GA03 Risk assessment
Company name
Location Project title
Risk assessment no. Review date Revision no.
Person supervising work Employer
Persons exposed (tick box) Employees Other workers Public/visitors Young persons
Estimated total number of
persons at risk
New/expectant mothers Vulnerable persons Others
5 5 10 15 20 25 Likelihood Severity
4 4 8 12 16 20
Severity
3 3 6 9 12 15 Rating 1 = Very unlikely Rating 1 = No injury
Rating 2 = Unlikely Rating 2 = Minor injury or illness
2 2 4 6 8 10
Rating 3 = Likely Rating 3 = 7-day injury or illness
1 1 2 3 4 5 Rating 4 = Very likely Rating 4 = Specified injury or illness
1 2 3 4 5 Rating 5 = Almost certain Rating 5 = Fatality, disabling injury, and so on
Likelihood
Acceptable Further review Unacceptable
Risk = Likelihood x Severity
1 2 3 4 5 6 7 8 9
Factors of harm Factors of harm Control measures Acceptable
Hazard Risk Residual risk risk
Likelihood Severity Control measures Likelihood Severity implemented by
(Likelihood x Severity) (Likelihood x Severity)
(1-5) (1-5) (1-5) (1-5) (name) Yes No
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication
GA03 Risk assessment continued
1 2 3 4 5 6 7 8 9
Factors of harm Factors of harm Control measures Acceptable
Hazard Risk Residual risk risk
Likelihood Severity Control measures Likelihood Severity implemented by
(Likelihood x Severity) (Likelihood x Severity)
(1-5) (1-5) (1-5) (1-5) (name) Yes No
Name Position Signature Date
Persons conducting assessment
This risk assessment must be communicated to operatives before work commences. A separate briefing sheet (GA11) should be used and be made available to the operatives for reference.
© Construction Industry Training Board Extracted from Construction site safety (GE 700) publication