Master List of Sop
Master List of Sop
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
P / MR / F - 001
Rev. 001, Dt. 11.06.2012
MASTER LIST OF STANDARD OPERATING PROCEDURES
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
OP 60- TOOL SETTING PROCEDURE OF CRANK, 1.Numbering methodology improved By IMS. Format
16 P/EM/M/V/016 Mfg.-Finish Block 15.12.2010 15.12.2010 10.07.2012 number and Document control number codification
CAM, & REAMER changed w.e.f 09.07.2012.
JOB SETUP CHANGE PROCEDURE LEAKTESTING 1.Numbering methodology improved By IMS. Format
29 P/EM/M/V/029 Mfg.-Finish Head 08.11.2011 08.11.2011 10.07.2012 number and Document control number codification
OP140 & WELCH PLUG PRESSING OP 130 changed w.e.f 09.07.2012.
TOOL SETTING PROCEDURE FOR ZOLLER ROOM 1.Numbering methodology improved By IMS. Format
30 P/EM/M/V/030 Tooling Shop -8 01.05.2011 01.05.2011 10.07.2012 number and Document control number codification
SHOP-08 changed w.e.f 09.07.2012.
FLOW CHART OF TOOL SETTING ON ZOLLER 1.Numbering methodology improved By IMS. Format
32 P/EM/M/V/032 Tooling Shop -8 01.05.2011 01.05.2011 10.07.2012 number and Document control number codification
MACHINE changed w.e.f 09.07.2012.
P / MR / F - 001
Rev. 001, Dt. 11.06.2012
MASTER LIST OF STANDARD OPERATING PROCEDURES
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
1.Numbering methodology improved By IMS. Format
number and Document control number codification
33 ROCKWELL HARDNESS TESTER P/EM/M/V/033 Quality 01.10.2011 01.10.2011 OBSOLETED changed w.e.f 09.07.2012.
2.Obsoleted due to QA function disintegrate from
Manufacturing Function w.e.f 25.09.2012
38
COMPONENT INSPECTION ON ACCURATE P/EM/M/V/038 Camshaft 01.04.2013 01.04.2013
MACHINE (Opn-190)
39 FIFO FOR FINISH GOODS- Finish Machining P/EM/M/V/039 PPC 01.08.2013 01.08.2013
40 DO'S & DON’T'S FOR OPERATION NO. 190 P/EM/M/V/040 Camshaft 01.04.2013 01.04.2013
42
CHEMICAL TITRATION / POITAGE CHECKING - P/EM/M/V/042 Camshaft 01.07.2013 01.07.2013
PHOSPHATING PLANT-CAMSHAFT
43 FINAL INSPECTION CHECK POINT SHEET P/EM/M/V/043 Mfg.-Finish Head 08.11.2013 08.11.2013
44
TOOL SETTING PROCEDURE FOR CENTER DRILL P/EM/M/V/044 Camshaft 10.11.2013 10.11.2013
FRONT AND REAR END
45
TOOL SETTING PROCEDURE FOR MLLLING P/EM/M/V/045 Camshaft 10.11.2013 10.11.2013
CUTTER FOR CAM LOBE
46
TOOL SETTING PROCEDURE FOR RH AND LH P/EM/M/V/046 Camshaft 10.11.2013 10.11.2013
MILLING CUTTER
47
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/047 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 10
48
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/048 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 20
P / MR / F - 001
Rev. 001, Dt. 11.06.2012
MASTER LIST OF STANDARD OPERATING PROCEDURES
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
49
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/049 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 30
50
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/050 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 40
51
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/051 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 50
52
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/052 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION60
53
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/053 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 70
54
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/054 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 80
55
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/055 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 90
56
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/056 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 100
57
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/057 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 120
58
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/058 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 130
59
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/059 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 140
60
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/060 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 150
61
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/061 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 160
62
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/062 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 170
63
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/063 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 180
64
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/064 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 190
65
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/065 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 200
66
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/066 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 220
P / MR / F - 001
Rev. 001, Dt. 11.06.2012
MASTER LIST OF STANDARD OPERATING PROCEDURES
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
67
SET UP CHANGE PROCEDUREDURING MODEL P/EM/M/V/067 Camshaft 10.11.2013 10.11.2013
CHANGE FROM H6 TO H4 AT OPERATION 230
68
HARDNESS CHECKING- ROCKWELL HARDNESS P/EM/M/V/068 Camshaft 10.11.2013 10.11.2013
TESTER
69
HARDNESS CHECKING-MACRO VICKERS P/EM/M/V/069 Camshaft 10.11.2013 10.11.2013
HARDNESS TESTER
70 COMPONENT CODIFICATION NUMBER P/EM/M/V/070 Engine & Gear Box 11.01.2014 11.01.2014
MACHINE SAFE RUNNING AFTER PROGRAM 1.Numbering methodology improved By IMS. Format
73 P/EB/M/V/003 Mfg.-SemiFinish Head 28.09.2011 28.09.2011 10.07.2012 number and Document control number codification
CURRUPT changed w.e.f 09.07.2012.
PROCEDURE FOR SWITCHING THE ZOLLER 1.Numbering methodology improved By IMS. Format
79 P/EB/M/V/009 Tooling , Shop-05 28.09.2011 28.09.2011 10.07.2012 number and Document control number codification
MACHINE ON-OFF changed w.e.f 09.07.2012.
