting document


6 Documenting 2 weeks Network Admin
& Prepare presentation for & Project manager
Presentation acceptance.

Total duration in weeks 16 weeks Total human power


=08

❖ Calculate the total duration of the project.


❖ Estimate total humanpower for the project based on the above activity to be performed.
Task 2: Prepare a presentation using MS Power point and present for the
company management team about the network infrastructure that you
created in project1.Your presentation must include the following.
❖ Hardware, equipment and software used in project.
❖ Estimate cost price.
❖ Implemetation plan.
❖ Physical design.

1,Hardware equipment

No Item Specification
1 Servers IBM core i9 CPU 3.00GHz, RAM 16B, HDD 2TB
2 Client PCs Dell core i5 CPU @2.6 GHz, RAM 8GB, HHD 1TB
3 Access switch D-Link 24 port
4 Distribution Cisco core switch 24 port
switch
5 Cable UTP cat6 full copper
6 WAP TP-link 450Mbs
7 Ventilator/fan Datacenter fan
8 UPS 3000V
9 Connecter jack Rj45
10 Crimper standard
11 Tester Standard

Downloaded by Leta Kemo (letakemo4@gmail.com)


lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

2, Software used in the project

No Item Specification
1 NOS Windows server 2008R2
2 Clients OS Windows 10 Pro
3 Database SQL Server 2008R2
software
4 Design software Microsoft Visio 2007
5 Office package Microsoft office 2010
6 Internet Chrome, Mozilla Firefox,
7 Utility software Kaspersky anti-virus
8 Driver software Snappy 209
9 Mailing Mail exchange
software

3,Cost estimation of the project


Hardware cost = 871,200
Software cost = 6,400
Labor cost = 40,000
Internet connectivity = 40,000
Estimated total cost of the project = 957,600
4, Implementation plan
No Phase/activity Duratin Month 1 Month 2 Month 3 Month 4
month W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
and
week
1 Planing
2 Identify requirements
3 Design network
4 Installation and
configuration
5 Testing and
maintenance
6 Documentation and
presentation

Downloaded by Leta Kemo (letakemo4@gmail.com)


lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

5. Physical design

5. Conclusion

The project is to be successfully completed with agreed time frame or deadline needs high and
efforts and right project management skill. This network implemeteation project for Textile
compnay has been emplementing the last 4 months according to our agreement as well as plan.
Now it is operational and the users must able share resources and access internet using newly
deployed network based on your organizational policy and guideline established. At the end,
we should like to request you to approve and accept finalization the project after evaluating
current status as tofully covered the remaining budget.

Downloaded by Leta Kemo (letakemo4@gmail.com)


lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

Task 3: Prepare maintenance and backup strategy for new proposed network system on
MS Word(The strategy must include Introduction, Scope and basic concepts).

Textile Company Network System Maintenance and Backup strategy

Introduction

We are implemented new network system. To use this system effectively and to troubleshoot any
failures on it we have prepare maintenance and backup strategy manual for you.

Scope of the project.

This network system design is designed to textile company based on their users and buildings.It
is simple,easy, secured and cost effective.

Offer client support mechanism


o All users must have user account and password
o Users must use resources based on the organization’s rules and guidelines.
o Report necessary information on time
o Be informed by help desk support.

Propose maintenance policy


1 preventive maintenance
o install anti viruses and computer scanners software
o Use disk cleanup
o Use disk defragment
o clean computer by removing unnecessary software’s.

2. corrective maintenance
o Correct hardware damage
o Correct cable functionality
o Upgrade and reinstall corrupted software

Backup strategy
Apply Bacula automatic backup configuration, every day at 6:30 PM to incremental backup.

Downloaded by Leta Kemo (letakemo4@gmail.com)


lOMoARcPSD|43736577

Abren Endeg YouTube Channel


www.youtube.com/c/abrenendeg
2014 EC

Basic concept

To use this network effectively and to protect your data from lost you should use the backup
method effectively. There will be miner hardware and software problems so to solve it by your
own refer this maintenance and back manual.

Downloaded by Leta Kemo (letakemo4@gmail.com)

You might also like