PROCEDURE FOR PRESETTING THE MILLING 1.Numbering methodology improved By IMS. Format
80 P/EB/M/V/010 Tooling , Shop-05 28.09.2011 28.09.2011 10.07.2012 number and Document control number codification
CUTTER ON ZOLLER MACHINE changed w.e.f 09.07.2012.
PROCEDURE FOR TOOL LIFE MONITORING , 1.Numbering methodology improved By IMS. Format
81 AVAILABILITY OF PRESET TOOL & DAILY TOOL P/EB/M/V/011 Tooling , Shop-05 28.09.2011 28.09.2011 10.07.2012 number and Document control number codification
ISSUANCE IN SHOP-V changed w.e.f 09.07.2012.
PROCEDURE FOR PRESETTING THE TOOL ON 1.Numbering methodology improved By IMS. Format
82 P/EB/M/V/012 Tooling , Shop-05 28.09.2011 28.09.2011 10.07.2012 number and Document control number codification
ZOLLER ROOM. changed w.e.f 09.07.2012.
PROCEDURE FOR TOOL PRESETTING ON HAIMER 1.Numbering methodology improved By IMS. Format
83 P/EB/M/V/013 Tooling , Shop-05 28.09.2011 28.09.2011 10.07.2012 number and Document control number codification
MACHINE changed w.e.f 09.07.2012.
P / MR / F - 001
Rev. 001, Dt. 11.06.2012
MASTER LIST OF STANDARD OPERATING PROCEDURES
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
98
REWORK ON SPARKONIX MACHINE - SEMI FINISH P/EB/M/V/028 Mfg.-SemiFinish Head 01.10.2012 10.10.2012
HEAD
99 TAP RETRACT PROCEDURE IN MAZAK HMC P/EB/M/V/029 Mfg.-SemiFinish Head 01.10.2012 10.10.2012
101 SOP FOR TRAINING OF NEW JOINED PERSON P/EB/M/V/031 Mfg.-SemiFinish Head 01.10.2012 10.10.2012
102 TOOL CHANGE IN AH10,20,30 MACHINE P/EB/M/V/032 Mfg.-SemiFinish Head 01.10.2012 10.10.2012
P / MR / F - 001
Rev. 001, Dt. 11.06.2012
MASTER LIST OF STANDARD OPERATING PROCEDURES
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
104
CHECKING PROCEDURE FOR PERIODIC P/EB/M/V/034 Wear Part Management 01.11.2012 01.11.12 01.01.2013 1.Wear Tolerance Revised Based on Wear Pattern
INSPECTION OF JIGS & FIXTURES Data Basis w.e.f 01.01.2013
105
MACHINING COMPONENT AFTER SURFACE FINISH P/EB/M/V/035 Mfg.-SemiFinish Block 11.12.2012 11.12.2012
NG
106
REWORK ON SPARKONIX MACHINE - SEMI FINISH P/EB/M/V/036 Mfg.-SemiFinish Block 11.12.2012 11.12.2012
BLOCK
107 HOW TO START THE MAZAK MACHINE IN FANUC P/EB/M/V/037 Mfg.-SemiFinish Head 11.08.2013 11.08.2013
108
QUILL HEIGHT SETTING IN P/EB/M/V/038 Mfg.-SemiFinish Head 11.08.2013 11.08.2013
AH10,AH20,AH30,AH50 MACHINE
110
OPERATION AH30 SHIFTING PROCEDURE IN AH P/EB/M/V/040 Mfg.-SemiFinish Head 22.11.2013 22.11.2013
10 IN CASE OF MACHINE BREAKDOWN
111 PROCEDURE FOR ARBOR MOUNTING IN MACHINE P/EB/M/V/041 Mfg.-SemiFinish Block 23.11.2013 23.11.2013
112
MACHINE OPERATING PROCEDURE IN CASE OF P/EB/M/V/042 Mfg.-SemiFinish Head 04.03.2014 04.03.2014
COMPONENT STUCK IN CYCLE AT CRADEL
119 JOB SET UP PROCEDURE- Engine P/EA/M/V/007 Engine Assembly 15.10.2012 15.10.2012
P / MR / F - 001
Rev. 001, Dt. 11.06.2012
MASTER LIST OF STANDARD OPERATING PROCEDURES
REVISION STATUS
# DOCUMENT NAME CONTROL NO. ORIGINATOR DATE OF ORIGIN REMARKS
0 1 2 3 4 5
122
MANUFACTURING QUALITY MATURITY INDEX P/EA/M/V/010 Mfg. - Common 17.12.2013 17.012.2013
MQMI
123
REVIEW MECHANISM OF PREDICTIVE P/EA/M/V/011 Maint. Engine BU 01.02.2014 01.02.2014
MAINTENANCE
ENSURING NRB & CIRCLIP BY PIKA PIKA SENCOR 1.Numbering methodology improved By IMS. Format
125 P/EG/M/V/002 Gear Box Assembly 24.02.2012 24.02.2012 10.07.2012 number and Document control number codification
MAIN SHAFT STAGE -02 changed w.e.f 09.07.2012.
131 JOB SET UP PROCEDURE-Gear Box P/EG/M/V/008 Gear Box Assembly 10.10.2012 10.10.2012
132
CHECKING PROCEDURE FOR PERIODIC P/EG/M/V/009 15.01.2013
Assembly, Tooling 15.01.2013
INSPECTION OF JIGS & FIXTURES
133 AMT GEAR BOX TESTING PROCEDURE P/EG/M/V/010 Gear Box Assembly 27.07.2013 27.07.2013
PREPARED BY APPROVED BY
P / MR / F - 001
Rev. 001, Dt. 11.06.2012